Water conservancy project building foundation pile

By designing the adjustment mechanism and anchor insertion mechanism in the foundation piles of water conservancy engineering construction, the automatic adjustment of the insertion rods on both sides and the stable movement of the threaded barrel are achieved, which solves the problem of poor anchoring effect of piles in the prior art and improves the foundation The load-bearing capacity and construction efficiency of piles.

CN222275537UActive Publication Date: 2024-12-31SICHUAN ZIXINAN CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420658505.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-12-31
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

The firmness of the existing water conservancy construction piles between the pile columns and the foundation is limited, resulting in insufficient bearing capacity of a single foundation pile, which requires increasing the number of pile columns and increasing construction costs. In addition, the existing technology can only carry out one side insertion rod. Adjustment leads to poor anchoring effect.

Method used

A water conservancy engineering foundation pile was designed, with pile bodies arranged at four corners of the bottom end of the bearing, and pile tips connected to the bottom end of the pile body, and adjustment mechanisms were embedded on both sides, including anchor insertion mechanisms and threaded cylinder systems, through oblique blocks and slides The combination of blocks realizes automatic extension and retraction of the insertion rod, rotating and lifting of the threaded rod, and improves the adjustment ability and anchoring performance of the insertion rods on both sides.

Benefits of technology

It effectively improves the anchoring performance and construction efficiency of foundation piles, and can adjust the insertion rods on both sides, which significantly improves the load-bearing capacity and construction cost-effectiveness of the pile body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222275537U_ABST
    Figure CN222275537U_ABST
Patent Text Reader

Abstract

The utility model provides a hydraulic engineering building foundation pile, which relates to the technical field of hydraulic engineering and comprises a bearing platform, pile bodies are arranged at four corners of the bottom end of the bearing platform, pile tips are connected to the bottom ends of the pile bodies, adjusting mechanisms are embedded at four corners of the top end of the bearing platform, a plurality of anchor inserting mechanisms are embedded at the bottom ends of two sides of each pile body, and each anchor inserting mechanism comprises an inserting rod. One end of the inserting rod is connected with an inserting head, the other end of the inserting rod penetrates through the inner side of the pile body, the inserting rod is slidably connected with the pile body, a first inclined block is installed at the other end of the inserting rod, a second inclined block is arranged in the pile body, one side of the first inclined block makes contact with the outer side of the second inclined block, a threaded cylinder is installed at the top end of the second inclined block, and a threaded rod is installed on the inner side of the threaded cylinder. The top end of the threaded rod is rotationally connected with the top end of the pile body. Inserting rods on the two sides of the pile body can be effectively adjusted, the anchoring effect is improved, and high practical value is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water conservancy engineering, and more specifically, particularly relates to a foundation pile for a water conservancy engineering building. Background Art

[0002] During the construction of water conservancy projects, the foundation piles are the core of the entire project. The firmness of the foundation piles determines the quality of the project. During the use of the foundation piles used in current water conservancy project construction, the firmness between the piles and the foundation is limited, and the bearing capacity of a single foundation pile is general. The number of piles needs to be increased to meet the bearing capacity of the foundation piles, which makes the construction cost high.

[0003] For example, a Chinese patent with publication number CN218373783U discloses a foundation pile for a water conservancy project, comprising a cap and two pile bodies arranged at the bottom of the cap, the two pile bodies are hollow structures, and a moving rod is vertically arranged inside the pile bodies, a plurality of plug rods are fixedly arranged on the opposite sides of the two moving rods, and extension holes are provided at the side walls of the two pile bodies and at positions corresponding to the positions of the plurality of plug rods, a placement groove is provided at the top of the cap, the upper ends of the two moving rods extend into the interior of the placement groove, a bidirectional screw is transversely provided in the middle of the placement groove, both ends of the bidirectional screw are threaded with threaded tubes, and the ends of the two threaded tubes away from the bidirectional screws are respectively fixedly connected to the rod walls of the two moving rods, a cover plate is provided at the opening of the placement groove, cavities are provided on both sides of the cover plate, and a pop-up mechanism that is clamped with the side wall of the placement groove is provided inside the cavity;

[0004] The technical solution recorded in this scheme is to set a bidirectional screw and a threaded tube inside the base, and rotate the middle part of the bidirectional screw, so that the two threaded tubes can move relatively apart, and at the same time, the two moving rods can move relatively apart, so that the insertion rod can be pushed out from the inside of the pile body and inserted into the soil, thereby improving the stability of the pile body inserted into the soil. This operation process is relatively convenient, and there is no need to operate each pile body one by one, thereby improving construction efficiency. However, when using this scheme, only the insertion rod on one side can be adjusted, resulting in poor anchoring effect of the pile body, affecting user use.

[0005] Therefore, in view of this, the existing structure and defects are studied and improved, and a water conservancy project building foundation pile is provided, in order to achieve a purpose with greater practical value. Utility Model Content

[0006] In order to solve the above technical problems, the utility model provides a foundation pile for a water conservancy project building.

[0007] The purpose and effect of the foundation pile of the water conservancy project construction of the utility model are achieved by the following specific technical means:

[0008] A foundation pile for a water conservancy project comprises a cap, wherein the four corners of the bottom end of the cap are provided with a pile body, the bottom end of the pile body is connected to a pile tip, the four corners of the top end of the cap are embedded with an adjustment mechanism, and the bottom ends of both sides of the pile body are embedded with a plurality of anchor mechanisms, the anchor mechanism comprises a plug rod, one end of the plug rod is connected with a plug, the other end of the plug rod passes through the inner side of the pile body, the plug rod and the pile body are slidably connected, the other end of the plug rod is installed with a first inclined block, the interior of the pile body is provided with a second inclined block, one side of the first inclined block is in contact with the outer side of the second inclined block, the top end of the second inclined block is installed with a threaded barrel, the inner side of the threaded barrel is installed with a threaded rod, and the top end of the threaded rod is rotatably connected to the top end of the pile body.

[0009] Furthermore, a support ring is mounted on the outer top end of the pile body, and the top end of the support ring is in contact with the bottom end of the cap.

[0010] Furthermore, the first inclined block is inclined on one side close to the second inclined block, and both sides of the second inclined block are inclined.

[0011] Furthermore, sliders are installed on both sides of the threaded barrel, and slide rails are installed on both sides of the interior of the pile body, and the inner side of the slider is slidably connected to one side of the slide rail.

[0012] Furthermore, a connecting plate is installed at the top and bottom ends of the first inclined block, a spring is installed at one end of the connecting plate, and one end of the spring is fixedly connected to the inner side of the pile body.

[0013] Furthermore, the adjustment mechanism includes a sleeve, the bottom end of the sleeve is fixedly connected to the top end of the pile body, the inner side of the sleeve is rotatably connected to a rotating shaft, and the bottom end of the rotating shaft is fixedly connected to the top end of the threaded rod.

[0014] Furthermore, a hexagonal prism is installed on the top of the rotating shaft.

[0015] Compared with the prior art, the utility model has the following beneficial effects:

[0016] The foundation pile of the water conservancy engineering building is provided with pile bodies at the four corners of the bottom end of the pedestal to realize the support and limitation of the pedestal, the bottom end of the pile body is connected with a pile tip to facilitate the insertion of the pile body into the ground, and a plug is connected to one end of the insertion rod to facilitate the insertion of the insertion rod into the ground. The setting of the insertion rod improves the anchoring performance of the pile body, and the setting of the first inclined block and the second inclined block enables the threaded barrel to descend so that the second inclined block pushes the first inclined block to move, thereby enabling the insertion rod to extend out of the pile body, and a threaded rod is installed on the inner side of the threaded barrel so that the threaded barrel can be driven to rise and fall by rotating the threaded rod, and the top and The bottom ends of the pedestals are in contact with each other to achieve pedestal support, and the inner side of the slider and one side of the slide rail are slidably connected to improve the movement stability of the threaded tube, and a spring is installed at one end of the connecting plate to achieve automatic rebound of the first inclined block, so that after the second inclined block rises, the plug automatically retracts into the pile body, and the bottom end of the rotating shaft and the top end of the threaded rod are fixedly connected to achieve rotation of the rotating shaft to drive the threaded rod to rotate, and a hexagonal column is installed at the top end of the rotating shaft to facilitate users to rotate the rotating shaft; the utility model can effectively adjust the plug rods on both sides of the pile body, improve the anchoring effect, and has high practical value. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 The utility model is a three-dimensional Figure 1 .

[0018] Figure 2 The utility model is a three-dimensional Figure 2 .

[0019] Figure 3 It is the front view of the utility model.

[0020] Figure 4 It is a cross-sectional view of the pile body of the utility model.

[0021] In the figure, the corresponding relationship between the component names and the figure numbers is as follows:

[0022] 100. Capping platform; 101. Pile body; 102. Pile tip; 103. Adjusting mechanism; 10301. Sleeve; 10302. Rotating shaft; 10303. Hexagonal prism; 104. Anchoring mechanism; 10401. Inserting rod; 10402. Plug; 10403. First inclined block; 10404. Connecting plate; 10405. Spring; 10406. Second inclined block; 10407. Threaded cylinder; 10408. Threaded rod; 10409. Sliding block; 10410. Sliding rail; 105. Support ring. DETAILED DESCRIPTION

[0023] The following is a further detailed description of the implementation of the present utility model in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present utility model, but cannot be used to limit the scope of the present utility model.

[0024] Example:

[0025] As attached Figure 1 To Attachment Figure 4 As shown:

[0026] The utility model provides a foundation pile for a water conservancy project, including a cap 100, wherein a pile body 101 is arranged at four corners of the bottom end of the cap 100, a pile tip 102 is connected to the bottom end of the pile body 101, an adjustment mechanism 103 is embedded at four corners of the top end of the cap 100, and a plurality of anchor mechanisms 104 are embedded at the bottom ends of both sides of the pile body 101, wherein the anchor mechanism 104 comprises an insertion rod 10401, one end of the insertion rod 10401 is connected to a plug 10402, and the insertion rod 10401 is connected to a plug 10402. The other end of the rod 10401 penetrates the inner side of the pile body 101, and the rod 10401 and the pile body 101 are slidably connected. The other end of the rod 10401 is installed with a first inclined block 10403, and the interior of the pile body 101 is provided with a second inclined block 10406. One side of the first inclined block 10403 is in contact with the outer side of the second inclined block 10406. The top of the second inclined block 10406 ​​is installed with a threaded barrel 10407, and the inner side of the threaded barrel 10407 is installed with a threaded barrel 10407. Threaded rod 10408, the top of threaded rod 10408 and the top of pile body 101 are rotatably connected, pile body 101 is arranged at four corners of the bottom end of pedestal 100, so as to realize support and limitation of pedestal 100, pile tip 102 is connected with the bottom end of pile body 101, so as to facilitate insertion of pile body 101 into the ground, plug 10402 is connected with one end of insertion rod 10401, so as to facilitate insertion of insertion rod 10401 into the ground, and the setting of insertion rod 10401 improves the anchoring performance of pile body 101, and the setting of first inclined block 10403 and second inclined block 10406 ​​can realize that threaded barrel 10407 descends and second inclined block 10406 ​​pushes first inclined block 10403 to move, so as to realize that insertion rod 10401 extends out from pile body 101, and threaded rod 10408 is installed on the inner side of threaded barrel 10407, so as to realize that rotation of threaded rod 10408 can drive threaded barrel 10407 to rise and fall.

[0027] The outer top of the pile body 101 is provided with a support ring 105 , and the top of the support ring 105 is in contact with the bottom of the cap 100 , so that the cap 100 is supported.

[0028] Among them, the first inclined block 10403 is inclined on one side close to the second inclined block 10406, and both sides of the second inclined block 10406 ​​are inclined.

[0029] Among them, sliders 10409 are installed on both sides of the threaded tube 10407, and slide rails 10410 are installed on both sides of the inside of the pile body 101. The inner side of the slider 10409 and one side of the slide rail 10410 are slidably connected. The movement stability of the threaded tube 10407 is improved through the slidable connection between the inner side of the slider 10409 and one side of the slide rail 10410.

[0030] Among them, connecting plates 10404 are installed at the top and bottom ends of the first inclined block 10403, and a spring 10405 is installed at one end of the connecting plate 10404. One end of the spring 10405 is fixedly connected to the inner side of the pile body 101. The spring 10405 is installed at one end of the connecting plate 10404 to achieve automatic rebound of the first inclined block 10403, so that after the second inclined block 10406 ​​rises, the plug 10402 automatically retracts into the pile body 101.

[0031] Among them, the adjustment mechanism 103 includes a sleeve 10301, the bottom end of the sleeve 10301 is fixedly connected to the top of the pile body 101, the inner side of the sleeve 10301 is rotatably connected with a rotating shaft 10302, the bottom end of the rotating shaft 10302 is fixedly connected to the top of the threaded rod 10408, and the bottom end of the rotating shaft 10302 and the top of the threaded rod 10408 are fixedly connected, so that the rotation of the rotating shaft 10302 can drive the threaded rod 10408 to rotate.

[0032] Among them, a hexagonal prism 10303 is installed on the top of the rotating shaft 10302, and the hexagonal prism 10303 is installed on the top of the rotating shaft 10302, which is convenient for the user to rotate the rotating shaft 10302.

[0033] The specific usage and function of this embodiment are as follows:

[0034] When using this product, first check whether the connection of the product is tightened. After ensuring that it is intact, place the product in the designated position. Pile bodies 101 are provided at the four corners of the bottom end of the base 100 to support and limit the base 100. A pile tip 102 is connected to the bottom end of the pile body 101 to facilitate the insertion of the pile body 101 into the ground. A plug 10402 is connected to one end of the insertion rod 10401 to facilitate the insertion of the insertion rod 10401 into the ground. The setting of the insertion rod 10401 improves the anchoring performance of the pile body 101. By setting the first inclined block 10403 and the second inclined block 10406, the threaded barrel 10407 can be lowered to enable the second inclined block 10406 ​​to push the first inclined block 10403 to move, so that the insertion rod 10401 can be extended from the pile body 101. A threaded rod 10408 is installed on the inner side of the threaded barrel 10407 to rotate the threaded rod 10408 to drive The threaded tube 10407 is raised and lowered, and the top end of the support ring 105 contacts the bottom end of the base 100 to support the base 100. The inner side of the slider 10409 and one side of the slide rail 10410 are slidably connected to improve the movement stability of the threaded tube 10407. A spring 10405 is installed at one end of the connecting plate 10404 to realize automatic rebound of the first inclined block 10403, so that after the second inclined block 10406 ​​rises, the plug 10402 automatically retracts into the pile body 101. The bottom end of the rotating shaft 10302 and the top end of the threaded rod 10408 are fixedly connected, so that the rotation of the rotating shaft 10302 can drive the threaded rod 10408 to rotate. A hexagonal prism 10303 is installed at the top of the rotating shaft 10302, which is convenient for users to rotate the rotating shaft 10302. The utility model can effectively adjust the plugs on both sides of the pile body to improve the anchoring effect, and has high practical value.

[0035] The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

Claims

1. A foundation pile for a hydraulic engineering project, comprising a cap (100), characterized in that: The four corners of the bottom end of the cap (100) are provided with a pile body (101), the bottom end of the pile body (101) is connected to a pile tip (102), the four corners of the top end of the cap (100) are embedded with an adjustment mechanism (103), the bottom ends of both sides of the pile body (101) are embedded with a plurality of anchor mechanisms (104), the anchor mechanisms (104) include an insertion rod (10401), one end of the insertion rod (10401) is connected to a plug (10402), the other end of the insertion rod (10401) passes through the inner side of the pile body (101), and the insertion rod (10401) is connected to the inner side of the pile body (101). ) is slidably connected to the pile body (101), the other end of the insertion rod (10401) is installed with a first inclined block (10403), the interior of the pile body (101) is provided with a second inclined block (10406), one side of the first inclined block (10403) is in contact with the outer side of the second inclined block (10406), a threaded tube (10407) is installed at the top end of the second inclined block (10406), a threaded rod (10408) is installed on the inner side of the threaded tube (10407), and the top end of the threaded rod (10408) is rotatably connected to the top end of the pile body (101).

2. The water conservancy engineering construction pile according to claim 1, characterized in that: A support ring (105) is sleeved on the outer top end of the pile body (101), and the top end of the support ring (105) is in contact with the bottom end of the base (100).

3. The foundation pile for water conservancy engineering construction as claimed in claim 1, characterized in that: The first inclined block (10403) is inclined on one side close to the second inclined block (10406), and both sides of the second inclined block (10406) are inclined.

4. The water conservancy engineering construction pile according to claim 1, characterized in that: Slide blocks (10409) are installed on both sides of the threaded cylinder (10407), and slide rails (10410) are installed on both sides of the interior of the pile body (101). The inner side of the slide block (10409) is slidably connected to one side of the slide rail (10410).

5. The foundation pile for water conservancy engineering construction as claimed in claim 1, characterized in that: A connecting plate (10404) is installed at the top and bottom ends of the first inclined block (10403), a spring (10405) is installed at one end of the connecting plate (10404), and one end of the spring (10405) is fixedly connected to the inner side of the pile body (101).

6. The water conservancy engineering construction pile according to claim 1, characterized in that: The adjustment mechanism (103) comprises a sleeve (10301), the bottom end of the sleeve (10301) is fixedly connected to the top end of the pile body (101), the inner side of the sleeve (10301) is rotatably connected to a rotating shaft (10302), and the bottom end of the rotating shaft (10302) is fixedly connected to the top end of the threaded rod (10408).

7. The foundation pile for water conservancy engineering construction as claimed in claim 6, characterized in that: A hexagonal prism (10303) is installed on the top of the rotating shaft (10302).