Scaffold for constructional engineering
By arranging insert blocks, slots and sliding connection rings on the scaffolding used in construction projects, the position limit and sliding of the second pedal are realized, which solves the problem of low safety of scaffolding in the existing technology and improves the safety and safety of workers. Ease of operation.
Patent Information
- Application Number
- CN202420831741.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-04-22
AI Technical Summary
When building scaffolding in existing construction projects, staff need to lift the scaffolding for a long time, resulting in arm fatigue and falling scaffolding, which is less safe.
A kind of scaffolding for construction engineering is designed. By setting the first plug-in block to be snap-connected with the first slot, and the second plug-in block to be snap-connected with the second slot, the second pedal is limited to avoid falling; at the same time, through The connecting ring is slidably connected to the sliding rod to realize the sliding of the second pedal, and is engaged and connected with the third slot through the inserting rod to limit the position of the slid second pedal.
Effectively avoiding the drop of the second pedal when moving, improving the safety of the scaffolding, reducing the fatigue and accident risk of staff.
Smart Images

Figure CN222390936U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a scaffold, in particular to a scaffold for construction engineering, and belongs to the technical field of scaffolds. Background Art
[0002] Scaffolding is a term used in the construction field and is a variety of supports set up at construction sites for workers to work at height. It is mainly used on construction sites for exterior walls, interior decoration, or places that are too high to be constructed directly.
[0003] However, in actual use, when constructing a scaffold at a high place, the existing scaffold for construction projects requires workers to lift the scaffold. The workers' arms will become sore after lifting the scaffold for a long time, which may cause the scaffold to fall and cause injuries to the workers, and the safety is low. Utility Model Content
[0004] The main purpose of the utility model is to solve the problem of low safety and provide a scaffold for construction engineering.
[0005] The purpose of the utility model can be achieved by adopting the following technical solutions:
[0006] A scaffold for construction projects comprises a first pedal, a plurality of supporting legs are installed at the bottom of the first pedal, a plurality of sliding rods are installed at the top of the first pedal, a connecting ring is slidably installed on the sliding rod, the connecting ring is connected to one side of a third connecting plate, a fourth connecting plate is installed on the third connecting plate, a second pedal is arranged on the top of the fourth connecting plate, a first plug block is installed at the bottom of the second pedal, a first slot that cooperates with the first plug block is provided on the third connecting plate, a second plug block is installed at the bottom of the second pedal, a second slot that cooperates with the second plug block is provided on the fourth connecting plate, a limiting frame is installed on the fourth connecting plate, the limiting frame is connected to the first pedal through an plug rod, and a third slot that cooperates with the plug rod is provided on the limiting frame and the first pedal.
[0007] Preferably, the number of the supporting legs is four, the four supporting legs are evenly distributed at the bottom of the first pedal, a bottom plate is installed at the bottom of the supporting legs, and a fourth anti-slip pad is installed at the bottom of the bottom plate.
[0008] Preferably: the number of the sliding rods is four, the four sliding rods are evenly distributed on the top of the first pedal, the number of the connecting rings is four, the four connecting rings are respectively slidably connected to the four sliding rods, and the connecting rings are provided with sliding holes adapted to the sliding rods.
[0009] Preferably: first connecting plates are installed on both sides of the second pedal, a first handle is installed on the first connecting plate, and a first anti-slip pad is installed on the first handle.
[0010] Preferably, a second connecting rod is installed on the limiting frame, a third handle is installed on the second connecting rod, and a third anti-slip pad is installed on the third handle.
[0011] Preferably: a second connecting plate is installed at one end of the insertion rod, a second handle is installed on the second connecting plate, and a second anti-slip pad is installed on the second handle.
[0012] Preferably, the insert rod is a square insert block, and the third slot is a square slot.
[0013] Beneficial technical effects of the utility model:
[0014] 1. According to the utility model of the scaffolding for construction engineering, by setting the first plug block to be engaged with the first slot, the second plug block to be engaged with the second slot, the first plug block is inserted into the first slot, and the second plug block is inserted into the second slot, the second pedal can be limited to avoid the second pedal falling and injuring the staff when moving the second pedal, and the safety of the scaffolding can be improved.
[0015] 2. By arranging a connecting ring and a sliding rod for sliding connection, the second pedal can be slid to a high position, and by arranging an insert rod and a third slot for snap-fit connection, the second pedal after sliding can be limited. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the rod structure of the utility model;
[0018] Figure 3 This is a schematic diagram of the first plug-in block structure of the utility model;
[0019] Figure 4 This is a schematic diagram of the second plug-in block structure of the utility model;
[0020] Figure 5 This is a schematic diagram of the connecting ring structure of the utility model;
[0021] Figure 6 This is a schematic diagram of the slide bar structure of the utility model.
[0022] In the figure: 1. first pedal; 2. supporting leg; 3. bottom plate; 4. sliding rod; 5. connecting ring; 6. first connecting rod; 7. second pedal; 8. first connecting plate; 9. first handle; 10. limiting frame; 11. second connecting plate; 12. second handle; 13. third handle; 14. third connecting plate; 15. plug rod; 16. first plug block; 17. fourth connecting plate; 18. second plug block; 19. second connecting rod; 20. sliding hole. DETAILED DESCRIPTION
[0023] In order to make the technical solution of the present invention more clear and specific to those skilled in the art, the present invention is further described in detail below in conjunction with embodiments and drawings, but the implementation methods of the present invention are not limited thereto.
[0024] like Figure 1-Figure 6 As shown, the scaffolding for construction engineering provided by this embodiment includes a first pedal 1, a plurality of supporting legs 2 are installed at the bottom of the first pedal 1, a plurality of sliding rods 4 are installed at the top of the first pedal 1, a connecting ring 5 is slidably installed on the sliding rod 4, and the connecting ring 5 is connected to one side of a third connecting plate 14, a fourth connecting plate 17 is installed on the third connecting plate 14, a second pedal 7 is arranged on the top of the fourth connecting plate 17, a first plug-in block 16 is installed at the bottom of the second pedal 7, a first slot that cooperates with the first plug-in block 16 is opened on the third connecting plate 14, a second plug-in block 18 is installed at the bottom of the second pedal 7, a second slot that cooperates with the second plug-in block 18 is opened on the fourth connecting plate 17, and a limited The positioning frame 10, the limiting frame 10 is connected to the first pedal 1 through the insertion rod 15, and the limiting frame 10 and the first pedal 1 are both provided with a third slot that cooperates with the insertion rod 15. By setting the first plug block 16 to be engaged with the first slot, and the second plug block 18 to be engaged with the second slot, the first plug block 16 is inserted into the first slot, and the second plug block 18 is inserted into the second slot, the second pedal 7 can be limited to avoid the second pedal 7 falling and injuring the staff when the second pedal 7 is moved, and the safety of the scaffolding can be improved. By setting the connecting ring 5 to be slidably connected with the sliding rod 4, the second pedal 7 can be slid to a high place, and by setting the insertion rod 15 to be engaged with the third slot, the second pedal 7 can be limited after sliding.
[0025] In this embodiment, if Figure 1 , Figure 2 , Figure 3 , Figure 5 and Figure 6As shown, there are four supporting legs 2, which are evenly distributed at the bottom of the first pedal 1. A bottom plate 3 is installed at the bottom of the supporting legs 2, and a fourth anti-skid pad is installed at the bottom of the bottom plate 3. By setting the supporting legs 2, the first pedal 1 can be supported. By setting the bottom plate 3, the bottom plate 3 is in contact with the ground, which can improve the stability of the scaffolding. By setting the fourth anti-skid pad, the friction of the bottom plate 3 can be increased. There are four sliding bars 4, which are evenly distributed at the top of the first pedal 1. There are four connecting rings 5, which are slidably connected to the four sliding bars 4 respectively. A sliding hole 20 adapted to the sliding bar 4 is provided on the connecting ring 5. By setting the sliding hole 20, the connecting ring 5 is slid, and the connecting ring 5 slides on the sliding bar 4 to slide the second pedal 7 to a higher place. First connecting plates 8 are installed on both sides of the second pedal 7, and a first handle 9 is installed on the first connecting plate 8. The first anti-skid pad can facilitate the carrying of the second pedal 7 by setting the first handle 9, and the friction of the first handle 9 can be increased by setting the first anti-skid pad. The limiting frame 10 is provided with a second connecting rod 19, and the second connecting rod 19 is provided with a third handle 13, and the third anti-skid pad is provided on the third handle 13. By providing the third handle 13, it is convenient to pull the limiting frame 10 and move the second pedal 7. By providing the third anti-skid pad, the friction of the third handle 13 can be increased. A second connecting plate 11 is provided at one end of the insertion rod 15, and a second handle 12 is provided on the second connecting plate 11, and a second anti-skid pad is provided on the second handle 12. The insertion rod 15 is a square insertion block, and the third slot is a square slot. By providing the second handle 12, it is convenient to pull the insertion rod 15 out of the third slot or insert the insertion rod 15 into the third slot. The friction of the third handle 13 can be increased by providing the second anti-skid pad.
[0026] In this embodiment, if Figure 1-Figure 6 As shown, the working process of a scaffold for construction engineering provided in this embodiment is as follows:
[0027] Step 1: Place the second pedal 7 on the limiting frame 10, insert the first plug block 16 into the first slot, and insert the second plug block 18 into the second slot;
[0028] Step 2: Slide the limiting frame 10 to move the second pedal 7 to a higher position, and insert the insertion rod 15 into the third slot to limit the sliding second pedal 7.
[0029] In summary, in the present embodiment, according to the scaffolding for construction engineering of the present embodiment, by setting the first plug block 16 to be engaged with the first slot and the second plug block 18 to be engaged with the second slot, the first plug block 16 is inserted into the first slot and the second plug block 18 is inserted into the second slot, the second pedal 7 can be limited to avoid the second pedal 7 falling and injuring the staff when the second pedal 7 is moved, and the safety of the scaffolding can be improved. By setting the connecting ring 5 to be slidably connected with the sliding rod 4, the second pedal 7 can be slid to a high place. By setting the plug rod 15 to be engaged with the third slot, the second pedal 7 after sliding can be limited. By setting the supporting leg 2, the first pedal 1 can be supported. By setting the bottom plate 3, the bottom plate 3 is connected to the ground. The stability of the scaffolding can be improved by setting the fourth anti-skid pad to increase the friction of the base plate 3. By setting the sliding hole 20 and sliding the connecting ring 5, the connecting ring 5 can slide the second pedal 7 to a higher place by sliding on the sliding rod 4. By setting the first handle 9, it is easy to carry the second pedal 7. By setting the first anti-skid pad, the friction of the first handle 9 can be increased. By setting the third handle 13, it is easy to pull the limit frame 10 and move the second pedal 7. By setting the third anti-skid pad, the friction of the third handle 13 can be increased. By setting the second handle 12, it is easy to pull the insertion rod 15 out of the third slot or insert the insertion rod 15 into the third slot. By setting the second anti-skid pad, the friction of the third handle 13 can be increased.
[0030] The above is only a further embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the scope disclosed by the present invention according to the technical solution and concept of the present invention, which fall within the protection scope of the present invention.
Claims
1. A scaffold for construction engineering, comprising a first step (1), characterized in that: A plurality of supporting legs (2) are installed at the bottom of the first pedal (1), a plurality of sliding rods (4) are installed at the top of the first pedal (1), a connecting ring (5) is slidably installed on the sliding rod (4), the connecting ring (5) is connected to one side of a third connecting plate (14), a fourth connecting plate (17) is installed on the third connecting plate (14), a second pedal (7) is arranged on the top of the fourth connecting plate (17), a first plug block (16) is installed at the bottom of the second pedal (7), and a third connecting plate (14) is opened. A first slot is provided which cooperates with the first plug block (16); a second plug block (18) is installed at the bottom of the second pedal (7); a second slot which cooperates with the second plug block (18) is provided on the fourth connecting plate (17); a limiting frame (10) is installed on the fourth connecting plate (17); the limiting frame (10) is connected to the first pedal (1) via an insert rod (15); and a third slot which cooperates with the insert rod (15) is provided on both the limiting frame (10) and the first pedal (1).
2. A scaffold for construction engineering according to claim 1, characterized in that: The number of the supporting legs (2) is four, and the four supporting legs (2) are evenly distributed at the bottom of the first pedal (1); a bottom plate (3) is installed at the bottom of the supporting legs (2), and a fourth anti-slip pad is installed at the bottom of the bottom plate (3).
3. A scaffold for construction engineering according to claim 2, characterized in that: The number of the sliding rods (4) is four, and the four sliding rods (4) are evenly distributed on the top of the first pedal (1). The number of the connecting rings (5) is four, and the four connecting rings (5) are respectively slidably connected to the four sliding rods (4). The connecting rings (5) are provided with sliding holes (20) adapted to the sliding rods (4).
4. A scaffold for construction engineering according to claim 1, characterized in that: First connecting plates (8) are installed on both sides of the second pedal (7), a first handle (9) is installed on the first connecting plate (8), and a first anti-slip pad is installed on the first handle (9).
5. A scaffold for construction engineering according to claim 1, characterized in that: A second connecting rod (19) is installed on the limiting frame (10), a third handle (13) is installed on the second connecting rod (19), and a third anti-slip pad is installed on the third handle (13).
6. A scaffold for construction engineering according to claim 1, characterized in that: A second connecting plate (11) is installed at one end of the inserting rod (15), a second handle (12) is installed on the second connecting plate (11), and a second anti-slip pad is installed on the second handle (12).
7. A scaffold for construction engineering according to claim 1, characterized in that: The inserting rod (15) is a square inserting block, and the third slot is a square slot.