Assembled movable foundation bolt positioning frame
By using the misalignment fit mechanism of semicircular card blocks and slide chutes and the use of limit blocks in the anchor bolt positioning frame, the problems of hole bias and welding efficiency are solved, and rapid splicing and efficient welding are achieved, reducing the Materials and labor costs.
Patent Information
- Application Number
- CN202421107480.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-21
- Publication Date
- 2025-01-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the installation of traditional anchor bolt positioning frames, there are often problems such as pore bias and low welding efficiency, which leads to an increase in material and time costs, and requires two staff to operate together, which is inefficient and wastes of manpower.
A movable anchor bolt positioning frame is designed, using the misalignment fitting mechanism of semicircular card blocks and slide chutes to achieve rapid splicing of the connecting plates, and the welding efficiency is improved through limit blocks and measuring instruments, reducing labor force. Resource dependency.
It reduces the need to replace the connecting plate due to biased hole position, improves installation efficiency, reduces material costs, and only one staff member can complete the welding operation, improving work efficiency and convenience.
Smart Images

Figure CN222295754U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of anchor bolts, in particular to an assembled movable anchor bolt positioning frame. Background Art
[0002] Rigid concrete, also known as steel-concrete or reinforced steel concrete, is a structure composed of rigid concrete, which is divided into a structure in which all structural members are made of rigid concrete and a structure in which some structural members are made of rigid concrete. Rigid concrete has the advantages of high strength, small cross-sectional size of components, strong bond with concrete, saving concrete, increasing the use of space, reducing project cost, and improving project quality. For example, common steel columns are connected to the concrete foundation through anchor bolts, and the longitudinal steel bars are wrapped on the outside of the steel columns. During the construction of foundation concrete, the anchor bolts are welded to the foundation bottom plate steel bars in groups according to design requirements, and the positioning plates are used for positioning and the steel derricks are used for reinforcement. Finally, the position and elevation of the anchor bolts are checked and accepted using theodolites and levels. After passing the inspection, the steel columns are wrapped with longitudinal steel bars and the upper steel bars of the concrete foundation. Concrete can be poured only after the acceptance of the hidden project. After the foundation concrete strength reaches 75% of the design strength, installation operations can be carried out. When pouring concrete, a vibrating rod should be used to vibrate and compact it.
[0003] However, there are often some problems in the installation process of traditional anchor bolt locators, such as the installation hole position deviation, which requires frequent replacement of the connecting plate, thereby increasing material costs and time costs; at the same time, the welding process usually requires the collaborative operation of two workers, which is inefficient and wastes manpower. In order to solve these problems and improve the installation efficiency and accuracy of the anchor bolt locator, an assembled movable anchor bolt locator is proposed. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes an assembled movable anchor bolt positioning frame.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: an assembled movable anchor bolt positioning frame, comprising a main body mechanism and a splicing mechanism, the splicing mechanism comprises a connecting plate one, the connecting plate one is fixedly connected to a connecting shell, the connecting shell is provided with a slide groove one, the connecting shell is fixedly connected with a protrusion inside, the protrusion is fixedly connected with a semicircular slide groove inside, the semicircular slide groove is rotatably connected with a semicircular clamping block inside, the semicircular clamping block is fixedly connected with a toggle shaft, the toggle shaft is fixedly connected with a fixed block, the fixed block is fixedly connected with a spring, one end of the spring away from the fixed block is fixedly connected to the connecting shell, the connecting shell is provided with a slide groove three, the toggle shaft is slidably connected to the slide groove three, the semicircular slide groove is provided with a slide groove two, and the slide groove two is slidably connected to the toggle shaft.
[0006] As a further description of the above technical solution:
[0007] The main body mechanism includes a limit block 1, a limit block 2, a fixed bracket, a limit groove 1, a limit groove 2, a connecting plate 2 and a mounting hole 2. The limit block 1 is fixedly connected to the connecting plate 1, the limit block 2 is fixedly connected to the connecting plate 1, the limit groove 1 is arranged on the fixed bracket, the limit groove 2 is arranged on the fixed bracket, and the connecting plate 2 is fixedly connected to the lower end of the fixed bracket.
[0008] As a further description of the above technical solution:
[0009] The connection shells are provided in a plurality of groups, and the connection shells are arranged at the lower end of the first connection plate.
[0010] As a further description of the above technical solution:
[0011] The connecting plates are provided with four groups in total, and the connecting plate 1 is provided with a mounting hole 1.
[0012] As a further description of the above technical solution:
[0013] The second connecting plate is provided with four groups, the second mounting holes are provided on the second connecting plate, and the second mounting holes are evenly arranged.
[0014] As a further description of the above technical solution:
[0015] The limiting grooves 1 and 2 are both provided with a plurality of groups. The limiting grooves 1 are evenly arranged on the fixed bracket, and the limiting grooves 2 are evenly arranged on the fixed bracket.
[0016] As a further description of the above technical solution:
[0017] The fixing block and the spring are both arranged inside the connecting shell.
[0018] The utility model has the following beneficial effects:
[0019] 1. In the utility model, the two sets of connecting plates can be quickly and accurately spliced together through the misalignment and cooperation of the semicircular clamping block and the semicircular sliding groove, which not only greatly reduces the need to replace the entire connecting plate due to misaligned hole positions during installation, thereby saving material costs, but also improves installation efficiency.
[0020] 2. In the utility model, the staff only needs to insert the mounting holes on the connecting plate into the limit grooves and fix the position with limit blocks, and then use a level meter to ensure that the angle of the connecting plate is correct, and finally perform welding. This changes the traditional welding process which usually requires two staff members to work together, one for positioning and the other for welding, which is not only inefficient but also wastes manpower. This method not only improves work efficiency, but also reduces dependence on human resources, making the installation process more convenient and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a three-dimensional structural schematic diagram of an assembled movable anchor bolt positioning frame proposed by the utility model;
[0022] Figure 2 A partial three-dimensional structure diagram of an assembled movable anchor bolt positioning frame proposed by the utility model Figure 1 ;
[0023] Figure 3 This is a partial structural cross-sectional view of an assembled movable anchor bolt positioning frame proposed by the utility model;
[0024] Figure 4 A partial three-dimensional structure diagram of an assembled movable anchor bolt positioning frame proposed by the utility model Figure 2 .
[0025] Legend:
[0026] 1. Connecting plate 1; 2. Bump; 3. Slide groove 1; 4. Connecting shell; 5. Semicircular slide groove; 6. Semicircular clamping block; 7. Slide groove 2; 8. Slide groove 3; 9. Driving shaft; 10. Fixed block; 11. Spring; 12. Mounting hole 1; 13. Limit block 1; 14. Limit block 2; 15. Fixed bracket; 16. Limit groove 1; 17. Limit groove 2; 18. Connecting plate 2; 19. Mounting hole 2. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] Reference Figure 1-Figure 4The utility model provides an embodiment: an assembled movable anchor bolt positioning frame, including a main body mechanism and a splicing mechanism, the splicing mechanism includes a connecting plate 1, the connecting plate 1 is fixedly connected to a connecting shell 4, the connecting shell 4 is provided with a slide 3, the connecting shell 4 is fixedly connected with a protrusion 2 inside, the protrusion 2 is fixedly connected with a semicircular slide 5 inside, the semicircular slide 5 is rotatably connected with a semicircular clamping block 6 inside, the semicircular clamping block 6 is fixedly connected with a toggle shaft 9, the toggle shaft 9 is fixedly connected with a fixed block 10, and the fixed block 10 is fixedly connected There is a spring 11, and one end of the spring 11 away from the fixed block 10 is fixedly connected to the connecting shell 4. The connecting shell 4 is provided with a slide groove 3 8, and the toggle shaft 9 is slidably connected to the slide groove 3 8. The semicircular slide groove 5 is provided with a slide groove 2 7, and the slide groove 2 7 is slidably connected to the toggle shaft 9. Through the misalignment and cooperation of the semicircular clamping block 6 and the semicircular slide groove 5, the two sets of connecting plates can be quickly and accurately spliced together, which not only greatly reduces the situation where the entire connecting plate needs to be replaced due to the deviation of the hole position during the installation process, thereby saving material costs, but also improves the installation efficiency.
[0029] The main body mechanism includes a limit block 13, a limit block 14, a fixed bracket 15, a limit groove 16, a limit groove 17, a connecting plate 18 and a mounting hole 19. The limit block 13 is fixedly connected to the connecting plate 1, the limit block 14 is fixedly connected to the connecting plate 1, the limit groove 16 is arranged on the fixing bracket 15, the limit groove 17 is arranged on the fixing bracket 15, the connecting plate 18 is fixedly connected to the lower end of the fixing bracket 15, the connecting shell 4 is provided with a plurality of groups, the connecting shell 4 is arranged at the lower end of the connecting plate 1, the connecting plate 1 is provided with four groups, the connecting plate 1 is provided with a mounting hole 12, the connecting plate 18 is provided with four groups, the mounting hole 19 is arranged on the connecting plate 18, and the mounting hole 19 is evenly arranged. The limiting groove 1 16 and the limiting groove 2 17 are each provided with several groups, the limiting groove 1 16 is evenly arranged on the fixed bracket 15, the limiting groove 2 17 is evenly arranged on the fixed bracket 15, the fixing block 10 and the spring 11 are both arranged inside the connecting shell 4, the staff only needs to insert the mounting holes on the connecting plate into the limiting grooves, and fix the position with the limiting blocks, and then use the level measuring instrument to ensure that the angle of the connecting plate is correct, and finally weld it, changing the traditional welding process which usually requires two staff members to work together, one for positioning and the other for welding, which is not only inefficient but also wastes manpower. This method not only improves work efficiency, but also reduces dependence on human resources, making the installation process more convenient and efficient.
[0030] Working principle: First, the staff connects multiple groups of connecting plates 1 together, aligns the protrusion 2 on the other group of connecting shells 4 with the slide groove 3 of this group, and inserts the protrusion 2 on the other group of connecting shells 4 into the interior of the slide groove 3 of this group. Since the semicircular slide groove 5 and the semicircular block 6 are staggered in the initial state, as the other group of protrusions 2 slowly slide into the interior of the slide groove 3, the semicircular block 6 on the other group of connecting shells 4 is squeezed to rotate, and the spring 11 is stretched. When the two groups of semicircular blocks 6 form a complete circle, and at this time the two groups of semicircular slide grooves 5 form a complete ring, the fixed block 10 is driven to slide under the tension of the spring 11, and the fixed block 10 drives the toggle shaft 9 to rotate, and the toggle shaft 9 drives the semicircular The shaped card block 6 is reset and stuck in the interior of the semicircular slide groove 5, so that the rapid splicing of the connecting plate 1 is realized, and the original fixing method of the connecting plate 1 is changed, so that when drilling holes on the connecting plate 1 to install the anchor bolts, the hole position needs to be replaced when the entire connecting plate 1 is offset, which wastes materials. Finally, the limit block 13 on the connecting plate 1 is inserted into the interior of the limit groove 17, and the limit block 2 14 is inserted into the interior of the limit groove 16. The angle of the connecting plate 1 is measured using a level measuring instrument, and then the connecting plate 1 and the fixed bracket 15 are welded, and the connecting plate 1 is supported on the fixed bracket 15, changing the traditional method that two workers need to work together during the original welding process, which wastes manpower. Finally, the positioning frame is installed on the mounting part through the mounting hole 2 19.
[0031] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An assembled movable anchor bolt positioning frame, comprising a main body mechanism and a splicing mechanism, characterized in that: The splicing mechanism comprises a connecting plate (1), wherein the connecting plate (1) is fixedly connected to a connecting shell (4), the connecting shell (4) is provided with a slide groove (3), the connecting shell (4) is fixedly connected with a convex block (2) inside, the convex block (2) is fixedly connected with a semicircular slide groove (5) inside, the semicircular slide groove (5) is rotatably connected with a semicircular clamping block (6) inside, the semicircular clamping block (6) is fixedly connected with a toggle shaft (9), the toggle shaft (9) is fixedly connected with a fixed block (10), the fixed block (10) is fixedly connected with a spring (11), one end of the spring (11) away from the fixed block (10) is fixedly connected to the connecting shell (4), the connecting shell (4) is provided with a slide groove (3) (8), the toggle shaft (9) is slidably connected to the slide groove (3) (8), the semicircular slide groove (5) is provided with a slide groove (2) (7), and the slide groove (2) (7) is slidably connected to the toggle shaft (9).
2. The assembled movable anchor bolt positioning frame according to claim 1, characterized in that: The main body mechanism comprises a limit block 1 (13), a limit block 2 (14), a fixed bracket (15), a limit groove 1 (16), a limit groove 2 (17), a connecting plate 2 (18) and a mounting hole 2 (19); the limit block 1 (13) is fixedly connected to the connecting plate 1 (1); the limit block 2 (14) is fixedly connected to the connecting plate 1 (1); the limit groove 1 (16) is arranged on the fixed bracket (15); the limit groove 2 (17) is arranged on the fixed bracket (15); and the connecting plate 2 (18) is fixedly connected to the lower end of the fixed bracket (15).
3. The assembled movable anchor bolt positioning frame according to claim 2, characterized in that: The connection shells (4) are provided in a plurality of groups, and the connection shells (4) are arranged at the lower end of the connection plate 1 (1).
4. The assembled movable anchor bolt positioning frame according to claim 3 is characterized in that: The connecting plate one (1) is provided with four groups in total, and the connecting plate one (1) is provided with a mounting hole one (12).
5. The assembled movable anchor bolt positioning frame according to claim 4, characterized in that: The second connecting plate (18) is provided with four groups, the second mounting holes (19) are provided on the second connecting plate (18), and the second mounting holes (19) are evenly arranged.
6. The assembled movable anchor bolt positioning frame according to claim 5, characterized in that: The limiting grooves 1 (16) and the limiting grooves 2 (17) are each provided in a plurality of groups. The limiting grooves 1 (16) are evenly arranged on the fixed bracket (15), and the limiting grooves 2 (17) are evenly arranged on the fixed bracket (15).
7. The assembled movable anchor bolt positioning frame according to claim 6, characterized in that: The fixing block (10) and the spring (11) are both arranged inside the connecting shell (4).