Ecological slope protection structure for ecological restoration
By using nail pins to connect the embankment and L-shaped rods in the ecological slope protection structure, the problem of loose bricks is solved, the stability is enhanced, and the moisture management is improved through permeable holes and vegetation management, achieving better use Effect.
Patent Information
- Application Number
- CN202421182842.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-05-28
AI Technical Summary
The existing ecological restoration slope protection bricks are prone to loosening after long-term rainwater washing, affecting the stability of use.
An ecological slope protection structure is designed, by setting two nail pins at the bottom of each brick to plug and connect the embankment, and connecting the bricks with the L-shaped rod and the slot to ensure the stability of the bricks. And set permeable holes and planting holes inside the bricks to promote vegetation growth and drainage.
It effectively avoids loosening of bricks, enhances stability after laying, and improves moisture management through vegetation and permeability holes, ensuring normal growth of vegetation and drying of road surfaces.
Smart Images

Figure CN222349585U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ecological restoration, in particular to an ecological slope protection structure used for ecological restoration. Background Art
[0002] The slope protection dike is an important water conservancy structure, which is mainly used to prevent siltation in the river channel, resist floods and breaches, prevent river landslides, resist flood erosion, reduce the impact of floods, and other water conservancy project planning and protection functions. Its main function is to protect the ground from soil erosion, reduce water pollution, prevent foundation sliding, and ecological restoration.
[0003] In the process of realizing the present application, the applicant discovered that the bricks of the existing ecological restoration slope protection structure are usually laid directly, which leads to the problem that the bricks are easily loosened after being washed by rain for a long time, thus affecting their normal use. Utility Model Content
[0004] In view of the above problems existing in the existing slope protection structure, the present utility model is proposed.
[0005] Therefore, the purpose of the utility model is to provide an ecological slope protection structure for ecological restoration, which solves the problem that bricks are prone to loosening after being washed by rain for a long time.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] An ecological slope protection structure for ecological restoration comprises a dike and a base, wherein a retaining seat is arranged on one side of the dike, and the retaining seat is arranged above the base, a geotextile is laid on the surface of the dike, and a plurality of bricks are laid on the surface of the geotextile, and each brick is symmetrically fixed with two nail pins on one side close to the dike, and each of the nail pins penetrates the geotextile and is plug-connected to the dike.
[0008] Preferably, two L-shaped rods are symmetrically fixedly sleeved on one side of each brick, and two slots are symmetrically opened on one side of each brick away from the two L-shaped rods, and each L-shaped rod matches with a corresponding slot.
[0009] Preferably, a planting opening is provided inside each of the bricks, and vegetation is planted inside each of the planting openings.
[0010] Preferably, a crest is provided on the top of the embankment body, and enclosures are laid around the sides of the crest.
[0011] Preferably, the substrate is sand and gravel.
[0012] Preferably, the retaining seat is C15 buried stone concrete.
[0013] Preferably, the top of the embankment is a 20 cm thick mud-stone road surface.
[0014] Preferably, the enclosure is made of C15 concrete.
[0015] Preferably, each brick is provided with a plurality of water-permeable holes inside.
[0016] In the above technical solution, the technical effects and advantages provided by the utility model are:
[0017] 1. The utility model can realize plug-in connection between bricks and the embankment body by means of two pins arranged at the bottom of each brick, thereby ensuring the stability of the bricks after laying and effectively preventing the bricks from loosening.
[0018] 2. The utility model can realize the connection between bricks by plugging the provided L-shaped rod into the corresponding slot when laying bricks, thereby further ensuring the stability of multiple bricks after laying. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0020] Figure 1 It is a schematic diagram of the structure of the utility model;
[0021] Figure 2 For the utility model Figure 1 A magnified schematic diagram of part A;
[0022] Figure 3 It is a schematic cross-sectional structure diagram of the brick of the present utility model.
[0023] Description of reference numerals:
[0024] 1. Embankment body; 2. Base; 3. Block seat; 4. Geotextile; 5. Bricks; 6. Pins; 7. L-shaped rods; 8. Slots; 9. Planting openings; 10. Vegetation; 11. Embankment top; 12. Fence; 13. Water permeability holes. DETAILED DESCRIPTION
[0025] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0026] The utility model embodiment discloses an ecological slope protection structure for ecological restoration.
[0027] Implementation
[0028] The utility model provides Figure 1-3 The ecological slope protection structure for ecological restoration shown in the figure comprises a dike body 1 and a base 2. A retaining seat 3 is arranged on one side of the dike body 1. The retaining seat 3 is arranged above the base 2. The retaining seat 3 is C15 buried stone concrete. The C15 buried stone concrete combines the advantages of concrete and stone. It has the strength and stability of concrete, and the economy and good drainage performance of stone, so as to ensure the performance of the retaining seat 3. The base 2 is sand and gravel. Sand and gravel refers to coarse and fine particles between rock particles and crushed stones in river sand or sea sand that have been dehydrated, screened and washed. The natural mineral particles have a particle size of 1.5-2.5 mm, which is hard in texture, dense, and not easily corroded in nature. The surface of the embankment 1 is paved with a geotextile 4, and the surface of the geotextile 4 is paved with a plurality of bricks 5. Each brick 5 is symmetrically fixed with two pins 6 on one side close to the embankment 1, and each pin 6 penetrates the geotextile 4 and is plugged into the embankment 1. The two pins arranged at the bottom of each brick 5 can realize the plug-in connection between the brick 5 and the embankment 1, thereby ensuring the stability of the brick 5 after laying and effectively preventing the brick 5 from loosening.
[0029] Embodiment 2
[0030] Based on the first embodiment, Figure 2-3 As shown, two L-shaped rods 7 are symmetrically fixed on one side of each brick 5, and two slots 8 are symmetrically opened on the side of each brick 5 away from the two L-shaped rods 7. Each L-shaped rod 7 matches with the corresponding slot 8. When laying bricks 5, the L-shaped rods 7 are plugged into the corresponding slots 8 to achieve connection between bricks 5, thereby further ensuring the stability of multiple bricks 5 after laying.
[0031] Embodiment 3
[0032] Based on the first embodiment, Figure 1-3 As shown, each brick 5 is provided with a planting opening 9, and vegetation 10 is planted inside each planting opening 9. The planting preparation can have a water storage function. Each brick 5 is provided with a plurality of water permeable holes 13. The plurality of water permeable holes 13 can be used to prevent water from accumulating inside the brick 5 on rainy days and affecting the normal growth of the vegetation 10.
[0033] Embodiment 4
[0034] Based on the first embodiment, Figure 1As shown, a crest 11 is provided on the top of the embankment body 1, and a fence 12 is laid around the side of the crest 11. The crest 11 is a 20 cm thick mud-stone pavement. The thick mud-stone pavement has good drainage performance. The permeability of the soil can quickly drain the moisture under the pavement and keep the pavement dry. The fence 12 is C15 concrete. C15 concrete has good plasticity and is easy to pour and form.
[0035] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. An ecological slope protection structure for ecological restoration, comprising a bank body (1) and a base (2), characterized in that: A retaining seat (3) is provided on one side of the embankment body (1), and the retaining seat (3) is arranged above the base (2). A geotextile (4) is laid on the surface of the embankment body (1), and a plurality of bricks (5) are laid on the surface of the geotextile (4). Two pins (6) are symmetrically fixedly provided on one side of each brick (5) close to the embankment body (1), and each of the pins (6) penetrates the geotextile (4) and is plug-connected to the embankment body (1).
2. The ecological slope protection structure for ecological restoration according to claim 1, characterized in that: Two L-shaped rods (7) are symmetrically fixedly mounted on one side of each brick (5), and two slots (8) are symmetrically opened on one side of each brick (5) away from the two L-shaped rods (7), and each L-shaped rod (7) matches with a corresponding slot (8).
3. The ecological slope protection structure for ecological restoration according to claim 1 is characterized in that: A planting opening (9) is provided inside each of the bricks (5), and vegetation (10) is planted inside each of the planting openings (9).
4. The ecological slope protection structure for ecological restoration according to claim 1 is characterized in that: A levee crest (11) is provided on the top of the levee body (1), and a fence (12) is laid around the side of the levee crest (11).
5. The ecological slope protection structure for ecological restoration according to claim 1, characterized in that: The substrate (2) is sand and gravel.
6. The ecological slope protection structure for ecological restoration according to claim 1, characterized in that: The retaining seat (3) is made of C15 buried stone concrete.
7. The ecological slope protection structure for ecological restoration according to claim 4 is characterized in that: The top of the embankment (11) is a 20 cm thick mud-stone road surface.
8. The ecological slope protection structure for ecological restoration according to claim 4, characterized in that: The enclosure (12) is made of C15 concrete.
9. The ecological slope protection structure for ecological restoration according to claim 1, characterized in that: Each brick (5) is provided with a plurality of water-permeable holes (13) inside.