Construction ladder for road and bridge construction
By using the cooperation of stable devices and positioning components in the construction ladder of the road and bridge, as well as the design of stitching fixed components and positioning plugs and positioning insertion, the problem of poor stability of the existing construction ladder has significantly improved, significantly improved the overall stability and overall stability of the construction ladder and the overall stability of the construction ladder and the overall stability of the construction ladder and the overall stability and the overall stability of the construction ladder and the overall stability and the overall stability and Safety.
Patent Information
- Application Number
- CN202420904378.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-28
- Publication Date
- 2025-01-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When building and installing the existing road and bridge construction ladders, the base is installed and fixed only by using concrete foundation and bolts, resulting in poor stability of the construction ladders and prone to safety hazards.
A kind of road and bridge construction ladder is designed, and the cooperation of four groups of stable devices and positioning components is used to increase the stability of fixed seats. Through the cooperation between stitching fixed components and positioning plugs Connection stability.
Through the above design, the overall stability of the construction ladder has been significantly improved, the hidden safety hazards are reduced, and the personal safety of the staff standing on the construction ladder.
Smart Images

Figure CN222412649U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of road and bridge construction, in particular to a construction ladder for road and bridge construction. Background Art
[0002] Road and bridge engineering originally refers to the survey, design, construction, maintenance, and management of highways and bridges. Road and bridge engineering can be divided into the following categories according to its structure: roadbed, pavement, bridges, culverts, tunnels, drainage, protection, greening, traffic engineering, electromechanical and other projects. Among them, the construction of construction ladders is essential in road and bridge construction, and it is one of the important facilities that cooperate with construction workers in building roads and bridges.
[0003] However, when the existing road and bridge construction ladder is built and installed, the base of the road and bridge construction ladder is only installed and fixed by the concrete foundation and bolts, and the connection of each layer of the frame is also only fixed by bolts. When the road and bridge construction ladder is set up higher, only the above-mentioned installation and connection method leads to poor stability of the construction ladder, which is prone to safety hazards and endangers the personal safety of the workers standing on the construction ladder. Utility Model Content
[0004] In order to solve the problem that the existing road and bridge construction ladders are installed and fixed only by the concrete foundation and bolts during construction and installation, and the connection of each layer of the frame is also fixed only by bolts, when the road and bridge construction ladder is erected higher, only the above-mentioned installation and connection method leads to poor stability of the construction ladder and prone to safety hazards; the purpose of the utility model is to provide a construction ladder for road and bridge construction.
[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions: a construction ladder for road and bridge construction, comprising a fixed seat, a base frame is fixedly installed on the top surface of the fixed seat, a splicing frame is fixedly installed on the top surface of the base frame, the base frame and the splicing frame both include an upper fixing frame, a lower fixing frame and a support rod, the number of the support rods is four and they are fixed at the four corners between the upper fixing frame and the lower fixing frame by bolts, and stabilizing devices are symmetrically installed on both sides of the fixed seat;
[0006] The number of the stabilizing devices is four, and the stabilizing device includes a mounting piece, which is slidably installed in one side of the fixed seat, a rotating piece is fixedly installed on one side of the mounting piece, a support plate is fixedly installed on one side of the rotating piece, and the support plate is rotatably installed on one side of the mounting piece through the rotating piece, a ground nail is inserted in one end of the support plate, and the fixed seat is located on both sides of the stabilizing device and positioning components are symmetrically installed, and the positioning component includes a limit pin, a sliding piece is fixedly installed on one end of the limit pin, and a return spring is fixedly installed on one end of the sliding piece, and a positioning buckle is fixedly installed in the middle of one side of the mounting piece, the limit pin is slidably inserted in the positioning buckle through the sliding piece and the return spring, and the positioning component and the positioning buckle cooperate with each other.
[0007] Preferably, both sides of the upper fixing frame and the lower fixing frame that are fitted together on the base frame and the splicing frame are sleeved with splicing fixing components, and the splicing fixing components include a splicing plate, and four corners of one side of the splicing plate are fixedly installed with clamping blocks, and the number of the clamping blocks is four, and the four clamping blocks are respectively clamped in the base frame and the splicing frame, and fixing buckles are fixedly installed in the middle of both sides of the splicing plate, and threaded buckles are threadedly clamped in the two fixing buckles, and the two threaded buckles penetrate the fixing buckles and are respectively threadedly clamped in the base frame and the splicing frame.
[0008] Preferably, one end of one side surface of two upper and lower adjacent support rods of the base frame and the splicing frame is fixedly mounted with a positioning insert, and positioning pins are inserted into the two positioning inserts, and the positioning pins cooperate with the positioning insert.
[0009] Compared with the prior art, the beneficial effects of the utility model are:
[0010] 1. In the utility model, the stability of the fixed seat after completion is increased by the cooperation of four sets of stabilizing devices and positioning components, and the stability of the construction ladder after assembly is increased, which solves the problem that the existing road and bridge construction ladder is installed and fixed only by the concrete foundation and bolts during construction and installation, resulting in poor stability of the construction ladder and prone to safety hazards;
[0011] 2. In the utility model, the splicing and fixing between each two adjacent layers of frames are completed by two splicing and fixing components, thereby increasing the overall stability of the construction ladder after installation. The positioning plugs respectively installed on one end of the surface of two upper and lower adjacent support rods of the base frame and the splicing frame cooperate with the corresponding positioning pins to complete the connection and fixing of the base frame and the splicing frame, thereby increasing the stability of each two adjacent layers of frames after splicing. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0013] Figure 1 This is a schematic diagram of the overall structure of the utility model.
[0014] Figure 2 This is a schematic diagram of the exploded structure of the upper frame, lower fixing frame and support rod of the utility model.
[0015] Figure 3 For this utility model Figure 2 A magnified view of the structure in the middle.
[0016] Figure 4 This is a schematic diagram of the structure of the fixing seat and the stabilizing device of the utility model.
[0017] Figure 5 For this utility model Figure 4 Enlarged view of the structure at point B in the middle.
[0018] In the figure: 1. fixing seat; 11. positioning assembly; 111. limit latch; 112. sliding member; 113. reset spring; 12. mounting groove; 13. guide groove; 2. base frame; 3. splicing frame; 4. upper fixing frame; 41. lower fixing frame; 42. support rod; 421. positioning plug cylinder; 422. positioning latch; 43. ladder; 44. protective net; 45. door opening; 5. stabilizing device; 51. mounting member; 511. guide strip; 52. rotating member; 53. support plate; 54. ground nail; 55. positioning buckle; 6. splicing fixing assembly; 61. splicing plate; 62. block; 63. fixing buckle; 64. threaded buckle. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] Example: Figure 1-5As shown, the utility model provides a construction ladder for road and bridge construction, including a fixed seat 1, a base frame 2 is fixedly installed on the top surface of the fixed seat 1, a splicing frame 3 is fixedly installed on the top surface of the base frame 2, the base frame 2 and the splicing frame 3 both include an upper fixed frame 4, a lower fixed frame 41 and a support rod 42, the number of the support rod 42 is four and is fixed to the four corners between the upper fixed frame 4 and the lower fixed frame 41 by bolts, both sides of the fixed seat 1 are symmetrically installed with stabilizing devices 5, the number of the stabilizing devices 5 is four, the stabilizing devices 5 include a mounting member 51, the mounting member 51 is slidably installed in one side of the fixed seat 1, and a rotating member 52 is fixedly installed on one side of the mounting member 51. A support plate 53 is fixedly installed on one side of 52, and the support plate 53 is rotatably installed on one side of the mounting member 51 through the rotating member 52. A ground nail 54 is inserted into one end of the support plate 53. The fixing seat 1 is symmetrically installed with positioning components 11 on both sides of the stabilizing device 5. The positioning component 11 includes a limit pin 111, a sliding member 112 is fixedly installed on one end of the limit pin 111, and a return spring 113 is fixedly installed on one end of the sliding member 112. A positioning buckle 55 is fixedly installed in the middle of one side of the mounting member 51. The limit pin 111 is slidably inserted in the positioning buckle 55 through the sliding member 112 and the return spring 113, and the positioning component 11 and the positioning buckle 55 cooperate with each other.
[0021] When it is necessary to install the construction frame, the fixing base 1 of the construction frame is fixed on the concrete foundation by bolts. After the fixing is completed, the four stabilizing devices 5 are respectively installed in the two installation grooves 12 through the installation parts 51, and two stabilizing devices 5 are installed in each installation groove 12. The stabilizing device 5 is limited by the positioning assembly 11 and the positioning buckle 55. After the limiting is completed, with the cooperation of the rotating member 52, the support plate 53 is rotated so that one end of the bottom surface of the support plate 53 is in contact with the ground. After the contact, the support plate 53 is limited and fixed by the ground nails 54. Through the cooperation of the four groups of stabilizing devices 5 and the positioning assembly 11, the stability of the fixing base 1 is increased after completion, and the stability of the construction ladder after assembly is increased. This solves the problem that the existing road and bridge construction ladder is installed and fixed only by the concrete foundation and bolts to complete the installation and fixing of the base of the road and bridge construction ladder, resulting in poor stability of the construction ladder and prone to safety hazards.
[0022] Both sides of the upper fixing frame 4 and the lower fixing frame 41 that fit together on the base frame 2 and the splicing frame 3 are sleeved with a splicing fixing assembly 6, and the splicing fixing assembly 6 includes a splicing plate 61, and four corners of one side of the splicing plate 61 are fixedly installed with a clamping block 62, and the number of the clamping blocks 62 is four, and the four clamping blocks 62 are respectively clamped in the base frame 2 and the splicing frame 3, and the middle of both sides of the splicing plate 61 are fixedly installed with a fixing buckle 63, and the two fixing buckles 63 are threadedly clamped with a threaded buckle 64, and the two threaded buckles 64 penetrate the fixing buckle 63 and are respectively threadedly clamped in the base frame 2 and the splicing frame 3;
[0023] After the splicing frame 3 is fixed to the base frame 2 by bolts, with the cooperation of the clamping blocks 62 in the two splicing fixing components 6, the two splicing fixing components 6 are respectively installed on the two side surfaces of the upper fixing frame 4 and the lower fixing frame 41 that are in contact with the base frame 2 and the splicing frame 3, and fixed by the fixing buckles 63 and the threaded buckles 64. The splicing and fixing between each two adjacent layers of the frames are completed by the splicing fixing components 6, thereby increasing the overall stability of the construction ladder after installation. Similarly, the splicing installation of the two splicing frames 3 also increases its stability after splicing through the two splicing fixing components 6.
[0024] The base frame 2 and the splicing frame 3 are fixedly mounted with a positioning sleeve 421 at one end of the surface of one side of the two upper and lower adjacent support rods 42 of the base frame 2 and the splicing frame 3, and a positioning pin 422 is inserted in the two positioning sleeves 421, and the positioning pin 422 cooperates with the positioning sleeve 421. The positioning sleeves 421 respectively installed at one end of the surface of one side of the two upper and lower adjacent support rods 42 of the base frame 2 and the splicing frame 3 cooperate with the corresponding positioning pin 422 to complete the connection and fixation of the base frame 2 and the splicing frame 3 (the two positioning sleeves 421 installed at one end of the surface of one side of the two upper and lower adjacent support rods 42 are a group with a positioning pin 422, and the connection between each two adjacent layers of the frames is connected through four groups), which increases the stability of the base frame 2 and the splicing frame 3 after splicing. Similarly, the splicing installation of the two splicing frames 3 also increases their stability after splicing through the positioning sleeves 421 and the positioning pin 422.
[0025] Both sides of the fixing seat 1 are provided with installation grooves 12, and the installation parts 51 are slidably installed in the installation grooves 12. The installation limit of the four stabilizing devices 5 is completed by cooperating with the two installation grooves 12 and the installation parts 51. Two stabilizing devices 5 are installed in each installation groove 12, and are symmetrically distributed in each installation groove 12.
[0026] A guide bar 511 is fixedly installed on the bottom surface of the mounting member 51, and a guide groove 13 is opened on the bottom surface of the mounting groove 12. The guide bar 511 is slidably clamped in the guide groove 13. The guide bar 511 is used to limit the mounting member 51 on both sides of the fixing seat 1, and assists the mounting member 51 to slide in the mounting groove 12, thereby increasing the stability of the mounting member 51 after installation.
[0027] Ladders 43 are installed in both the base frame 2 and the splicing frame 3. The ladders 43 cooperate with the base frame 2 and the splicing frame 3. The ladders 43 installed in the base frame 2 and the splicing frame 3 help construction workers go up and down in the construction ladder.
[0028] Protective nets 44 are fixedly installed on the four sides of the base frame 2 and the splicing frame 3. A door opening 45 is opened in the edge of the protective net 44 on one side of the base frame 2 and the splicing frame 3. The four sides of the base frame 2 and the splicing frame 3 are protected by the protective net 44. The protective door is installed and fixed through the door opening 45 opened in the protective net 44 on one side of the base frame 2 and the splicing frame 3, which is convenient for construction personnel to enter the base frame 2 and the splicing frame 3.
[0029] Working principle: when the construction frame needs to be installed, the fixing base 1 of the construction frame is fixed on the concrete foundation by bolts. After the fixing is completed, the four stabilizing devices 5 are respectively installed in the two installation grooves 12 through the installation parts 51. Two stabilizing devices 5 are installed in each installation groove 12. The stabilizing devices 5 are limited by the positioning assembly 11 in cooperation with the positioning buckle 55. After the limiting is completed, the support plate 53 is rotated with the cooperation of the rotating member 52 so that one end of the bottom surface of the support plate 53 is in contact with the ground. After the contact, the support plate 53 is fixed by the ground nails 54. The stability of the fixing base 1 after completion is increased by the cooperation of the four groups of stabilizing devices 5 and the positioning assembly 11.
[0030] After the splicing frame 3 is fixed to the base frame 2 by bolts, with the cooperation of the clamping blocks 62 in the two splicing fixing components 6, the two splicing fixing components 6 are respectively installed on the two side surfaces of the upper fixing frame 4 and the lower fixing frame 41 that are in contact with the base frame 2 and the splicing frame 3, and fixed by the fixing buckles 63 and the threaded buckles 64. The splicing and fixing between each two adjacent layers of the frames are completed by the splicing and fixing components 6. Similarly, the splicing and fixing of the two splicing frames 3 are also completed by the two splicing and fixing components 6.
[0031] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A construction ladder for road and bridge construction, comprising a fixing base (1), characterized in that: A base frame (2) is fixedly mounted on the top surface of the fixing seat (1), and a splicing frame (3) is fixedly mounted on the top surface of the base frame (2). Both the base frame (2) and the splicing frame (3) comprise an upper fixing frame (4), a lower fixing frame (41) and support rods (42). The support rods (42) are four in number and are fixed at four corners between the upper fixing frame (4) and the lower fixing frame (41) by bolts. Stabilizing devices (5) are symmetrically mounted on both sides of the fixing seat (1); The number of the stabilizing devices (5) is four. The stabilizing devices (5) include a mounting member (51), the mounting member (51) being slidably mounted in one side of a fixing seat (1), a rotating member (52) being fixedly mounted in one side of the mounting member (51), a supporting plate (53) being fixedly mounted in one side of the rotating member (52), the supporting plate (53) being rotatably mounted in one side of the mounting member (51) via the rotating member (52), a ground nail (54) being inserted into one end of the supporting plate (53), and the fixing seat (1) being located in both sides of the stabilizing device (5). A positioning component (11) is symmetrically installed, the positioning component (11) comprising a limit pin (111), a sliding member (112) is fixedly installed on one end of the limit pin (111), a return spring (113) is fixedly installed on one end of the sliding member (112), a positioning buckle (55) is fixedly installed in the middle of one side of the mounting member (51), the limit pin (111) is slidably inserted in the positioning buckle (55) through the sliding member (112) and the return spring (113), and the positioning component (11) and the positioning buckle (55) cooperate with each other.
2. A construction ladder for road and bridge construction as claimed in claim 1, characterized in that: Both sides of the upper fixing frame (4) and the lower fixing frame (41) that are bonded to each other on the base frame (2) and the splicing frame (3) are sleeved with a splicing fixing assembly (6), and the splicing fixing assembly (6) comprises a splicing plate (61), and four corners of one side of the splicing plate (61) are fixedly mounted with a clamping block (62), and the number of the clamping blocks (62) is four, and the four clamping blocks (62) are respectively clamped in the base frame (2) and the splicing frame (3), and the middle of both sides of the splicing plate (61) are fixedly mounted with a fixing buckle (63), and a threaded buckle (64) is threadedly mounted in the two fixing buckles (63), and the two threaded buckles (64) penetrate the fixing buckle (63) and are respectively threadedly clamped in the base frame (2) and the splicing frame (3).
3. A construction ladder for road and bridge construction as claimed in claim 1, characterized in that: A positioning insert (421) is fixedly mounted on one end of one side surface of two upper and lower adjacent support rods (42) of the base frame (2) and the splicing frame (3), and a positioning pin (422) is inserted into each of the two positioning inserts (421), and the positioning pin (422) cooperates with the positioning insert (421).
4. A construction ladder for road and bridge construction as claimed in claim 1, characterized in that: Both sides of the fixing seat (1) are provided with mounting grooves (12), and the mounting member (51) is slidably mounted in the mounting grooves (12).
5. A construction ladder for road and bridge construction as claimed in claim 4, characterized in that: A guide strip (511) is fixedly mounted on the bottom surface of the mounting member (51), a guide slot (13) is provided on the inner bottom surface of the mounting slot (12), and the guide strip (511) is slidably mounted in the guide slot (13).
6. A construction ladder for road and bridge construction as claimed in claim 1, characterized in that: A ladder (43) is installed in both the base frame (2) and the splicing frame (3), and the ladder (43) cooperates with the base frame (2) and the splicing frame (3).
7. A construction ladder for road and bridge construction as claimed in claim 1, characterized in that: Protective nets (44) are fixedly installed on the four sides of the base frame (2) and the splicing frame (3), and a door opening (45) is provided in the edge of the protective net (44) on one side of the base frame (2) and the splicing frame (3).