Temporary finger-shaped plate for operation and maintenance period of straddle type rail transit

By using temporary finger plate solutions during the operation and maintenance period of the cross-seat rail transit, the premature damage caused by insufficient strength of anchor bolt filling concrete is solved, and stable passage and adaptability during the operation is achieved.

CN222275110UInactive Publication Date: 2024-12-31芜湖市轨道交通有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421052497.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2024-12-31
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the operation and maintenance period of cross-seat rail transit, when the strength of the anchor bolt filled concrete does not meet the requirements, it is easy to cause premature damage.

Method used

A temporary finger plate scheme is designed, including a first finger plate and a second finger plate, the first finger plate is fixedly installed on the maintenance track beam, and the second finger plate is fixedly installed on the adjacent non-maintenance track beam On the other hand, a simple support state is formed, and an elastic pad is provided at the bottom of the second finger plate to adapt to the installation error and the beam end angle.

Benefits of technology

It effectively avoids premature tension damage to the anchor bolt, improves the adaptability and stability of the finger plate, and ensures smooth passage during operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222275110U_ABST
    Figure CN222275110U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary finger-shaped plate for a straddle type rail transit operation maintenance period, which relates to the technical field of finger-shaped plates, and comprises a first finger-shaped plate and a second finger-shaped plate, the second finger-shaped plate is fixedly installed on the working face, close to the gap, of the adjacent non-maintenance track beam, the first finger-shaped plate is located at the position close to the gap and not stretching out of the gap, and the second finger-shaped plate extends across the gap to the position of the first finger-shaped plate and is attached to the surface of the first finger-shaped plate to form a simple supporting state. And an elastic base plate is fixedly arranged between the bottom of the second finger-shaped plate and the track beam. The second finger-shaped plate can be borne by an anchor bolt on a non-maintenance track beam, the second finger-shaped plate and the first finger-shaped plate can form a simple supporting state, the stress condition is good, and it is guaranteed that the maintained anchor bolt on the maintenance track beam cannot be damaged due to premature pulling force.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of finger-shaped plates, in particular to a temporary finger-shaped plate during the operation and maintenance period of a straddle-type rail transit. Background Art

[0002] The straddle-type monorail line is composed entirely of track beams, so there are a large number of joints (i.e. gaps) between the track beams. The joints between the track beams are the content that needs special consideration in the construction of the track beams. If not handled properly, the concrete at the end of the track beam will be crushed or the vehicle will not travel smoothly. Monorails at home and abroad generally use the method of installing finger plates at the end of the track beam to ensure the smooth passage of vehicles. The finger plates are steel plates shaped like fingers. They are installed on the top surface and both sides of the track beam end at positions corresponding to the running wheels, stabilizing wheels, and guide wheels. They are fixedly connected to the track beams through anchor bolts. At present, the finger plates on two adjacent track beams generally cooperate with each other in a symmetrical cantilever state on both sides. When the vehicle passes, the finger plates on both sides need to participate in the work to meet the requirements of the vehicle passing the joints smoothly. The straddle-type monorail needs to be operated during the day and can only be repaired during the night window period. After the anchor bolt is repaired, the concrete filled with it needs a certain amount of time to increase its strength and cannot immediately bear the force. However, vehicles will pass through the anchor bolt about 2 hours after the repair. At this time, the strength of the concrete filled with the anchor bolt cannot meet the strength requirements, which can easily cause the anchor bolt to be damaged by tension prematurely after the repair. Therefore, it is necessary to provide a temporary finger plate solution that can bear force on one side and meet the requirements of operation and maintenance period. Summary of the invention

[0003] The purpose of the utility model is to provide a temporary finger-shaped plate for the operation and maintenance period of a straddle-type rail transit in order to solve the above-mentioned problem.

[0004] The utility model achieves the above-mentioned purpose through the following technical solutions:

[0005] A temporary finger-shaped plate for the operation and maintenance period of a straddle-type rail transit, comprising a first finger-shaped plate and a second finger-shaped plate, wherein the first finger-shaped plate and the second finger-shaped plate are used for temporary transition during the operation and maintenance period of the straddle-type rail transit, wherein the first finger-shaped plate is fixedly mounted on a working surface of a maintenance track beam close to a gap, and the second finger-shaped plate is fixedly mounted on a working surface of an adjacent non-maintenance track beam close to a gap, wherein the first finger-shaped plate corresponds to and cooperates with the second finger-shaped plate, wherein the top surface of the first finger-shaped plate is flush with the working surface of the maintenance track beam, and the top surface of the second finger-shaped plate is flush with the working surface of the non-maintenance track beam, wherein the first finger-shaped plate is located close to the gap and does not extend into the gap, wherein the second finger-shaped plate extends across the gap to the position of the first finger-shaped plate and fits with the surface of the first finger-shaped plate to form a simply supported state, and an elastic pad is fixedly arranged between the bottom of the second finger-shaped plate and the track beam.

[0006] Preferably, a mounting hole is machined through the first finger-shaped plate near one end of the top surface of the first finger-shaped plate, a groove is arranged near the other end of the top surface of the first finger-shaped plate, the bottom of the groove is arranged to be flat, the first finger-shaped plate is located in the groove and is provided with finger-shaped teeth, there are multiple finger-shaped teeth and they are evenly spaced along the length direction of the first finger-shaped plate; a mounting hole is machined through the second finger-shaped plate near one end of the top surface of the second finger-shaped plate, the second finger-shaped plate is arranged near the other end, there are multiple finger-shaped teeth and they are evenly spaced along the width direction of the second finger-shaped plate, and the finger-shaped teeth of the second finger-shaped plate and the finger-shaped teeth of the first finger-shaped plate are staggered with each other.

[0007] Preferably, the thickness of the second finger plate has a smaller value than the thickness of the first finger plate.

[0008] Preferably, the finger-shaped teeth are in the shape of an isosceles trapezoid.

[0009] Preferably, the elastic pad is made of rubber material.

[0010] Preferably, the thickness of the elastic pad is 10-18 mm.

[0011] Preferably, installation grooves are processed on the working surfaces of the maintenance track beam and the adjacent non-maintenance track beam near the gap, the installation groove of the maintenance track beam is fixedly provided with a first anchor bolt and a second anchor bolt, the installation groove of the non-maintenance track beam is fixedly provided with a first anchor bolt, seat plates are fixedly provided in the two installation grooves, installation holes are processed on the seat plates at positions corresponding to the first anchor bolt and the second anchor bolt, the seat plate of the installation groove of the maintenance track beam is fixedly provided with a first finger-shaped plate, and the seat plates of the installation grooves of the adjacent non-maintenance track beams are fixedly provided with an elastic pad and a second finger-shaped plate in sequence from bottom to top.

[0012] Preferably, the first finger plate is fixedly mounted on the top working surface or the side working surface of the maintenance track beam, and the second finger plate is fixedly mounted on the top working surface or the side working surface of the adjacent non-maintenance track beam.

[0013] The beneficial effects of the present invention are as follows: (1) the present invention installs a first finger-shaped plate that does not generate tension on the anchor bolts on the maintenance track beam, and installs a second finger-shaped plate on the non-maintenance track beam. The second finger-shaped plate can not only rely on the anchor bolts on the non-maintenance track beam to bear the load, but also form a simply supported state with the first finger-shaped plate. The stress condition is good, ensuring that the anchor bolts on the maintenance track beam after maintenance will not be damaged due to premature tension; (2) the second finger-shaped plate adopts a thinning design, which reduces the bending stiffness of the second finger-shaped plate, increases the deflection of the second finger-shaped plate, and improves the adaptability of the second finger-shaped plate to installation errors (3) an elastic pad is provided under the second finger-shaped plate. When the end of the non-maintenance track beam and the end of the maintenance track beam rotate at any side due to live load, the elastic pad under the second finger-shaped plate can be used to adapt and adjust the angular deformation of the beam end through uneven compression, thereby further improving the adaptability of the second finger-shaped plate to various working conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a three-dimensional diagram of the overall structure of the utility model;

[0015] Figure 2 It is the first exploded view of the overall structure of the utility model;

[0016] Figure 3 This is the second exploded view of the overall structure of the utility model;

[0017] Figure 4 It is a top view of the overall structure of the utility model;

[0018] Figure 5 It is a sectional view of the overall structure of the utility model.

[0019] Description of reference numerals:

[0020] 11. first finger-shaped plate; 111. groove; 112. finger-shaped teeth; 12. second finger-shaped plate;

[0021] 21. Maintenance track beam; 211. Installation slot; 22. Non-maintenance track beam;

[0022] 3. Clearance;

[0023] 4. Mounting holes;

[0024] 5. Seat plate;

[0025] 6. Elastic pad;

[0026] 71. First anchor bolt; 72. Second anchor bolt. DETAILED DESCRIPTION

[0027] The utility model is further described below in conjunction with the accompanying drawings:

[0028] like Figure 1 , Figure 2 , Figure 3 and Figure 5 As shown, the utility model provides a temporary finger-shaped plate during the operation and maintenance period of straddle-type rail transit, including a first finger-shaped plate 11 and a second finger-shaped plate 12. The first finger-shaped plate 11 and the second finger-shaped plate 12 are used for temporary transition during the operation and maintenance period of straddle-type rail transit. Specifically, the first finger-shaped plate 11 and the second finger-shaped plate 12 are only used during the maintenance period of the second anchor bolt 72 of the maintenance track beam 21. After the strength of the concrete filled at the second anchor bolt 72 reaches the age, the first finger-shaped plate 11 and the second finger-shaped plate 12 are removed and replaced with permanent finger-shaped plates, wherein the working time of the first finger-shaped plate 11 and the second finger-shaped plate 12 is during the period when the concrete strength rises, and the concrete strength rise time takes about 3 to 5 days. The first finger-shaped plate 11 is fixedly mounted on the working surface of the maintenance track beam 21 near the gap 3, and the second finger-shaped plate 12 is fixedly mounted on the working surface of the adjacent non-maintenance track beam 22 near the gap 3. The first finger-shaped plate 11 corresponds to the second finger-shaped plate 12 and cooperates with each other. The top surface of the first finger-shaped plate 11 is flush with the working surface of the maintenance track beam 21, and the top surface of the second finger-shaped plate 12 is flush with the working surface of the non-maintenance track beam 22. The first finger-shaped plate 11 is located near the gap 3 and does not extend into the gap 3. The second finger-shaped plate 12 extends across the gap 3 to the position of the first finger-shaped plate 11 and fits with the surface of the first finger-shaped plate 11 to form a simply supported state. An elastic pad 6 is fixedly arranged between the bottom of the second finger-shaped plate 12 and the track beam, wherein the elastic pad 6 is made of rubber material. The thickness of the elastic pad 6 is 10 to 18 mm. In this embodiment, the thickness of the elastic pad 6 is 15 mm. The elastic pad 6 can reduce the angular stiffness of the second finger-shaped plate 12 and improve the applicability of the beam end angle. It is required that every 100 cm 2The static compressive stiffness of the elastic pad 6 is 5 to 15 kN / mm. The first finger-shaped plate 11 is fixedly mounted on the top working surface or the side working surface of the maintenance track beam 21, and the second finger-shaped plate 12 is fixedly mounted on the top working surface or the side working surface of the adjacent non-maintenance track beam 22. Specifically, the first finger-shaped plate 11 and the second finger-shaped plate 12 can be mounted on the top working surface of the maintenance track beam 21 and the non-maintenance track beam 22, and the first finger-shaped plate 11 and the second finger-shaped plate 12 can also be mounted on the two side working surfaces of the maintenance track beam 21 and the non-maintenance track beam 22. The maintenance track beam 21 and the adjacent non-maintenance track beam 22 are both machined with mounting grooves 211 near the gap 3. The mounting groove 211 of the maintenance track beam 21 is fixedly provided with a first anchor bolt 71 and a second anchor bolt 72, and the mounting groove 211 of the non-maintenance track beam 22 is fixedly provided with a first anchor bolt 71. The two installation grooves 211 are both fixedly provided with seat plates 5, and the seat plates 5 are processed with installation holes 4 at positions corresponding to the first anchor bolts 71 and the second anchor bolts 72. Whether installing the first finger-shaped plate 11 and the second finger-shaped plate 12, or replacing and installing the permanent finger-shaped plate, the seat plates 5 on the installation grooves 211 of the maintenance track beam 21 and the adjacent non-maintenance track beam 22 do not need to be removed, and the seat plates 5 are compatible with the installation and use of the first finger-shaped plate 11, the second finger-shaped plate 12 and the permanent finger-shaped plate. In this embodiment, the seat plates 5 of the installation grooves 211 of the maintenance track beam 21 are fixedly installed with the first finger-shaped plate 11, and the seat plates 5 of the installation grooves 211 of the adjacent non-maintenance track beam 22 are fixedly installed with the elastic pads 6 and the second finger-shaped plates 12 in sequence from bottom to top. The elastic pads 6 can only be used in conjunction with the second finger-shaped plate 12. When the second finger-shaped plate 12 needs to be removed and replaced with the permanent finger-shaped plate, the elastic pads 6 need to be removed together with the second finger-shaped plate 12.

[0029] like Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, on the basis of the above embodiment, further, a mounting hole 4 is processed through the first finger-shaped plate 11 near one end of the top surface of the first finger-shaped plate 11, and a groove 111 is provided near the other end of the top surface of the first finger-shaped plate 11. The bottom of the groove 111 is set in a plane shape, and the first finger-shaped plate 11 is provided with finger-shaped teeth 112 in the groove 111. There are multiple finger-shaped teeth 112 and they are evenly spaced along the length direction of the first finger-shaped plate 11. A mounting hole 4 is processed through the second finger-shaped plate 12 near one end of the top surface of the second finger-shaped plate 12, and the second finger-shaped plate 12 is provided with finger-shaped teeth 112 near the other end. There are multiple finger-shaped teeth 112 and they are evenly spaced along the width direction of the second finger-shaped plate 12. The finger-shaped teeth 112 of the second finger-shaped plate 12 and the finger-shaped teeth 112 of the first finger-shaped plate 11 are staggered with each other, wherein the finger-shaped teeth 112 are in the shape of an isosceles trapezoid. The thickness of the second finger-shaped plate 12 is smaller than that of the first finger-shaped plate 11 , which can reduce the bending rigidity of the second finger-shaped plate 12 and improve the adaptability of the second finger-shaped plate 12 .

[0030] like Figures 1 to 5 As shown, during installation, the two seat plates 5 are placed in the installation grooves 211 on the maintenance track beam 21 and the non-maintenance track beam 22 respectively, and then the first finger plate 11 is placed on the seat plate 5 of the maintenance track beam 21, and the second finger plate 12 is placed on the seat plate 5 of the non-maintenance track beam 22. The first finger plate 11 is fixedly installed on the seat plate 5 of the maintenance track beam 21 by the nut and the first anchor bolt 71 and the second anchor bolt 72, and the second finger plate 12 is fixedly installed on the seat plate 5 of the non-maintenance track beam 22 by the nut and the first anchor bolt 71, completing the installation process of the temporary finger plate. Figure 5 As shown, the first anchor bolt 71 is a non-maintenance location, and the second anchor bolt 72 is a maintenance location that needs to be opened for maintenance and then filled with concrete. The first finger-shaped plate 11 and the second finger-shaped plate 12 cooperate to form a simply supported state, so that the second anchor bolt 72 is not subjected to tension, ensuring that the second anchor bolt 72 will not be damaged by tension too early. Therefore, the first finger-shaped plate 11 and the second finger-shaped plate 12 cooperate to meet the use requirements during operation and maintenance.

[0031] The above are only preferred embodiments of the present invention, and do not limit the scope of the present invention. A person skilled in the art should understand that various changes, modifications, substitutions and deformations can be made to these embodiments without departing from the principles and purposes of the present invention, which should all be included in the scope of protection of the present invention. The scope of protection of the present invention is defined by the claims and their equivalents.

Claims

1. A temporary finger-shaped board for the operation and maintenance period of straddle-type rail transit, characterized in that: It includes a first finger-shaped plate and a second finger-shaped plate, which are used for temporary transition during the operation and maintenance period of straddle-type rail transit. The first finger-shaped plate is fixedly mounted on the working surface of the maintenance track beam near the gap, and the second finger-shaped plate is fixedly mounted on the working surface of the adjacent non-maintenance track beam near the gap. The first finger-shaped plate corresponds to the second finger-shaped plate and cooperates with each other. The top surface of the first finger-shaped plate is flush with the working surface of the maintenance track beam, and the top surface of the second finger-shaped plate is flush with the working surface of the non-maintenance track beam. The first finger-shaped plate is located near the gap and does not extend into the gap. The second finger-shaped plate extends across the gap to the position of the first finger-shaped plate and fits with the surface of the first finger-shaped plate to form a simply supported state. An elastic pad is fixedly arranged between the bottom of the second finger-shaped plate and the track beam.

2. A temporary finger-shaped board for operation and maintenance of straddle-type rail transit according to claim 1, characterized in that: A mounting hole is machined through the first finger-shaped plate near one end of the top surface of the first finger-shaped plate, a groove is arranged near the other end of the top surface of the first finger-shaped plate, the bottom of the groove is arranged to be flat, the first finger-shaped plate is arranged in the groove and finger-shaped teeth are arranged, there are multiple finger-shaped teeth and they are evenly spaced along the length direction of the first finger-shaped plate; a mounting hole is machined through the second finger-shaped plate near one end of the top surface of the second finger-shaped plate, the second finger-shaped plate is arranged near the other end, there are multiple finger-shaped teeth and they are evenly spaced along the width direction of the second finger-shaped plate, and the finger-shaped teeth of the second finger-shaped plate and the finger-shaped teeth of the first finger-shaped plate are staggered with each other.

3. A temporary finger-shaped board for operation and maintenance of straddle-type rail transit according to claim 1 or 2, characterized in that: The thickness of the second finger plate is smaller than the thickness of the first finger plate.

4. A temporary finger-shaped board for operation and maintenance of straddle-type rail transit according to claim 2, characterized in that: The finger-shaped teeth are in the shape of an isosceles trapezoid.

5. The temporary finger-shaped board for the operation and maintenance period of straddle-type rail transit according to claim 1, characterized in that: The elastic pad is made of rubber material.

6. A temporary finger-shaped board for straddle-type rail transit operation and maintenance period according to claim 1, characterized in that: The thickness of the elastic pad is 10 to 18 mm.

7. A temporary finger-shaped board for straddle-type rail transit operation and maintenance period according to claim 1, characterized in that: The maintenance track beam and the adjacent non-maintenance track beam are both machined with installation grooves at the working surfaces near the gap, the installation groove of the maintenance track beam is fixedly provided with a first anchor bolt and a second anchor bolt, the installation groove of the non-maintenance track beam is fixedly provided with a first anchor bolt, both installation grooves are fixedly provided with seat plates, the seat plates are machined with installation holes at positions corresponding to the first anchor bolt and the second anchor bolt, the seat plate of the installation groove of the maintenance track beam is fixedly provided with a first finger-shaped plate, and the seat plates of the installation grooves of the adjacent non-maintenance track beams are fixedly provided with an elastic pad and a second finger-shaped plate in sequence from bottom to top.

8. The temporary finger-shaped board for straddle-type rail transit operation and maintenance period according to claim 1, characterized in that: The first finger-shaped plate is fixedly mounted on the top working surface or the side working surface of the maintenance track beam, and the second finger-shaped plate is fixedly mounted on the top working surface or the side working surface of the adjacent non-maintenance track beam.