Slag removing device for bridge cast-in-situ bored pile
By using a combination of a slag suction and hole cleaning pump and a dry and wet separator in the bridge drilling pile slag cleaning device, the problem of mixed discharge of drilling slag and mud is solved, and the efficient slag cleaning and resource utilization is improved. The device and Designed for easy operation and flow regulation.
Patent Information
- Application Number
- CN202421135469.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-23
- Publication Date
- 2024-12-27
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When the existing bridge drilling pile slag cleaning device suctions the drilling slag, the drilling slag and mud are mixed and discharged directly, resulting in low resource utilization and easy waste.
A bridge drilling pile slag cleaning device is designed, using a slag cleaning pump and a suction steel pipe combination, and the slurry is transported to a dry and wet separator through an L-shaped conveying pipe for dry and wet separation, separation of dry slag and reflux of the slurry. The pool realizes the recycling of mud and regulates the flow rate through the flow control valve and flowmeter.
It improves slag cleaning efficiency, improves resource utilization, reduces environmental impact, and makes the device stable connection, convenient operation, and adjustable flow and controllable flow.
Smart Images

Figure CN222253881U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of slag cleaning devices, in particular to a slag cleaning device for bored cast-in-place piles of bridges. Background Art
[0002] The bridge bored pile slag removal device is a device used to remove the drilling slag and mud generated during the bored pile construction process. This device is crucial to ensure the quality of the pile foundation and construction efficiency.
[0003] After searching, the announcement number is CN220166915U, a slag cleaning device for bored cast-in-place piles of bridges, which relates to the technical field of slag cleaning devices for cast-in-place piles, including a slag suction pump and a conduit, wherein the conduit is arranged below the slag suction pump, and an alignment mechanism is arranged inside the slag suction pump, and the alignment mechanism includes a positioning bolt and an alignment plate; the alignment plate is arranged below the inside of the slag suction pump and extends downward, the positioning bolt is rotatably connected to the outer wall of the slag suction pump and extends inward, and the positioning bolt is threadedly connected to the alignment plate; the outer wall of the slag suction pump is located below the positioning bolt and is rotatably connected with a locking ring.
[0004] Although the above-mentioned bridge bored pile slag removal device sucks the drilling slag through the slag suction pump, the sucked drilling slag is mixed in the mud. The drilling slag is directly discharged along with the mud, which is not conducive to improving resource utilization and is likely to cause waste.
[0005] In view of the above problems, the utility model document proposes a slag cleaning device for bored cast-in-place piles of bridges. Utility Model Content
[0006] The utility model provides a slag cleaning device for bored cast-in-place piles of bridges, which solves the disadvantages in the prior art that the sucked out drill slag is mixed in the mud, and the drill slag is directly discharged along with the mud, which is not conducive to improving resource utilization and easily causes waste.
[0007] The utility model provides the following technical solutions:
[0008] A slag removal device for bored cast-in-place piles of bridges, comprising:
[0009] A slag suction hole cleaning pump, wherein the input end of the slag suction hole cleaning pump is provided with a suction steel pipe extending into the borehole, and the output end of the slag suction hole cleaning pump is connected to an L-shaped conveying pipe;
[0010] The installation assembly is arranged on the slag suction hole cleaning pump and the suction steel pipe, and is used to firmly connect the input end of the slag suction hole cleaning pump and the top end of the suction steel pipe;
[0011] The dry-wet separation component is arranged outside the slag suction and hole cleaning pump and is used to separate the dry and wet mud containing drilling slag, thereby improving resource utilization.
[0012] In one possible design, the mounting assembly includes a first connecting flange fixedly arranged at the input end of the slag suction and hole cleaning pump, and a second connecting flange matched with the first connecting flange is fixedly arranged at the top end of the suction steel pipe, and the first connecting flange and the second connecting flange are fixed by a plurality of matching bolts and nuts.
[0013] In one possible design, the dry-wet separation component includes a dry-wet separator arranged outside the slag suction and hole cleaning pump, the input end of the dry-wet separator is connected to the L-shaped conveying pipe through a rubber hose, the dry slag in the dry-wet separator is discharged from the dry slag discharge port for unified collection and treatment, and the drain port of the dry-wet separator is connected to the mud pool through a connecting pipe.
[0014] In a possible design, a flow control valve for adjusting the flow rate is provided on the L-shaped delivery pipe.
[0015] In a possible design, a flow meter for monitoring flow rate is provided on the L-shaped delivery pipe.
[0016] In a possible design, a hook ring used in conjunction with a crane hook is symmetrically fixed on the top of the slag suction hole cleaning pump so as to hang the slag suction hole cleaning pump and connect it to the suction steel pipe.
[0017] It should be understood that the above general description and the following detailed description are merely exemplary and do not limit the present invention.
[0018] In this application, the specific usage process is as follows:
[0019] Installation stage: insert the suction steel pipe into the borehole to the predetermined depth, use a crane to hook the hook ring and lift the suction hole cleaning pump, then align the first connecting flange with the second connecting flange, and tighten them with bolts and nuts to ensure that the suction hole cleaning pump is firmly connected to the suction steel pipe;
[0020] Operation phase: Start the suction and hole cleaning pump to extract mud containing drilling cuttings from the borehole, and transport the mud to the dry-wet separator through the L-shaped conveying pipe. In the dry-wet separator, the mud is processed, and the dry slag is discharged from the dry slag outlet and collected in a predetermined container. The separated mud flows back to the mud pool through the connecting pipe to realize the recycling of the mud. According to needs, the mud flow is adjusted by the flow control valve and the flow is monitored by the flow meter.
[0021] The utility model has the following beneficial effects:
[0022] Efficient slag cleaning: The combination of the slag suction and hole cleaning pump and the suction steel pipe can efficiently extract the mud containing drilling slag from the borehole, thereby improving the slag cleaning efficiency.
[0023] Resource utilization: The dry-wet separator can effectively separate the dry residue from the mud, improve the utilization rate of resources and reduce the impact on the environment.
[0024] Easy to operate: The design of the installation assembly makes the connection between the slag suction and hole cleaning pump and the suction steel pipe stable and easy to operate, which is convenient for on-site installation and use.
[0025] Adjustable and controllable flow: Through the setting of flow control valve and flow meter, the flow of mud can be easily adjusted and controlled to meet different work requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 A schematic diagram of the three-dimensional structure of a slag removal device for bored cast-in-place piles of a bridge provided by an embodiment of the utility model;
[0027] Figure 2 A schematic structural diagram of another perspective of a bridge bored pile slag removal device provided by an embodiment of the utility model;
[0028] Figure 3 A schematic diagram of the structure of a slag suction and hole cleaning pump of a bridge bored pile slag cleaning device provided by an embodiment of the utility model;
[0029] Figure 4 This is a schematic diagram of the enlarged structure of point A of a bridge bored cast-in-place pile slag cleaning device provided in an embodiment of the utility model.
[0030] Figure numerals: 1. Slag suction and hole cleaning pump; 2. Suction steel pipe; 3. First connecting flange; 4. Second connecting flange; 5. Bolt; 6. Nut; 7. L-shaped conveying pipe; 8. Flow control valve; 9. Flow meter; 10. Dry-wet separator; 11. Rubber hose; 12. Dry slag discharge outlet; 13. Connecting pipe; 14. Hook ring. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] In the description of the present invention, it should be understood that the terms "opening", "upper", "middle", "length", "inside" and the like indicating orientation or positional relationship are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the components or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0033] In order to keep the following description of the embodiments of the present invention clear and concise, the present invention omits detailed descriptions of known functions and known components.
[0034] Embodiment 1
[0035] Please refer to Figure 1-4 , a bridge bored pile slag cleaning device, which is used in the field of slag cleaning devices, including:
[0036] Slag suction hole cleaning pump 1: Model 150ZJQ250-15-22, this pump is the power source of the entire slag cleaning device, its input end is provided with a suction steel pipe 2 extending into the borehole, used to extract mud containing drilling slag, and its output end is connected to an L-shaped conveying pipe 7, used to convey the mud to the subsequent processing equipment;
[0037] Installation component: This component is used to firmly connect the input end of the slag suction and hole cleaning pump 1 and the top end of the suction steel pipe 2. Specifically, the installation component includes a first connecting flange 3 fixedly arranged at the input end of the slag suction and hole cleaning pump 1, and a second connecting flange 4 fixedly arranged at the top end of the suction steel pipe 2 and used in conjunction with the first connecting flange 3. The first connecting flange 3 and the second connecting flange 4 are fixed by a plurality of bolts 5 and nuts 6 used in conjunction with each other to ensure the stability of the connection;
[0038] Dry-wet separation component: This component is arranged outside the suction and cleaning pump 1, and is used to separate the mud containing drilling debris into dry and wet parts. The dry-wet separation component mainly includes a dry-wet separator 10, model SDFLJ-TS-180, whose input end is connected with the L-shaped conveying pipe 7 through a rubber hose 11. The dry slag in the dry-wet separator 10 is discharged from the dry slag discharge port 12, which is convenient for unified collection and treatment. The separated mud is connected through the connecting pipe 13 between the drainage port of the dry-wet separator 10 and the mud pool, and flows back to the mud pool to realize the recycling of the mud;
[0039] Flow regulation and control: A flow control valve 8 is provided on the L-shaped conveying pipe 7 to adjust the flow of the mud to meet different slag cleaning requirements. At the same time, in order to monitor the flow of the mud in real time, a flow meter 9 is also provided on the L-shaped conveying pipe 7 to provide accurate data support for the operator.
[0040] Embodiment 2
[0041] Improvements based on Example 1:
[0042] Please refer to Figure 3 In order to facilitate the hanging and movement of the entire device, a hook ring 14 used in conjunction with a crane hook is symmetrically fixed on the top of the slag suction and hole cleaning pump 1. Through equipment such as a crane, the operator can easily hang the slag suction and hole cleaning pump 1 and the suction steel pipe 2 as a whole for movement and positioning.
[0043] During the specific operation, the operator first extends the suction steel pipe 2 into the borehole, and then starts the suction and hole cleaning pump 1, and extracts the mud containing drilling cuttings through the suction steel pipe 2. The mud is introduced into the dry-wet separator 10 through the L-shaped conveying pipe 7 and the rubber hose 11 for dry-wet separation. The separated dry slag is discharged from the dry slag discharge port 12, and the mud is returned to the mud pool through the connecting pipe 13. During the whole process, the operator can adjust the flow rate of the mud through the flow control valve 8 and monitor the flow rate of the mud in real time through the flow meter 9. When it is necessary to move or adjust the position of the device, the operator can use equipment such as a crane to suspend the suction and hole cleaning pump 1 and the suction steel pipe 2 as a whole through the hook ring 14 for movement.
[0044] However, as is well known to those skilled in the art, the working principles and wiring methods of the slag suction and hole cleaning pump 1 and the dry-wet separator 10 are commonplace, and are conventional means or common knowledge, and will not be elaborated here. Those skilled in the art can make any optional selections according to their needs or convenience.
[0045] The above are only specific implementations of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model; in the absence of conflict, the embodiments of the utility model and the features in the embodiments can be combined with each other. Therefore, the protection scope of the utility model shall be based on the protection scope of the claims.
Claims
1. A slag removal device for bored piles of bridges, characterized in that: include: A slag suction hole cleaning pump (1), wherein the input end of the slag suction hole cleaning pump (1) is provided with a suction steel pipe (2) extending into the borehole, and the output end of the slag suction hole cleaning pump (1) is connected to an L-shaped conveying pipe (7); An installation component is arranged on the slag suction hole cleaning pump (1) and the suction steel pipe (2) and is used to firmly connect the input end of the slag suction hole cleaning pump (1) and the top end of the suction steel pipe (2); The dry-wet separation component is arranged outside the slag suction and hole cleaning pump (1) and is used to separate the dry and wet parts of the mud containing drilling slag, thereby improving resource utilization.
2. A slag removal device for bored piles of bridges according to claim 1, characterized in that: The installation assembly comprises a first connecting flange (3) fixedly arranged at the input end of the slag suction and hole cleaning pump (1); a second connecting flange (4) matched with the first connecting flange (3) is fixedly arranged at the top end of the suction steel pipe (2); the first connecting flange (3) and the second connecting flange (4) are fixed by a plurality of matched bolts (5) and nuts (6).
3. A slag removal device for bored piles of bridges according to claim 1, characterized in that: The dry-wet separation component comprises a dry-wet separator (10) arranged outside the slag suction and hole cleaning pump (1); the input end of the dry-wet separator (10) is connected to the L-shaped conveying pipe (7) via a rubber hose (11); the dry slag in the dry-wet separator (10) is discharged from a dry slag discharge port (12) for unified collection and treatment; the drainage port of the dry-wet separator (10) is connected to the mud pool via a connecting pipe (13).
4. A slag removal device for bored piles of bridges according to claim 1, characterized in that: The L-shaped delivery pipe (7) is provided with a flow control valve (8) for adjusting the flow rate.
5. A slag removal device for bored piles of bridges according to claim 1, characterized in that: The L-shaped delivery pipe (7) is provided with a flow meter (9) for monitoring flow rate.
6. A slag removal device for bored piles of bridges according to claim 1, characterized in that: Said A hook ring (14) for use with a crane hook is symmetrically fixedly arranged on the top of the slag suction hole cleaning pump (1). So that the slag suction hole cleaning pump (1) can be hung and connected with the suction steel pipe (2).