By using a combination device of walking, hanging, side connection and drag mechanism during the installation of suspension cable clamps, the problem of lack of initial positioning of cable clamp installation is solved, and the rapid and accurate installation of cable clamps is achieved, and the installation accuracy and quality.
Patent Information
- Application Number
- CN202420623998.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-28
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2034-03-28
Smart Images

Figure CN222332476U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of suspension bridges, in particular to a suspension bridge retaining device. Background Art
[0002] A suspension bridge, also known as a suspension bridge, refers to a bridge that uses cables (or steel chains) suspended from towers and anchored on both banks (or both ends of the bridge) as the main load-bearing components of the upper structure. The geometric shape of the cables is determined by the balance of forces and is generally close to a parabola. Many hangers are hung from the cables to suspend the bridge deck. Stiffening beams are often set between the bridge deck and the hangers to form a combined system with the cables to reduce the deflection caused by the load.
[0003] The cable clamp of a suspension bridge is a key load-bearing component in the upper structure of a suspension bridge. A suspension bridge is mainly composed of main cables, side cables and oblique cables, and the cable clamp of a suspension bridge is an important component used to fix these cables. The cable clamp of a suspension bridge can bear huge tension, and make the cables tightly connected, and maintain the stability and safety of the structure. The role of the cable clamp is similar to that of a clamp. It needs to have sufficient strength and rigidity so that it does not slide when the main cable is subjected to tension, and it must also be able to flexibly adapt to the expansion and contraction changes of the main cable. In addition, the cable clamp also bears the weight of the bridge deck system and other live loads, which is crucial to the safety and durability of the suspension bridge.
[0004] The cable clamps of suspension bridges are mostly in the form of two halves, but in the current technology, the cable clamps do not have the function of initial positioning during installation. The heavy cable clamps require manual placement and positioning by installation workers throughout the entire process. In addition, the installation height of the main cable is affected, which makes the installation work more cumbersome and difficult. In addition, when installing bolts and nuts to fix the cable clamps, shaking or displacement is very likely to occur, causing the installed cable clamps to deviate from the predetermined position, affecting the installation accuracy. Utility Model Content
[0005] The utility model aims to provide a suspension bridge retaining device to solve the above problems.
[0006] In order to achieve the above-mentioned purpose, the embodiment of the utility model provides a suspension bridge retaining device, including: a main cable, a cable clamp, a walking mechanism, a hoisting mechanism, a side connection part and a dragging mechanism;
[0007] The cable clamp is arranged on the main cable, the traveling mechanism is arranged on the main cable, and the cable clamp is located inside the traveling mechanism, the hanging mechanism is arranged on the traveling mechanism, two sets of side connection parts are arranged on the traveling mechanism and are respectively located at the front and rear sides of the cable clamp, and the dragging mechanism is arranged on the main cable and the traveling mechanism;
[0008] The two groups of side connecting parts are connected to the main cable, wherein
[0009] The walking mechanism is suitable for moving back and forth on the main cable to reach the installation point of the cable clamp;
[0010] The hoisting and closing mechanism is suitable for hoisting the cable clamp to close it;
[0011] The dragging mechanism is suitable for dragging the walking mechanism in the reverse direction to fix the position of the walking mechanism;
[0012] The cable clamp comprises an upper half and a lower half;
[0013] The upper half and the lower half are aligned and tightly embraced on the main cable.
[0014] Furthermore, the walking mechanism includes a left frame, a right frame, a main roller and a back plate;
[0015] The left frame and the right frame are respectively arranged on the left and right sides of the main cable, a plurality of the back plates are evenly distributed on the left frame and the right frame, and both ends of the two main rollers are rotatably mounted on the back plates;
[0016] The two main rollers are connected to the main cable.
[0017] Furthermore, the hoisting mechanism comprises a load-bearing plate, a fixed point block and a hand chain hoist;
[0018] The load-bearing plate is installed between the left frame and the right frame, and the load-bearing plate is located on the top of the left frame and the right frame, two fixed-point blocks are arranged at intervals on the bottom surface of the load-bearing plate, and two hand chain hoists are hoisted on the two fixed-point blocks respectively;
[0019] The two hand chain hoists are located just above the cable clamps.
[0020] Furthermore, a suspension bridge retaining device also includes a hydraulic telescopic rod and a downward pressure arc plate;
[0021] The hydraulic telescopic rod is installed on the bottom surface of the load-bearing plate, and the back of the lower arc plate is connected to the end of the hydraulic telescopic rod;
[0022] The lower arc plate is in close contact with the upper half.
[0023] Furthermore, the towing mechanism includes an elastic sleeve, a horizontal platform, a winch, a round rod and a towing rope;
[0024] The elastic sleeve is arranged on the main rope, the horizontal platform is arranged on the elastic sleeve, the winch is arranged on the horizontal platform, the round rod is installed between the left frame and the right frame, one end of the traction rope is wound on the winch, and the other end of the traction rope is bolted to the round rod.
[0025] Further, the side connection portion includes a positioning bar and a side roller;
[0026] The two groups of positioning bars are respectively arranged on the left frame and the right frame, and the two side rollers are respectively rotatably arranged between the two groups of positioning bars;
[0027] The two side rollers are connected to the main cable from left and right sides respectively.
[0028] Furthermore, the side connection portion further comprises a base block, a hole and a locking bolt;
[0029] The two base blocks are installed on the left frame and the right frame and are respectively located directly below the two groups of positioning strips. A plurality of holes are collinearly passed through the two groups of positioning strips and embedded in the two base blocks. The two locking bolts are respectively inserted into the two groups of positioning strips and the two base blocks through the holes.
[0030] Furthermore, a suspension bridge retaining device also includes a pull rod and a guide rod;
[0031] The two pull rods are installed between the ends of the left frame and the right frame, and the two soft guide rods are arranged on the upper half and the lower half.
[0032] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0033] 1. The suspension bridge retaining device can move flexibly along the main cable through the walking mechanism, thereby ensuring mobility to quickly reach different cable clamp installation points. At the same time, with the cooperation of the towing mechanism, the walking mechanism can be pulled after it reaches the cable clamp installation point, thereby limiting the movement of the walking mechanism and fixing it at the cable clamp installation point, ensuring the smooth installation of the cable clamp;
[0034] 2. The suspension bridge retaining device can press the upper half tightly against the main cable under the action of the hydraulic telescopic rod and the downward pressure arc plate, and at the same time can lift the lower half upward through the lifting mechanism to facilitate its combination with the upper half, thereby quickly and accurately completing the docking of the cable clamp and realizing the initial positioning of the cable clamp on the main cable.
[0035] 3. The suspension bridge retaining device has a good pre-positioning effect on the cable clamp. During the installation process, there is no need for the installation workers to manually place the cable clamp, which greatly simplifies the installation process and effectively reduces the installation difficulty. At the same time, it can avoid shaking or shifting of the cable clamp during installation, thereby ensuring that the cable clamp is accurately installed in the predetermined position, ensuring the installation accuracy, and effectively improving the installation quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0037] Figure 1 Shows a stereogram of the utility model;
[0038] Figure 2 A three-dimensional view of the utility model at another angle is shown;
[0039] Figure 3 A partial front view of the utility model is shown;
[0040] Figure 4 A partial stereoscopic view of the utility model at another angle is shown;
[0041] Figure 5 The utility model is shown Figure 1 A magnified image of point A;
[0042] Figure 6 The utility model is shown Figure 1 Enlarged view of point B.
[0043] In the picture
[0044] 1. Main rope; 2. Rope clamp; 21. Upper part; 22. Lower part; 3. Traveling mechanism; 31. Left frame; 32. Right frame; 33. Main roller; 34. Back plate; 4. Lifting mechanism; 41. Load-bearing plate; 42. Fixed point block; 43. Hand chain hoist; 5. Side connection; 51. Positioning strip; 52. Side roller; 53. Base block; 54. Hole; 55. Locking bolt; 6. Towing mechanism; 61. Elastic sleeve; 62. Horizontal platform; 63. Winch; 64. Round rod; 65. Towing rope; 7. Hydraulic telescopic rod; 8. Lower pressure arc plate; 9. Pull rod; 10. Guide rod. DETAILED DESCRIPTION
[0045] Now the utility model is further described in detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.
[0046] See also Figure 1 , Figure 1 Shows a three-dimensional diagram of the utility model; please refer to Figure 2 , Figure 2 Shows a three-dimensional view of the utility model at another angle; please refer to Figure 3 , Figure 3 Shows a partial front view of the utility model; please refer to Figure 4 , Figure 4 It shows a partial stereoscopic view of the utility model at another angle; please refer to Figure 5 , Figure 5 The utility model is shown Figure 1 See the enlarged view of point A in Figure 6 , Figure 6 The utility model is shown Figure 1 The enlarged view of point B; Figure 1-6 As shown, a suspension bridge retaining device comprises: a main cable 1, a cable clamp 2, a walking mechanism 3, a hoisting mechanism 4, a side connection part 5 and a dragging mechanism 6;
[0047] The cable clamp 2 is arranged on the main cable 1, the traveling mechanism 3 is arranged on the main cable 1, and the cable clamp 2 is inside the traveling mechanism 3, the hoisting mechanism 4 is arranged on the traveling mechanism 3, two sets of side connecting parts 5 are arranged on the traveling mechanism 3 and are respectively located at the front and rear sides of the cable clamp 2, and the dragging mechanism 6 is arranged on the main cable 1 and the traveling mechanism 3;
[0048] The two groups of side connecting parts 5 are connected to the main cable 1, wherein
[0049] The walking mechanism 3 is suitable for moving back and forth on the main cable 1 to reach the installation point of the cable clamp 2;
[0050] The hoisting mechanism 4 is suitable for hoisting the cable clamp 2 to close it;
[0051] The dragging mechanism 6 is suitable for dragging the walking mechanism 3 in the reverse direction to fix the position of the walking mechanism 3;
[0052] The cable clamp 2 includes an upper half 21 and a lower half 22;
[0053] The upper half 21 and the lower half 22 are aligned and tightly fit on the main cable 1. Threaded holes are provided at the corners of the upper half 21 and the lower half 22, and the two are connected together by bolts and nuts. The suspension bridge fixing device can flexibly move along the main cable 1 through the walking mechanism 3, thereby ensuring mobility to quickly reach different cable clamp 2 installation points. At the same time, with the cooperation of the towing mechanism 6, the walking mechanism 3 can be pulled after it reaches the cable clamp 2 installation point, thereby limiting the movement of the walking mechanism 3 and fixing it at the cable clamp 2 installation point to ensure smooth installation of the cable clamp 2. The upper part 21 can be pressed tightly against the main cable 1, and the lower part 22 can be lifted upwards through the lifting mechanism 4 to facilitate its combination with the upper part 21, thereby quickly and accurately completing the docking of the cable clamp 2 and realizing the preliminary positioning of the cable clamp 2 on the main cable 1. The suspension bridge retaining device has a good pre-positioning effect on the cable clamp 2. During the installation process, there is no need for the installation workers to manually position the cable clamp 2, which greatly simplifies the installation process and effectively reduces the difficulty of installation. At the same time, it can avoid shaking or displacement of the cable clamp 2 during installation, thereby ensuring that the cable clamp 2 is accurately installed in the predetermined position, ensuring the installation accuracy, and thus effectively improving the installation quality.
[0054] Optionally, the walking mechanism 3 includes a left frame 31, a right frame 32, a main roller 33 and a back plate 34;
[0055] The left frame 31 and the right frame 32 are respectively arranged on the left and right sides of the main cable 1, a plurality of back plates 34 are evenly distributed on the left frame 31 and the right frame 32, and both ends of the two main rollers 33 are rotatably mounted on the back plates 34;
[0056] The two main rollers 33 are connected to the main cable 1. When installing the cable clamp 2, the installer can push and pull the left frame 31 and the right frame 32 to cause the two main rollers 33 to roll on the main cable 1 until they reach the predetermined installation position of the cable clamp 2, ensuring that they can move along the main cable 1 to reach different installation points to accommodate the continuous installation of a large number of cable clamps 2.
[0057] Optionally, the hoisting mechanism 4 includes a load-bearing plate 41, a fixed point block 42 and a hand chain hoist 43;
[0058] The load-bearing plate 41 is installed between the left frame 31 and the right frame 32, and the load-bearing plate 41 is located at the top of the left frame 31 and the right frame 32. The two fixed-point blocks 42 are arranged at intervals on the bottom surface of the load-bearing plate 41. The two hand chain hoists 43 are hoisted on the two fixed-point blocks 42 respectively. The hand chain hoist 43 is an existing manual lifting machine that is simple to use and easy to carry.
[0059] The two hand winches 43 are located directly above the cable clamp 2. After the walking mechanism 3 moves to the predetermined installation position of the cable clamp 2, the upper part 21 is first buckled on the main cable 1, and then the lower part 22 is taken out, and the lifting chains of the two hand winches 43 are wrapped and tied around the lower part 22. After the lower part 22 is fixed on the two hand winches 43, the hand chains of the two hand winches 43 are pulled to lift the lower part 22 steadily until the lower part 22 is combined with the upper part 21, thereby quickly and accurately completing the docking of the upper part 21 and the lower part 22, and realizing the preliminary positioning of the cable clamp 2 on the main cable 1. At the same time, there is no need for the installation workers to manually place and position the upper part 21 and the lower part 22, which greatly simplifies the installation process, reduces the labor burden for the installation workers, and reduces the difficulty of installation.
[0060] Optionally, a suspension bridge retaining device further includes a hydraulic telescopic rod 7 and a downward arc-pressing plate 8;
[0061] The hydraulic telescopic rod 7 is installed on the bottom surface of the load-bearing plate 41, and the back of the lower arc-pressing plate 8 is connected to the end of the hydraulic telescopic rod 7;
[0062] The lower arc-pressing plate 8 is tightly attached to the upper half 21, and the hydraulic telescopic rod 7 is in a retracted state under normal conditions, that is, the lower arc-pressing plate 8 is not attached to the upper half 21. After the upper half 21 is buckled on the main cable 1 and before the hoisting mechanism 4 lifts the lower half 22, the hydraulic telescopic rod 7 is pulled down to extend it until the lower arc-pressing plate 8 is tightly attached to the upper half 21, and a downward force is applied to the upper half 21, thereby pressing the upper half 21 down on the main cable 1 to prevent the upper half 21 from moving, thereby preventing the upper half 21 from shifting during subsequent installation, and at the same time avoiding the displacement of the upper half 21 due to the collision between the lower half 22 and the upper half 21 when hoisting, thereby ensuring that the cable clamp 2 is accurately installed at the predetermined position, ensuring the installation accuracy and quality.
[0063] Optionally, the towing mechanism 6 includes an elastic sleeve 61, a horizontal platform 62, a winch 63, a round rod 64 and a towing rope 65;
[0064] The elastic sleeve 61 is arranged on the main rope 1, the horizontal platform 62 is arranged on the elastic sleeve 61, the winch 63 is arranged on the horizontal platform 62, the round rod 64 is installed between the left frame 31 and the right frame 32, one end of the traction rope 65 is wound on the winch 63, and the other end of the traction rope 65 is bolted to the round rod 64. When the walking mechanism 3 moves, the elastic sleeve 61 is loosened, so that the towing mechanism 6 can move along the main rope 1 with the movement of the walking mechanism 3, or when When the length of the traction rope 65 allows, the traction rope 65 is gradually loosened through the winch 63 as the traveling mechanism 3 moves. After the traveling mechanism 3 reaches the specified position, the winch 63 is locked, and the traction rope 65 and the round rod 64 are used to pull the left frame 31 and the right frame 32, thereby preventing the two main rollers 33 from continuing to roll forward on the main rope 1, thereby preventing the traveling mechanism 3 from moving abnormally during the subsequent installation process of the cable clamp 2 and affecting the installation of the cable clamp 2, thereby ensuring the smooth installation of the cable clamp 2 while ensuring the installation accuracy.
[0065] Optionally, the side connection portion 5 includes a positioning bar 51 and a side roller 52;
[0066] The two groups of positioning bars 51 are respectively arranged on the left frame 31 and the right frame 32, and the two side rollers 52 are respectively rotatably arranged between the two groups of positioning bars 51;
[0067] The two side rollers 52 are connected to the main cable 1 from the left and right sides respectively. When the walking mechanism 3 moves, the four side rollers 52 roll forward along the main cable 1 synchronously. The rolling relationship between the four side rollers 52 and the main cable 1 is utilized to increase the rolling connection points between the suspension bridge retaining device and the main cable 1, thereby reducing the load on the main roller 33, greatly improving the smoothness when walking on the main cable 1, and ensuring the performance of the suspension bridge retaining device.
[0068] Optionally, the side connection portion 5 further includes a base block 53, a hole 54 and a locking bolt 55;
[0069] The two base blocks 53 are installed on the left frame 31 and the right frame 32 and are respectively located directly below the two groups of positioning strips 51. A plurality of holes 54 are colinearly passed through the two groups of positioning strips 51 and embedded in the two base blocks 53. The two locking bolts 55 are respectively inserted into the two groups of positioning strips 51 and the two base blocks 53 through the holes 54. When the thickness of the main rope 1 changes, the locking bolts 55 are taken out and the position of the positioning strips 51 is adjusted until the four side rollers 52 are connected to the main rope 1. Then, the locking bolts 55 are reinserted into the corresponding holes 54. The locking of the positioning strips 51 is restored by relying on the locking bolts 55 and the base blocks 53, so that the side connection part 5 can adapt to main ropes 1 of different sizes, thereby greatly improving the applicability.
[0070] Optionally, a suspension bridge retaining device further includes a pull rod 9 and a guide rod 10;
[0071] The two pull rods 9 are installed between the ends of the left frame 31 and the right frame 32 to lock the ends of the left frame 31 and the right frame 32, thereby enhancing the overall firmness; the two pull rods 9 are detachably installed to ensure that the suspension bridge fixing device can be removed from the main cable 1, and the two soft guide rods 10 are arranged on the upper half 21 and the lower half 22. A small part of the two guide rods 10 is slightly larger than the threaded holes on the lower half 22 and the upper half 21, and the remaining parts are slightly smaller than the threaded holes on the lower half 22 and the upper half 21. Before hoisting the lower half 22, the two guide rods 10 are slightly larger than the threaded holes on the lower half 22 and the upper half 21. The parts are all inserted into the two threaded holes at the opposite vertices on the lower half 22, and then the lower half 22 is hoisted. During the hoisting process, the two guide rods 10 are inserted into the corresponding threaded holes on the upper half 21, so that the position of the lower half 22 is corrected by relying on the two guide rods 10 during the hoisting process to ensure that the upper half 21 and the lower half 22 are accurately docked to prevent deviation, thereby ensuring the installation accuracy of the cable clamp 2. After the upper half 21 and the lower half 22 are docked, the other two threaded holes on the upper half 21 and the lower half 22 are first installed with bolts and nuts, and then the two guide rods 10 are removed to install the remaining bolts and nuts.
[0072] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A suspension bridge retaining device, characterized in that: include: A main rope (1), a rope clamp (2), a walking mechanism (3), a lifting mechanism (4), a side connection part (5) and a dragging mechanism (6); The cable clamp (2) is arranged on the main cable (1), the walking mechanism (3) is arranged on the main cable (1), and the cable clamp (2) is located inside the walking mechanism (3), the hanging mechanism (4) is arranged on the walking mechanism (3), two sets of side connection parts (5) are arranged on the walking mechanism (3) and are respectively located at the front and rear sides of the cable clamp (2), and the dragging mechanism (6) is arranged on the main cable (1) and the walking mechanism (3); The two groups of side connecting parts (5) are connected to the main cable (1), wherein The walking mechanism (3) is suitable for moving back and forth on the main cable (1) to reach the installation point of the cable clamp (2); The lifting and closing mechanism (4) is suitable for lifting the cable clamp (2) to close it; The dragging mechanism (6) is suitable for dragging the walking mechanism (3) in the reverse direction to fix the position of the walking mechanism (3); The cable clamp (2) comprises an upper half (21) and a lower half (22); The upper half (21) and the lower half (22) are aligned with each other and tightly embraced on the main cable (1); The walking mechanism (3) comprises a left frame (31), a right frame (32), a main roller (33) and a back plate (34); The left frame (31) and the right frame (32) are respectively arranged on the left and right sides of the main cable (1); a plurality of back plates (34) are evenly distributed on the left frame (31) and the right frame (32); and both ends of the two main rollers (33) are rotatably mounted on the back plates (34); The two main rollers (33) are connected to the main cable (1).
2. A suspension bridge retaining device as claimed in claim 1, characterized in that: The hoisting mechanism (4) comprises a load-bearing plate (41), a fixed point block (42) and a hand chain hoist (43); The load-bearing plate (41) is installed between the left frame (31) and the right frame (32), and the load-bearing plate (41) is located on the top of the left frame (31) and the right frame (32), two fixed-point blocks (42) are arranged at intervals on the bottom surface of the load-bearing plate (41), and two hand chain hoists (43) are hoisted on the two fixed-point blocks (42) respectively; The two hand chain hoists (43) are located directly above the cable clamp (2).
3. A suspension bridge retaining device as claimed in claim 2, characterized in that: A suspension bridge retaining device further comprises a hydraulic telescopic rod (7) and a downward arc-pressing plate (8); The hydraulic telescopic rod (7) is mounted on the bottom surface of the load-bearing plate (41), and the back of the lower arc-pressing plate (8) is connected to the end of the hydraulic telescopic rod (7); The lower arc-pressing plate (8) is in close contact with the upper half (21).
4. A suspension bridge retaining device as claimed in claim 3, characterized in that: The towing mechanism (6) comprises an elastic sleeve (61), a horizontal platform (62), a winch (63), a round rod (64) and a towing rope (65); The elastic sleeve (61) is arranged on the main rope (1), the horizontal platform (62) is arranged on the elastic sleeve (61), the winch (63) is arranged on the horizontal platform (62), the round rod (64) is installed between the left frame (31) and the right frame (32), one end of the traction rope (65) is wound on the winch (63), and the other end of the traction rope (65) is bolted to the round rod (64).
5. A suspension bridge retaining device as claimed in claim 4, characterized in that: The side connection part (5) comprises a positioning strip (51) and a side roller (52); The two groups of positioning strips (51) are respectively arranged on the left frame (31) and the right frame (32), and the two side rollers (52) are respectively rotatably arranged between the two groups of positioning strips (51); The two side rollers (52) are connected to the main cable (1) from left and right sides respectively.
6. A suspension bridge retaining device as claimed in claim 5, characterized in that: The side connection portion (5) further comprises a base block (53), a hole (54) and a locking bolt (55); The two base blocks (53) are installed on the left frame (31) and the right frame (32) and are respectively located directly below the two groups of positioning strips (51); a plurality of holes (54) are colinearly passed through the two groups of positioning strips (51) and embedded in the two base blocks (53); and the two locking bolts (55) are respectively inserted into the two groups of positioning strips (51) and the two base blocks (53) through the holes (54).
7. A suspension bridge retaining device as claimed in claim 6, characterized in that: A suspension bridge retaining device further comprises a pull rod (9) and a guide rod (10); The two pull rods (9) are installed between the ends of the left frame (31) and the right frame (32), and the two soft guide rods (10) are arranged on the upper half (21) and the lower half (22).