Construction treatment method of filling karst tunnel
A treatment method and tunnel construction technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as endangering the safety of construction personnel and mechanical equipment, surrounding rock stress concentration, and surrounding rock collapse
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in various ways defined and covered below.
[0024] Such as figure 1As shown, the construction and processing method of the filled karst tunnel in this embodiment includes the following steps: a. Finding the controlling factors and development laws of karst development; b. Karst detection and advanced geological prediction; impact analysis; d, filled karst treatment. The present invention organically combines the advanced geological prediction and pre-reinforcement measures of the filled karst with the conventional tunnel construction process procedures, and makes full use of means and measures such as the advanced geological forecast and pre-reinforcement to avoid or reduce the safety risk of tunnel construction in the filled karst section. Strictly follow the construction process of: advanced geological f...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com