Current nursery stock in-situ high fill protection structure
Through the design of the current status of seedlings to protect the structure in the original situation, the use of the trunk of the seedlings from the wall and the breathable water reservation layer is used to solve the problem of affected the growth of the seedlings and the normal growth and high survival rate of the seedlings.
Patent Information
- Application Number
- CN202420675522.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-04-03
AI Technical Summary
In garden projects, during earthwork construction, the trunks of the seedlings are easily buried too deep, resulting in mechanical damage to the root system, hypoxia and aerial root growth, which in turn affects the normal growth and survival of the seedlings.
Design an in-situ high-fill protection structure for existing seedlings. By setting up isolation walls outside the trunks of the seedlings, a vertical cavity is formed inside the isolation walls. The cavity is filled with a breathable and water-retaining layer to prevent earthwork from burying the trunks and ensure the normal functioning of the root system. grow.
It effectively avoids tree trunk burial and root hypoxia, promotes the normal growth of seedlings, reduces damage to seedlings caused by transplantation and fake planting operations, and improves the survival rate and landscape effect of seedlings.
Smart Images

Figure CN222382282U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of garden engineering, in particular to an existing seedling in-situ high filling protection structure. Background Art
[0002] In the construction of landscaping, it is necessary to transplant and transplant the original seedlings in the shaping area, and then restore the seedlings after the earthwork is cleaned, leveled, improved, and shaped. If transplantation and transplanting are not performed, the backfilled earth will cover part of the tree trunk, and the backfill height may reach about 1m. The backfilling of earth will affect the normal growth of the seedlings and even cause the death of the seedlings. Since transplantation and transplanting will cause a certain degree of damage to the roots, branches and leaves of the seedlings during the operation, it will lead to problems such as slow recovery of the seedlings after planting, cumbersome maintenance and management, and poor landscape effects. Utility Model Content
[0003] In order to solve the above-mentioned technical problems, the utility model provides an in-situ high-fill protection structure for existing seedlings. This protection structure prevents the trunks of the seedlings from being buried too deeply, which may cause mechanical damage to the roots, root hypoxia, and the growth of aerial roots on the trunks that affect the balance of the root system. It replaces transplantation and temporary planting operations, realizes the in-situ growth of existing seedlings, and ensures the survival of seedlings after earthwork shaping construction.
[0004] The technical purpose of this utility model is achieved through the following technical solutions:
[0005] A high-fill protection structure for existing seedlings in situ, wherein an isolation wall is sleeved on the outside of the trunk of the existing seedling, and the outside of the isolation wall is filled with shaped earth, and the shaped earth covers the original soil layer where the roots of the seedlings are located. A vertical cavity is formed in the isolation wall, and the cavity extends upward to be flush with the shaped earth, and the trunk passes through the cavity; the cavity is filled with a breathable water-retaining layer, and the breathable water-retaining layer is filled along the bottom of the cavity to near the upper end of the cavity, and a protective layer is arranged above the breathable water-retaining layer in the cavity to prevent the breathable water-retaining layer from detaching from the cavity, and the protective layer is a water-permeable and breathable protective layer.
[0006] Furthermore, the isolation wall comprises an outer supporting structure layer and a waterproof layer arranged on the inner layer of the supporting structure.
[0007] Furthermore, the air-permeable and water-retaining layer includes a plurality of granular spheres, each granular sphere has a plurality of water-absorbing pores, and a plurality of gap channels are formed between the granular spheres.
[0008] Furthermore, the protective layer is a planting soil layer, and the granular spheres are perlite particles.
[0009] Furthermore, the planting soil layer filling cavity is flush with the modeling soil, and the planting soil layer and the modeling soil are respectively covered with a soil consolidation layer.
[0010] Furthermore, the supporting structure layer has a uniformly arranged corrugated structure, the waterproof layer is arranged in contact with the interior of the supporting structure layer, and a plurality of annular air chambers are formed between the corrugated structure of the supporting structure layer and the outer surface of the waterproof layer.
[0011] Furthermore, the side wall of the partition wall is provided with an opening for the tree trunk to enter the cavity, the opening extends from one end of the cavity to the other end, and an interface for the opening to mate is provided at the opening.
[0012] Furthermore, the planting soil layer is a peat soil layer, and the thickness of the peat soil layer is 80-100mm.
[0013] Compared with the prior art, the beneficial effects of the present invention are:
[0014] The utility model isolates the modeling earth from the tree trunk through the isolation wall, so as to prevent the modeling earth from burying the tree trunk and ensure the air permeability around the tree trunk; the air-permeable and water-retaining layer can be used to fill the inner wall of the isolation wall on the one hand, and to realize air permeability and water retention in the cavity of the isolation wall on the other hand, so as to prevent the tree trunk from growing aerial roots and form conditions for the normal growth of the tree. Compared with transplantation and transplanting, the utility model can realize the in-situ growth of existing seedlings and ensure the normal growth of seedlings to the greatest extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the use of the current seedling in-situ high fill protection structure of the utility model.
[0016] Figure 2 It is a structural schematic diagram of a partition wall in the utility model.
[0017] Figure 3 It is a structural schematic diagram of another type of partition wall in the utility model.
[0018] In the figure, 1. isolation wall; 2. breathable water-retaining layer; 3. protective layer; 4. original soil layer; 5. modeling earthwork; 6. turf; 7. supporting structure layer; 8. waterproof layer; 9. corrugated structure. DETAILED DESCRIPTION
[0019] The technical solution of the utility model is further described below in conjunction with specific implementation methods:
[0020] A high fill protection structure for seedlings in situ includes a partition wall 1, a breathable water-retaining layer 2, and a protective layer 3. This embodiment takes slope construction as an example. Figure 1As shown, shaping earth is covered on top of the original soil layer 4 where the roots of the seedlings are located, so that part of the tree trunk will be buried in the shaping earth 5. In this embodiment, the isolation wall 1 is installed on the outside of the trunk of the existing seedling, and a cavity is formed in the isolation wall 1. The shaping earth 5 is filled on the outside of the isolation wall 1, and the shaping earth 5 and the trunk are separated by the isolation wall 1; the cavity formed by the isolation wall 1 is vertically arranged, and the cavity extends upward to be flush with the shaping earth 5, and the trunk passes through the cavity.
[0021] The breathable water-retaining layer 2 is filled in the cavity. When water enters the cavity from the upper end of the cavity, part of the water seeps into the original soil layer 4 and is absorbed by the roots, and part of the water is absorbed and stored in the breathable water-retaining layer 2, thereby avoiding water accumulation in the cavity, causing root hypoxia and the production of organic acids and other substances, and preventing the tree trunks from being soaked in water and causing mildew and rot. In addition, due to the backfilling of the modeling earthwork 5, the roots of the seedlings move downward relative to the ground surface, and the moisture situation at the roots cannot be observed. The water on the surface can enter the cavity, and the breathable water-retaining layer 2 can store part of the water. When the roots are short of water, the water stored in the breathable water-retaining layer 2 can be released to provide water to the roots, thereby avoiding water shortage at the roots.
[0022] The breathable water-retaining layer 2 is filled along the original soil layer 4 at the bottom of the cavity to near the upper end of the cavity. A protective layer 3 is arranged above the breathable water-retaining layer 2 in the cavity to prevent the breathable water-retaining layer from escaping from the cavity. The protective layer 3 is a water-permeable and breathable protective layer, and external rainwater can enter the cavity through the protective layer 3.
[0023] The air-permeable water-retaining layer 2 includes a plurality of granular spheres, each granular sphere having a plurality of water-absorbing pores, and a plurality of gap channels formed between the granular spheres, which can not only realize the function of absorbing and storing water, but also ensure the air permeability in the cavity. In this embodiment, the granular spheres are such as perlite particles, and the protective layer 3 is such as a planting soil layer, which confines the perlite particles in the cavity and can also ensure the air permeability and water permeability in the cavity.
[0024] As a preferred method, the planting soil layer is a peat soil layer with a thickness of 80-100 mm. Peat soil is soft and breathable but has weak water retention, which can ensure that water can penetrate into the cavity.
[0025] The planting soil layer fills the cavity flush with the modeling soil 5, and the planting soil layer and the modeling soil 5 are respectively covered with a soil consolidation layer, such as turf 6, which can achieve both soil protection and aesthetic purposes. Peat soil has a high organic matter content, which can slowly release a large amount of trace elements for the growth of turf, ensuring the growth of turf.
[0026] In another embodiment, the protective layer may also be a mesh structure, such as a wire mesh, which is tied and fixed to the upper edge of the partition wall.
[0027] The partition wall 1 includes an outer supporting structure layer 7 and a waterproof layer 8 arranged inside the supporting structure layer 7. This embodiment provides a form of a partition wall, such as Figure 2 As shown, the supporting structure layer 7 has a uniformly arranged corrugated structure 9, and the waterproof layer 8 is arranged in contact with the inside of the supporting structure layer 7, and a number of annular air chambers are formed between the corrugated structure 9 of the supporting structure layer 7 and the outer surface of the waterproof layer 8. The corrugated shape increases the strength of the partition wall, and at the same time can ensure that the partition wall has a certain toughness and is not easy to crack under the pressure of the outer modeling earthwork. In this embodiment, the partition wall is made of high-density polyethylene (HDPE). When in use, the partition wall is first cut to facilitate the tree trunk to enter the cavity from the side of the partition wall, and then the cut position is fixed by tying strips, steel wires, hoops, etc., and waterproof glue can also be applied to the cut position for bonding.
[0028] This embodiment also provides a form of a partition wall, such as Figure 3 As shown, the side wall of the partition wall 1 is provided with an opening for the tree trunk to enter the cavity, the opening extends from one end of the cavity to the other end, and an interface for the opening to be matched is provided at the opening, such as a mortise and tenon interface, and the mortise and tenon interface is connected. The partition wall is elastic, and the opening can be enlarged to facilitate the entry of the tree trunk. The material of the partition wall is a high-density polyethylene material (HDPE). In order to increase the tightness of the interface, sealant can also be applied to the mortise and tenon interface, and hoops, steel wires, etc. can be added to the outside of the partition wall for reinforcement.
[0029] This embodiment is only a further explanation of the utility model, not a limitation of the utility model. After reading this specification, those skilled in the art can make non-creative modifications to the embodiment as needed, but as long as it is within the scope of the claims of the utility model, it will be protected by the patent law.
Claims
1. A high fill protection structure for existing seedlings in situ, characterized in that: An isolation wall is set on the outside of the trunk of the existing seedling, and the outside of the isolation wall is filled with shaping soil. The shaping soil covers the original soil layer where the roots of the seedling are located. A vertical cavity is formed in the isolation wall, and the cavity extends upward to be flush with the shaping soil, and the trunk passes through the cavity; the cavity is filled with a breathable water-retaining layer, and the breathable water-retaining layer is filled along the bottom of the cavity to near the upper end of the cavity. A protective layer is arranged above the breathable water-retaining layer in the cavity to prevent the breathable water-retaining layer from detaching from the cavity, and the protective layer is a water-permeable and breathable protective layer.
2. The in-situ high fill protection structure for existing seedlings according to claim 1, characterized in that: The isolation wall comprises an outer supporting structure layer and a waterproof layer arranged on the inner layer of the supporting structure.
3. The in-situ high fill protection structure for existing seedlings according to claim 1, characterized in that: The air-permeable and water-retaining layer comprises a plurality of granular spheres, each of which has a plurality of water-absorbing pores, and a plurality of gap channels are formed between the granular spheres.
4. The in-situ high fill protection structure for existing seedlings according to claim 3 is characterized in that: The protective layer is a planting soil layer, and the granular spheres are perlite particles.
5. The in-situ high fill protection structure for existing seedlings according to claim 4, characterized in that: The planting soil layer filling cavity is flush with the modeling soil, and the planting soil layer and the modeling soil are respectively covered with a soil consolidation layer.
6. The in-situ high fill protection structure for existing seedlings according to claim 2, characterized in that: The supporting structure layer has a uniformly arranged corrugated structure, the waterproof layer is arranged in contact with the interior of the supporting structure layer, and a plurality of annular air chambers are formed between the corrugated structure of the supporting structure layer and the outer surface of the waterproof layer.
7. The in-situ high fill protection structure for existing seedlings according to claim 1, characterized in that: The side wall of the partition wall is provided with an opening for the tree trunk to enter the cavity, the opening extends from one end of the cavity to the other end, and the opening is provided with an interface for the opening to mate.
8. The in-situ high fill protection structure for existing seedlings according to claim 4, characterized in that: The planting soil layer is a peat soil layer, and the thickness of the peat soil layer is 80-100mm.