Emergency treatment device for cooling system of chlorine turbine compressor
By designing the emergency treatment device for the cooling system of the chlorine turbine compressor, using its own water source and electrical chain control system, the rapid temperature rise caused by the failure of the circulating pump is solved, and the smooth operation and safe production of the chlorine turbine compressor are achieved.
Patent Information
- Application Number
- CN202420516517.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2034-03-18
AI Technical Summary
The existing chlorine turbine compressor cooling system cannot recover quickly when the circulation pump fails, resulting in a rapid rise in the temperature of the chlorine turbine compressor, causing a parking accident and affecting production safety.
An emergency treatment device for cooling system of chlorine turbine compressor was designed, including a circulation pool, a circulation water cooler, a chlorine intercooler, a chlorine aftercooler and a controller. It uses its own water source and electrical chain control system to quickly solve the circulation pump Failure ensures smooth operation of the chlorine turbine compressor.
It effectively shortens the emergency treatment time, ensures the safe and continuous production of chlorine turbine compressors, and improves the safety productivity and production efficiency of the enterprise.
Smart Images

Figure CN222315469U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of stable operation of a cooling system of a chlorine turbine compressor in the chlor-alkali industry, and is an emergency treatment device for a cooling system of a chlorine turbine compressor. Background Art
[0002] Chlorine has strong oxidizing properties and can react with all metals under heating conditions. For example, gold and platinum burn in hot chlorine, and react with variable-valent metals such as Fe and Cu to produce high-valent metal chlorides. When the temperature of chlorine reaches 149°C, it will react violently with iron.
[0003] At present, the chlorine-alkali plant of a certain chemical enterprise uses a chlorine turbine compressor to perform secondary compression of chlorine to the required pressure. Only the compressed chlorine can enter the process system for preparing high-concentration alkali. In the process of compressing chlorine, the chlorine turbine compressor will increase the temperature of the chlorine. The high-temperature chlorine will react with the Fe in the chlorine turbine compressor equipment to generate high-valent metal chlorides. As the chlorine turbine compressor operates at high temperature for a long time, the high-temperature chlorine will cause serious damage to the chlorine turbine compressor equipment, affecting the safe operation of the chlorine turbine compressor. Therefore, the heat generated by the chlorine turbine compressor after the first and second compression must be removed in time.
[0004] To solve the above-mentioned problem of high-temperature chlorine damaging the chlorine turbine compressor, a chemical company's chlor-alkali unit uses a closed pure water circulation cooling system to cool the compressed chlorine, and the closed pure water circulation cooling system uses a circulating pump without pressure return water to drive the system water circulation. The circulating pump is a self-priming water pump. Before starting, it is necessary to remove the pump body water supply bolts, and then find a water source to fill the circulating pump cavity with water before starting. After starting, it is also necessary to adjust the circulating pump return valve several times to gradually exhaust the air in the suction pipeline to avoid cavitation of the water pump, so that the water can completely enter the pump and complete the self-priming water circulation process. It takes at least 3 to 5 minutes from starting the pump to the pressure reaching the normal working state. The maximum safety electric interlock value of the first and second stage compression inlet temperatures of the chlorine turbine compressor is 110°C, while the normal operating cooling temperature of the closed pure water circulation cooling system is 85°C to 90°C. If the circulating pump fails and stops, the entire closed pure water circulating cooling system will be unbalanced, and the first and second stage compression inlet temperatures of the chlorine turbine compressor will rise rapidly and soon reach the maximum safety interlock value of the chlorine turbine compressor inlet temperature, causing the chlorine turbine compressor to stop, which will eventually cause the entire chlor-alkali plant to shut down.
[0005] Once the circulation pump trips and stops, the existing emergency treatment measures cannot overcome the above problems. Improving the safe production rate of the chlorine turbine compressor cooling system has become a technical problem that is difficult for enterprises to overcome. Summary of the invention
[0006] The utility model provides an emergency treatment device for a cooling system of a chlorine gas turbine compressor, which overcomes the deficiencies of the above-mentioned prior art and can effectively ensure the stable and safe operation of the chlorine gas turbine compressor in the chlor-alkali industry, thereby improving the safety production rate and production efficiency of the enterprise.
[0007] The technical scheme of the utility model is realized by the following measures: an emergency treatment device for a cooling system of a chlorine turbine compressor, comprising a circulating water pool, a circulating water cooler, a chlorine intermediate cooler, a chlorine aftercooler, and a chlorine turbine compressor, wherein an upper liquid inlet of the circulating water cooler is fixedly connected with a chilled water supply pipeline, a lower liquid outlet of the circulating water cooler is fixedly connected with a chilled water return pipeline, a first circulating water pipeline is fixedly connected between a first liquid outlet at the top of the circulating water pool and a lower liquid inlet of the circulating water cooler, a first circulating pump is fixedly installed on the first circulating water pipeline, a third circulating water pipeline is fixedly connected between the upper liquid outlet of the circulating water cooler and the lower liquid inlet of the chlorine intermediate cooler, a fourth circulating water pipeline is fixedly connected between the third circulating water pipeline and the lower liquid inlet of the chlorine aftercooler, a third circulating water pipeline is fixedly connected between the upper liquid outlet of the chlorine intermediate cooler and the first liquid inlet at the top of the circulating water pool, and a fourth circulating water pipeline is fixedly connected between the upper liquid outlet of the chlorine intermediate cooler and the first liquid inlet at the top of the circulating water pool. Five circulating water pipelines, a sixth circulating water pipeline is fixedly connected between the upper liquid outlet of the chlorine aftercooler and the fifth circulating water pipeline, a first chlorine pipeline is fixedly connected to the first air inlet at the bottom of the chlorine turbine compressor, a second chlorine pipeline is fixedly connected between the first air outlet at the bottom of the chlorine turbine compressor and the top air inlet of the chlorine intermediate cooler, a third chlorine pipeline is fixedly connected between the top air outlet of the chlorine intermediate cooler and the second air inlet at the bottom of the chlorine turbine compressor, a fourth chlorine pipeline is fixedly connected between the second air outlet at the bottom of the chlorine turbine compressor and the top air inlet of the chlorine aftercooler, a fifth chlorine pipeline is fixedly connected to the top air outlet of the chlorine aftercooler, a first crossing pipeline is fixedly connected between the third circulating water pipeline and the first circulating water pipeline between the first circulating pump and the lower liquid inlet of the circulating water cooler, and a second crossing pipeline is fixedly connected between the chilled water upper water pipeline and the first crossing pipeline.
[0008] The following are further optimizations and / or improvements to the above utility model technical solution:
[0009] A second circulating water pipeline is fixedly connected between the second liquid outlet at the top of the circulating water pool and the first circulating water pipeline between the first circulating pump and the lower liquid inlet of the circulating water cooler, and a second circulating pump is fixedly installed on the second circulating water pipeline.
[0010] A seventh circulating water pipeline is fixedly connected between the first circulating water pipeline between the first circulating pump and the second circulating water pipeline and the second liquid inlet at the top of the circulating water pool.
[0011] The first circulating water pipeline between the first circulating pump and the seventh circulating water pipeline is fixedly connected with a first shower pipeline.
[0012] An eighth circulating water pipeline is fixedly connected between the second circulating water pipeline between the second circulating pump and the first circulating water pipeline and the third liquid inlet on the top of the circulating water pool.
[0013] The second circulating water pipeline between the second circulating pump and the eighth circulating water pipeline is fixedly connected with a second shower pipeline.
[0014] The first shower conduit is provided with a first pressure gauge, and the second shower conduit is provided with a second pressure gauge.
[0015] A first thermometer is arranged on the third circulating water pipeline between the first crossing pipeline and the lower liquid inlet of the chlorine intermediate cooler, a second thermometer is arranged on the second chlorine pipeline, a third thermometer is arranged on the fourth chlorine pipeline, a fourth thermometer is arranged on the fifth chlorine pipeline, and a liquid level meter is arranged on the circulating water pool.
[0016] A first solenoid valve is fixedly installed on the above-mentioned second crossing pipeline, a second solenoid valve is fixedly installed on the third circulating water pipeline between the upper liquid outlet of the circulating water cooler and the first crossing pipeline, a third solenoid valve is fixedly installed on the first crossing pipeline between the third circulating water pipeline and the second crossing pipeline, a fourth solenoid valve is fixedly installed on the first circulating water pipeline between the first crossing pipeline and the lower liquid inlet of the circulating water cooler, a fifth solenoid valve is fixedly installed on the first circulating water pipeline between the seventh circulating water pipeline and the second circulating water pipeline, a sixth solenoid valve is fixedly installed on the seventh circulating water pipeline, a seventh solenoid valve is fixedly installed on the second circulating water pipeline between the eighth circulating water pipeline and the first circulating water pipeline, an eighth solenoid valve is fixedly installed on the eighth circulating water pipeline, a ninth solenoid valve is fixedly installed on the first shower pipeline between the first pressure gauge and the outlet of the first shower pipeline, and a tenth solenoid valve is fixedly installed on the second shower pipeline between the second pressure gauge and the outlet of the second shower pipeline.
[0017] The above-mentioned device also includes a controller, and the chlorine turbine compressor, the first pressure gauge, the second pressure gauge, the first thermometer, the second thermometer, the third thermometer, the fourth thermometer, the liquid level gauge, the first solenoid valve, the second solenoid valve, the third solenoid valve, the fourth solenoid valve, the fifth solenoid valve, the sixth solenoid valve, the seventh solenoid valve, the eighth solenoid valve, the ninth solenoid valve, and the tenth solenoid valve are all electrically connected to the controller.
[0018] The utility model has a reasonable and compact structure and is easy to use. It utilizes the device's own water source, increases process pipelines, and utilizes a controller to electrically interlock valves and other components, so that the device can not only ensure continuous safe production, but also quickly resolve circulation pump tripping failures that occur during production, effectively ensuring the smooth and safe operation of the chlorine turbine compressor in the chlor-alkali industry, and improving the enterprise's safety productivity and production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Attached Figure 1 This is a schematic diagram of the process flow of the utility model.
[0020] Attached Figure 1 The codes in are as follows: 1 is a circulating water tank, 2 is a circulating water cooler, 3 is a chlorine gas intermediate cooler, 4 is a chlorine gas aftercooler, 5 is a chlorine gas turbine compressor, 6 is a chilled water supply pipeline, 7 is a chilled water return pipeline, 8 is a first circulating water pipeline, 9 is a second circulating water pipeline, 10 is a first circulating pump, 11 is a second circulating pump, 12 is a third circulating water pipeline, 13 is a fourth circulating water pipeline, 14 is a fifth circulating water pipeline, 15 is a sixth circulating water pipeline, 16 is a first chlorine gas pipeline, 17 is a second chlorine gas pipeline, 18 is a third chlorine gas pipeline, 19 is a fourth chlorine gas pipeline, 20 is a fifth chlorine gas pipeline, 21 is a sixth chlorine gas pipeline, 22 is a sixth chlorine gas pipeline, 23 is a sixth chlorine gas pipeline, 24 is a sixth chlorine gas pipeline, 25 is a sixth chlorine gas pipeline, 26 is a sixth chlorine gas pipeline, 27 is a sixth chlorine gas pipeline, 28 is a sixth chlorine gas pipeline, 29 is a sixth chlorine gas pipeline, 30 is a sixth chlorine gas pipeline, 31 is a sixth chlorine gas pipeline, 32 is a sixth chlorine gas pipeline, 33 is a sixth chlorine gas pipeline, 34 is a sixth chlorine gas pipeline, 35 is a sixth chlorine gas pipeline, 36 is a first chlorine gas pipeline, 37 is a second chlorine gas pipeline, 38 is a third chlorine gas pipeline, 39 is a fourth chlorine gas pipeline, 40 is a fifth chlorine gas pipeline, 41 is a sixth chlorine gas pipeline, 42 is a sixth chlorine gas pipeline, 43 is a sixth chlorine gas pipeline, 44 is a sixth chlorine gas pipeline, 45 is a sixth chlor Two crossing pipelines, 22 is the first crossing pipeline, 23 is the seventh circulating water pipeline, 24 is the eighth circulating water pipeline, 25 is the first pressure gauge, 26 is the second pressure gauge, 27 is the first thermometer, 28 is the second thermometer, 29 is the third thermometer, 30 is the fourth thermometer, 31 is the liquid level gauge, 32 is the first solenoid valve, 33 is the second solenoid valve, 34 is the third solenoid valve, 35 is the fourth solenoid valve, 36 is the fifth solenoid valve, 37 is the sixth solenoid valve, 38 is the seventh solenoid valve, 39 is the eighth solenoid valve, 40 is the first shower line, 41 is the second shower line, 42 is the ninth solenoid valve, and 43 is the tenth solenoid valve. DETAILED DESCRIPTION
[0021] The present invention is not limited by the following embodiments, and specific implementation methods can be determined according to the technical solution of the present invention and actual conditions.
[0022] In the present invention, unless otherwise specified, the equipment and devices used are all the equipment and devices known and used in the art.
[0023] In the present invention, for the convenience of description, the relative position relationship of each component is described according to the attached manual. Figure 1 The layout is described in detail, such as the positional relationship of front, back, top, bottom, left, right, etc., which is based on the attached manual. Figure 1 The layout direction is determined by the
[0024] The present invention is further described below in conjunction with the embodiments and drawings:
[0025] Embodiment 1: As attached Figure 1As shown, the emergency treatment device for the cooling system of the chlorine turbine compressor comprises a circulating water pool 1, a circulating water cooler 2, a chlorine intercooler 3, a chlorine aftercooler 4, and a chlorine turbine compressor 5. The upper liquid inlet of the circulating water cooler 2 is fixedly connected with a chilled water supply pipeline 6, and the lower liquid outlet of the circulating water cooler 2 is fixedly connected with a chilled water return pipeline 7. A first circulating water pipeline 8 is fixedly connected between the first liquid outlet at the top of the circulating water pool 1 and the lower liquid inlet of the circulating water cooler 2. A first circulating pump 10 is fixedly installed on the first circulating water pipeline 8. A third circulating water pipeline 12 is fixedly connected between the upper liquid outlet of the circulating water cooler 2 and the lower liquid inlet of the chlorine intercooler 3. A fourth circulating water pipeline 13 is fixedly connected between the third circulating water pipeline 12 and the lower liquid inlet of the chlorine aftercooler 4. A fifth circulating water pipeline 14 is fixedly connected between the upper liquid outlet of the chlorine intercooler 3 and the first liquid inlet at the top of the circulating water pool 1. A sixth circulating water pipeline 15 is fixedly connected between the bottom liquid outlet and the fifth circulating water pipeline 14, a first chlorine pipeline 16 is fixedly connected to the first air inlet at the bottom of the chlorine turbine compressor 5, a second chlorine pipeline 17 is fixedly connected between the first air outlet at the bottom of the chlorine turbine compressor 5 and the top air inlet of the chlorine intermediate cooler 3, a third chlorine pipeline 18 is fixedly connected between the top air outlet of the chlorine intermediate cooler 3 and the second air inlet at the bottom of the chlorine turbine compressor 5, a fourth chlorine pipeline 19 is fixedly connected between the second air outlet at the bottom of the chlorine turbine compressor 5 and the top air inlet of the chlorine aftercooler 4, a fifth chlorine pipeline 20 is fixedly connected to the top air outlet of the chlorine aftercooler 4, a first crossover pipeline 22 is fixedly connected between the third circulating water pipeline 12 and the first circulating water pipeline 8 between the first circulating pump 10 and the lower liquid inlet of the circulating water cooler 2, and a second crossover pipeline 21 is fixedly connected between the chilled water upper water pipeline 6 and the first crossover pipeline 22.
[0026] According to the needs, the circulating water cooler 2 is a plate cooler, the chlorine intermediate cooler 3 and the chlorine aftercooler 4 are tube-and-tube coolers, the circulating water pool 1 provides the required water for the cooling system of the device, and its liquid level is controlled at 75% of its own volume, which can avoid the overflow phenomenon caused by the excessive liquid level of the circulating water pool 1 after the device is put into use. The first circulating pump 1 and the second circulating pump 2 provide circulating power for the cooling system of the device, and the water in the circulating water pool 1 exchanges heat with the +7°C cooling water in the circulating water cooler 2, and the circulating water temperature of the cooling system of the device is controlled at 12°C to 15°C, and the chlorine after primary compression and the chlorine after secondary compression are cooled by the chlorine intermediate cooler 3 and the chlorine aftercooler 4. The circulating water after heat exchange by the chlorine intermediate cooler 3 and the chlorine aftercooler 4 is collected in the circulating water pool 1 through the fifth circulating water pipeline 14 and the sixth circulating water pipeline 15 for repeated circulation.
[0027] As needed, the first crossing pipeline 22 and the second crossing pipeline 21 are key pipelines for emergency treatment of the cooling system of the device. The device's own water source is used to introduce the faulty first circulating pump 10 or the faulty second circulating pump 11, which overcomes the drawbacks of the original emergency treatment measures of the device, shortens the fault tripping time of the first circulating pump 10 or the second circulating pump 11 for emergency treatment, and ensures the smooth and safe operation of the chlorine turbine compressor 5.
[0028] The above-mentioned emergency treatment device for the cooling system of the chlorine gas turbine compressor can be further optimized and / or improved according to actual needs:
[0029] As attached Figure 1 As shown, a second circulating water pipeline 9 is fixedly connected between the second liquid outlet at the top of the circulating water pool 1 and the first circulating water pipeline 8 between the first circulating pump 10 and the lower liquid inlet of the circulating water cooler 2, and a second circulating water pipeline 9 is fixedly installed with a second circulating pump 11.
[0030] As attached Figure 1 As shown, a seventh circulating water pipeline 23 is fixedly connected between the first circulating water pipeline 8 between the first circulating pump 10 and the second circulating water pipeline 9 and the second liquid inlet at the top of the circulating water pool 1 .
[0031] As attached Figure 1 As shown, the first circulating water pipeline 8 between the first circulating pump 10 and the seventh circulating water pipeline 23 is fixedly connected with the first shower pipeline 40 .
[0032] As attached Figure 1 As shown, an eighth circulating water pipeline 24 is fixedly connected between the second circulating water pipeline 9 between the second circulating pump 11 and the first circulating water pipeline 8 and the third liquid inlet at the top of the circulating water pool 1 .
[0033] As attached Figure 1 As shown, the second circulating water pipeline 9 between the second circulating pump 11 and the eighth circulating water pipeline 24 is fixedly connected with a second shower pipe 41 .
[0034] As attached Figure 1 As shown, a first pressure gauge 25 is provided on the first shower conduit line 40 , and a second pressure gauge 26 is provided on the second shower conduit line 41 .
[0035] As attached Figure 1 As shown, a first thermometer 27 is provided on the third circulating water pipeline 12 between the first crossing pipeline 22 and the lower liquid inlet of the chlorine intermediate cooler 3, a second thermometer 28 is provided on the second chlorine pipeline 17, a third thermometer 29 is provided on the fourth chlorine pipeline 19, a fourth thermometer 30 is provided on the fifth chlorine pipeline 20, and a liquid level meter 31 is provided on the circulating water pool 1.
[0036] As attached Figure 1As shown, a first solenoid valve 32 is fixedly installed on the second cross-over pipeline 21, a second solenoid valve 33 is fixedly installed on the third circulating water pipeline 12 between the upper liquid outlet of the circulating water cooler 2 and the first cross-over pipeline 22, a third solenoid valve 34 is fixedly installed on the first cross-over pipeline 22 between the third circulating water pipeline 12 and the second cross-over pipeline 21, a fourth solenoid valve 35 is fixedly installed on the first circulating water pipeline 8 between the first cross-over pipeline 22 and the lower liquid inlet of the circulating water cooler 2, and a first circulating water pipeline between the seventh circulating water pipeline 23 and the second circulating water pipeline 9 is fixedly installed. 8, a fifth solenoid valve 36 is fixedly installed on the seventh circulating water pipeline 23, a sixth solenoid valve 37 is fixedly installed on the seventh circulating water pipeline 23, a seventh solenoid valve 38 is fixedly installed on the second circulating water pipeline 9 between the eighth circulating water pipeline 24 and the first circulating water pipeline 8, an eighth solenoid valve 39 is fixedly installed on the eighth circulating water pipeline 24, a ninth solenoid valve 42 is fixedly installed on the first shower line 40 between the first pressure gauge 25 and the outlet of the first shower line 40, and a tenth solenoid valve 43 is fixedly installed on the second shower line 41 between the second pressure gauge 26 and the outlet of the second shower line 41.
[0037] As required, the first solenoid valve 32, the third solenoid valve 34, and the fourth solenoid valve 35 are all butterfly valves with self-locking function, which can be opened and closed quickly and have good fluid control characteristics. The rest can be conventional solenoid valves in the art.
[0038] As attached Figure 1 As shown, the device also includes a controller, and the chlorine turbine compressor 5, the first pressure gauge 25, the second pressure gauge 26, the first thermometer 27, the second thermometer 28, the third thermometer 29, the fourth thermometer 30, the liquid level gauge 31, the first solenoid valve 32, the second solenoid valve 33, the third solenoid valve 34, the fourth solenoid valve 35, the fifth solenoid valve 36, the sixth solenoid valve 37, the seventh solenoid valve 38, the eighth solenoid valve 39, the ninth solenoid valve 42, and the tenth solenoid valve 43 are all electrically connected to the controller.
[0039] According to the needs, the first solenoid valve 32, the third solenoid valve 34, the sixth solenoid valve 37, the eighth solenoid valve 39, the ninth solenoid valve 42, and the tenth solenoid valve 43 of the device are all in a normally closed state. When the first circulating pump 10 or the second circulating pump 11 fails, the emergency system of the device is started for emergency treatment. The whole operation process is simple and convenient, and can be operated by one person, overcoming the disadvantages of the original emergency system operated by multiple people and the long time of handling the emergency system. By using the device's own water source, the third solenoid valve 34 and the fourth solenoid valve 35 are closed, and water is injected into the first circulating pump 10 or the second circulating pump 11, and then the fifth solenoid valve 36, the seventh solenoid valve 37, the eighth solenoid valve 37, the eighth solenoid valve 37, the ninth solenoid valve 37, the tenth ... first solenoid pump 10 or the second circulating pump 11 is closed. Solenoid valve 38, open the ninth solenoid valve 42, the tenth solenoid valve 43, the sixth solenoid valve 37 and the eighth solenoid valve 39 are all opened to 1 / 2 opening, when the first pressure gauge 25 and the second pressure gauge 26 show 0.2MPa, complete the self-priming restart process of the first circulating pump 10 or the second circulating pump 11, and finally immediately close the first solenoid valve 32, the third solenoid valve 34, the sixth solenoid valve 37, the eighth solenoid valve 39, the ninth solenoid valve 42, and the tenth solenoid valve 43 to prevent the circulating water of the device from exchanging heat with the +7℃ cooling water in the circulating water pool 1, thereby preventing the process temperature balance of the closed circulating water system of the device from being destroyed. After each restart of the pump, the circulating water in the circulating water pool 1 needs to be replaced 2 to 3 times in time to ensure that the water quality indicators of the closed water circulation system of the device are qualified.
[0040] According to the needs, the pipelines and equipment of the emergency treatment device of the chlorine gas turbine compressor cooling system can also be equipped with conventional valves, thermometers and pressure gauges known in the art according to production needs. The controller is a DCS controller, and the model of the DCS controller can be the CS3000 controller produced by Yokogawa Corporation of Japan.
[0041] The above technical features constitute the embodiments of the present utility model, which have strong adaptability and implementation effect. Non-essential technical features can be added or reduced according to actual needs to meet the requirements of different situations.
[0042] The use process of the embodiment of the utility model is as follows: First, the stored water in the circulating water pool 1 enters the circulating water cooler 2 through the first circulating water pipeline 8 and the second circulating water pipeline 9 under the power of the first circulating pump 10 and the second circulating pump 11. At the same time, the chilled water enters the circulating water cooler 2 through the chilled water supply pipeline 6. In the circulating water cooler 2, the chilled water exchanges heat and cools the circulating water entering from the first circulating water pipeline 8 to obtain the circulating water with the required temperature of the device. The circulating water with the required temperature enters the pipe path of the chlorine intermediate cooler 3 and the chlorine aftercooler 4 through the third circulating water pipeline 12 and the fourth circulating water pipeline 13. At this time, the chlorine enters the chlorine turbine compressor 5 through the first chlorine pipeline 16 for primary compression, and the compressed chlorine enters the shell side of the chlorine intermediate cooler 3 through the second chlorine pipeline 17. The condensed medium in the tube side of the chlorine intermediate cooler 3 cools the chlorine in the shell side of the chlorine intermediate cooler 3 to obtain chlorine at the required temperature. The chlorine at the required temperature enters the chlorine turbine compressor 5 through the third chlorine pipeline 18 for secondary compression. The chlorine after the secondary compression enters the chlorine aftercooler 4 through the fourth chlorine pipeline 19 for heat exchange and cooling to obtain chlorine at the required temperature of the downstream process. Finally, the tube side condensed medium of the chlorine intermediate cooler 3 and the chlorine aftercooler 4 enters the circulating water pool 1 through the fifth circulating water pipeline 14 and the sixth circulating water pipeline 15.
[0043] When the first circulating pump 10 or the second circulating pump 11 fails during the above-mentioned use, chilled water is injected into the first circulating pump 10 or the second circulating pump 11 through the chilled water supply pipeline 6, the second crossing pipeline 21, the first crossing pipeline 22, the first circulating water pipeline 8, and the second circulating water pipeline 9 to complete the pump self-priming restart process.
Claims
1. An emergency treatment device for a chlorine turbine compressor cooling system, characterized in that The invention comprises a circulating water pool, a circulating water cooler, a chlorine intermediate cooler, a chlorine aftercooler and a chlorine turbine compressor. The upper liquid inlet of the circulating water cooler is fixedly connected with a chilled water supply pipeline, the lower liquid outlet of the circulating water cooler is fixedly connected with a chilled water return pipeline, the first circulating water pipeline is fixedly connected between the first liquid outlet at the top of the circulating water pool and the lower liquid inlet of the circulating water cooler, a first circulating pump is fixedly installed on the first circulating water pipeline, the upper liquid outlet of the circulating water cooler and the lower liquid inlet of the chlorine intermediate cooler are fixedly connected with a third circulating water pipeline, the third circulating water pipeline and the lower liquid inlet of the chlorine aftercooler are fixedly connected with a fourth circulating water pipeline, the upper liquid outlet of the chlorine intermediate cooler and the first liquid inlet at the top of the circulating water pool are fixedly connected with a fifth circulating water pipeline, the upper liquid outlet of the chlorine aftercooler is connected with the fifth circulating water pipeline, and the upper liquid outlet of the chlorine aftercooler is connected with the fifth circulating water pipeline. A sixth circulating water pipeline is fixedly connected between the circulating water pipelines, a first chlorine pipeline is fixedly connected to the first air inlet at the bottom of the chlorine turbine compressor, a second chlorine pipeline is fixedly connected between the first air outlet at the bottom of the chlorine turbine compressor and the top air inlet of the chlorine intermediate cooler, a third chlorine pipeline is fixedly connected between the top air outlet of the chlorine intermediate cooler and the second air inlet at the bottom of the chlorine turbine compressor, a fourth chlorine pipeline is fixedly connected between the second air outlet at the bottom of the chlorine turbine compressor and the top air inlet of the chlorine aftercooler, a fifth chlorine pipeline is fixedly connected to the top air outlet of the chlorine aftercooler, a first crossing pipeline is fixedly connected between the third circulating water pipeline and the first circulating water pipeline between the first circulating pump and the lower liquid inlet of the circulating water cooler, and a second crossing pipeline is fixedly connected between the chilled water supply pipeline and the first crossing pipeline.
2. The chlorine turbine compressor cooling system emergency treatment device according to claim 1, characterized in that A second circulating water pipeline is fixedly connected between the second liquid outlet at the top of the circulating water pool and the first circulating water pipeline between the first circulating pump and the lower liquid inlet of the circulating water cooler, and a second circulating pump is fixedly installed on the second circulating water pipeline.
3. The chlorine turbine compressor cooling system emergency treatment device according to claim 2 is characterized in that A seventh circulating water pipeline is fixedly connected between the first circulating water pipeline between the first circulating pump and the second circulating water pipeline and the second liquid inlet at the top of the circulating water pool.
4. The chlorine gas turbine compressor cooling system emergency treatment device according to claim 3 is characterized in that The first circulating water pipeline between the first circulating pump and the seventh circulating water pipeline is fixedly connected with a first shower pipeline.
5. The chlorine gas turbine compressor cooling system emergency treatment device according to claim 2, 3 or 4, characterized in that An eighth circulating water pipeline is fixedly connected between the second circulating water pipeline between the second circulating pump and the first circulating water pipeline and the third liquid inlet on the top of the circulating water pool.
6. The chlorine gas turbine compressor cooling system emergency treatment device according to claim 5, characterized in that The second circulating water pipeline between the second circulating pump and the eighth circulating water pipeline is fixedly connected with a second shower pipeline.
7. The chlorine gas turbine compressor cooling system emergency treatment device according to claim 6, characterized in that A first pressure gauge is provided on the first shower conduit line, and a second pressure gauge is provided on the second shower conduit line.
8. The chlorine gas turbine compressor cooling system emergency treatment device according to claim 7, characterized in that A first thermometer is arranged on the third circulating water pipeline between the first crossing pipeline and the lower liquid inlet of the chlorine intermediate cooler, a second thermometer is arranged on the second chlorine pipeline, a third thermometer is arranged on the fourth chlorine pipeline, a fourth thermometer is arranged on the fifth chlorine pipeline, and a liquid level meter is arranged on the circulating water pool.
9. The chlorine gas turbine compressor cooling system emergency treatment device according to claim 6, 7 or 8, characterized in that A first solenoid valve is fixedly installed on the second crossing pipeline, a second solenoid valve is fixedly installed on the third circulating water pipeline between the upper liquid outlet of the circulating water cooler and the first crossing pipeline, a third solenoid valve is fixedly installed on the first crossing pipeline between the third circulating water pipeline and the second crossing pipeline, a fourth solenoid valve is fixedly installed on the first circulating water pipeline between the first crossing pipeline and the lower liquid inlet of the circulating water cooler, a fifth solenoid valve is fixedly installed on the first circulating water pipeline between the seventh circulating water pipeline and the second circulating water pipeline, a sixth solenoid valve is fixedly installed on the seventh circulating water pipeline, a seventh solenoid valve is fixedly installed on the second circulating water pipeline between the eighth circulating water pipeline and the first circulating water pipeline, an eighth solenoid valve is fixedly installed on the eighth circulating water pipeline, a ninth solenoid valve is fixedly installed on the first shower pipeline between the first pressure gauge and the outlet of the first shower pipeline, and a tenth solenoid valve is fixedly installed on the second shower pipeline between the second pressure gauge and the outlet of the second shower pipeline.
10. The chlorine gas turbine compressor cooling system emergency treatment device according to claim 9, characterized in that It also includes a controller, and the chlorine turbine compressor, the first pressure gauge, the second pressure gauge, the first thermometer, the second thermometer, the third thermometer, the fourth thermometer, the liquid level gauge, the first solenoid valve, the second solenoid valve, the third solenoid valve, the fourth solenoid valve, the fifth solenoid valve, the sixth solenoid valve, the seventh solenoid valve, the eighth solenoid valve, the ninth solenoid valve, and the tenth solenoid valve are all electrically connected to the controller.