Dustproof device for constructional engineering

By designing a dust-proof device with built-in water pipes in construction projects, using bearing connections and multiple nozzle distributions, the problems of inconvenient installation and transportation damage are solved, and convenient installation and efficient spraying effect are achieved.

CN222314790UActive Publication Date: 2025-01-07HUAMAO CONSTR ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421091135.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-20
Publication Date
2025-01-07
Estimated Expiration
2034-05-20

AI Technical Summary

Technical Problem

During construction projects, dustproof water pipes are inconvenient to install and are easily damaged during transportation.

Method used

Design a dustproof device for construction projects. The water pipe is built into the frame and is connected by bearings. The nozzle is evenly distributed with the nozzle. The plug-in pipe, the snap-on and the tapered ring are arranged for easy connection. The spring hook is used to fix the nozzle and pass it through Seal grooves and seal rings prevent water leakage.

Benefits of technology

It realizes convenient installation of water pipes and improves spraying effect, prevents damage to the nozzle during transportation, and simplifies the connection process between water pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222314790U_ABST
    Figure CN222314790U_ABST
Patent Text Reader

Abstract

The utility model discloses an anti-dust device for constructional engineering, which comprises a frame, a water pipe is connected inside the frame through a bearing, the outer wall of one side of the water pipe is connected with uniformly distributed spray pipes, the outer wall of one side of each spray pipe is connected with uniformly distributed nozzles through threads, and connecting pipes are welded on the side walls of two ends of the water pipe. A hose is arranged on one side of the connecting pipe, inserting pipes are connected to the two ends of the hose, one inserting pipe is inserted into the connecting pipe, conical rings are integrally formed on the outer walls of the inserting pipes, elastic plates are fixed to the outer walls of the two sides of the connecting pipe, and clamping teeth are integrally formed at the top ends of the elastic plates. According to the dustproof device, the water pipe is arranged in the frame of the fence, so that the water pipe does not need to be independently installed after the fence is fixed, the water pipe of the dustproof device is more convenient to install, and meanwhile, the spraying effect of the dustproof device is better by installing the multiple nozzles on the spraying pipe; and therefore, the dustproof device in the constructional engineering is better in use effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a dustproof device for construction engineering. Background Art

[0002] Construction engineering refers to the engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. It is a basic engineering project in human social activities. During the construction of construction projects, it is necessary to first fix the construction fence, and then fix the dustproof water pipe on the fence. In this way, the water pipe needs to be fixed separately, which makes the installation of the dustproof water pipe inconvenient. Therefore, it is urgent to design a dustproof device for construction projects to solve the above problems. Utility Model Content

[0003] The purpose of the utility model is to provide a dustproof device for construction engineering to solve the above-mentioned deficiencies in the prior art.

[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0005] A dust prevention device for construction engineering comprises a frame, wherein a water pipe is connected to the interior of the frame via a bearing, an outer wall on one side of the water pipe is connected to evenly distributed nozzles, an outer wall on one side of the nozzle is connected to evenly distributed nozzles via threads, connecting pipes are welded to the side walls at both ends of the water pipe, a hose is provided on one side of the connecting pipe, both ends of the hose are connected to plug-in pipes, one of the plug-in pipes is plugged into the interior of the connecting pipe, a conical ring is integrally formed on the outer wall of the plug-in pipe, spring plates are fixed to the outer walls on both sides of the connecting pipe, a latch tooth is integrally formed on the top of the spring plate, and the latch tooth is adapted to the conical ring.

[0006] Furthermore, a tension spring is fixed to the top inner wall of the frame, a hook is fixed to one end of the tension spring away from the frame, and the hook is connected to the nozzle.

[0007] Furthermore, a shielding plate is fixed to an outer wall on one side of the frame, a transverse plate is welded to an outer wall on one bottom side of the frame, and a reinforcing rod is welded between the transverse plate and the frame.

[0008] Furthermore, a mounting plate is welded to an outer wall of one side of the transverse plate, and a mounting hole is opened on the top outer wall of the mounting plate.

[0009] Furthermore, a sealing groove is formed on the inner wall of the connecting pipe, and a sealing ring is arranged inside the sealing groove.

[0010] Furthermore, a clamp is fixed to an outer wall of one side of the shielding plate, and the clamp is adapted to the nozzle.

[0011] In the above technical scheme, the utility model provides a dust-proof device for construction projects, which has the following beneficial effects: the water pipe is built into the frame of the enclosure, so that the water pipe does not need to be installed separately after the enclosure is fixed, thereby making the water pipe of the dust-proof device more convenient to install, and at the same time, by installing multiple nozzles on the nozzle, the spray effect of the dust-proof device is better, thereby making the dust-proof device in the construction project more effective when in use; the water pipe is connected to the frame by a bearing when the enclosure is transported, so that the water pipe can be fixed with the clamping part, thereby achieving the effect of folding the water pipe inside the frame, thereby preventing the frame from causing damage to the nozzle during handling and transportation; and the nozzle is hung with the hook on the tension spring, so that it is more convenient to fix the nozzle when it needs to be facing upward; the plug-in tube is directly plugged into the connecting pipe on the water pipe, and the plug-in tube is fixed inside the connecting pipe through the cooperation of the clamping tooth and the conical ring, thereby making it more convenient to connect the two water pipes on adjacent enclosures. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0013] Figure 1 The utility model provides an overall structural schematic diagram of a dustproof device for construction engineering.

[0014] Figure 2 The utility model is a schematic diagram of a plug-in pipe structure provided in an embodiment of a dustproof device for construction engineering.

[0015] Figure 3 This is a schematic diagram of the enlarged structure of point A provided in an embodiment of the utility model for a dustproof device for construction engineering.

[0016] Figure 4 This is a schematic diagram of the enlarged structure of point B provided in an embodiment of the utility model for a dustproof device for construction engineering.

[0017] Description of reference numerals:

[0018] 1 frame, 2 water pipe, 3 spray pipe, 4 nozzle, 5 baffle, 6 tension spring, 7 hook, 8 connecting pipe, 9 hose, 10 cross plate, 11 reinforcement rod, 12 mounting plate, 13 mounting hole, 14 plug-in tube, 15 conical ring, 16 spring plate, 17 clamping teeth, 18 sealing groove, 19 sealing ring, 20 clamp. DETAILED DESCRIPTION

[0019] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0020] like Figure 1-4 As shown, a dust prevention device for construction engineering provided by an embodiment of the utility model includes a frame 1, a water pipe 2 is connected to the inside of the frame 1 through a bearing, an outer wall on one side of the water pipe 2 is connected to a uniformly distributed nozzle 3, an outer wall on one side of the nozzle 3 is connected to a uniformly distributed nozzle 4 through a thread, connecting pipes 8 are welded to the side walls at both ends of the water pipe 2, a hose 9 is provided on one side of the connecting pipe 8, and plug-in tubes 14 are connected to both ends of the hose 9, one of the plug-in tubes 14 is plugged into the inside of the connecting pipe 8, a conical ring 15 is integrally formed on the outer wall of the plug-in tube 14, and spring plates 16 are fixed to the outer walls on both sides of the connecting pipe 8, and a latch tooth 17 is integrally formed on the top of the spring plate 16, and the latch tooth 17 is adapted to the conical ring 15.

[0021] Specifically, in this embodiment, a frame 1 is included, and the frame 1 is a frame body of the engineering enclosure. The interior of the frame 1 is connected to a water pipe 2 through a bearing, and both ends of the water pipe 2 are closed. One side outer wall of the water pipe 2 is connected to a uniformly distributed nozzle 3, and the nozzle 3 is connected to the water pipe 2. One side outer wall of the nozzle 3 is connected to a uniformly distributed nozzle 4 through a thread. There are multiple nozzles 4, so that the amount of spray is larger, and thus the dust prevention effect within the construction range is better. Connecting pipes 8 are welded to the side walls at both ends of the water pipe 2, and the connecting pipe 8 is connected to the water pipe 2. A hose 9 is provided on one side of the connecting pipe 8, and both ends of the hose 9 are connected to plug-in pipes 14, one of which is plugged into the inside of the connecting pipe 8, so that the hose 9 is connected to the water pipe 2, and the outer wall of the plug-in pipe 14 is integrally formed with a cone The spring plates 16 have a certain elasticity, and the top of the spring plates 16 is integrally formed with latch teeth 17, which are matched with the conical ring 15. The water pipes 2 in the two adjacent engineering enclosures are connected in the first place through the hose 9, and the plug-in tube 14 is directly plugged into the connecting pipe 8 on the water pipe 2, and the plug-in tube 14 is fixed inside the connecting pipe 8 through the cooperation of the latch teeth 17 and the conical ring 15, so that the connection between the two water pipes 2 on the adjacent enclosures is more convenient, and the inner wall of the connecting pipe 8 is provided with a sealing groove 18, and a sealing ring 19 is arranged inside the sealing groove 18. The sealing ring 19 is used to make the sealing effect between the plug-in tube 14 and the connecting pipe 8 better to prevent water leakage.

[0022] The utility model provides a dust prevention device for construction projects, in which a water pipe 2 is built into a frame 1 of an enclosure, so that after the enclosure is fixed, there is no need to install the water pipe 2 separately, thereby making the water pipe 2 of the dust prevention device more convenient to install. At the same time, by installing multiple nozzles 4 on the nozzle pipe 3, the spray effect of the dust prevention device is better, thereby making the dust prevention device in the construction project more effective when used.

[0023] In another embodiment provided by the utility model, a tension spring 6 is fixed to the top inner wall of the frame 1, a hook 7 is fixed to the end of the tension spring 6 away from the frame 1, the hook 7 is hooked to the nozzle 3, and the nozzle 3 is hooked through the hook 7 on the tension spring 6, making it more convenient to fix the nozzle 3 when it is needed to face upward.

[0024] In another embodiment provided by the utility model, a shielding plate 5 is fixed to the outer wall of one side of the frame 1, and the shielding plate 5 plays the role of blocking the line of sight and blocking the wind and sand. A horizontal plate 10 is welded to the outer wall of one side of the bottom of the frame 1, and a reinforcing rod 11 is welded between the horizontal plate 10 and the frame 1; a mounting plate 12 is welded to the outer wall of one side of the horizontal plate 10, and a mounting hole 13 is opened on the top outer wall of the mounting plate 12, and the mounting plate 12 is conveniently bolted through the mounting hole 13; a clamping member 20 is fixed to the outer wall of one side of the shielding plate 5, and the clamping member 20 is adapted to the nozzle 3. When the water pipe 2 is turned, the nozzle 3 can be clamped and fixed with the clamping member 20. The water pipe 2 is connected to the frame 1 through a bearing, so that when the enclosure is transported, the water spray pipe 2 can be fixed with the clamping member 20, thereby achieving the effect of folding the water spray pipe 2 inside the frame 1, thereby preventing the frame 1 from causing damage to the nozzle 3 during handling and transportation.

[0025] Working principle: When in use, firstly, multiple frames 1 are placed close together within the construction range, and expansion bolts are inserted into the mounting holes 13 to fix the mounting plate 12 to the ground, so that the frames 1 and the shielding plate 5 form a retaining wall for the construction project; then the nozzle 3 is detached from the inside of the clamp 20, and the water pipe 2 is rotated so that the nozzle 3 is located at the top of the water pipe 2, and at this time, the nozzle 3 is hung with the hook 7 on the tension spring 6; when it is necessary to connect the water pipes 2 on two adjacent enclosures, the plug-in tube 14 is plugged into the inside of the connecting tube 8, so that the latching teeth 17 on the spring plate 16 are latched with the conical ring 15, thereby achieving the effect of first-line connection between the two water pipes 2, making the connection between the two water pipes 2 more convenient.

[0026] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A dust prevention device for construction engineering, characterized in that: The invention comprises a frame (1), wherein a water pipe (2) is connected to the inside of the frame (1) via a bearing, an outer wall of one side of the water pipe (2) is connected to uniformly distributed nozzles (3), an outer wall of one side of the nozzle (3) is connected to uniformly distributed nozzles (4) via a thread, connecting pipes (8) are welded to the side walls at both ends of the water pipe (2), a hose (9) is provided on one side of the connecting pipe (8), both ends of the hose (9) are connected to plug-in pipes (14), one of the plug-in pipes (14) is plugged into the inside of the connecting pipe (8), a conical ring (15) is integrally formed on the outer wall of the plug-in pipe (14), and spring plates (16) are fixed to the outer walls of both sides of the connecting pipe (8), a latching tooth (17) is integrally formed at the top of the spring plate (16), and the latching tooth (17) is matched with the conical ring (15).

2. A dust prevention device for construction engineering according to claim 1, characterized in that: A tension spring (6) is fixed to the inner wall of the top of the frame (1), and a hook (7) is fixed to one end of the tension spring (6) away from the frame (1), and the hook (7) is connected to the nozzle (3).

3. A dust prevention device for construction engineering according to claim 1, characterized in that: A shielding plate (5) is fixed to an outer wall on one side of the frame (1), a transverse plate (10) is welded to an outer wall on one side of the bottom of the frame (1), and a reinforcing rod (11) is welded between the transverse plate (10) and the frame (1).

4. A dust prevention device for construction engineering according to claim 3, characterized in that: A mounting plate (12) is welded to an outer wall on one side of the transverse plate (10), and a mounting hole (13) is formed on the top outer wall of the mounting plate (12).

5. A dust prevention device for construction engineering according to claim 1, characterized in that: The inner wall of the connecting pipe (8) is provided with a sealing groove (18), and a sealing ring (19) is arranged inside the sealing groove (18).

6. A dust prevention device for construction engineering according to claim 3, characterized in that: A clamping piece (20) is fixed to an outer wall of one side of the baffle plate (5), and the clamping piece (20) is compatible with the nozzle (3).