Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

232results about How to "Simple construction method" patented technology

Construction method of cable-stayed-continuous cooperative system composite beam bridge

The invention relates to the technical field of bridge construction, and provides a construction method of a cable-stayed-continuous cooperative system composite beam bridge, which does not need to arrange a large batch of prestressed corrugated pipes and steel beams to ensure the use performance of a bridge deck slab, fully utilizes the structural characteristics of the cable-stayed-continuous cooperative system composite beam bridge, and improves the construction efficiency of the cable-stayed-continuous cooperative system composite beam bridge. By changing the overlapping sequence of the continuous composite beam bridge deck slabs, it is guaranteed that the bridge deck slabs in the hogging moment area of the continuous composite beam do not generate tensile stress, the bridge deck slabs in the sagging moment area generate pressure stress reserve, and by increasing the tension stay cable force, the continuous composite beam moves upwards close to a side main beam of the cable-stayed bridge and moves downwards close to a side span side main beam; the bridge deck slab generates compressive stress, the steel main beam generates tensile stress, the compressive property of concrete materials and the tensile property of steel are fully played, the material utilization rate is increased, the compressive pre-stress of the bridge deck slab is completed through internal force distribution of the composite beam, the construction method is simple and operable, the structural stress is clear, and the reasonability and safety of the structural stress are guaranteed.
Owner:HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD

Anti-freezing and anti-seepage coating based on fluorosilane modified epoxy resin and preparation method of anti-freezing and anti-seepage coating

The invention belongs to the technical field of concrete protection, and particularly relates to an anti-freezing and anti-seepage coating based on fluorosilane modified epoxy resin and a preparation method of the anti-freezing and anti-seepage coating. The anti-freezing and anti-seepage coating based on the fluorosilane modified epoxy resin is prepared from 30 to 40 parts of fluorosilane modified epoxy resin, 30 to 60 parts of a curing agent, 0.5 to 1.5 parts of a curing accelerator and 1 to 2.5 parts of a wetting agent, wherein the fluorosilane modified epoxy resin is synthesized by grafting reaction of fluoroalkyl, silane substances and an epoxy compound; the epoxy compound is composed of bisphenol A epoxy resin and polyfunctional glycidyl ether resin. The curing agent comprises a polyamine curing agent and a polysulfide rubber curing agent. The anti-freezing and anti-seepage coating based on the fluorosilane modified epoxy resin can form a hydrophobic low-surface-energy structure on the surface of concrete, and corrosion ions and an aqueous solution are inhibited from permeating into the concrete; meanwhile, the coating based on the fluorosilane modified resin has good permeability and water vapor permeability, the coating is endowed with excellent freeze-thaw resistance, and the service life of concrete engineering is effectively prolonged.
Owner:BEIJING ACAD OF BUILDING ENG +1

Radiation cooling coating and preparation method thereof

The invention relates to the technical field of high polymer materials, and provides a radiation refrigeration coating and a preparation method thereof.The radiation refrigeration coating is prepared from, by weight, 5-20 parts of heat reflection filler, 5-20 parts of heat radiation filler, 5-20 parts of common filler, 0.1-0.5 part of a thickening agent, 10-25 parts of aerogel paste, 0.25-0.75 part of a water repellent agent, 0.2-0.5 part of a defoaming agent, 0.3-1.5 parts of a dispersing agent, 0.1-0.3 part of a pH value regulator and 0.3-1 part of a sterilizing, anti-corrosion and anti-mildew agent, 0.1-0.5 part of a wetting agent, 25-40 parts of an acrylic emulsion, 1-2 parts of an anti-freezing agent, 2-4 parts of a coalescing agent and 15-30 parts of water; the functional coating with both high reflection and radiation refrigeration, provided by the invention, is remarkable in reflective insulation / radiation refrigeration effect, non-toxic, odorless, pollution-free and convenient to construct, and is an ideal decorative material.
Owner:SHANGHAI ZHONGNAN BUILDING MATERIAL CO

Canal channel construction area excavation quality three-dimensional visual control system

The invention discloses a canal channel construction area excavation quality three-dimensional visualization control system, and belongs to the technical field of constructional engineering. The system comprises a three-dimensional scanning device, a data processing device, a three-dimensional visualization display module, a quality comparison detection module, a system control decision module, a remote communication monitoring module and a historical data storage module. The data are compared with a standard three-dimensional model generated by a design drawing, a deviation area is accurately detected, the construction precision and quality are improved, it is ensured that construction always meets design requirements, real-time data of a construction site are converted into the three-dimensional model, constructors are helped to rapidly recognize problems and adjust the problems in time, and the construction efficiency is improved. According to the invention, automatic correction suggestions are provided for constructors, the construction method, equipment selection and resource allocation are optimized, the construction efficiency is greatly improved, and the remote and high-efficiency construction requirements can be met through remote communication and remote control functions.
Owner:CCCC SHANGHAI DREDGING CO LTD

Novel reinforced concrete prefabricated pipe gallery construction method

The invention discloses a novel reinforced concrete prefabricated pipe gallery construction method, relates to the technical field of industrial and civil structure reinforced concrete prefabricated pipe galleries, and solves the technical problems of short construction period and low cost. The method comprises the steps that firstly, concrete beams and columns of the reinforced concrete pipe gallery are split according to a construction drawing and then prefabricated in a prefabrication yard; 2, after construction of the cup foundation is completed, the corresponding prefabricated columns and prefabricated beams are transported to the side of the foundation, the prefabricated columns are hoisted and fixed in the cup foundation, temporary inclined struts are installed, then the prefabricated beams are installed and fixed layer by layer through an elevator or a crank arm vehicle, and formwork clamps are installed at the beam column connecting joints; thirdly, after completion, high-strength-grade non-shrinkage concrete is poured, and therefore the transverse frame without weakening of the integrity is formed; the construction method is simple and easy to operate, and the requirement for the construction technology is not high.
Owner:EAST CHINA ENGINEERING SCIENCE AND TECHNOLOGY CO LTD

Piezoelectric film-based point sensor and manufacturing, calibration and construction method thereof

PendingCN119063780Ahigh sensitivityMany monitoring parametersMeasurement devicesAccelerometerData acquisition
The invention discloses a piezoelectric film-based point sensor and a manufacturing, calibration and construction method thereof, and the point sensor comprises a sensor series which comprises a piezoelectric steel bar stress meter, a piezoelectric anchor rod dynamometer, a piezoelectric soil pressure meter, a piezoelectric bidirectional displacement crack meter and a piezoelectric three-way accelerometer; the piezoelectric steel bar stress meter, the piezoelectric anchor rod dynamometer, the piezoelectric soil pressure meter, the piezoelectric bidirectional displacement crack meter and the piezoelectric three-way accelerometer are each internally provided with a piezoelectric film diaphragm body and a suspended temperature compensation piezoelectric film diaphragm. Based on a sensing technology with unified sensing materials, all sensor cores in the series are piezoelectric film sheets, strain is sensed through an impedance strain effect, vibration is sensed through a piezoelectric effect, data acquisition and analysis are carried out in cooperation with a voltage signal comprehensive acquisition instrument, and the accuracy of data acquisition is improved. And parameters such as force, displacement and acceleration can be further converted through calibration, and the method has the advantages of high sensitivity, multiple monitoring parameters, simple manufacturing calibration and construction methods and the like.
Owner:SOUTHEAST UNIV

Cast-in-place box girder arc-shaped cantilever inclined web wing plate supporting structure and construction method thereof

The invention provides a cast-in-place box girder arc-shaped cantilever inclined web wing plate supporting structure and a construction method thereof. The supporting structure comprises a disc buckle supporting frame, an arc-shaped truss, a batten keel, a first horizontal connecting piece, a reinforcing piece and an arc-shaped formwork used for supporting a cast-in-place box girder arc-shaped cantilever inclined web wing plate. Straight parts at the bottoms of the arc-shaped trusses are installed on the top side of the disc buckle supporting frame, the multiple arc-shaped trusses are vertically arranged at intervals, every two adjacent arc-shaped trusses are detachably connected through a first horizontal connecting piece, one end of each reinforcing piece is fixedly connected to the corresponding first horizontal connecting piece, and the other end of each reinforcing piece is fixedly connected to the disc buckle supporting frame. The batten keels are arranged on the top sides of the semi-arc arch portions of the arc-shaped trusses at intervals, and the arc-shaped formworks are laid on the top sides of the batten keels. Compared with the prior art, the supporting structure adopts the supporting form that the arc-shaped truss is matched with the arc-shaped formwork, and the problems existing when a set-shaped steel formwork structure and a double-spliced steel pipe keel are matched with a wood formwork structure are solved.
Owner:GUANGZHOU FIRST MUNICIPAL ENG CO LTD +1

Prefabricated reinforced concrete silo and construction method thereof

The invention relates to a prefabricated reinforced concrete silo and a construction method thereof.A silo body of the silo is provided with a plurality of silo layers formed by mutually assembling and connecting arc-shaped reinforced concrete prefabricated pieces, positioning steel bars are arranged on supports of the silo, and positioning through holes are formed in the reinforced concrete prefabricated pieces; positioning during assembly of the prefabricated pieces is achieved through the positioning steel bars and the positioning through holes which are matched with each other, positioning is simple, convenient and rapid, the bin body assembly efficiency can be effectively improved, the two adjacent barrel layers of the bin body are bonded and fixed through cement mortar, the two adjacent prefabricated pieces of the same barrel layer are matched through concave-convex spigots and locked through locking bolts, and the bin body assembly efficiency can be effectively improved. Every two upper and lower adjacent prefabricated pieces are connected in a sleeve grouting mode, the connecting strength of the prefabricated pieces can be effectively improved, and the structural stability of the silo is improved.
Owner:THE FOURTH OF CHINA CONSTR SEVENTH ENG +2

Fabricated track structure facilitating vibration reduction upgrading and construction method

The invention relates to a fabricated track structure facilitating vibration reduction upgrading and a construction method. According to the fabricated track structure convenient for vibration reduction upgrading, the prefabricated track plate is provided with a first supporting surface and an arrangement space, and the top surface of the base is provided with an embedded sleeve, so that a supporting adjusting piece or a special vibration reduction component can be detachably connected between the prefabricated track plate and the base through a fixing bolt; therefore, the replacement from the support adjusting piece to the special vibration reduction component can be realized, that is, common vibration reduction can be upgraded to special vibration reduction; and the corners are arranged through the prefabricated track plates, so that the second supporting surfaces of the prefabricated track plates are lower than the first supporting surfaces, and then the anti-vibration pads can be laid between the prefabricated track plates and the base after the supporting adjusting pieces are dismounted, namely common vibration reduction can be upgraded to high-level vibration reduction. According to the assembly type track structure facilitating vibration reduction and upgrading, conversion or upgrading from common vibration reduction to high-level vibration reduction and special vibration reduction can be achieved at the same time. And compared with the prior art, the replacement efficiency is high.
Owner:CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD

Rapid plugging device and plugging method used after collapse extraction

The invention discloses a rapid plugging device used after collapse lifting and a plugging method. The rapid plugging device comprises a plurality of frames which are connected with one another. Each single face of each single frame comprises an upper chord, a lower chord, vertical rods and inclined rods, the vertical rods connect the two ends of the upper chord and the two ends of the lower chord to form a frame-shaped structure, the inclined rods are obliquely connected into the frame-shaped structure, the four single faces serve as side faces and are perpendicularly welded to one another to form a cube structure, and iron gauzes are welded to the peripheries of the four side faces. The end parts of the upper and lower chord members are welded with female and male joints for transverse connection, and the top and bottom parts of the upper and lower chord members are provided with screw holes for vertical connection. According to the method, the water flow speed of the breach can be effectively reduced, and good construction conditions are provided for follow-up blocking and reinforcing of the burst embankment.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD

Quick-release mold and concrete tower tube segment

The utility model discloses a quick release mould and concrete tower tube segment, the quick release mould comprises a bottom mould, a plurality of joint bar sleeves and a plurality of connecting pieces, the connecting pieces, the joint bar sleeves and positioning holes are in one-to-one correspondence, each connecting piece comprises a first part and a second part, the first part extends upwards into the joint bar sleeves and is connected with the joint bar sleeves, and the second part extends upwards into the joint bar sleeves and is connected with the joint bar sleeves. The second part extends downwards into the corresponding positioning hole and is connected with the bottom die, at least one guide groove is formed in the peripheral surface of the connecting piece, the guide groove is located between the first part and the second part, and the guide groove is used for guiding damage when the die is disassembled, so that the first part and the second part are separated. The joint bar is connected with the bottom die through the joint bar sleeve and the connecting piece, the embedding precision and the pouring stability of the joint bar are effectively guaranteed, the connecting piece is self-guided to be broken at the position of the groove during die removal, and therefore the bottom die can be rapidly separated from the joint bar, die disassembly, die reassembly and repouring after pipe piece pouring are facilitated, and the production efficiency of pipe piece pouring is improved.
Owner:上海风领新能源有限公司

Partially cast-in-place post-closed type diaphragm wall structure and construction method thereof

PendingCN118932935AGuaranteed anti-seepage effectearly start timeEarth-fill damsRock-fill damsArchitectural engineeringHydraulic engineering
The invention discloses a partially cast-in-place post-closed type diaphragm wall structure and a construction method thereof, and belongs to the technical field of hydraulic engineering building construction.The partially cast-in-place post-closed type diaphragm wall structure is characterized in that a columnar concrete short wall is arranged over the interface of a deep covering layer foundation and a bedrock foundation, and diaphragm walls are arranged on the two sides; between every two adjacent diaphragm walls, holes are drilled in the columnar concrete short walls to form diaphragm wall staggered seams, dam body inner seepage-proofing bodies are correspondingly arranged above the two sections of diaphragm walls, and seepage-proofing body segmentation seams are correspondingly arranged above the diaphragm wall staggered seams. By wrapping plastic or low-strength concrete around the diaphragm wall right above the interface, rigid connection of the two sections of diaphragm walls is changed into flexible connection, and a space is reserved for settlement deformation of the diaphragm wall on a deep and thick covering layer foundation; therefore, the starting time of the construction operation of the diaphragm wall can be greatly advanced while the anti-seepage effect of the diaphragm wall is not influenced, and beneficial help is provided for optimizing the project progress arrangement.
Owner:HYDROPOWER WATER CONSERVANCY GUIHUA DESIGN ZONGYUAN +2

Deep foundation pit supporting structure

The utility model provides a deep foundation pit supporting structure, which relates to the technical field of foundation pit supporting and comprises an external Larsen steel sheet pile and a steel enclosing purlin positioned on the inner side of the Larsen steel sheet pile, and the inner side of the steel enclosing purlin is connected with a steel supporting piece through a steel cushion box; a plurality of layers of steel enclosing purlins are horizontally arranged, each layer of steel enclosing purlins is connected with a layer of steel supporting pieces, four sets of steel supporting pieces are arranged on each layer of steel enclosing purlins, and a set of steel supporting pieces is connected between the steel enclosing purlins on the inner sides of every two adjacent Larsen steel sheet piles. Each set of steel supporting pieces comprises at least two steel supporting pieces, each set of steel supporting pieces comprises a long support and a plurality of short supports, and the long supports and the short supports of each set of steel supporting pieces are arranged in parallel. The utility model has the beneficial effects of reasonable design, simple structure, safety and reliability, and can provide reliable support for different soil layers, improve the supporting effect and reduce the construction difficulty and cost.
Owner:THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD

Passive airtight window structure and construction method

The present invention relates to a passive airtight window structure and a construction method thereof, in which a waterproof vapor barrier film is adhered to an indoor side, a waterproof breathable film is adhered to an outdoor side, the waterproof vapor barrier film and the waterproof breathable film seal gaps among an auxiliary frame, a window frame and a window opening from indoor and outdoor sides, and an airtight layer is provided on the indoor side. The airtight layer protects the waterproof vapor-proof film and seals the gaps among the auxiliary frame, the window frame and the window from the indoor side again, the pre-pressing waterproof expansion sealing tape is arranged on the outdoor side and protects the waterproof vapor-proof film, and the gaps among the auxiliary frame, the window frame and the window are sealed from the outdoor side again. Double sealing is formed on the two sides of the window, so that the airtight performance of the airtight window is effectively improved, and the energy-saving effect of a building is improved.
Owner:THE CONSTR DECORATION OF CHINA CONSTR NO 7 ENG BUREAU

Ecological reservoir for water conservancy and hydropower engineering

The utility model provides an ecological reservoir for water conservancy and hydropower engineering, which comprises a reservoir body, and the reservoir body comprises a dry stone protection slope, a coarse sand layer, a natural sodium bentonite waterproof blanket and a plain soil layer which are sequentially arranged from top to bottom; a plurality of parallel water permeable pipes are laid below the bottom wall of the reservoir at intervals, each water permeable pipe is provided with a check valve at intervals, and the lower surface of each water permeable pipe is coated with non-woven geotechnical cloth. The stress on the bottom of the reservoir body is reduced by arranging the water permeable pipe below the reservoir body, and the crack resistance of the reservoir is comprehensively improved by combining with the arrangement of the expansion joints; the ecological reservoir takes the natural footstone as a slope protection, the bentonite waterproof blanket is waterproof, the construction method is simple, the anti-seepage effect is good, and the ecological reservoir is economical, practical, ecological and environment-friendly.
Owner:POWERCHINA BEIJING ENG CORP

Construction elevator anti-collision device

The invention discloses an anti-collision device of a construction elevator. The anti-collision device comprises a construction elevator door and a three-dimensional buffer device, the three-dimensional buffering device can synchronously ascend and descend along with the construction elevator door, when the construction elevator door is opened, the three-dimensional buffering device automatically moves upwards along with the construction elevator door without affecting entering and exiting of the construction elevator, when the construction elevator door is closed, the three-dimensional buffering device automatically moves downwards, and the three-dimensional protection effect is achieved through the adjustable three-dimensional device; the telescopic buffering device can maintain the safe distance between the trolley and the construction elevator door, safety accidents are avoided, the device adopts the buffering energy absorption technology of the spring, impact force can be effectively dispersed when the trolley collides, the elevator door is protected against damage, meanwhile, the construction method is simple, convenient and easy to implement, and the construction cost is reduced. Rapid installation can be achieved without greatly transforming an existing construction elevator, and powerful support is provided for construction safety management.
Owner:CSCEC TECH GRP EAST CHINA CO LTD +1

Perpendicularity control method for structural vertical main reinforcements in slip form construction

InactiveCN118933376Aprevent inversionSolve frequent adjustmentsForms/shuttering/falseworksBuilding reinforcementsClassical mechanicsRebar
The invention relates to the technical field of slip form construction, in particular to a method for controlling the perpendicularity of structural vertical main reinforcements in slip form construction, which comprises the following steps of: pre-burying supporting rods, and binding structural reinforcements; in the step S2, the sliding formwork system further comprises an automatic reset mechanism arranged on a cross beam of the door-shaped frame, the automatic reset mechanism comprises two positioning horizontal ribs fixed to the cross beam of the door-shaped frame and limiting ribs arranged on the positioning horizontal ribs, one positioning horizontal rib is arranged on the outer side of the outer side vertical main rib, and the other positioning horizontal rib is arranged on the outer side of the outer side vertical main rib; the other vertical rib is arranged on the inner side of the inner side vertical main rib; limiting ribs used for limiting the outer side vertical main ribs or the inner side vertical main ribs are further arranged on the positioning horizontal ribs. Pouring concrete layer by layer; the problem that the stability is poor due to the fact that the free height of the inner side vertical main reinforcement and the free height of the outer side vertical main reinforcement are too large is solved, the inner side vertical main reinforcement and the outer side vertical main reinforcement are kept in the vertical state all the time in slip-form construction, and a simple, rapid and effective construction method is provided for limiting of the vertical main reinforcement in slip-form construction.
Owner:CHINA MCC22 GROUP CORP LTD

A variable cross-section tunnel construction method

The present invention discloses a variable-section tunnel construction method, including: constructing a first section of the tunnel by a first tunnel boring machine; setting a first receiving well for receiving the first tunnel boring machine at the end position of the first section of the tunnel; in the first receiving well, replacing the first tunnel boring machine with a second tunnel boring machine, the construction section sizes of the first tunnel boring machine and the second tunnel boring machine are different; converting the first receiving well into a starting well of the second tunnel boring machine; constructing a second section of the tunnel by the second tunnel boring machine; setting a second receiving well for receiving the second tunnel boring machine at the end position of the second section of the tunnel. The functions of receiving and starting can be realized through the same working well, thereby achieving the purpose of reducing construction costs and improving construction efficiency. In addition, the construction of different tunnel sections can be realized, which can effectively reduce construction costs compared to traditional integrated switching construction equipment, and the construction method is simple and easy to operate.
Owner:CHINA RAILWAY CONSTR HEAVY IND +2

Cantilever handling frame for edge of precast beam of multi-layer industrial factory building

The utility model relates to a prefabricated beam edge overhanging operation frame for a multi-layer industrial factory building, which is mounted on an edge prefabricated main beam through mounting holes reserved in the edge prefabricated main beam and comprises a plurality of overhanging cross rods, lower supporting rods, fixing rods, vertical connecting rods, inclined supporting rods, protective vertical rods, protective cross rods and large walkway cross rods. The mounting holes are reserved in the edge precast beam, and the overhanging type handling frame can be mounted on the side face of the precast beam in a steel pipe overhanging mode, so that the defects in the prior art are overcome; particularly, the operation frame can be installed on the precast beam in advance before the precast beam is hoisted, and after the precast beam is hoisted to a floor, floor surface edge protection is immediately formed, so that the safety risk of follow-up high-altitude operation is avoided.
Owner:JIANGMEN HAILONG TECH CO LTD +1

Shield launching well rail supporting device and construction method

The invention discloses a shield launching well rail supporting device and a construction method, and relates to the technical field of shield construction, the shield launching well rail supporting device comprises a prefabricated concrete pier, and the prefabricated concrete pier is composed of a barrel body and concrete poured in the barrel body; the at least two groups of precast concrete piers are arranged side by side, the top of each group of precast concrete piers is connected with a first support, the side-by-side first supports are connected through second supports perpendicular to the first supports, and the second supports serve as sleepers of a horizontal transportation track. Concrete is poured in the barrel body to form the prefabricated concrete pier to replace I-shaped steel horse stool supporting leg laying rails, and the compressive strength and the stability are high; the waste oil drum can be recycled, and the construction cost is reduced; and the construction method is simple and convenient to operate.
Owner:POWERCHINA RAILWAY CONSTR +1

Multi-layer composite spherical tank heat insulation structure and construction method thereof

PendingCN119289267AImprove anti-corrosion functionImprove bonding functionVessel wallsContainer filling methodsThermal insulationInsulation system
The invention provides a multi-layer composite spherical tank heat insulation structure which comprises a plurality of felt-shaped heat insulation material layers and paste-shaped heat insulation material layers which are alternately arranged on a storage tank body and wrap the storage tank body. The felt-shaped heat insulation material layer and the paste-shaped heat insulation material layer are both aerogel coatings. Comprising strip-shaped heat insulation materials which are wound on the surfaces of felt-shaped heat insulation material layers in a transverse or longitudinal mode and used for fixing the first felt-shaped heat insulation material layer, the third felt-shaped heat insulation material layer, the fifth felt-shaped heat insulation material layer and the like. The netted heat insulation layer is used for fixing the second layer, the fourth layer, the sixth layer... the felt-shaped heat insulation material layer; and the outer protective layer structure plays a role in protecting the whole heat insulation structure. The aerogel felt and the aerogel coating are jointly applied to the storage tank heat insulation field for the first time, and compared with a traditional heat insulation material, the material has the obvious advantages of heat insulation, fire prevention, hydrophobicity and the like; the energy-saving effect of a heat insulation system can be improved, the service life can be prolonged, and the anti-corrosion function, the bonding function, the sealing function, the protection function and the like of a heat insulation structure can be improved.
Owner:CNCEC HUALU NEW MATERIALS CO LTD

Multifunctional double-row construction method pile supporting structure for waterworks and construction method of multifunctional double-row construction method pile supporting structure

The multifunctional double-row construction method pile supporting structure comprises front-row SMW construction method piles, rear-row SMW construction method piles, top beams and connecting beams, the rear-row SMW construction method piles are arranged on the rear sides of the front-row SMW construction method piles, and the pile tops of the front-row SMW construction method piles and the pile tops of the rear-row SMW construction method piles are connected through the top beams correspondingly; the front-row SMW construction method piles and the rear-row SMW construction method piles are connected through connecting beams, and after building construction is completed and a foundation pit is backfilled, pipelines are laid between the front-row SMW construction method piles and the rear-row SMW construction method piles. According to the multifunctional double-row construction method pile supporting structure for the waterworks, the H-shaped steel in the SMW construction method piles can be repeatedly used and is environmentally friendly and economical, the water stopping effect of an enclosure structure can be effectively improved, the integrality is better, the construction efficiency is improved, and meanwhile waste concrete is reduced; and after building construction is completed, the double-row construction method piles can be reused to serve as a pipeline supporting structure, the economical efficiency is improved, and meanwhile the construction method is more convenient.
Owner:SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD

Overhead line system tunnel embedded chute detection device

The utility model provides a catenary tunnel embedded chute detection device which comprises a moving plate, moving wheels are arranged at the four corners of the bottom of the moving plate, an adjusting platform is arranged on the moving plate, a detection plate is installed above the adjusting platform, two sets of laser devices are installed on the detection plate in a sliding mode, and the two sets of laser devices are arranged on the adjusting platform. A graduated scale is arranged on the side face of the detection plate, a reserved hole used for containing a gradienter is formed in the upper surface of the detection plate, and an adjusting assembly used for adjusting the detection plate to be horizontal is arranged between the adjusting platform and the movable plate. The device is simple in structure and reasonable in design, can effectively measure the width of the pre-embedded chute, greatly improves the detection efficiency of the overhead line system reserved tunnel chute, simplifies the on-site detection and adjustment process, and enables the detection and adjustment process to be accurate, simple and efficient.
Owner:CHINA RAILWAY CONSTR ELECTRIFICATION BUREAU GRP SOUTH ENG CO LTD

A bonding anchoring type pre-anchoring pressure-releasing hollow anchor rod and anchoring method

A bonding anchor type pre-anchored pressure-yielding hollow anchor and anchoring method, which still has a good supporting effect under the condition of large deformation of the surrounding rock to ensure the stability of the tunnel, meet the problem of large deformation of the tunnel surrounding rock, and realize the rapid installation of the anchor, solve the technical problem of mixing and anchoring of the bonding anchor type pre-anchored hollow anchor. A constant resistance pressure-yielding mechanism is arranged at the rear of the hollow anchor rod body, and the constant resistance pressure-yielding mechanism includes an outer sleeve, a pressure-yielding cylinder and a pressure-yielding nut. The pressure-yielding cylinder is sleeved in the outer sleeve, and its distal and proximal ends have guide sections that slide with the annular inner wall of the outer sleeve, and the deformation section formed by radial inward contraction is between the distal and proximal guide sections. The distal end of the outer sleeve is a limit ring formed by radial inward contraction, and the rear of the hollow anchor rod body passes through the limit ring and the inner cavity of the pressure-yielding cylinder, and the pressure-yielding nut is threadedly connected with the hollow anchor rod body and acts on the inner wall of the transition section between the proximal guide section and the deformation section, and the end face of the distal guide section acts on the limit ring. The backing plate is sleeved on the outer sleeve, the nut is threadedly connected with the external thread section at the rear of the outer sleeve, and the front end surface of the nut acts on the backing plate surface.
Owner:CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD +1

Adjustable corrugated steel web positioning device

The utility model relates to an adjustable corrugated steel web positioning device which comprises a connecting steel frame, connecting ends are arranged at four corners of two ends of the connecting steel frame, the connecting ends are connected with fixed ends through axially welded adjusting components, and the fixed ends on two sides are connected with a corrugated steel web through welding. An adjusting component is arranged between the connecting steel frame and the corrugated steel web and comprises a supporting rod and an adjusting knob, the two ends of the adjusting component are connected with the connecting end and the fixing end through the supporting rod respectively, the adjusting knob is arranged on the supporting rod, and the adjusting knob is connected with the corrugated steel web through the fixing end. And the connecting steel frame and the corrugated steel web are integrated into a whole. The positioning device can be prefabricated in a factory and directly transported to a construction site for use and site construction welding in a modularized mode, the construction time is shortened, positioning is convenient and fast, and operation is fast.
Owner:ZHENGZHOU UNIV +1

Chimney anti-corrosion structure

The chimney anti-corrosion structure comprises an outer cylinder and a steel inner cylinder, an anti-corrosion layer is arranged on the inner circumferential face of the steel inner cylinder, the anti-corrosion layer sequentially comprises a framework, a primer layer, foam glass bricks and a protective layer from inside to outside, the framework is installed on the inner circumferential face of the steel inner cylinder, and a plurality of brick lattices are formed between the framework and the steel inner cylinder. The primer layer and the foam glass bricks are sequentially arranged in the brick lattices, and the protective layer is arranged on the outer sides of the framework and the foam glass bricks. According to the anti-corrosion structure, the framework serves as an installation foundation of the foam glass bricks and plays a role in supporting and fixing the foam glass bricks, and the foam glass bricks have the advantages of being resistant to chemical corrosion, resistant to high temperature, excellent in heat insulation performance, resistant to temperature change, light in weight, low in volatilization, safe to construct, long in service life, resistant to fire disasters and beneficial to relieving chimney rain. Construction is simple, and corrosion resistance is high.
Owner:DATANG LINZHOU THERMAL POWER CO LTD

A construction method for controlling the stability of the tunnel face in high water pressure and water-rich strata

The present invention discloses a construction method for controlling the stability of the tunnel face in a high-water-pressure water-rich stratum tunnel, comprising the following steps: locating the water-rich stratum, conducting advanced geological forecasting of the tunnel, exploring the distribution of the water-rich stratum in the front tunnel face and the characteristics of groundwater storage, and determining the surrounding rock parameters of the water-rich stratum in combination with geological survey reports and field tests; establishing a mechanical calculation model of the rock disk between the water-rich stratum and the front tunnel face, and calculating and ensuring a safe distance between the water-rich stratum and the rock disk between the front tunnel face. L , according to the safety distance L Determine the location of the advanced high-level drainage structure; arrange the advanced high-level drainage structure; monitor the water inflow at the face, and when the water inflow is lower than the predetermined value, continue tunnel excavation and construct grouting rings and stop walls until the water-rich stratum is crossed; arrange the drainage system behind the lining and construct the secondary lining. The method integrates detection and drainage, realizes long-distance drainage and pressure reduction and high-level drainage, ensures construction safety and stability, and is very practical.
Owner:KUNMING SURVEY DESIGN & RES INST OF CREEC

Induced air duct structure for tunnel ventilation

An induced air duct structure for tunnel ventilation comprises a tunnel main hole, and a roadbed is arranged below the tunnel main hole. An air supply duct partition plate is arranged below the arched top of the tunnel main hole, and the upper end of the air supply duct partition plate and the inner wall of the tunnel main hole form an air supply duct; induced air duct partition plates are arranged below the air supply duct partition plates and close to the two sides of the tunnel main hole, a plurality of induced air ducts are arranged on the induced air duct partition plates and the inner side wall of the tunnel main hole, and each induced air duct is communicated with the air supply duct; a plurality of sets of partition plate fixing pieces are arranged between the air inducing channel partition plate and the inner side wall of the tunnel main hole. The air supply duct partition plate is in lap joint with the tunnel main hole structural steel bars, reinforced concrete pouring is adopted, and it is guaranteed that the air supply duct partition plate is evenly stressed; the induced air duct partition plate is fixedly connected with the inner wall of the tunnel main hole through the partition plate fixing piece, so that the installation stability of the induced air duct partition plate is improved, and the induced air duct partition plate made of galvanized steel sheets is simple in construction, easy to operate, low in construction cost, short in working time and convenient to maintain and disassemble.
Owner:CCCC URBAN RAIL TRANSIT DESIGN & RES INST CO LTD

Expansive soil embankment drainage structure and construction method thereof

The present invention discloses an anti-drainage structure for an expansive soil embankment and a construction method thereof. The anti-drainage structure includes a stepped slope, a first drainage device, a second drainage device, an ecological protection device and an interval energy controller; the first drainage device includes a hollow anchor rod, a pumping head and a vacuum head, the second drainage device includes a fly ash soil layer, a vacuum drainage pipe, an expansive soil waterproof pad and a blind ditch, and the ecological protection device is arranged on the second drainage device, including a sand cushion layer, a plurality of bagged soils, a cultivated soil layer and plants. The interval energy controller is used to monitor the amount of accumulated water, vacuum degree, settlement and soil moisture. The anti-drainage structure of the present invention takes into account the functions of vacuum drainage, anti-seepage and moisture retention, heap loading and de-swelling and ecological protection; the construction method of the present invention is simple and easy to implement, and completes the treatment and improvement of the expansive soil embankment slope in one stop, reduces the construction cost, and shortens the construction period from filling, consolidation, reinforcement to greening.
Owner:CHINA RAILWAY NO 9 BUREAU GRP NO 1 CONSTR CO LTD

Anti-seepage construction method for hidden and reverse ridges of balcony

The invention provides an anti-seepage construction method for a hidden and reverse sill of a balcony. The anti-seepage construction method comprises the following steps that a lower-layer structural plate and structural beam steel bars are bound, and a formwork is erected; arranging hidden and reverse ridge reinforcing steel bars on a structural beam at a balcony, and erecting a hidden and reverse ridge template; concrete is poured into the lower-layer structural slab, the structural beam and the hidden reverse ridge; after the lower-layer structural plate, the structural beam and the hidden reverse ridge reach the strength, reinforcing steel bar binding and formwork erecting of the upper reverse ridge of the balcony are conducted at the position of the hidden reverse ridge; and concrete is poured on the upper reverse ridge of the balcony. Compared with the prior art, the construction method has the beneficial effects that the anti-leakage construction process for the balcony reverse ridge is improved, the construction method is simple and easy to implement, convenient to operate and low in cost, leakage of the balcony reverse ridge can be eradicated to a great extent, meanwhile, labor can be saved, and the construction quality can be guaranteed. And meanwhile, by means of the construction method, common quality problems such as reverse ridge displacement, formwork expansion and formwork shifting are avoided, the self-waterproof construction requirement of the structure is met, leakage of the balcony is greatly eradicated, and the construction quality of the reverse ridge of the balcony is improved.
Owner:CHINA MCC22 GROUP CORP LTD