Building construction rainfall drainage device
By designing conical positioning rings and positioning slots in the construction rainwater drainage device, the coaxial vertical connection of the well ring is realized, and the installation direction is adjusted by using the pull rope, which solves the problem of unstable connection of the well ring in the existing technology and improves the Improve installation efficiency and safety.
Patent Information
- Application Number
- CN202421000929.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2034-05-09
AI Technical Summary
The surfaces of the two ends of the well ring of the existing drainage well pit are flat and cannot be stably and vertically stuck, resulting in manual down-to-the-hole connection.
A rainwater drainage device for building construction is designed. The upper end of the well circle is fixedly connected with a conical positioning ring, and the inner cavity of the lower end is provided with a positioning slot. Through the matching inner cavity of the positioning slot and the outer ring of the conical positioning ring, the synchronization of the well circle is achieved. The shaft is connected vertically, and the installation direction is adjusted through the pull rope.
It achieves a stable coaxial vertical connection of the well circle, avoids manual downhole operations, and improves the installation efficiency and safety of the drainage pipe well.
Smart Images

Figure CN222375459U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of drainage wells, in particular to a rainfall drainage device for building construction. Background Art
[0002] In construction projects, foundation pit drainage and rainfall drainage, as important contents of engineering construction, are directly related to the safety and bearing capacity of the foundation. As a pipe well for rainfall drainage, it is necessary to combine the bottom water collection and open drainage measures to solve the foundation pit precipitation problem. The current installation process of the drainage pipe well is: first, the drainage well pit is excavated mechanically, and the multiple well rings that constitute the drainage pipe well are hoisted into the drainage well pit in turn by an 8t or 6t truck crane and connected vertically.
[0003] The inner diameter of the above-mentioned drainage pit is only slightly larger than the outer diameter of the well ring. An 8t or 6t truck crane cannot accurately install multiple well rings vertically from bottom to top in the drainage pit in a narrow space. Moreover, the surfaces at both ends of the well rings are flat, and two adjacent well rings cannot be stably connected vertically. Therefore, it is often necessary to manually go down into the drainage pit to vertically connect multiple well rings. This article aims to propose a structure that can guide the coaxial vertical connection of two well rings. Utility Model Content
[0004] The utility model aims to solve the problem that the surfaces of both ends of the well ring constituting the drainage well are flat in the prior art, and two adjacent well rings cannot be stably vertically connected by a car crane, and proposes a rainfall drainage device for construction.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:
[0006] A rainwater drainage device for building construction comprises a plurality of well rings, wherein the upper end of the well ring is fixedly connected with a conical positioning ring, the inner cavity of the lower end of the well ring is provided with a positioning slot, the inner cavity of the positioning slot and the outer ring of the conical positioning ring are mutually matched, and a plurality of the well rings are coaxially and vertically connected in sequence through the positioning slots and the conical positioning rings thereon.
[0007] Preferably, more than three pull ropes are evenly arranged on the periphery of the lowermost well ring, and the installation directions of several well rings can be adjusted by pulling outward the upper ends of the pull ropes at different positions.
[0008] Preferably, both ends of the pull rope are respectively installed on the periphery of the uppermost and lowermost well circles through two steel bars, and the pull rope and the steel bars are bound and connected.
[0009] Preferably, a plurality of the steel bars are fixedly mounted on the two shaft rings at the uppermost end and the lowermost end, respectively.
[0010] Preferably, the middle portion of the outer periphery of the conical positioning ring is a conical curved surface.
[0011] Preferably, a steel cage is provided in the well ring.
[0012] Compared with the prior art, the utility model provides a rainwater drainage device for building construction, which has the following beneficial effects:
[0013] 1. The construction rainfall drainage device can connect two adjacent well rings through the mutually matching inner cavity of the positioning card groove and the outer ring of the conical positioning ring, and the middle part of the outer periphery of the conical positioning ring is a conical surface. The conical surface has the purpose of automatically finding the center, which is helpful to assist the positioning card groove of the upper well ring to be coaxially placed on the conical positioning ring at the upper end of the lower well ring.
[0014] 2. The rainfall drainage device for building construction can adjust the installation direction of the well ring by pulling the upper end of the pull rope at different positions outward. The well ring can be straightened and the position of the well ring can be adjusted without going down the well manually. That is, during the installation of the drainage pipe well, there is no need for manual work to go down the well, and the vertical connection of several well rings can be completed above the drainage well pit. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the structure of a rainwater drainage device for building construction proposed by the utility model;
[0016] Figure 2 The utility model is a cross-sectional view of a well ring in a rainfall drainage device for building construction.
[0017] In the figure: 1. well ring; 2. steel bar column; 3. pull rope; 4. conical positioning ring; 5. steel bar cage; 6. positioning slot. DETAILED DESCRIPTION
[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0019] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0020] See attached Figure 1-2A rainwater drainage device for building construction includes a plurality of well rings 1, which are coaxially and vertically connected from top to bottom in sequence. The well rings 1 are tubular in shape as a whole. The well rings 1 are composed of a steel cage 5 and concrete casting. The steel cage 5 is arranged inside the concrete. Positioning grooves 6 are arranged on the inner walls of the lower openings of the plurality of well rings 1, and the upper opening inner rings of the plurality of well rings 1 are fixedly connected with conical positioning rings 4.
[0021] It should be noted that the outer diameter of the top end of the conical positioning ring 4 is much smaller than the inner diameter of the opening at the lower end of the positioning slot 6, that is, the top end of the conical positioning ring 4 can be easily inserted into the positioning slot 6, and the inner cavity of the positioning slot 6 and the outer ring of the conical positioning ring 4 are consistent with each other. The middle part of the outer periphery of the conical positioning ring 4 is a conical surface. The conical surface has the purpose of automatically finding the center, which is conducive to assisting the upper well ring 1 to be coaxially placed on the upper end of the lower well ring 1, that is, the conical positioning ring 4 can be coaxially embedded and installed in the positioning slot 6, mainly used to assist the coaxial docking of two adjacent well rings 1.
[0022] In this embodiment, six steel bars 2 are fixedly installed on the periphery of the uppermost and lowermost well rings 1. The steel bars 2 are T-shaped as a whole. The six steel bars 2 are evenly distributed with the central axis of the well ring 1 as the center of the circle. Pull ropes 3 are bound and installed on the six lower steel bars 2, and the upper ends of the six pull ropes 3 are respectively bound and installed on the six upper steel bars 2.
[0023] According to the utility model, after the drainage pit is dug in the construction site, the inner diameter of the drainage pit is greater than the outer diameter of the well ring 1 by 50 cm, that is, after the well ring 1 is coaxially installed in the drainage pit, a certain gap is reserved between the inner wall of the drainage pit and the outer wall diameter of the well ring 1 for backfilling with crushed stone or mortar. The backfilled crushed stone or mortar supports a plurality of well rings 1 from the outside of the well ring 1 to prevent the plurality of well rings 1 installed vertically from being deformed or collapsed. The construction process of the plurality of well rings 1 is as follows:
[0024] 1) First, one end of the six pull ropes 3 is fixedly bound to the six steel bars 2 on the periphery of the bottom well ring 1, and then the bottom well ring 1 is stably placed on the inner bottom surface of the drainage well pit by the six pull ropes 3 using a car crane, and the conical positioning ring 4 is placed upward. After the bottom well ring 1 is placed, the installation direction of the well ring 1 can be adjusted by manually pulling the upper ends of the pull ropes 3 at different positions outward, and the opening of the bottom well ring 1 is vertically facing upward. Then, along the inner wall of the drainage well pit, mortar is filled to the periphery of the well ring 1, and the well ring 1 is vertically and stably installed in the drainage well pit, that is, the well ring 1 in the drainage well pit can be adjusted above the ground by the six pull ropes 3;
[0025] 2) After the mortar filled on the outer periphery of the lowermost well ring 1 solidifies, the remaining well rings 1 are hoisted downwards into the drainage well pit in sequence by the automobile crane, and the well ring 1 with the steel bar column 2 is placed at the last installation, and the positioning card slot 6 below the well ring 1 hoisted into the well pit is sleeved on the conical positioning ring 4 on the lower well ring 1. Through the mutually matching inner cavities of the positioning card slot 6 and the conical positioning ring 4, the upper and lower adjacent well rings 1 can be coaxially connected. If the upper and lower adjacent well rings 1 are not coaxially vertically connected, if the upper well ring 1 is installed tilted, the installation direction of the well ring 1 can be adjusted by manually pulling the upper ends of the pull ropes 3 at different positions outward, and the well ring 1 can be straightened without manual downhole operation to complete the position adjustment of the well ring 1;
[0026] 3) After the several well rings 1 are butt-jointed and straightened, the upper end of the uppermost well ring 1 is higher than the upper opening of the drainage pit, and the upper ends of the six pull ropes 3 are vertically tied to the six steel bars 2 on the periphery of the uppermost well ring 1, so that the several well rings 1 constituting the drainage well are fixedly connected, and the connection between the several well rings 1 can be effectively deformed and tilted;
[0027] 4) After the six pull ropes 3 are installed, gravel is filled toward the periphery of the well ring 1 along the inner wall of the drainage well pit again. The backfilled gravel is used to support several well rings 1 from the outside of the well ring 1 to prevent several well rings 1 installed vertically from deformation or collapse.
[0028] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A rainwater drainage device for building construction, comprising a plurality of well rings (1), characterized in that: The upper end of the well ring (1) is fixedly connected to a conical positioning ring (4), and the inner cavity of the lower end of the well ring (1) is provided with a positioning slot (6). The inner cavity of the positioning slot (6) and the outer ring of the conical positioning ring (4) are mutually matched, and a plurality of the well rings (1) are coaxially and vertically connected in sequence through the positioning slots (6) and the conical positioning rings (4) thereon.
2. A construction rainwater drainage device according to claim 1, characterized in that: More than three pull ropes (3) are evenly arranged on the periphery of the lowermost well ring (1), and the installation directions of a plurality of well rings (1) can be adjusted by pulling outward the upper ends of the pull ropes (3) at different positions.
3. A construction rainwater drainage device according to claim 2, characterized in that: The first and second ends of the pull rope (3) are respectively installed on the outer periphery of the uppermost and lowermost well rings (1) through two steel bars (2), and the pull rope (3) and the steel bars (2) are bound and connected.
4. A construction rainwater drainage device according to claim 3, characterized in that: A plurality of the steel bars (2) are respectively fixedly mounted on the two upper and lower shaft rings (1).
5. A construction rainwater drainage device according to claim 1, characterized in that: The middle part of the outer periphery of the conical positioning ring (4) is in the form of a conical curved surface.
6. A construction rainwater drainage device according to claim 1, characterized in that: A steel cage (5) is arranged inside the well ring (1).