Boiling device for cement stability test in plateau area
By using the design of lifting screws and servo motors in the cement stability test boiling device in the plateau area, combined with the control of air compressors and electric heating pipes, the problems of cumbersome operations and waste of resources in the existing technology are solved, and efficient Testing process and greater practicality.
Patent Information
- Application Number
- CN202420800613.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-04-17
AI Technical Summary
When the existing cement stability test boiling device in the plateau area is continuously subject to multiple tests and testing, the operation is complicated and leads to waste of water resources and heat, reducing the test efficiency and being more practical.
A device including a sealing box, a sealing cover and a specimen rack was designed. The rapid up and down movement of the specimen rack was achieved through lifting screws and servo motors, avoiding the discharge of heated water, improving the test efficiency, and passing through an air compressor and electric heating pipes realize air pressure and heating control to ensure sealing effect and safety.
It realizes the rapid removal of boiled test pieces and test piece holders without discharging heated water, which improves the test efficiency, saves water resources and heat energy, and enhances the practicality of the device.
Smart Images

Figure CN222299627U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cement boiling devices, in particular to a cement stability test boiling device in plateau areas. Background Art
[0002] Cement stability, also known as "cement volume stability", is one of the important indicators of cement quality. It reflects the uniformity of cement volume change during the coagulation and hardening process. Cement stability can be determined by the test cake method. The volume stability is characterized by observing the changes in the appearance of the cement standard consistency pure paste test cake after boiling. In order to determine the cement stability in the plateau environment, a plateau cement stability test boiling device is required.
[0003] The prior art discloses a boiling device for cement stability test in plateau areas with publication number: CN218646979U, which comprises a sealed box, an electric heating pipe arranged in the sealed box, a test piece rack arranged in the sealed box and a pressurizing mechanism arranged on the sealed box; the pressurizing mechanism comprises an air compressor arranged on the sealed box, a one-way air valve connected to the output end of the air compressor and a barometer arranged on the sealed box; the output end of the one-way air valve is connected to the inside of the sealed box. The utility model has the advantages of high detection accuracy and is suitable for high-altitude areas.
[0004] When using the above utility model, it is necessary to place the test piece rack in the pre-grooved groove first, and then fill water to the water filling line. After closing the sealing cover and adjusting the air pressure standard in the sealing box, the cement test pieces in the plateau area can be boiled. However, since the test pieces and the test piece rack are both submerged below the water filling line, the heated water needs to be discharged after each boiling treatment, and then the test piece rack and the test piece can be taken out for testing. In this way, when multiple test pieces are tested continuously, not only is the operation cumbersome and the test efficiency reduced, but it also causes a waste of water resources and heat, and its practicality is relatively general. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies in the prior art, the utility model provides a boiling device for cement stability testing in plateau areas, which allows users to take out boiled test pieces and test piece racks without discharging heated water, thereby not only improving the test efficiency but also saving water resources and thermal energy, and having the advantage of greater practicality, thereby solving the problems in the above-mentioned background technology.
[0007] (II) Technical solution
[0008] In order to achieve the above-mentioned advantages that the user can take out the boiled test piece and the test piece rack without discharging the heated water, which not only improves the test efficiency, but also saves water resources and heat energy, and has a stronger practicality, the specific technical scheme adopted by the utility model is as follows: a boiling device for cement stability test in plateau areas, including a sealing box, a sealing cover and a test piece rack, the side walls of both sides of the sealing box are symmetrically welded with fixed blocks, a lifting screw is installed on the fixed block on one side, and the bottom end of the lifting screw is connected to the output end of the servo motor, and a guide slide rod is fixedly installed on the fixed block on the other side, and connecting blocks are symmetrically welded on both sides of the sealing cover, and the inner side of the connecting block on one side is provided with a guide slide rod. A screw sleeve is fixedly installed, and a lifting screw is sleeved on the inner thread of the screw sleeve, a guide sleeve is fixedly installed in the connecting block on the other side, and a guide slide rod is sleeved in the guide sleeve, a connecting frame is fixedly installed on the top of the specimen frame, and a first mounting block is symmetrically welded on the top surface of the connecting frame, and a fixing pin groove is provided on the outer wall of the first mounting block, a second mounting block is symmetrically welded on the bottom surface of the sealing cover, and a mounting cavity is provided in the second mounting block, and a push plate is provided in the mounting cavity, a fixing pin plate is fixedly installed on one side of the push plate, and a pulling rod is fixedly connected to the center of the other side of the push plate, and a number of return springs are evenly installed between the side wall of the push plate and the inner wall of the mounting cavity.
[0009] Furthermore, an air compressor is installed on one side of the top surface of the sealing cover, and the output end of the air compressor is connected to one end of an air pipe, and the other end of the air pipe passes through the sealing cover, a one-way valve is installed on the air pipe, a barometer is installed on the top surface of the sealing cover, an exhaust pipe is installed on the sealing cover, and an exhaust valve is installed on the exhaust pipe, and an electric heating tube is installed at the bottom of the inner cavity of the sealing box.
[0010] Furthermore, a drain pipe is installed in the center of the bottom of the inner cavity of the sealed box, and a drain valve is installed on the drain pipe.
[0011] Furthermore, a sealing ring is fixedly mounted on the bottom edge of the sealing cover, a sealing groove is formed on the top edge of the sealing box, and the sealing ring is embedded in the sealing groove.
[0012] Furthermore, a control panel is fixedly mounted on the side wall of the sealed box, and the control panel is electrically connected to the servo motor, the air compressor, the electric heating pipe, the exhaust valve and the drain valve.
[0013] Furthermore, a water filling line is painted on the inner wall of the sealed box.
[0014] Furthermore, heat-insulating handles are symmetrically fixedly mounted on the side walls on both sides of the connection frame.
[0015] Furthermore, support legs are evenly and fixedly installed at the four corners of the bottom surface of the sealing box.
[0016] (III) Beneficial effects
[0017] Compared with the prior art, the utility model provides a boiling device for cement stability test in plateau areas, which has the following beneficial effects:
[0018] (1) The utility model is provided with a sealing box, a sealing cover and a specimen rack. When in use, the cement test piece to be tested is placed in the specimen rack. The top of the specimen rack is fixedly connected with a connecting frame, and a first mounting block is symmetrically welded to the top surface of the connecting frame, and a fixing pin groove is provided on the outer wall of the first mounting block. The bottom surface of the sealing cover is symmetrically welded with a second mounting block, and a mounting cavity is provided in the second mounting block, and a push plate is provided in the mounting cavity. A fixing pin plate is fixedly installed on one side of the push plate, and a pulling rod is fixedly installed at the center of the other side of the push plate, and a plurality of reset springs are installed between the side wall of the push plate and the inner wall of the mounting cavity. Therefore, when the user pushes the two first mounting blocks to move between the two second mounting blocks, the fixing pin plates can be pushed to be correspondingly inserted into the fixing pin grooves under the elastic force of the reset springs, so that the connecting frame and the specimen rack are installed under the sealing cover. Then, the user can start the servo motor through the control panel to drive the lifting screw installed on the top surface of one fixed block to rotate, because the sealing box is symmetrically welded with the fixing blocks on both sides, and the lifting screw is installed on the top surface of one fixed block , a guide slide rod is fixedly installed on the top surface of the fixed block on the other side, and connecting blocks are symmetrically welded on both sides of the sealing cover, a screw sleeve is fixedly installed in one connecting block, and a lifting screw is sleeved in the inner thread of the screw sleeve, and a guide slide sleeve is fixedly installed in the connecting block on the other side, and a guide slide rod is sleeved in the guide slide sleeve, so as to drive the sealing cover together with the connecting frame and the test piece frame to move downward with the rotation of the lifting screw, and clean water up to the water injection line can be injected into the set sealing box, and when the sealing ring fixedly installed on the bottom surface of the sealing cover is embedded in the sealing groove opened on the top surface of the sealing box, the test The specimen rack and the test piece are immersed below the water filling line, while the connecting frame and the heat-insulating handle are located above the water filling line. After the boiling test is completed, the user can quickly take out the specimen rack and the test piece from the hot water by reversing the above steps, and then remove the connecting frame and the specimen rack through the heat-insulating handle, and then perform deformation variable detection on the test piece after boiling, without draining the hot water. After the next test piece enters the hot water, it can be quickly boiled, thereby effectively improving the test efficiency, saving water resources and heat energy, and being more practical.
[0019] (2) The utility model is provided with a sealing box, a sealing cover and an air compressor. As described above, when the sealing cover drives the connecting frame, the test piece rack and the test piece to enter the inner cavity of the sealing cover and the sealing ring is embedded in the sealing groove, the user can start the air compressor through the control panel and use the air compressor, the air pipe and the one-way valve to increase the air pressure in the sealing box. When the barometer detects that the air pressure in the sealing box reaches a standard atmospheric pressure, the air compressor can be turned off, and then the electric heating tube is started to heat the water to boiling. After the boiling treatment is completed, the electric heating tube is turned off, and then the exhaust valve installed on the exhaust pipe is opened to release air to ensure safety when opening the sealing cover. The sealing cover, the connecting frame and the test piece rack are lifted by the lifting screw to take out the test piece after the boiling treatment. In this process, the opening and closing of the sealing cover are all electrically controlled, which is not only more convenient to open and close and simpler to operate, but also can better ensure the sealing effect between the sealing cover and the sealing box, and is more practical. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 It is a structural schematic diagram of a boiling device for cement stability test in plateau areas according to an embodiment of the utility model;
[0022] Figure 2 According to the embodiment of the utility model Figure 1 A magnified image of point A;
[0023] Figure 3 According to the embodiment of the utility model Figure 1 The enlarged view of point B;
[0024] Figure 4 It is a three-dimensional diagram of a specimen rack of a boiling device for cement stability test in plateau areas according to an embodiment of the utility model;
[0025] Figure 5 It is a stereoscopic diagram of a fixed pin plate of a boiling device for cement stability test in plateau areas according to an embodiment of the utility model.
[0026] In the figure:
[0027] 1. Sealing box; 2. Fixing block; 3. Guide slide rod; 4. Water injection line; 5. Sealing groove; 6. Connecting block; 7. Guide slide sleeve; 8. Check valve; 9. Air pipe; 10. Air compressor; 11. Sealing cover; 12. Barometer; 13. Exhaust pipe; 14. Lifting screw; 15. Exhaust valve; 16. Test piece rack; 17. Servo motor; 18. Support leg; 19. Drain valve; 20. Drain pipe; 21. Electric heating pipe; 22. Connecting frame; 23. Insulating handle; 24. First mounting block; 25. Fixing pin groove; 26. Fixing pin plate; 27. Second mounting block; 28. Mounting cavity; 29. Reset spring; 30. Push plate; 31. Pull rod; 32. Sealing ring; 33. Screw sleeve. DETAILED DESCRIPTION
[0028] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments. They can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementation methods and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.
[0029] According to an embodiment of the utility model, a boiling device for cement stability test in plateau areas is provided.
[0030] The present invention is now further described in conjunction with the accompanying drawings and specific implementation methods. Figure 1-5As shown, according to the embodiment of the utility model, the boiling device for cement stability test in plateau areas includes a sealed box 1, a sealed cover 11 and a test piece rack 16. The fixed blocks 2 are symmetrically welded on the side walls of the sealed box 1. A lifting screw 14 is installed on the fixed block 2 on one side, and the bottom end of the lifting screw 14 is connected to the output end of the servo motor 17. A guide slide bar 3 is fixedly installed on the fixed block 2 on the other side. Connecting blocks 6 are symmetrically welded on both sides of the sealing cover 11. A screw sleeve 33 is fixedly installed in the connecting block 6 on one side, and the lifting screw 14 is sleeved on the inner thread of the screw sleeve 33. A guide sleeve 7 is fixedly installed in the connecting block 6 on the other side, and the guide slide bar 3 is sleeved in the guide sleeve 7. A connecting frame 22 is fixedly installed on the top of the test piece rack 16, and A first mounting block 24 is symmetrically welded to the top surface of the connecting frame 22, and a fixing pin groove 25 is provided on the outer wall of the first mounting block 24, and a second mounting block 27 is symmetrically welded to the bottom surface of the sealing cover 11, and a mounting cavity 28 is provided in the second mounting block 27, and a push plate 30 is provided in the mounting cavity 28, a fixing pin plate 26 is fixedly installed on one side of the push plate 30, and a pulling rod 31 is fixedly connected to the center of the other side of the push plate 30, and a plurality of return springs 29 are evenly installed between the side wall of the push plate 30 and the inner wall of the mounting cavity 28, which makes it convenient for the user to take out the boiled test piece and the test piece rack 16 without discharging the heated water, which not only improves the test efficiency, but also saves water resources and heat energy, and is more practical.
[0031] In one embodiment, an air compressor 10 is installed on one side of the top surface of the sealing cover 11, and the output end of the air compressor 10 is connected to one end of the gas pipe 9, and the other end of the gas pipe 9 passes through the sealing cover 11, a one-way valve 8 is installed on the gas pipe 9, a barometer 12 is installed on the top surface of the sealing cover 11, an exhaust pipe 13 is installed on the sealing cover 11, and an exhaust valve 15 is installed on the exhaust pipe 13, and an electric heating tube 21 is installed at the bottom of the inner cavity of the sealing box 1, which can be used to test the stability of cement in plateau areas and is more practical.
[0032] In one embodiment, a drain pipe 20 is installed in the center of the bottom of the inner cavity of the sealed box 1 , and a drain valve 19 is installed on the drain pipe 20 to discharge unused water from the inner cavity of the sealed box 1 .
[0033] In one embodiment, a sealing ring 32 is fixedly installed on the bottom edge of the sealing cover 11, and a sealing groove 5 is opened on the top edge of the sealing box 1. The sealing ring 32 is embedded in the sealing groove 5 to ensure the sealing effect between the sealing cover 11 and the sealing box 1.
[0034] In one embodiment, a control panel is fixedly mounted on the side wall of the sealed box 1, and the control panel is electrically connected to the servo motor 17, the air compressor 10, the electric heating pipe 21, the exhaust valve 15 and the drain valve 19, so as to control the normal operation of the equipment.
[0035] In one embodiment, a water filling line 4 is printed on the inner wall of the sealed box 1 to indicate the amount of clean water added to the inner cavity of the sealed box 1 .
[0036] In one embodiment, heat-insulating handles 23 are symmetrically fixedly installed on the side walls of the connection frame 22 , which facilitates the user to take and place the connection frame 22 and the specimen rack 16 .
[0037] In one embodiment, support legs 18 are evenly and fixedly installed at the four corners of the bottom surface of the sealing box 1 to play a role in fixing and supporting the sealing box 1.
[0038] Working principle: The utility model is provided with a sealing box 1, a sealing cover 11 and a specimen rack 16. When in use, the cement test piece to be tested is placed in the specimen rack 16. The top of the specimen rack 16 is fixedly connected with a connecting frame 22, and a first mounting block 24 is symmetrically welded on the top surface of the connecting frame 22, and a fixing pin groove 25 is provided on the outer side wall of the first mounting block 24. The bottom surface of the sealing cover 11 is symmetrically welded with a second mounting block 27, and a mounting cavity 28 is provided in the second mounting block 27, and a push plate 30 is provided in the mounting cavity 28. A fixing pin plate 26 is fixedly installed on one side of the push plate 30, and a pulling rod 31 is fixedly installed in the center of the other side of the push plate 30, and a plurality of return springs 29 are installed between the side wall of the push plate 30 and the inner wall of the mounting cavity 28. Therefore, when the user pushes the two first mounting blocks 24 to move between the two second mounting blocks 27, the fixing pin plate 26 can be pushed to be correspondingly inserted into the fixing pin groove 25 under the elastic force of the reset spring 29, so that the connecting frame 22 and the specimen holder 16 are installed under the sealing cover 11, and then the user can start the servo motor 17 through the control panel to drive the lifting screw 14 installed on the top surface of the fixing block 2 on one side to rotate, because the sealing box 1 is symmetrically welded with the fixing blocks 2 on both sides, and the lifting screw 14 is installed on the top surface of the fixing block 2 on one side, and the guide slide bar 3 is fixedly installed on the top surface of the fixing block 2 on the other side, and the sealing cover 11 is symmetrically welded with the connecting blocks 6 on both sides, and the screw sleeve 33 is fixedly installed in the connecting block 6 on one side, and the lifting screw 14 is connected to the screw sleeve 33 through the internal thread. The lowering screw 14 has a guide sleeve 7 fixedly installed in the connecting block 6 on the other side, and the guide sleeve 7 has a guide slide rod 3 sleeved therein, so as the lifting screw 14 rotates, the sealing cover 11 together with the connecting frame 22 and the test piece holder 16 can be driven to move downward, and the set sealing box 1 can be injected with clean water up to the water injection line 4. When the sealing ring 32 fixedly installed on the bottom surface of the sealing cover 11 is embedded in the sealing groove 5 opened on the top surface of the sealing box 1, the test piece holder 16 and the test piece are immersed below the water injection line 4, and the connecting frame 22 and the heat-insulating handle 23 are located above the water injection line 4. After the boiling test is completed, the user can quickly remove the test piece holder 16 and the test piece from the hot water by reversing the above steps, and then remove the connecting frame 22 and the test piece holder 16 through the heat-insulating handle 23. , the deformation variable detection of the test piece after boiling can be carried out without discharging the hot water. After the next test piece enters the hot water, it can be quickly boiled, thereby effectively improving the test efficiency, saving water resources and heat energy, and being more practical. In addition, the utility model is provided with a sealing box 1, a sealing cover 11 and an air compressor 10. As mentioned above, when the sealing cover 11 drives the connecting frame 22, the test piece rack 16 and the test piece to enter the inner cavity of the sealing cover 11, and the sealing ring 32 is embedded in the sealing groove 5, the user can start the air compressor 10 through the control panel, and use the air compressor 10, the air pipe 9 and the one-way valve 8 to increase the air pressure in the sealing box 1. When the barometer 12 detects that the air pressure in the sealing box 1 reaches a standard atmospheric pressure, the air compressor 10 can be turned off.Then start the electric heating tube 21 to heat the incoming water to boiling. After the boiling process is completed, close the electric heating tube 21, and then open the exhaust valve 15 installed on the exhaust pipe 13 to release air to ensure safety when opening the sealing cover 11. Lift the sealing cover 11, the connecting frame 22 and the test piece rack 16 through the lifting screw 14 to take out the test piece after the boiling process. In this process, the opening and closing of the sealing cover 11 are all controlled by electricity, which is not only more convenient to open and close, and the operation is simpler, but also can better ensure the sealing effect between the sealing cover 11 and the sealing box 1, and is more practical.
[0039] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.
[0040] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A boiling device for cement stability test in plateau areas, comprising a sealed box (1), a sealed cover (11) and a test piece rack (16), characterized in that: The side walls of the sealing box (1) are symmetrically welded with fixed blocks (2), a lifting screw (14) is installed on the fixed block (2) on one side, and the bottom end of the lifting screw (14) is connected to the output end of the servo motor (17), and a guide slide bar (3) is fixedly installed on the fixed block (2) on the other side. The sealing cover (11) is symmetrically welded with connecting blocks (6) on both sides, a screw sleeve (33) is fixedly installed in the connecting block (6) on one side, and the lifting screw (14) is sleeved in the inner thread of the screw sleeve (33), and a guide sleeve (7) is fixedly installed in the connecting block (6) on the other side, and the guide sleeve (7) is sleeved with the guide slide bar (3), and the specimen rack (16) is symmetrically welded with the side walls of the sealing box (1) on the other side, and a lifting screw (14) is fixedly installed in the fixing block (2) on one side, and the bottom end of the lifting screw (14) is connected to the output end of the servo motor (17), and a guide slide bar (3) is fixedly installed on the fixing block (2) on the other side. ) A connecting frame (22) is fixedly installed on the top, and a first mounting block (24) is symmetrically welded to the top surface of the connecting frame (22), and a fixing pin groove (25) is provided on the outer wall of the first mounting block (24), and a second mounting block (27) is symmetrically welded to the bottom surface of the sealing cover (11), and a mounting cavity (28) is provided in the second mounting block (27), and a push plate (30) is provided in the mounting cavity (28), a fixing pin plate (26) is fixedly installed on one side of the push plate (30), and a pulling rod (31) is fixedly connected to the center of the other side of the push plate (30), and a plurality of return springs (29) are evenly installed between the side wall of the push plate (30) and the inner wall of the mounting cavity (28).
2. The boiling device for cement stability test in plateau areas according to claim 1 is characterized in that: An air compressor (10) is installed on one side of the top surface of the sealing cover (11), and the output end of the air compressor (10) is connected to one end of an air supply pipe (9), and the other end of the air supply pipe (9) passes through the sealing cover (11), a one-way valve (8) is installed on the air supply pipe (9), a barometer (12) is installed on the top surface of the sealing cover (11), an exhaust pipe (13) is installed on the sealing cover (11), and an exhaust valve (15) is installed on the exhaust pipe (13), and an electric heating pipe (21) is installed at the bottom of the inner cavity of the sealing box (1).
3. The boiling device for cement stability test in plateau areas according to claim 1 is characterized in that: A drainage pipe (20) is installed in the center of the bottom of the inner cavity of the sealed box (1), and a drainage valve (19) is installed on the drainage pipe (20).
4. The boiling device for cement stability test in plateau areas according to claim 1 is characterized in that: A sealing ring (32) is fixedly mounted on the bottom edge of the sealing cover (11), a sealing groove (5) is provided on the top edge of the sealing box (1), and the sealing ring (32) is embedded in the sealing groove (5).
5. The boiling device for cement stability test in plateau areas according to claim 1 is characterized in that: A control panel is fixedly mounted on the side wall of the sealed box (1), and the control panel is electrically connected to the servo motor (17), the air compressor (10), the electric heating pipe (21), the exhaust valve (15) and the drain valve (19).
6. The boiling device for cement stability test in plateau areas according to claim 1 is characterized in that: The inner wall of the sealed box (1) is provided with a water injection line (4).
7. The boiling device for cement stability test in plateau areas according to claim 1 is characterized in that: Heat-insulating handles (23) are symmetrically fixedly mounted on the side walls of both sides of the connection frame (22).
8. The boiling device for cement stability test in plateau areas according to claim 1 is characterized in that: Support legs (18) are evenly and fixedly mounted at the four corners of the bottom surface of the sealing box (1).