Mounting structure for temporary water retaining service gate at inlet of diversion tunnel
By designing a fixed structure and a water-retaining structure in the inlet of the diversion hole, using slide columns, expansion wires and motor systems to achieve stable installation of gates and fish blocking, the problem of incomplete installation and inability to block large fish in the prior art is solved. The stable installation of the gate and fish protection are achieved.
Patent Information
- Application Number
- CN202323483553.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-20
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2033-12-20
AI Technical Summary
The installation structure of the existing temporary water-blocking working gate inlet inlets lacks detailed description during the installation process and cannot effectively block larger fish, resulting in fish being easily injured when passing through the diversion hole.
A temporary water-blocking gate installation structure of the diversion tunnel inlet including a fixed structure and a water-blocking structure was designed. The gate frame was built using components such as concrete piles, slide columns, expansion wires, top frames and docking screws, and the gate frame was built through power parts. , the combination of sewage and water barrier parts, and the motor and worm system can move the water barrier up and down to intercept fish.
The stable installation of the gate and effective blocking of larger fish is achieved, ensuring that the fish are not harmed when passing through the diversion hole, and at the same time it is convenient to operate and saves investment.
Smart Images

Figure CN222275406U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy and hydropower engineering, and in particular to an installation structure of a temporary water retaining working gate at an inlet of a diversion tunnel. Background Art
[0002] A gate is usually set at the entrance of the diversion tunnel to control whether the upstream river water flows into the diversion tunnel. However, the current gate only has a separate water-blocking function. After the gate is opened, due to the large flow of water in the Lancang River and the large number of fish inside, some larger fish will be harmed when passing through the diversion tunnel. In addition, the water flow out of the diversion tunnel outlet is very turbulent, which can easily cause inevitable harm to larger or fragile fish.
[0003] Chinese patent number CN211498768U provides a gate combining diversion tunnel plugging and discharge, including a diversion tunnel, an arc gate installed at one end of the diversion tunnel, a plane plugging and emergency gate used in conjunction with the arc gate installed upstream of the arc gate, a gate groove for mutual cooperation with the plane plugging and emergency gate is opened on the top wall inside the diversion tunnel, a pull rod is fixedly installed on the top wall of the plane plugging and emergency gate, and the top of the pull rod is connected to an opening and closing device. In the utility model, the diversion tunnel discharge flow adopts an arc gate, and a plane plugging and emergency gate is used to block water after the arc gate is closed. The arc gate water seal device only needs to meet the rising head of the gate when the highest operating head is closed and blocked within 24 hours, and the rising head is usually lower than the final water blocking head, generally not exceeding 80m. The conventional pre-pressure water seal device can meet the water stopping requirements, and complex pressurized water stopping or eccentric hinge water stopping devices can be used without the need for complex pressurized water stopping or eccentric hinge water stopping devices, which is easy to operate and saves investment.
[0004] At present, the existing temporary water retaining gate installation structure at the diversion tunnel inlet is convenient to operate and saves investment, but there is no detailed description on how to install the gate, and the existing gate usually does not have the function of blocking larger fish in the water. Utility Model Content
[0005] In order to make up for the above shortcomings, the utility model provides a temporary water retaining working gate installation structure at the diversion tunnel inlet, aiming to improve the temporary water retaining working gate installation structure at the diversion tunnel inlet. Under normal circumstances, it does not introduce how to install the gate and the gate does not have the ability to block larger fish.
[0006] The utility model is achieved in this way:
[0007] The utility model provides a temporary water retaining working gate installation structure for a diversion tunnel inlet, comprising a fixing structure and a water retaining structure.
[0008] The fixed structure includes a concrete pile and a mounting part, the mounting part includes a sliding column 1 and a sliding column 2, the sliding column 1 is slidably connected to the inside of the concrete pile, the sliding column 1 is sleeved with an expansion wire 1, the sliding column 2 is slidably connected to the inside of the concrete pile, the sliding column 2 is sleeved with an expansion wire 2, a top frame is fixed to the top of the sliding column 2, and a docking screw is sleeved inside the top frame, the water retaining structure includes a power part, a dirt isolation part and a water retaining part, the power part is fixed to the top of the mounting part, the dirt isolation part is slidably connected to one side of the mounting part, and the water retaining part is slidably connected to one side of the mounting part.
[0009] In an embodiment of the utility model, a water guide plate is fixed to one side of the concrete pile, and two mounting holes are opened inside the concrete pile.
[0010] In one embodiment of the utility model, an expansion tube 1 is arranged inside the installation hole, and an expansion tube 2 is arranged inside the other installation hole.
[0011] In an embodiment of the utility model, the power component includes a motor, the motor is fixed to the top of the top frame, a worm gear 1 is fixed to an output shaft end of the motor, and a worm gear 2 is fixed to an output shaft end on the other side of the motor.
[0012] In one embodiment of the utility model, the dirt-isolating member comprises a screw rod 1, the screw rod 1 is rotatably connected to the inside of the top frame, a worm gear 1 is fixed to the end of the screw rod 1, the worm gear 1 is meshed with a worm rod 1, one side of the screw rod 1 is threadedly connected to a material blocking frame, and a water hole is provided on one side of the material blocking frame.
[0013] In an embodiment of the utility model, the water retaining member includes a second screw rod, the second screw rod is rotatably connected to one side of the top frame, a second worm wheel is fixed to the second end of the screw rod, and the second worm wheel is meshed with the second worm rod.
[0014] In an embodiment of the utility model, one side of the screw rod is threadedly connected with a water baffle plate, and a sealing gasket is fixed at the bottom of the water baffle plate.
[0015] The beneficial effect of the utility model is that the utility model obtains a temporary water retaining working gate installation structure at the inlet of the diversion tunnel through the above-mentioned design. When in use, the sliding column 1 can be fixed on the concrete pile by screwing the expansion wire 1 into the expansion tube 1, and then the sliding column 2 can be fixed on the concrete pile by screwing the expansion wire 2 into the expansion tube 2, and then the top frame is fixed to the sliding column 1 and the sliding column 2 by using the docking screws, so that the outer frame structure of the gate is completed, and the dirt partition and the water retaining member are respectively connected to the power member, so that when the water retaining plate moves up, the material retaining frame will move down, thereby realizing the interception of larger fish in the water upstream. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0017] Figure 1 It is a schematic diagram of the overall structure of the installation structure of the temporary water retaining working gate at the inlet of the diversion tunnel provided by the embodiment of the utility model;
[0018] Figure 2 A schematic diagram of a power component of a temporary water retaining working gate installation structure for a diversion tunnel inlet provided by an embodiment of the utility model;
[0019] Figure 3 A schematic diagram of the fixing structure of the temporary water retaining working gate installation structure at the inlet of the diversion tunnel provided by the embodiment of the utility model;
[0020] Figure 4 A schematic diagram of the pollution-isolating component of the installation structure of the temporary water-retaining working gate at the inlet of the diversion tunnel provided in an embodiment of the utility model.
[0021] In the figure: 100-fixed structure; 110-concrete pile; 111-water guide plate; 112-installation hole; 113-expansion tube one; 114-expansion tube two; 120-installation piece; 121-sliding column one; 122-expansion wire one; 123-sliding column two; 124-expansion wire two; 125-top frame; 126-jointing screw; 200-water retaining structure; 210-power piece; 211-motor; 212-worm one; 213-worm two; 220-dirt separator; 221-screw one; 222-worm wheel one; 223-material blocking frame; 224-water hole; 230-water retaining piece; 231-screw two; 232-worm wheel two; 233-water retaining plate; 234-sealing pad. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example
[0024] See also Figure 1-4The utility model provides a technical solution: a temporary water retaining working gate installation structure at the inlet of a diversion tunnel, comprising a fixing structure 100 and a water retaining structure 200.
[0025] See also Figure 1-3 The fixed structure 100 includes a concrete pile 110 and a mounting member 120. The mounting member 120 includes a sliding column 121 and a sliding column 123. The sliding column 121 is slidably connected to the interior of the concrete pile 110. An expansion thread 122 is sleeved inside the sliding column 121. The expansion thread 122 is screwed into the expansion tube 113, so that the sliding column 121 can be fixed inside the concrete pile 110. The sliding column 123 is slidably connected to the interior of the concrete pile 110. An expansion wire 124 is sleeved inside the second sliding column 123, and the expansion wire 124 is screwed into the expansion tube 114, so that the second sliding column 123 can be fixed inside the concrete pile 110. A top frame 125 is fixed on the top of the second sliding column 123, and the top frame 125 plays a role in supporting the power part 210. A docking screw 126 is sleeved inside the top frame 125, and the top frame 125 can be fixed together with the first sliding column 121 and the second sliding column 123 by using multiple docking screws 126.
[0026] A water guide plate 111 is fixed on one side of the concrete pile 110, and the water guide plate 111 is also a concrete structure. Two mounting holes 112 are opened inside the concrete pile 110, and an expansion tube 113 is arranged inside the mounting hole 112. The expansion tube 113 and the expansion tube 2 114 are only slightly smaller in diameter than the mounting hole 112, and the expansion tube 2 114 is arranged inside the other mounting hole 112.
[0027] See also Figure 1-2 and Figure 4 The water retaining structure 200 includes a power member 210, a dirt-isolating member 220 and a water retaining member 230. The power member 210 is fixed on the top of the mounting member 120, the dirt-isolating member 220 is slidably connected to one side of the mounting member 120, and the water retaining member 230 is slidably connected to one side of the mounting member 120.
[0028] The power member 210 includes a motor 211, which is fixed to the top of the top frame 125. A worm 212 is fixed to the output shaft end of the motor 211, and a worm 213 is fixed to the output shaft end of the other side of the motor 211. The spiral directions of the worm 212 and the worm 213 are opposite. The dirt-isolating member 220 includes a screw 221, and the screw 221 and the screw 231 have the same spiral direction. The screw 221 is rotatably connected to the inside of the top frame 125. A worm wheel 222 is fixed to the end of the screw 221, and the worm wheel 222 is meshed with the worm 212. A material blocking frame 223 is threadedly connected to one side of the screw 221, and the material blocking frame 223 can block the water. Larger fish are intercepted, and a water hole 224 is opened on one side of the blocking frame 223. The water hole 224 facilitates water to pass through the blocking frame 223. The water retaining member 230 includes a screw rod 231, which is rotatably connected to one side of the top frame 125. A worm gear 232 is fixed to the end of the screw rod 231, and the worm gear 232 is meshed with the worm 213. A water retaining plate 233 is threadedly connected to one side of the screw rod 231. The water retaining plate 233 can block the flow of water. A sealing gasket 234 is fixed to the bottom of the water retaining plate 233. The sealing gasket 234 can fill the gap between the water retaining plate 233 and the bottom of the river channel, thereby ensuring that water does not seep out from the bottom of the water retaining plate 233.
[0029] Specifically, the working principle of the temporary water retaining working gate installation structure of the diversion tunnel inlet is as follows: when in use, firstly, the expansion tube 113 and the expansion tube 2 114 are introduced into the installation hole 112, and then the sliding column 121 and the sliding column 2 123 are placed in the grooves opened in the concrete pile 110, and then the expansion wire 122 is passed through the sliding column 121 and then screwed into the expansion tube 113, so that the expansion tube 113 expands outward, so that the expansion tube 113 drives the expansion wire 122 to be unable to be pulled out of the installation hole 112, thereby fixing the sliding column 121. Similarly, the sliding column 2 123 can also be fixed in this way, and then the material blocking frame 223 is slid into the sliding column 2 123, and the water retaining plate 233 is slid into the sliding column 121. At this time, the worker needs to lift the material blocking frame 223, and then screw rod 1 221 is screwed into the material blocking frame 223, and the screw rod 231 is screwed into the water baffle 233. By screwing in different depths, the material blocking frame 223 and the water baffle 233 are in an up-and-down situation, and then a plurality of docking screws 126 are respectively screwed into the sliding column 121 and the sliding column 2 123 to fix the top frame 125, thereby completing the installation of the gate. When it is necessary to block water, start the motor 211, so that the motor 211 drives the worm 1 212 and the worm 213 to rotate respectively, and the worm wheel 1 222 is driven to rotate by the worm 1 212, so that the screw rod 1 221 drives the material blocking frame 223 to move upward by rotation, and the worm wheel 2 232 is driven to rotate by the worm 213, so that the screw rod 231 can drive the water baffle 233 to move downward, thereby completing the water blocking process of the gate.
[0030] It should be noted that the specific model and specifications of the motor 211 need to be selected and determined according to the actual specifications of the device, and the specific selection calculation method adopts the existing technology in the field, so it will not be described in detail.
[0031] The power supply and principle of the motor 211 are clear to those skilled in the art and will not be described in detail here.
[0032] The above description is only the preferred implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A temporary water retaining working gate installation structure at the inlet of a diversion tunnel, characterized in that: include A fixed structure (100), the fixed structure (100) comprising a concrete pile (110) and a mounting member (120), the mounting member (120) comprising a first sliding column (121) and a second sliding column (123), the first sliding column (121) being slidably connected to the interior of the concrete pile (110), the first sliding column (121) having an expansion thread (122) sleeved therein, the second sliding column (123) being slidably connected to the interior of the concrete pile (110), the second sliding column (123) having an expansion thread (124) sleeved therein, a top frame (125) being fixed to the top of the second sliding column (123), the top frame (125) having a butt screw (126) sleeved therein; A water retaining structure (200), the water retaining structure (200) comprising a power member (210), a dirt-isolating member (220) and a water retaining member (230), the power member (210) being fixed to the top of the mounting member (120), the dirt-isolating member (220) being slidably connected to one side of the mounting member (120), and the water retaining member (230) being slidably connected to one side of the mounting member (120).
2. A temporary water retaining working gate installation structure at the inlet of a diversion tunnel according to claim 1, characterized in that: A water guide plate (111) is fixed to one side of the concrete pile (110), and two mounting holes (112) are opened inside the concrete pile (110).
3. A temporary water retaining working gate installation structure at the inlet of a diversion tunnel according to claim 2, characterized in that: An expansion tube 1 (113) is disposed inside the installation hole (112), and an expansion tube 2 (114) is disposed inside the other installation hole (112).
4. A temporary water retaining working gate installation structure at the inlet of a diversion tunnel according to claim 1, characterized in that: The power member (210) comprises a motor (211), the motor (211) being fixed to the top of the top frame (125), a worm gear 1 (212) being fixed to the output shaft end of the motor (211), and a worm gear 2 (213) being fixed to the output shaft end on the other side of the motor (211).
5. The temporary water retaining working gate installation structure at the diversion tunnel inlet according to claim 1 is characterized in that: The dirt-isolating member (220) comprises a screw rod (221), the screw rod (221) being rotatably connected to the interior of the top frame (125), a worm wheel (222) being fixed to the end of the screw rod (221), the worm wheel (222) being meshed with a worm rod (212), a material blocking frame (223) being threadedly connected to one side of the screw rod (221), and a water-passing hole (224) being provided on one side of the material blocking frame (223).
6. A temporary water retaining working gate installation structure at the inlet of a diversion tunnel according to claim 1, characterized in that: The water retaining member (230) comprises a second screw rod (231), the second screw rod (231) being rotatably connected to one side of the top frame (125), a second worm wheel (232) being fixed to the end of the second screw rod (231), and the second worm wheel (232) being meshed with the second worm rod (213).
7. A temporary water retaining working gate installation structure at the inlet of a diversion tunnel according to claim 6, characterized in that: One side of the second screw rod (231) is threadedly connected to a water baffle plate (233), and a sealing gasket (234) is fixed to the bottom of the water baffle plate (233).