Prefabricated finished product through-wall pipe assembly of gas pipeline
Through the prefabricated gas pipeline through-wall pipe components, including through-wall casing, centering ring and structural adhesive, the problems of inaccurate material estimates and low efficiency of high altitude operation in gas pipeline renovation are solved, and more efficient installation and improvement are achieved Good corrosion resistance.
Patent Information
- Application Number
- CN202421159501.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-05-27
AI Technical Summary
In gas pipeline renovation projects, the existing technology has problems of wasting or delayed construction periods caused by inaccurate material estimates. At the same time, workers have large workloads, long construction periods and high costs for working at high altitudes, and the gas pipeline is susceptible to wall compression. and corrosion.
Provide a prefabricated gas pipeline through-wall pipe assembly, including a gas pipe body, a through-wall sleeve, a center ring, a structural glue and a foam glue, by customizing fixed-size through-wall sleeves and support structures in the factory, Reduce on-site processing, improve installation efficiency, and protect the pipeline from corrosion through heat shrink sleeves.
It has achieved the reduction of material waste and construction period delays, improved installation efficiency and safety performance, reduced the risks of high-altitude operations, and had good corrosion resistance, avoided wall extrusion and corrosion.
Smart Images

Figure CN222297200U_ABST
