Power construction defense organizing device
By designing adjustable telescopic structures and limiting parts in the power construction defense device, the problem of bending and extruding of the belt during the winding process is solved, the normal use and service life of the device are extended, and the range of defense is increased and stability.
Patent Information
- Application Number
- CN202421017595.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2034-05-10
AI Technical Summary
The anti-bar belts of existing power construction anti-bar device are prone to bend and squeezed during the winding process, resulting in the device being unable to continue to be used and affecting its service life.
An electric construction and defense device including an adjustable telescopic structure is designed. Through the telescopic structure between the first support column and the second support column, the sliding connection pipe group and the limiting member are used to avoid jamming, thereby increasing the ability of the device. Adjust the range and stability, and reduce the space occupancy during storage through elastic clamping parts.
The normal use and movement of the power construction defense device is achieved, which facilitates the expansion of the defense range, increases the service life and stability of the device, and avoids stagnation during the storage process.
Smart Images

Figure CN222314788U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of electric power construction, and in particular to an electric power construction deployment device. Background Art
[0002] With the rapid development of cities, high-rise buildings are becoming increasingly popular. In order to increase the safety of power supply, it is usually chosen to bury the wires that transmit electricity underground to reduce the impact of the wires on residents and improve the safety of residents' living.
[0003] When repairing or modifying the wires, it is necessary to first excavate the location of the pre-buried wires to form a foundation pit, then expose the wires in the foundation pit, and then repair or modify the wires. In order to increase the safety of maintenance personnel and pedestrians, a defense device is usually set up at the foundation pit to serve as a visual reminder to pedestrians.
[0004] In the related art, for example, the Chinese utility model patent with the announcement number CN217326736U discloses a power construction deployment device, which includes a positioning support cylinder, a counterweight base is installed below the positioning support cylinder, an adjustable telescopic rod is movably installed inside the positioning support cylinder, a protective cylinder is fixedly installed on the left side of the adjustable telescopic rod, and a fixing bolt is installed on the right side of the positioning support cylinder; a winding motor is installed inside the protective cylinder, a winding drum is installed at the output end of the winding motor, a deployment belt is connected to the outer surface of the winding drum, a through opening is opened on the inner wall of the protective cylinder, a connecting block is installed at the end of the deployment belt away from the winding drum, and a protective rubber pad is installed on the inner wall of the connecting block. When the power construction deployment device is stored, the winding motor is started, and then the winding motor drives the winding drum to rotate, so that the deployment belt is wound onto the winding drum.
[0005] The above-mentioned related technologies have the following defects: the inventor believes that since the deployment belt is relatively soft, the deployment belt is prone to bending when the winding motor reels it, causing the deployment belt to be squeezed in the opening, which in turn causes the power construction deployment device to be unable to continue to be used, affecting the service life of the power construction deployment device. Utility Model Content
[0006] In order to alleviate the problem that the electric power construction deployment device cannot be used any longer and to increase the service life of the electric power construction deployment device, the present application provides an electric power construction deployment device.
[0007] The present application provides a power construction deployment device that adopts the following technical solution:
[0008] A power construction deployment device includes a first support column, a second support column arranged parallel to the first support column, and a telescopic structure arranged between the first support column and the second support column, the telescopic structure includes a first connecting pipe group arranged on the first support column and a second connecting pipe group arranged on the second support column, the second connecting pipe group is slidably connected to the first connecting pipe group so that the distance between the first support column and the second support column is adjustable, and the bottoms of the first support column and the second support column are both provided with supports.
[0009] Furthermore, the second connecting tube groups are provided in a plurality of groups, and the plurality of second connecting tube groups are sequentially sleeved from inside to outside, and the second connecting tube group located innermost among the plurality of second connecting tube groups is connected to the second supporting column.
[0010] Furthermore, the first connecting tube group includes a plurality of first connecting tubes, each of the second connecting tube groups includes a plurality of second connecting tubes, and the second connecting tubes are arranged in a one-to-one correspondence with the first connecting tubes.
[0011] Furthermore, a first reinforcing rod is provided between two adjacent first connecting tubes, and a second reinforcing rod is provided between two adjacent second connecting tubes in each group of the second connecting tubes.
[0012] Furthermore, a limiting member is provided on the first connecting tube and the second connecting tube, and a limiting groove is provided on the second connecting tube corresponding to the limiting member, and when the distance between the first support column and the second support column is in the farthest state, the limiting member cooperates with the end wall stop corresponding to the limiting groove.
[0013] Furthermore, the limiting member is a hexagonal bolt, and the hexagonal bolt passes through the first connecting tube or the second connecting tube and extends into the limiting groove.
[0014] Furthermore, the circumferential surfaces of the first support column and the second support column are both provided with matching holes, the support comprises supporting legs and connecting columns, and the connecting columns are provided with elastic clamping parts that are engaged with the matching holes.
[0015] Furthermore, the elastic clamping member includes a clamping portion and an elastic portion acting on the clamping portion, and the clamping portion has an arc surface that is guided and matched with the matching hole.
[0016] Furthermore, a plurality of elastic clamping parts are evenly spaced along the circumference of the connecting column.
[0017] Furthermore, the first support column is provided with a connecting rod, and the second support column is provided with a connecting pipe corresponding to the connecting rod.
[0018] In summary, the beneficial technical effects of this application are:
[0019] 1. The electric power construction deployment device in the present application includes a first support column, a second support column arranged parallel to the first support column, and a telescopic structure arranged between the first support column and the second support column, the telescopic structure includes a first connecting pipe group arranged on the first support column and a second connecting pipe group arranged on the second support column, the second connecting pipe group is slidably connected to the first connecting pipe group so that the distance between the first support column and the second support column is adjustable, and the bottoms of the first support column and the second support column are both provided with supports. When the electric power construction deployment device is stored, the second support column is pushed to move the second support column toward the first support column, thereby causing the second connecting pipe group and the first connecting pipe group to slide relative to each other, thereby causing the gap between the second support column and the first support column to gradually decrease, so as to realize the storage of the electric power construction deployment device, thereby achieving the effect of facilitating the movement of the electric power construction deployment device. Since the first support column and the second support column are connected through the first connecting pipe group and the second connecting pipe group, the situation of easy jamming during the storage of the electric power construction deployment device is avoided, thereby ensuring the normal use of the electric power construction deployment device, thereby increasing the service life of the electric power construction deployment device.
[0020] 2. The second connecting pipe groups in the present application are provided with multiple groups, and the multiple groups of second connecting pipe groups are sequentially arranged from the inside to the outside. The second connecting pipe group located innermost among the multiple groups of second connecting pipe groups is connected to the second support column to further increase the adjustable range of the second support column, thereby increasing the distance between the second support column and the first support column under extreme conditions, thereby increasing the range in which the power construction deployment device can be deployed, and at the same time increasing the adjustable range of the power construction deployment device, thereby ensuring the flexibility of the power construction deployment device.
[0021] 3. In the present application, limiting members are provided on the first connecting tube and the second connecting tube, and limiting grooves are provided on the second connecting tube corresponding to the limiting members. When the distance between the first support column and the second support column is at the farthest state, the limiting members cooperate with the end wall stops of the corresponding limiting grooves to limit the second connecting tube, thereby increasing the connection stability between the second support column and the first support column, and thereby increasing the stability and deployment effect of the power construction defense device. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of the electric power construction deployment device in the embodiment of the present application in the storage state;
[0023] Figure 2 It is a structural schematic diagram of the electric power construction deployment device in an extended state according to an embodiment of the present application;
[0024] Figure 3 It is a structural schematic diagram of the support of the embodiment of the present application;
[0025] Figure 4 This is a partial structural cross-sectional view of the electric power construction deployment device according to an embodiment of the present application;
[0026] Figure 5 yes Figure 4 A magnified view of the middle A area;
[0027] Figure 6 This is a schematic diagram of the structure of the base of an embodiment of the present application, mainly showing the elastic clip.
[0028] Reference numerals:
[0029] 1. first supporting column; 11. support; 111. supporting leg; 112. connecting column; 113. supporting sheet; 114. accommodating cavity; 12. matching hole; 13. connecting rod;
[0030] 2. Second support column; 21. Connecting pipe;
[0031] 3. Telescopic structure; 31. First connecting pipe group; 311. First connecting pipe; 312. First reinforcing rod; 313. Stopper; 32. Second connecting pipe group; 321. Second connecting pipe; 322. Second reinforcing rod; 323. Stopper groove;
[0032] 4. Elastic clamping piece; 41. Clamping portion; 411. Arc surface; 42. Elastic portion. DETAILED DESCRIPTION
[0033] The technical solution of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
[0034] The embodiment of the present application discloses a power construction deployment device.
[0035] Reference Figure 1 and Figure 2, a power construction deployment device, comprising a first support column 1, a second support column 2 and a telescopic structure 3, wherein the second support column 2 is arranged in parallel with the first support column 1, and the bottoms of the first support column 1 and the second support column 2 are both provided with a support 11 to support the first support column 1 and the second support column 2, thereby increasing the stability of the first support column 1 and the second support column 2. The telescopic structure 3 comprises a first connecting pipe group 31 and a second connecting pipe group 32 slidably connected to the first connecting pipe group 31, the first connecting pipe group 31 is arranged on the first support column 1, and the second connecting pipe group 32 is arranged on the second support column 2, so that the power construction deployment device has a storage state in which the distance between the second support column 2 and the first support column 1 is the shortest, and an extended state in which the distance between the second support column 2 and the first support column 1 is the longest.
[0036] When using the electric power construction deployment device, first place the support 11 to the position where deployment is required, then make the support 11 support the first support column 1 and the second support column 2, and then pull the second support column 2 to move the second support column 2 away from the first support column 1, so that the distance between the second support column 2 and the first support column 1 gradually increases and the foundation pit is deployed.
[0037] When the electric power construction deployment device is stored, the second support column 2 is pushed, and then the second connecting pipe group 32 and the first connecting pipe group 31 slide relative to each other, and at the same time, the distance between the second support column 2 and the first support column 1 is gradually reduced, and finally the electric power construction deployment device is stored. Since the first support column 1 and the second support column 2 are connected by the first connecting pipe group 31 and the second connecting pipe group 32, the situation that the electric power construction deployment device is easily stuck during the storage process is avoided, thereby ensuring the normal use of the electric power construction deployment device, and then increasing the service life of the electric power construction deployment device.
[0038] Reference Figure 1 and Figure 2 In order to increase the deployment range of the electric power construction deployment device, multiple groups of second connecting pipe groups 32 are provided, and the multiple groups of second connecting pipe groups 32 are sequentially arranged from the inside to the outside. The second connecting pipe group 32 located innermost among the multiple groups of second connecting pipe groups 32 is connected to the second support column 2 to increase the adjustable range of the second support column 2, thereby increasing the deployment range of the electric power construction deployment device, and at the same time making the adjustable range of the electric power construction deployment device larger, thereby increasing the flexibility of the electric power construction deployment device.
[0039] Reference Figure 1 and Figure 2In order to increase the connection stability between the second support column 2 and the first support column 1, the first connecting tube group 31 includes a plurality of first connecting tubes 311, which are arranged in parallel and spaced apart and are all arranged perpendicular to the first support column 1, and each group of second connecting tube groups 32 includes a plurality of second connecting tubes 321, which are arranged in parallel and spaced apart and are all arranged perpendicular to the second support column 2. The second connecting tubes 321 in each group of second connecting tube groups 32 are arranged one-to-one with the first connecting tubes 311 to increase the guiding effect on the second support column 2 and increase the connection stability between the second support column 2 and the first support column 1.
[0040] Reference Figure 2 In order to increase the stability of the first connecting tube 311 and the second connecting tube 321, a first reinforcing rod 312 is arranged between two adjacent first connecting tubes 311, so that the multiple first connecting tubes 311 are connected as a whole, the structural strength of the first connecting tube 311 is increased, and thus the stability of the first connecting tube 311 is increased; a second reinforcing rod 322 is arranged between two adjacent second connecting tubes 321 in each group of second connecting tube groups 32, so that the multiple second connecting tubes 321 are connected as a whole, the structural strength of the second connecting tube 321 is increased, and thus the stability of the second connecting tube 321 is increased.
[0041] Reference Figure 2 , Figure 4 and Figure 5 In order to increase the connection stability between the second support column 2 and the first support column 1, a limiting member 313 is provided on the first connecting tube 311 and the second connecting tube 321, and a limiting groove 323 is provided on the second connecting tube 321 corresponding to the limiting member 313. When the distance between the first support column 1 and the second support column 2 is in the farthest state, the limiting member 313 cooperates with the end wall stopper corresponding to the limiting groove 323 to prevent the second connecting tube 321 from separating from the first connecting tube 311, or the second connecting tube 321 is separated from each other, resulting in the second support column 2 being separated from the first support column 1, thereby increasing the connection stability between the second support column 2 and the first support column 1.
[0042] The present application does not specifically limit the structure of the limiter 313. Preferably, refer to Figure 2 and Figure 5 The limiting member 313 is a hexagonal bolt, which is threadedly connected to the corresponding first connecting pipe 311 or the second connecting pipe 321, and the hexagonal bolt passes through the corresponding first connecting pipe 311 or the second connecting pipe 321 and extends into the corresponding limiting groove 323, so as to facilitate the production of the power construction deployment device, improve the production efficiency of the power construction deployment device, and reduce the production difficulty of the power construction deployment device. In other embodiments, the limiting member 313 can also be a limiting block or a screw or other structure that can extend into the limiting groove 323.
[0043] Reference Figure 1 and Figure 6 In order to reduce the space occupied by the electric power construction deployment device after storage, the circumferential surfaces of the first support column 1 and the second support column 2 are provided with matching holes 12, the support 11 includes a support leg 111 and a connecting column 112, and the connecting column 112 is provided with an elastic clip 4 that is engaged with the matching hole 12. A plurality of elastic clips 4 are evenly spaced along the circumference of the connecting column 112. Preferably, four elastic clips 4 are provided, two of which are arranged perpendicular to the plane where the support 11 and the first support column 1 and the second support column 2 are located, and the other two elastic clips 4 are arranged parallel to the plane where the support 11 and the first support column 1 and the second support column 2 are located. So that when the power construction deployment device is stored, the support 11 can be rotated, so that the elastic clip 4 perpendicular to the plane where the corresponding support 11 and the first support column 1 and the second support column 2 are located is separated from the matching hole 12, and the elastic clip 4 parallel to the plane where the corresponding support 11 and the first support column 1 and the second support column 2 are located is engaged with the matching hole 12, so as to reduce the space occupied by the power construction deployment device after storage.
[0044] Reference Figure 6 In order to reduce the force required by the construction personnel to rotate the support 11, the elastic clamping member 4 includes a clamping portion 41 and an elastic portion 42 acting on the clamping portion 41. The clamping portion 41 has an arcuate surface 411 that guides and cooperates with the matching hole 12. Then, when the construction personnel rotate the support 11, the arcuate surface 411 guides and cooperates with the matching hole 12 to separate the clamping portion 41 from the matching hole 12, thereby reducing the force required by the construction personnel to rotate the support 11.
[0045] The present application does not specifically limit the structure of the elastic portion 42. Preferably, refer to Figure 6 , the elastic part 42 is a spring, the connecting column 112 is provided with an accommodating cavity 114, the spring is located in the accommodating cavity 114, and when the first supporting column 1 or the second supporting column 2 corresponding to the clamping part 41 presses the clamping part 41, the clamping part 41 compresses the spring and moves toward the inside of the accommodating cavity 114, so that the clamping part 41 is separated from the matching hole 12. In other embodiments, the elastic part 42 can also be an elastic sheet.
[0046] Reference Figure 3 and Figure 6 In order to increase the stability of the support 11, support plates 113 are provided at both ends of the support legs 111. The support legs 111 are in contact with the ground through the support plates 113, thereby increasing the contact area between the support legs 111 and the ground, thereby increasing the stability of the support 11 and further increasing the stability of the power construction deployment device.
[0047] Reference Figure 1 and Figure 2 , because it is usually necessary to use multiple power construction deployment devices when deploying defenses in foundation pits. In order to increase the stability of two or more adjacent power construction deployment devices, the first support column 1 is provided with a connecting rod 13, and the end of the connecting rod 13 away from the first support column 1 is extended downward and parallel to the first support column 1, and the second support column 2 is provided with a connecting pipe 21 corresponding to the connecting rod 13. Then, when assembling multiple power construction deployment devices, the second support column 2 of the previous power construction deployment device is arranged close to the first support column 1 of the next power construction deployment device, and the connecting rod 13 is plugged and matched with the connecting pipe 21 to realize the assembly of two adjacent power construction deployment devices, thereby increasing the stability of the two adjacent power construction deployment devices.
[0048] The implementation principle of an electric power construction deployment device in an embodiment of the present application is: when using the electric power construction deployment device, first place the support 11 to the position where deployment is required, then make the support 11 support the first support column 1 and the second support column 2, and then pull the second support column 2 to make the second support column 2 move in a direction away from the first support column 1, so that the distance between the second support column 2 and the first support column 1 gradually increases and the foundation pit is deployed.
[0049] When the electric power construction deployment device is stored, the second support column 2 is pushed, and then the second connecting pipe group 32 and the first connecting pipe group 31 slide relative to each other, and at the same time, the distance between the second support column 2 and the first support column 1 is gradually reduced, and finally the electric power construction deployment device is stored. Since the first support column 1 and the second support column 2 are connected by the first connecting pipe group 31 and the second connecting pipe group 32, the situation that the electric power construction deployment device is easily stuck during the storage process is avoided, thereby ensuring the normal use of the electric power construction deployment device, and then increasing the service life of the electric power construction deployment device.
[0050] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A power construction defense device, characterized in that: The invention comprises a first support column (1), a second support column (2) arranged parallel to the first support column (1), and a telescopic structure (3) arranged between the first support column (1) and the second support column (2), wherein the telescopic structure (3) comprises a first connecting pipe group (31) arranged on the first support column (1) and a second connecting pipe group (32) arranged on the second support column (2), the second connecting pipe group (32) being slidably connected to the first connecting pipe group (31) so that the distance between the first support column (1) and the second support column (2) is adjustable, and the bottoms of the first support column (1) and the second support column (2) are both provided with supports (11).
2. The electric power construction defense device according to claim 1, characterized in that: The second connecting tube groups (32) are provided in a plurality of groups, and the plurality of groups of the second connecting tube groups (32) are sequentially sleeved from the inside to the outside, and the second connecting tube group (32) located innermost among the plurality of groups of the second connecting tube groups (32) is connected to the second supporting column (2).
3. The electric power construction defense device according to claim 2, characterized in that: The first connecting tube group (31) comprises a plurality of first connecting tubes (311), and each of the second connecting tube groups (32) comprises a plurality of second connecting tubes (321), wherein the second connecting tubes (321) are arranged in a one-to-one correspondence with the first connecting tubes (311).
4. The electric power construction defense device according to claim 3, characterized in that: A first reinforcing rod (312) is provided between two adjacent first connecting tubes (311), and a second reinforcing rod (322) is provided between two adjacent second connecting tubes (321) in each group (32) of second connecting tubes.
5. The electric power construction defense device according to claim 3, characterized in that: The first connecting tube (311) and the second connecting tube (321) are both provided with a limiting member (313), and the second connecting tube (321) is provided with a limiting groove (323) corresponding to the limiting member (313), and when the distance between the first supporting column (1) and the second supporting column (2) is at the farthest state, the limiting member (313) cooperates with an end wall stopper corresponding to the limiting groove (323).
6. The electric power construction defense device according to claim 5, characterized in that: The limiting member (313) is a hexagon socket bolt, and the hexagon socket bolt passes through the first connecting tube (311) or the second connecting tube (321) and extends into the limiting groove (323).
7. The electric power construction defense device according to claim 1, characterized in that: The circumferential surfaces of the first support column (1) and the second support column (2) are both provided with matching holes (12); the support (11) comprises a support leg (111) and a connecting column (112); and the connecting column (112) is provided with an elastic clamping piece (4) that is clamped and matched with the matching hole (12).
8. The electric power construction defense device according to claim 7, characterized in that: The elastic clamping member (4) comprises a clamping portion (41) and an elastic portion (42) acting on the clamping portion (41); the clamping portion (41) has an arcuate surface (411) that is guided and matched with the matching hole (12).
9. The electric power construction defense device according to claim 7, characterized in that: A plurality of the elastic clamping parts (4) are evenly spaced along the circumference of the connecting column (112).
10. The electric power construction defense device according to claim 1, characterized in that: The first support column (1) is provided with a connecting rod (13), and the second support column (2) is provided with a connecting pipe (21) corresponding to the connecting rod (13).
Citation Information
Patent Citations
Power construction defense organizing device
CN217326736U