Tunnel secondary lining pouring monitoring device

By designing a tunnel secondary lining pouring monitoring device, the leakage during the secondary lining pouring process can be monitored and compensated in real time, which solves the problems of insufficient timeliness and high cost of the secondary lining vault voiding in the existing technology, and achieves high efficiency and low cost. Cost of the secondary lining pouring process.

CN222376559UActive Publication Date: 2025-01-21GUIZHOU ROAD & BRIDGE GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420899240.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2025-01-21
Estimated Expiration
2034-04-28

AI Technical Summary

Technical Problem

In the prior art, the solution to the air-removing of the second lining vault is insufficient and the cost is too high. The radar detection technology is time-consuming and labor-intensive to replenish the slurry, and the tunnel vault vault air-removing alarm system is costly and affects the integrity of the second lining.

Method used

A tunnel secondary lining pouring monitoring device is designed, including a fixing mechanism, a monitoring mechanism and an adjusting mechanism. The pouring process is monitored in real time through a camera. If a leak is found, concrete can be replenished immediately. The cleaning component can easily clean the dust on the surface of the camera, reducing costs and Ensure the integrity of the second lining.

Benefits of technology

Real-time monitoring of the secondary lining pouring process is realized, leaks are filled in time, the void rate of the secondary lining vault is reduced, costs are reduced, and the integrity and quality of the secondary lining are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222376559U_ABST
    Figure CN222376559U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of secondary lining vault disengaging, in particular to a tunnel secondary lining pouring monitoring device which comprises a fixing mechanism serving as a device body, and a monitoring mechanism used for checking the concrete pouring process is arranged at one end of the fixing mechanism. And the monitoring mechanism is provided with an adjusting mechanism for simply and conveniently adjusting a monitoring angle. By arranging the monitoring mechanism and the adjusting mechanism, a worker can observe the secondary lining pouring process in real time, the pull rope a and the pull rope b are controlled through the pull ring a and the pull ring b, the rotating rod is rotationally connected into the connecting shell, and therefore the sleeve shell can be driven to rotate by controlling the acting force on the pull rope a and the pull rope b; therefore, the recording direction of the camera is simply and conveniently controlled, the internal pouring process is monitored in multiple directions, the situation that the secondary lining vault is void due to the fact that a worker judges only according to experience is reduced, and the void rate of the secondary lining vault is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of secondary lining vault voiding, in particular to a tunnel secondary lining pouring monitoring device. Background Art

[0002] There are two solutions to the problem of secondary lining vault voids in the prior art. One is to use radar to detect after the final setting of the pouring is completed, and then inject grouting to fill the vault again; the other is a tunnel vault void alarm system, which uses four sensors arranged in a continuous manner in the longitudinal direction of the vault. When the concrete pouring reaches the top, the sensor alarm is triggered to determine whether the vault concrete is poured full.

[0003] However, radar detection technology is used to detect vault voids only after the secondary lining has been cast and finally set. The grouting measures taken are time-consuming and labor-intensive. Excessive voids may even lead to the dismantling of the first mold and the second lining, and the solution to the vault voids is not timely. The tunnel vault void alarm system is too expensive and is directly left in the secondary lining concrete after use, which has a certain impact on the integrity of the secondary lining concrete. Utility Model Content

[0004] In view of the shortcomings of the prior art, the utility model provides a tunnel secondary lining pouring monitoring device, which has strong real-time monitoring capabilities. When leakage is found, concrete can be supplemented immediately. The cost is low, and the observed materials can be withdrawn from the secondary lining, ensuring the integrity of the secondary lining. It solves the problems in the prior art that the radar detection technology grouting measures are time-consuming and labor-intensive, and the timeliness is poor, and the tunnel vault de-airing alarm system is too expensive, which has a certain impact on the integrity of the secondary lining concrete.

[0005] In order to solve the above technical problems, the utility model provides the following technical solutions:

[0006] A tunnel secondary lining pouring monitoring device comprises a fixing mechanism as the main body of the device, the fixing mechanism comprises a connecting outer tube and a connecting outer shell, one end of the fixing mechanism is provided with a monitoring mechanism for viewing the concrete pouring process, the monitoring mechanism is provided with an adjustment mechanism for simply adjusting the monitoring angle, the adjustment mechanism comprises a fixing ring a and a fixing ring b, the fixing ring a and the fixing ring b are respectively fixedly connected with a pull rope a and a pull rope b, two limit blocks a are fixedly connected to the middle part of the connecting outer tube, two limit blocks b are fixedly connected to the connecting outer tube near the port, one end of the connecting outer tube is installed with a clamping block for fixing the pull rope a and the pull rope b, and two cleaning components are symmetrically arranged in the connecting outer shell.

[0007] Preferably, the cleaning assembly includes an arc-shaped fixing plate fixedly connected to the inner side of the connecting shell, an arc-shaped groove is opened on one side of the arc-shaped fixing plate, an arc-shaped clamping plate is clamped in the arc-shaped groove, a connecting frame is fixedly connected to one side of the bottom of the arc-shaped clamping plate, an arc-shaped connecting plate is fixedly connected to one side of the connecting frame, and a cleaning cotton is detachably installed on one side of the arc-shaped connecting plate.

[0008] Preferably, the monitoring mechanism comprises a rotating rod rotatably connected to the inside of the connecting shell, the rotating rod is fixedly connected to a casing, and a camera is installed in the casing.

[0009] Preferably, the fixing ring a and the fixing ring b are both fixedly connected to one side of the casing, and the fixing ring a and the fixing ring b are symmetrically located above and below one side of the casing.

[0010] Preferably, the two limit blocks a and the two limit blocks b are respectively provided with a circular hole a and a circular hole b, the pull rope a passes through the circular hole a and the circular hole b on one side in sequence, and the pull rope b passes through the circular hole a and the circular hole b on the other side in sequence.

[0011] Preferably, the end of the pull rope a connected to the outside of the outer tube is fixedly connected to a pull ring a, and the end of the pull rope b connected to the outside of the outer tube is fixedly connected to a pull ring b.

[0012] By means of the above technical solution, the utility model provides a tunnel secondary lining pouring monitoring device, which has at least the following beneficial effects:

[0013] 1. The utility model provides a monitoring mechanism and an adjusting mechanism so that the staff can observe the pouring process of the secondary lining in real time, and control the pull rope a and the pull rope b through the pull ring a and the pull ring b. Since the rotating rod is rotatably connected in the connecting shell, the sleeve shell can be driven to rotate by controlling the force acting on the pull rope a and the pull rope b, so as to simply control the recording direction of the camera, thereby performing multi-directional monitoring of the internal pouring process, reducing the situation where the workers only rely on experience to judge, resulting in the second lining vault being empty, and greatly reducing the emptying rate of the second lining vault.

[0014] 2. The utility model provides a cleaning component so that the device can easily clean the dust adhered to the surface of the camera during the monitoring process. The arc groove and the arc clamping plate are connected so that the staff can easily replace the internal cleaning cotton. The camera can be rotated 90° by pulling the pull rope a or the pull rope b. Since the cleaning cotton is elastic, the camera can be closely attached to it during the rotation process, so that the camera can be easily cleaned and the clarity of the monitoring picture is ensured. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The accompanying drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application:

[0016] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0017] Figure 2 It is a schematic diagram of the structure of the monitoring mechanism of the utility model;

[0018] Figure 3 It is a schematic cross-sectional structure diagram of the adjustment mechanism of the utility model;

[0019] Figure 4 It is a structural schematic diagram of the cleaning component of the utility model.

[0020] Reference numerals:

[0021] 1. Fixing mechanism; 101. Connecting outer tube; 102. Connecting outer shell; 2. Monitoring mechanism; 201. Rotating rod; 202. Sleeve shell; 203. Camera; 3. Adjusting mechanism; 301. Fixing ring a; 302. Fixing ring b; 303. Pull rope a; 304. Pull rope b; 305. Block; 306. Limit block a; 307. Limit block b; 308. Cleaning assembly; 3081. Arc fixing plate; 3082. Arc groove; 3083. Arc clamping plate; 3084. Connecting frame; 3085. Arc connecting plate; 3086. Cleaning cotton. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] The radar detection technology in the prior art performs vault void detection only after the secondary lining is poured and finally set. The grouting measures taken are time-consuming and labor-intensive. Excessive voids may even lead to the removal and redoing of the first mold and the second lining. The solution to the vault void is not timely. The cost of the tunnel vault void alarm system is too high, and it is directly left in the secondary lining concrete after use, which has a certain impact on the integrity of the secondary lining concrete. The following describes a tunnel secondary lining pouring monitoring device provided by some embodiments of the utility model in conjunction with the accompanying drawings.

[0024] Embodiment 1:

[0025] In order to monitor the pouring process of the tunnel secondary lining in real time, so as to timely supplement the concrete bonding Figure 1 , Figure 2 and Figure 3As shown, a tunnel secondary lining pouring monitoring device is proposed, wherein a fixing mechanism 1 serves as the device body, and a monitoring mechanism 2 is arranged at one end of the fixing mechanism 1, through which the monitoring mechanism 2 is used to monitor the concrete pouring process in real time, and an adjusting mechanism 3 is arranged on the monitoring mechanism 2, through which the adjusting mechanism 3 is used to simply adjust the monitoring angle of the monitoring mechanism 2, so that the staff can monitor the concrete pouring process more comprehensively.

[0026] In order to avoid the situation where the workers rely on experience alone to judge, resulting in the second lining vault being emptied, a more direct and more real-time observable adjustment mechanism 3 is proposed. The adjustment mechanism 3 is provided with a fixed ring a301 and a fixed ring b302. The fixed ring a301 and the fixed ring b302 are respectively fixedly connected with a pull rope a303 and a pull rope b304. Two limit blocks a306 are fixedly connected to the middle part of the outer tube 101, and two limit blocks b307 are fixedly connected to the outer tube 101 near the port. One end of the outer tube 101 is equipped with a pull rope for pulling. The clamp block 305 for fixing the rope a303 and the pull rope b304 is symmetrically arranged in the connecting shell 102. The pull rope a303 is fixedly connected to the pull ring a at one end connected to the outside of the outer tube 101, and the pull rope b304 is fixedly connected to the pull ring b at one end connected to the outside of the outer tube 101. The fixing ring a301 and the fixing ring b302 are both fixedly connected to one side of the casing 202. The fixing ring a301 and the fixing ring b302 are symmetrically located above and below one side of the casing 202. The pull rope a303 is fixedly connected to the pull rope a303 through the pull ring a and the pull ring b. The casing 202 rotates with the rotating rod 201 under the action of the fixing ring a301 and the fixing ring b302, and the moving paths of the pulling ropes a303 and b304 are restricted by the two limiting blocks a306 and the two limiting blocks b307. When the staff needs to fix the pulling length of the pulling ropes a303 and b304, the clamping block 305 is clamped with one end connected to the outer tube 101 to fix the pulling ropes a303 and b304, so that the staff can fix the pulling ropes a303 and b304. The recording direction of the camera 203 is easily controlled, so as to monitor the internal pouring process in all directions, reduce the situation where workers rely on experience to judge, resulting in the second lining vault being hollowed out, and greatly reduce the hollowing rate of the second lining vault. Compared with the radar detection method, it is more real-time, and when the void is found, the concrete is immediately supplemented to avoid spending a lot of money, manpower and time on grouting after the final setting of the second lining, thereby reducing costs and increasing efficiency. Compared with the tunnel vault hollowing alarm system, the construction cost is greatly reduced, and the required observation materials can be removed from the second lining, ensuring the integrity of the second lining.

[0027] The fixing mechanism 1 includes a connecting outer tube 101 and a connecting outer shell 102, and the monitoring mechanism 2 includes a rotating rod 201 rotatably connected to the inside of the connecting outer shell 102, and a casing 202 is fixedly connected to the rotating rod 201, and a camera 203 is installed in the casing 202. The position of the rotating rod 201 is fixed by the connecting outer shell 102, and the angle of the camera 203 can be adjusted following the rotating rod 201 through the casing 202, thereby ensuring the monitoring effect.

[0028] Embodiment 2:

[0029] On the basis of Example 1, the technical solution proposed in Example 1 is used to solve the problems in the prior art that the radar detection technology grouting measures are time-consuming and labor-intensive, have poor timeliness, the tunnel vault de-airing alarm system is too expensive, and has a certain impact on the integrity of the secondary lining concrete. However, when the camera 203 records the pouring process, dust may be generated inside the tunnel secondary lining during the pouring process, thereby affecting the clarity of the picture recorded by the camera 203.

[0030] In order to ensure the clarity of the picture during the pouring process, Figure 1-Figure 4 As shown, a cleaning component 308 is proposed for easily cleaning the surface of the camera 203. The cleaning component 308 is connected to an arc-shaped fixing plate 3081 fixedly on the inner side of the connecting shell 102. An arc-shaped groove 3082 is provided on one side of the arc-shaped fixing plate 3081. An arc-shaped clamping plate 3083 is clamped in the arc-shaped groove 3082. A connecting frame 3084 is fixedly connected to one side of the bottom of the arc-shaped clamping plate 3083. An arc-shaped connecting plate 3085 is fixedly connected to one side of the connecting frame 3084. A cleaning cotton 3086 is detachably installed on one side of the arc-shaped connecting plate 3085. The arc-shaped clamping plate 3083 is clamped and fixed by the arc-shaped groove 3082 on the arc-shaped fixing plate 3081, and the arc-shaped connecting plate 3085 is fixed by the connecting frame 3084. The radius of the arc-shaped connecting plate 3085 is slightly larger than the rotation radius of the housing 202. Therefore, when the staff rotates the camera 203 90° through the pull rope a303 or the pull rope b304, the cleaning cotton 3086 on the arc-shaped connecting plate 3085 will be tightly attached to the surface of the camera 203, so that the camera 203 can be easily cleaned and the clarity of the monitoring image is ensured.

[0031] A circular hole a and a circular hole b are respectively provided on the two limit blocks a306 and the two limit blocks b307. The pull rope a303 passes through the circular hole a and the circular hole b on one side in turn, and the pull rope b304 passes through the circular hole a and the circular hole b on the other side in turn, so as to avoid the entanglement of the pull ropes a303 and b304 during the control process of the staff, thereby ensuring the adjustment effect of the device.

[0032] It should be noted that the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A tunnel secondary lining pouring monitoring device, comprising a fixing mechanism (1) as the device body, the fixing mechanism (1) comprising a connecting outer tube (101) and a connecting outer shell (102), characterized in that: A monitoring mechanism (2) for monitoring the concrete pouring process is disposed at one end of the fixing mechanism (1), and an adjustment mechanism (3) for simply adjusting the monitoring angle is disposed on the monitoring mechanism (2); The adjustment mechanism (3) comprises a fixing ring a (301) and a fixing ring b (302), and the fixing ring a (301) and the fixing ring b (302) are respectively fixedly connected with a pull rope a (303) and a pull rope b (304), two limit blocks a (306) are fixedly connected to the middle part of the connecting outer tube (101), and two limit blocks b (307) are fixedly connected to the connecting outer tube (101) near the port, and a clamping block (305) for fixing the pull rope a (303) and the pull rope b (304) is installed at one end of the connecting outer tube (101), and two cleaning components (308) are symmetrically arranged in the connecting outer shell (102).

2. A tunnel secondary lining pouring monitoring device according to claim 1, characterized in that: The cleaning assembly (308) comprises an arc-shaped fixing plate (3081) fixedly connected to the inner side of the connecting shell (102), an arc-shaped groove (3082) being provided on one side of the arc-shaped fixing plate (3081), an arc-shaped clamping plate (3083) being clamped in the arc-shaped groove (3082), a connecting frame (3084) being fixedly connected to one side of the bottom of the arc-shaped clamping plate (3083), an arc-shaped connecting plate (3085) being fixedly connected to one side of the connecting frame (3084), and a cleaning cotton (3086) being detachably mounted on one side of the arc-shaped connecting plate (3085).

3. A tunnel secondary lining pouring monitoring device according to claim 2, characterized in that: The monitoring mechanism (2) comprises a rotating rod (201) rotatably connected to the inside of the connecting shell (102), a casing (202) being fixedly connected to the rotating rod (201), and a camera (203) being installed in the casing (202).

4. A tunnel secondary lining pouring monitoring device according to claim 1, characterized in that: The fixing ring a (301) and the fixing ring b (302) are both fixedly connected to one side of the casing (202), and the fixing ring a (301) and the fixing ring b (302) are symmetrically located above and below one side of the casing (202).

5. A tunnel secondary lining pouring monitoring device according to claim 1, characterized in that: The two limit blocks a (306) and the two limit blocks b (307) are respectively provided with a circular hole a and a circular hole b. The pull rope a (303) passes through the circular hole a and the circular hole b on one side in sequence, and the pull rope b (304) passes through the circular hole a and the circular hole b on the other side in sequence.

6. A tunnel secondary lining pouring monitoring device according to claim 5, characterized in that: The end of the pull rope a (303) connected to the outside of the outer tube (101) is fixedly connected to a pull ring a, and the end of the pull rope b (304) connected to the outside of the outer tube (101) is fixedly connected to a pull ring b.