Detachable and length-adjustable pre-embedded type ring lock scaffold wall connecting piece

The design of pre-embedded disc-lock scaffolding wall ties solves the problems of cutting and recycling traditional wall ties, realizes the disassembly and length adjustment of materials, and reduces construction costs and workload.

CN222333247UActive Publication Date: 2025-01-10SHANGHAI BAOYE GRP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420805620.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2025-01-10
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

Traditional scaffolding wall ties require cutting embedded steel pipes after use, resulting in a large amount of concrete filling work, and the steel cannot be recycled. In addition, the lengths are not uniform and need to be adjusted on site, which wastes materials.

Method used

The wall ties for scaffolding are made of detachable and adjustable length and are pre-embedded disc-lock scaffolding. They include pre-embedded bolt sleeves, front threaded rods, adjustable connecting sleeves and rear threaded rods. The length can be adjusted through bolt connections and adjustment holes, reducing cutting work and allowing for material recycling.

Benefits of technology

It reduces the amount of concrete filling work, enables material recycling, adapts to the length requirements of different concrete structures, and simplifies construction operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222333247U_ABST
    Figure CN222333247U_ABST
Patent Text Reader

Abstract

The utility model relates to a detachable and length-adjustable pre-embedded type ring lock scaffold wall connecting piece. Comprising an embedded bolt sleeve, a front screw rod, an adjustable connecting sleeve and a rear screw rod, the front screw rod is connected with the embedded bolt sleeve, two ports of the adjustable connecting sleeve are provided with internal threads which are respectively used for being connected with the front screw rod and the rear screw rod, the middle part of the adjustable connecting sleeve is provided with an observation window, the front section of the rear screw rod is a threaded rod section used for being connected with the adjustable connecting sleeve, and the tail part of the threaded rod section is provided with a disc buckle bolt. According to the utility model, the pre-embedding work of the scaffold wall connecting piece in the traditional operation can be optimized, a short steel pipe can be prevented from being pre-embedded, only one cylindrical nut is required to be pre-embedded, cutting is not required during later disassembly, the plugging workload can be reduced, and other materials can be recycled, so that the cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering, in particular to a detachable and length-adjustable pre-buried disc-buckle scaffolding wall connecting piece. Background Art

[0002] Traditional scaffolding wall ties require a short steel pipe to be embedded in the concrete before pouring the concrete structure. When the frame is erected, the horizontal steel pipe is connected to the frame upright with fasteners. After the scaffold is used, the embedded short steel pipe needs to be cut off with a cutting machine, and the cut hole is filled with concrete. In this way, the workload of concrete filling is large, and the steel pipe embedded in the concrete after the wall tie is cut cannot be recycled and reused; and because buildings usually have multiple planes, the length of the wall tie is not uniform, and it needs to be cut and adjusted according to the actual length of the construction site, which wastes steel. Utility Model Content

[0003] The purpose of the utility model is to overcome the above-mentioned defects and propose a detachable and length-adjustable embedded disc-type scaffolding wall connection part, which can avoid the need to embed short steel pipes and only requires one cylindrical nut to be embedded. No cutting is required for later disassembly, which can reduce the workload of blocking, and the remaining materials can be recycled to save costs.

[0004] In order to achieve the above object, the utility model is achieved as follows:

[0005] A detachable and length-adjustable embedded disc-buckle scaffolding wall connection part comprises an embedded bolt sleeve, a front screw rod, an adjustable connecting sleeve and a rear screw rod; the front screw rod comprises a front threaded section for connecting with the embedded bolt sleeve and a rear threaded section for connecting with the adjustable connecting sleeve, a shoulder baffle is arranged between the front threaded section and the rear threaded section, two ends of the adjustable connecting sleeve are provided with internal threads, which are respectively used to connect with the front screw rod and the rear screw rod, an observation window is arranged in the middle of the adjustable connecting sleeve, the front section of the rear screw rod is a threaded rod section for connecting with the adjustable connecting sleeve, and a disc-buckle latch is arranged at the tail of the threaded rod section.

[0006] The detachable and length-adjustable embedded disc-buckle scaffolding wall connecting piece has an adjustment hole arranged along the diameter direction on the rear thread section of the front screw rod.

[0007] The detachable and length-adjustable embedded disc-lock scaffolding wall connection piece, the front screw rod, the adjustable connecting sleeve and the rear screw rod are connected by bolts and support the spacing distance between the disc-lock frame upright pole and the concrete structure.

[0008] The above-mentioned detachable and length-adjustable embedded disc-shaped scaffolding wall connection member proposed in the utility model has the following advantages compared with the traditional wall connection member:

[0009] 1. The utility model is composed of a pre-embedded bolt sleeve, a front screw with a bolt, an adjustable connecting sleeve, and a rear screw with a buckle latch. The pre-embedded bolt sleeve can reduce the workload of repairs, and the rest of the wall connection parts except the pre-embedded parts can be recycled and reused.

[0010] 2. The length of the wall connecting member in the utility model is adjustable. The extension length of the front and rear screws is controlled by an adjustable connecting sleeve to control the length of the entire wall connecting member, thereby being able to adapt to different concrete structures and the spacing distances between the buckle frames.

[0011] 3. The rear screw rod is equipped with a national standard buckle pin, which can be directly connected to the connecting plate of the buckle frame upright, making it convenient for construction workers to operate.

[0012] 4. The adjustable connecting sleeve is equipped with an observation hole and a scale on the surface, so that the length of the front and rear screws extending into the sleeve can be visually seen, which is convenient for inspection. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 The utility model is a schematic structural diagram of a detachable and length-adjustable embedded disc-shaped scaffolding wall connection member.

[0014] Figure 2 The utility model is a schematic diagram showing the use status of the detachable and length-adjustable embedded disc-type scaffolding wall connection member. DETAILED DESCRIPTION

[0015] The present invention is further described below through specific embodiments.

[0016] like Figure 1 , Figure 2 As shown, a detachable and length-adjustable embedded disc-buckle scaffolding wall connection part comprises an embedded bolt sleeve 1, a front screw rod 2, an adjustable connecting sleeve 3, and a rear screw rod 4; the front screw rod 2 comprises a front threaded section 5 for connecting with the embedded bolt sleeve 1 and a rear threaded section 6 for connecting with the adjustable connecting sleeve 3, a shoulder baffle 7 is arranged between the front threaded section 5 and the rear threaded section 6, internal threads 8 are arranged at two ends of the adjustable connecting sleeve 3, which are respectively used to connect with the front screw rod 2 and the rear screw rod 4, an observation window 9 is opened in the middle of the adjustable connecting sleeve 3, the front section of the rear screw rod 4 is a threaded rod section 10 for connecting with the adjustable connecting sleeve 3, and a disc-buckle pin 11 is arranged at the tail of the threaded rod section 10.

[0017] The above-mentioned detachable and length-adjustable embedded disc-type scaffolding wall connecting member has an adjustment hole on the rear threaded section 6 of the front screw rod 2 along the diameter direction.

[0018] The method of using the above-mentioned detachable and length-adjustable embedded disc-type scaffolding wall connection member includes:

[0019] 1. Measure and lay out, draw the scaffolding layout according to the actual situation on site, and carry out the next step of pre-embedding work according to the layout position;

[0020] 2. After the construction of the mixed beam and shear wall reinforcement is completed, the embedded bolt sleeves are installed on the inner side of the formwork according to the position of the layout drawing, and the matching bolts on the outside of the formwork are screwed into the bolt sleeves to fix the embedded bolt sleeves on the formwork;

[0021] 3. Installation of concrete structure formwork and concrete pouring;

[0022] 4. Install the wall connection piece, unscrew the fixing bolt in the embedded bolt sleeve, use the adjustable connecting sleeve to connect and tighten the front screw and the rear screw, and screw the connected wall connection piece into the embedded bolt sleeve as a whole;

[0023] 5. Set up the scaffolding and install the scaffolding poles to the wall connection position according to the layout diagram;

[0024] 6. According to the distance between the scaffolding pole and the wall on site, adjust the front and rear screws to the appropriate length by rotating the adjustable connecting sleeve;

[0025] 7. Fix the buckle pin at the end of the rear screw rod to the connecting plate of the buckle frame upright and the wall connection piece is installed;

[0026] 8. Acceptance and use;

[0027] 9. Removal of wall connection parts: Loosen the buckle pin at the rear screw, remove the vertical pole, and remove the rear screw, adjustable connecting sleeve, and front screw in order.

Claims

1. A detachable and length-adjustable embedded disc-type scaffolding wall connection member, characterized by: It includes an embedded bolt sleeve, a front screw rod, an adjustable connecting sleeve, and a rear screw rod; the front screw rod includes a front threaded section for connecting with the embedded bolt sleeve and a rear threaded section for connecting with the adjustable connecting sleeve, a shoulder baffle is arranged between the front threaded section and the rear threaded section, internal threads are arranged at two ends of the adjustable connecting sleeve, which are respectively used to connect with the front screw rod and the rear screw rod, an observation window is opened in the middle of the adjustable connecting sleeve, the front section of the rear screw rod is a threaded rod section for connecting with the adjustable connecting sleeve, and a buckle pin is arranged at the tail of the threaded rod section.

2. The detachable and length-adjustable embedded disc-shaped scaffolding wall connection member according to claim 1 is characterized in that: An adjusting hole is arranged on the rear thread section of the front screw rod along the diameter direction.

3. The detachable and length-adjustable embedded buckle scaffolding wall connection member according to claim 1 or 2 is characterized in that: The front screw rod, the adjustable connecting sleeve and the rear screw rod are connected by bolts and support the spacing distance between the plate buckle frame pole and the concrete structure.