Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

732results about How to "Improve the anchoring effect" patented technology

Artificial valve prosthesis with valve leaflet clamping device

The invention relates to artificial valve prosthesis with a valve leaflet clamping device. The manual valve prosthesis comprises a bracket and an artificial valve, wherein the bracket comprises an auxiliary support clamping section and a valve sewing section; the artificial valve is fixedly connected to the valve sewing section; the auxiliary support clamping section is composed of a support bracket, a valve leaflet clamping device and an upper connection fixing section; the leaflet clamping device, the support bracket and the upper connection fixing section are integrally cut; a lower connection fixing section matched with the upper connection fixing section is arranged on the valve sewing section; the bracket is embedded and connected with the lower connection fixing section into a whole through the upper connection fixing section; one part of the valve leaflet clamping device is overlapped with the valve sewing section; the overlapped part is tightly attached to the outer surface of the valve sewing section in a natural state; a bump which protrudes outwards along the radial direction is arranged on a skeleton structure of the valve sewing section in the overlapped region; and a bending section which bends towards the axis direction of the bracket along the radial direction of the bracket is arranged on the valve leaflet clamping device or the support bracket or the upper connection fixing section.
Owner:NINGBO JENSCARE BIOTECHNOLOGY CO LTD

Pre-tensioning prestressed composite beam structural system and construction method thereof

The invention relates to a pre-tensioning prestressed composite beam structural system and a construction method of the pre-tensioning prestressed composite beam structural system. Lower longitudinal reinforcements are bound and lapped on lower longitudinal prestress wires in composite frame beam prefabricated components; the lower longitudinal reinforcements are inserted into frame pillars; second pre-buried steel plates are buried in the lower end portions of the composite frame beam prefabricated components; lower portion longitudinal prestress wires are buried in the composite frame beam prefabricated components; secondary beam longitudinal reinforcements are lapped and bound on the lower portion longitudinal prestress wires; the second pre-buried steel plates are welded with the secondary beam longitudinal reinforcements; first pre-buried steel plates opposite to the second pre-buried steel plates are arranged on the composite frame beam prefabricated components; pitch point steel plates are respectively welded on the first pre-buried steel plates and the second pre-buried steel plates; and the pitch point steel plates are connected through bolts, which enables the composite frame beam prefabricated components to connect with composite secondary beam prefabricated components. Wires and longitudinal reinforcements are lapped to use in the pre-tensioning prestressed composite beam structural system, and therefore the connecting mode of the pre-tensioning prestressed composite beam structural system is scientific and reasonable, and quality is safe and reliable.
Owner:HUA HUI ENGINEERING DESIGN GROUP CO LTD

Tension-compression coupled yielding energy-absorbing grouting anchor rod for large deformation of surrounding rock and working method thereof

ActiveCN109723480AStrengthen the anchoring effectReduce stress concentrationAnchoring boltsTension compressionEngineering
The invention discloses a tension-compression coupled yielding energy-absorbing grouting anchor rod for large deformation of a surrounding rock and a working method thereof. The tension-compression coupled yielding energy-absorbing grouting anchor rod comprise a hollow grouting anchor rod, an anchor rod locking device, a plurality of yielding grouting devices and an energy-absorbing anchor head, wherein a protection sleeve is arranged on a rod body of the hollow grouting anchor rod, a plurality of first grouting holes are formed in the rod body, and the first grouting holes penetrate through the protection sleeve and are communicated with a drilling hole; the multiple yielding grouting devices sleeve the rod body of the hollow grouting anchor rod at intervals, the surfaces of the yieldinggrouting devices are provided with second grouting holes, the energy-absorbing anchor head is fixed to the end of the hollow grouting anchor rod, and the anchor rod locking device is arranged at the free end of the hollow grouting anchor rod. By means of the yielding grouting devices, the real-time reinforcement support at the initial stage of deformation of the surrounding rock is achieved, the step-by-step automatic yielding effect is also played, the large supporting resistance is provided for the anchor rod body through the energy-absorbing anchor head, and the technical problems of anchorrod failure and insufficient grouting caused by high stress and large deformation of the surrounding rock are solved.
Owner:SHANDONG UNIV OF SCI & TECH

Bond type anchorage and anchoring method for anchoring fibre reinforced plastic reinforcement or bracing cable

The present invention relates to an adhesive anchoring unit and an anchoring method for anchoring fiber reinforcement plastic bar or cable, an end cover is arranged at one end of the anchoring unit and a sleeve with a locating hole is arranged at the other end of the anchoring unit. An internal cone chamber is arranged in the sleeve, and a nut is arranged surrounding the sleeve provided with a mortar filling hole and a ventilation hole. The fiber reinforcement plastic bar or cable passes through the locating hole and one end in the internal cone chamber was cut into two halves, which are inserted with a wedge to become a wedge form. A starting section of the half of one end of the bar or cable is coated with a retaining ring and the section passing through the locating hole is coated with a thin wall aluminum sleeve tube and active powder concrete is filled in the internal cone chamber of the sleeve. The method is described as follows: after the bar or cable shaft passes through the sleeve of the anchoring unit, a pretension is required on the sleeve, and the active powder concrete is added into the sleeve. The present invention improves anchoring performances of the adhesive media and the FRP bar, therefore, the anchoring length is reduced, the structure is simple, the use is convenient, the present invention is safe and reliable, the cost is low and the PRC manufacturing and maintenance is easy.
Owner:HUNAN UNIV

Multi-level back-grasp-type hollow anchor rod and construction method thereof

The invention discloses a multi-level back-grasp-type hollow anchor rod. The multi-level back-grasp-type hollow anchor rod comprises an anchoring rod with a grouting passage inside, an anchor head is fixed at the lower end of the anchoring rod, a plurality of back-grasp buckles are fixed on the anchoring rod, a grout outlet is formed in the anchor head, and the parts, at the upper side of the back-grasp buckles, of the anchoring rod and the parts, at the lower side of the back-grasp buckles, of the anchoring rod are provided with grout outlets and air return holes respectively, and the grout outlets and the air return holes are communicated with the grouting passage. Compared with the construction method of a hard rock body and a soil body, the construction method of the multi-level back-grasp-type hollow anchor rod comprises the steps of (a) preparation of equipment, (b) measurement and distribution of holes, (c) drilling, (d) hole cleaning and detection, (e) inserting of the anchor rod, (f) installation of a grout stop plug, (g) screwing of nuts and (h) grouting, and the anchor rod is directly inserted through the anchor head according to the construction method of a soft soil body, sand and water. The multi-level back-grasp-type hollow anchor rod and the construction method of the multi-level back-grasp-type hollow anchor rod increase the contact area and anchoring force between the anchor rod and the hole wall and prevent the anchor rod from falling out and injuring people. A uniform cement mortar layer can be formed around the anchor rod through the grout outlets and the air return holes, the damage of corrosion is avoided, and the purpose of long-time supporting is achieved.
Owner:SHANDONG JIAOTONG UNIV

Coordinated-deformation energy-absorption anchor rod suitable for mining high-stress large-deformation rock mass

The invention discloses a coordinated-deformation energy-absorption anchor rod suitable for mining a high-stress large-deformation rock mass. The rod body of the anchor rod mainly comprises an elongated anchoring section straight rod body (1) and an energy-absorption section bending rod body (2), wherein one end, close to the energy-absorption section bending rod body, of the rod body is provided with a threaded section (5); a fastening nut (4) is screwed on the threaded section (5); and a steel pallet (3) is sleeved between the fastening nut (4) on the threaded section (5) and the energy-absorption section bending rod body. The anchor rod is mainly characterized in that: a wavelike bending energy-absorption section in a specific length and a specific shape is mechanized on a long straight threaded steel rod body in a heat treatment mode; the energy-adsorption section restrictively allows a wall rock to deform properly and simultaneously absorb the deformation energy of the rock mass until reaching total allowable deformation quantity meeting a design requirement. In the process, the supporting force of the anchor rod is increased gradually; and finally, after the bending section is completely straightened and a yielding effect controlled by a high-stress roadway ground pressure is achieved, the anchor rod becomes a high-strength rigid resin anchor rod for providing greater supporting force for a supported wall rock mass.
Owner:CENT SOUTH UNIV

Construction method of prestressed anchor cable

ActiveCN103147440AQuality assuranceGuaranteed anti-slurry effectBulkheads/pilesPre stressAdhesive
The invention discloses a construction method of a prestressed anchor cable, which comprises the steps of drilling anchor cable holes, fabricating the anchor cable, mounting the anchor cable, erecting an anchor pier, injecting slurry in the anchor cable holes and tensioning the anchor cable according to a design requirement, wherein in the step of fabricating the anchor cable, an inner anchoring section is fabricated into a ripple shape by wire bunching rings and isolating frames that are alternately mounted on steel strands at intervals; a tensioning section is fabricated into a straight-line shape by the isolating frames mounted on the steel strands at intervals; sleeves are mounted on the steel strands of the tensioning section in a sleeving manner; the lower end parts of the sleeves, which are located at a slurry stopping ring, are sealed by structural adhesives; in the step of injecting the slurry in the anchor cable holes, the slurry is injected in the tensioning section anchor cable hole by a tensioning section slurry injection pipe; after the sand slurry is solidified, the slurry is injected in the inner anchoring section anchor cable hole by an inner anchoring section slurry injection pipe; and after the slurry injection of the inner anchoring section is accomplished, the step of tensioning the anchor cable is conducted. The construction method has the advantages that the tensioning section accomplishing the slurry injection serves as the slurry stopping ring for the slurry injection of the inner anchoring section, and a slurry stopping effect can be ensured under any rock mass conditions, so that the quality of the whole anchor cable is ensured.
Owner:YELLOW RIVER ENG CONSULTING

Carbon beaverboard anchorage

The invention relates to an anchorage device, in particular to a carbon fiber plate anchorage device used in civil engineering and building construction. The anchorage device consists of an anchor plate and a clamping piece; the anchor plate is a whole part and is internally provided with a wedged-shape through hole, the clamping piece is a two-piece type wedge block, the clamping piece is wedged into the anchor plate for tightly clamping the carbon fiber plate, then the wedge block is in close fit with the wedged-shape through hole in the anchor plate; the anchor plate is of a cylinder with rectangular or square or elliptic or circular cross section, the anchor plate is internally provided with the wedged-shape through hole with the rectangular or square or elliptic or circular cross section and tapering longitudinal section, and the folding contour formed after the clamping piece is wedged into the anchor plate for tightly clamping the carbon fiber plate is the same as that of the wedged-shape through hole with the rectangular or square or elliptic or circular cross section and tapering longitudinal section in the anchor plate; the clamping face of the clamping piece has a layer of a contact reinforcing material of the carbon fiber plate; and the contact surface of the clamping piece and the anchor plate is coated with lubricating oil or lubricating grease. The anchorage device has the advantages of reliable anchoring property, simple and compact structure, convenient manufacture, construction and operation, high efficiency and various shapes, and the anchorage device can meet the requirement of different construction environments.
Owner:LIUZHOU OVM MASCH CO LTD

Long rail laying and welding construction technology under conditions of large temperature difference and strong wind and sand

The invention discloses a long steel rail laying and welding construction process under the conditions of large temperature differences and strong sandstorms. The process comprises the following steps: carrying out track panel nail interlocking construction: nail interlocking construction is continuously carried out on a plurality of track panels used for construction by adopting track panel nailinterlocking lines, wherein the track panel comprises a plurality of sleepers and two tool rails arranged on the sleepers; 2. carrying out track panel lifting; 3. carrying out track panel laying construction; 4. carrying out long steel rail laying construction: the construction process comprises the two steps of displacing long steel rails and replacing and laying the tool rails in the laid trackpanels segment by segment by adopting the long steel rails; 5. carrying out plastic gas pressure welding on the two adjacent laid long steel rails by utilizing a dustproof incubator; and 6. carrying out stress dispersion and locking construction. The long steel rail laying and welding construction process provided by the invention is reasonable in design, simple in construction steps, convenient in realization, short in construction period and high in construction quality, and can be used for solving the problems of long construction period, low construction efficiency, poor construction effect and difficultly controlled welding quality and the like existing in the long steel rail laying construction under the conditions of large temperature differences and strong sandstorms.
Owner:THE FOURTH ENG CO LTD OF CHINA RAILWAYNO 20 BUREAU GRP +1

Side slope self-drainage electroosmosis anchor rod and construction method thereof

The invention discloses a side slope self-drainage electroosmosis anchor rod and a construction method thereof, and belongs to the technical field of rock-soil anchoring. The self-drainage electroosmosis anchor rod comprises two electric geotechnical bags, anchors, base plates and a siphon. Hollow tubes are sleeved with the electric geotechnical bags to extend to the bottoms, sleeve valves are fastened to reserved holes in the electric geotechnical bags, and the electric geotechnical bags are strapped to the hollow tubes externally through plastic clamps on the left sides and the right sides of bags. Slurry is solidified and anchored in a stable side slope, and the front sections of the electric geotechnical bags are anchored on the base plates by the anchors. A moisture inductive control switch is buried in soil of the slope surface, a solar battery is disposed outside the slope, and a positive pole, the moisture inductive control switch, the solar battery and a negative pole are sequentially connected in series through wires. A water suction tube is inserted into the hollow tube of the negative pole and is connected with a balance water discharge device on the slope surface through a connection elbow and a water discharge tube. A water inlet of the water suction tube is the same as a water outlet of the balance water discharge device in elevation. The side slope self-drainage electroosmosis anchor is ingenious in structure, has functions of anchoring, water discharging and solidification acceleration and is high in automation degree, and the construction method is simple and convenient.
Owner:LANZHOU UNIVERSITY OF TECHNOLOGY

Recyclable expansion anchor rod and construction method thereof

The invention relates to a recyclable expansion anchor rod and a construction method thereof. The recyclable expansion anchor rod comprises an anchor head, a rod body, a protecting bag and a rod body protecting tube; the anchor head is composed of a screw, a herringbone expanding head, a spiral steel wire, a steel wire protecting tube and an anchoring piece; the herringbone expanding head is screwed in the screw; the spiral steel wire penetrates the herringbone expanding head to extend into the steel wire protecting tube; the steel wire protecting tube sleeves the screw; the anchoring piece is mounted at one end of the rod body; the rod body is composed of a plurality of equidistantly arranged steel strands, steel strand position fixing parts and steel strand tensioning parts, and the steel strands are respectively fixed on the anchoring piece, the steel strand position fixing parts and the steel strand tensioning parts; the protecting bag is arranged outside the anchor head; the rod body protecting tube sleeves the rod body and are in butt joint with the protecting bag. The recyclable expansion anchor rod and the construction method thereof have the advantages that simpleness in structure, convenience in mounting, repeated use and low cost are achieved and the like.
Owner:HUA HUI ENGINEERING DESIGN GROUP CO LTD

Self-drilling differential grouting combined anchor rod and method for anchoring same

The invention discloses a self-drilling differential grouting combined anchor rod and a method for anchoring the same. The self-drilling differential grouting combined anchor rod comprises a drill bit, a grouting pipe, a spindle, an anchor head mechanism and an anchor tail mechanism. The anchor head mechanism comprises a fixed ring, a slip ring, a limit pipe and a plurality of pairs of driven connecting rods and driving connecting rods. The anchor head mechanism can be matched with fracturing grouting, so that the stability of inner anchor ends of the self-drilling differential grouting combined anchor rod can be guaranteed. The anchor tail mechanism comprises an anchor disc, a connecting cap, a spring and a nut; the grouting pipe and the spindle can deform in a coordinated manner by the aid of the connecting cap, joint bearing effects can be realized by the grouting pipe and the spindle, and the self-drilling differential grouting combined anchor rod can be timely in driving support states by the aid of the spring and can be in the driving support states for a long term. The self-drilling differential grouting combined anchor rod has the advantages that drilling, inner anchor end reaming and fracturing grouting can be carried out on weak broken surrounding rock by the aid of the self-drilling differential grouting combined anchor rod, and permeation grouting can be carried out on remaining sections by the aid of the self-drilling differential grouting combined anchor rod; the surrounding rock in small ranges around the grouting pipe can be anchored by the grouting pipe in a full-length anchoring mode; squeezing reinforcing effects can be realized by the spindle for the surrounding rock in large ranges including anchoring regions of the grouting pipe, the anchoring regions of the grouting pipe and anchoring regions of the spindle act with one another, the synergistic bearing effects can be realized by the grouting pipe and the spindle, and accordingly support effects can be improved.
Owner:CHINA UNIV OF MINING & TECH

Connecting structure for assembly type concrete shear wall edge member

The invention discloses a connecting structure for an assembly type concrete shear wall edge member. vertical connecting reinforcing steel bar, which can be provided with an upset head, is reserved through a hole reserved in a large-diameter metal bellows, and is sleeved with a continuous spiral stirrup; then the vertical connecting reinforcing steel bar and the continuous spiral stirrup are commonly inserted into the large-diameter metal bellows; and fine aggregate concrete (or a grounding material) is poured into the metal bellows, so that the reliable connection of the edge member is realized. Due to reliable anchoring of the vertical connecting reinforcing steel bar, the optimization of the diameter, the quantity and the plane arrangement of the vertical connecting reinforcing steel bar, and the increase of the wet joint area on a splicing surface, full exertion of the bearing capacity of the shear wall is ensured; and multiple effective restrain for the subsequentlly-poured fine aggregate concrete (or the grouting material) is formed by the shear wall stirrup, a horizontal tie bar, the metal bellows and the continuous circular spiral stirrup, and thus the integral performance of the part is remarkably improved. According to the connecting method for the edge member, which is provided by the invention, the stress continuousness of the vertical steel reinforcing bar is ensured, the deformaility and the ductility performance of the vertical steel reinforcing bar are remarkably improved, and the shock resistance of the assembly type concrete shear wall is improved. Meanwhile, the method is simple in manufacturing process and facilitates the practice and application.
Owner:SOUTHEAST UNIV

Segmented anchoring and grouting anchor rod device capable of achieving automatic clamping and anchoring method thereof

ActiveCN105257328AStrong controllabilityEnhance self-stable bearing capacityAnchoring boltsEngineeringRock bolt
The invention provides a segmented anchoring and grouting anchor rod device capable of achieving automatic clamping and an anchoring method thereof. According to the device, a grouting anchor rod, a first connecting piece, a cylinder, a second connecting piece and a resin anchor rod are sequentially connected into a rod body through threads; a piston and a piston rod are arranged in the cylinder and are fixedly connected; the end, connected with the second connecting piece, of the cylinder is provided with an annular groove, a plurality of supports are arranged at the end of the cylinder, one end of a movable connection rod is connected with the end of the piston rod, the other end of the movable connection rod penetrates through the annular groove of the cylinder and is hinged to a clamping wing, and the end of the clamping wing is hinged to the supports. According to the device and the method, resin cartridge anchoring and grouting anchoring are fully used, and the clamping wing is added and deeply embedded into the anchor hole wall, so that anchoring force is greatly enhanced. The device and method are suitable for unstable roadways with various mine soft rock crushing, can greatly improve anchoring capacity of a whole anchor rod, effectively improve self-stability of a roadway surrounding rock body, and have the advantages of being good in end anchoring effect, high in anchoring efficiency, convenient to install and the like.
Owner:HUNAN UNIV OF SCI & TECH

Multi-layer telescopic multi-point displacement meter anchor head for water-rich soft stratum

The invention relates to a multi-layer telescopic multi-point displacement meter anchor head for water-rich soft stratum. A plurality of in-hole measuring point anchor head units are arranged in the longitudinal direction one after another. Each in-hole measuring point anchor head unit is designed to be a surface contact type and comprises a main anchor head and an anchor head protective cover, wherein each main anchor head is connected with the corresponding anchor head protective cover by a positioning hole. Each main anchor head comprises an indium steel wire, a fixed pulley device, an external force conversion device and an anchor claw execution mechanism; each indium steel wire and each fixed pulley device receive external force; a contraction action is realized by each anchor claw execution mechanism through the conversion and the drive of each external force conversion device; each external force conversion device comprises a tension spring device and a plurality of special springs; each anchor claw execution mechanism comprises a plurality of triangular blade-type anchor claws; and the number of the special springs is the same as that of the anchor claws. The multi-layer telescopic multi-point displacement meter anchor head has the advantages of good anchoring effect, wide measuring range, simple structure, convenience in construction, high anti-sliding capacity, reliable performance and the like.
Owner:TONGJI UNIV

Manual hole digging support pile prestress anchor cable anchoring structure and construction method of anchoring structure

The invention relates to a manual hole digging support pile prestress anchor cable anchoring structure and a construction method of the anchoring structure. The structure comprises a circle of support piles, connecting beams and a prestress anchor cable, wherein the support piles are arranged along the inner side of a foundation pit, the connecting beams are arranged on the pile tops of the adjacent support piles, the prestress anchor cable is divided into an anchor head and an anchoring body, the support piles are respectively provided with anchor holes at the same height in the foundation pit, the anchoring body passes through the anchor holes, the outer end of the anchoring body is fixed by the anchor head, the inner end of the anchoring body is anchored into a rock soil body, and the anchor head is positioned at the outer side of the support pile. The anchoring structure and the construction method have the advantages that the technical problems that the erection of profile steel beams at the waist parts of the support piles are needed by the traditional support pile anchor cable for integral anchoring, and the construction process is relatively complicated are solved; and the technical problems that during the early-stage construction, all support piles cannot be ensured to be on the same vertical surface, the support pile prestress anchor cable of partial belt type steel beams cannot realize the effect, the great waste is caused, and in addition, the manufacture cost is higher are solved.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD

Rock slope anchoring calculation method based on safety and economy multi-objective optimization

The invention discloses a rock slope anchoring calculation method based on safety and economy multi-objective optimization. The rock slope anchoring calculation method comprises the following steps: step 1, drawing up calculation parameters of a rock slope; step 2, carrying out stress analysis on the rock slope; step 3, establishing a dual-objective function of rock slope safety and economy; step4, establishing a rock slope safety and economy multi-objective optimization nonlinear mathematical programming model which uses the double-objective function and combines rock balance equation constraint conditions, structural surface yield conditions and anchor rod additional constraint conditions at the same time; step 5, constructing an evaluation function by using a weighted sum method, and converting the nonlinear mathematical programming model for solving the multi-objective optimization into a nonlinear mathematical programming model for solving the single-objective optimization; and solving the model by using a penalty function method of nonlinear programming to obtain a safety coefficient and an anchoring cost which meet the optimal safety and economy at the same time, and an optimal anchoring angle. According to the method, the unification of economy and safety is achieved.
Owner:KUNMING UNIV OF SCI & TECH

Short-chain branch cross-linked water-retaining solvent layer controlled-release type polycarboxylic acid slump retaining agent and preparation method thereof

The invention provides a short-chain branch cross-linked water-retaining solvent layer controlled-release type polycarboxylic acid slump retaining agent and a preparation method thereof. The polycarboxylic acid slump retaining agent contains the following components in parts by weight except water: 320-325 parts of polyether macromonomers, 3.0-4.5 parts of sodium hypophosphite, 2.0-6.0 parts of phosphate, 0.5-3.5 parts of hydrogen peroxide, 1.0-2.0 parts of ammonium persulfate, 101.7-124.8 parts of an initiator, 115-160 parts of a small monomer solution and 10-15 parts of liquor of industrialsodium. The method comprises the following steps: 1, performing primary charging; 2, performing secondary charging; and 3, preparing the finished product. According to the method, a reducing agent containing hydroxyl, amido and phosphate, a carbodiimide cross-linking agent, phosphate and other components are adopted, anchoring ability and moisture conditions of the short solvent layer are enhanced, a lubricating effect and a hydrophilic state of cement-based binding material granules are improved, cohesiveness of a cement-based binding material mixture is increased, and the segregation and weeping probability of the mixture is reduced.
Owner:HUBEI UNIV OF TECH

Amphoteric early-strength polycarboxylate superplasticizer mother solution for C30 concrete

The invention provides an amphoteric early-strength polycarboxylate superplasticizer mother solution for C30 concrete. The polycarboxylate superplasticizer mother solution comprises, by weight, 330-339 parts of polyether macromonomers with the molecular weight being 4000, 22-25 parts of acrylic acid, 11-18 parts of quaternary ammonium and quaternary phosphorus cation micromonomers, 2-5 parts of 27.5% industrial-grade hydrogen peroxide, 3-6 parts of unsaturated sulfonate, 2-4 parts of phosphate functional monomers, 4-8 parts of amide micromonomers, 0.4-1 part of reducing agent, 6-12 parts of caustic soda liquid, 0.4-0.8 part of chain transfer agent and the balance water, wherein the total weight of the components is 1000 parts. The mass fraction of the polycarboxylate superplasticizer mother solution is 40%, and the acid-ether ratio of the mother solution is controlled to be 3.7-4.1. Compared with relatively-low-molecular-weight polyether macromonomers such as polyether macromonomers with the molecular weight being 2400 used by existing common polycarboxylate superplasticizers, the polyether macromonomers with the molecular weight being 4000 and used by the polycarboxylate superplasticizer mother solution have cost advantages and can meet the production requirements of low cost and high effectiveness.
Owner:HUBEI UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products