Quality acceptance device for water conservancy construction engineering
By designing the quality acceptance device for water conservancy construction projects, the use of hair brush, stuck teeth, conveyor belts and collecting boxes to remove the impurities and sludge of the river, solve the problem of the impurities and sludge influence quality acceptance of the river at the bottom of the river. The accuracy and reliability of acceptance.
Patent Information
- Application Number
- CN202420709789.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-04-08
AI Technical Summary
After the river is opened to water, impurities and sludge remain at the bottom of the river, affecting the camera's lighting effect, resulting in inaccurate acceptance of water conservancy construction quality.
A quality acceptance device for water conservancy construction projects is designed, including brush, stuck teeth, conveyor belts and collecting boxes. It cleans the impurities and sludge at the bottom of the river through the brush brush, and is transported to the collection box for collection.
Effectively remove the impurities and sludge of the river, improve the lighting effect of the camera, and improve the accuracy and reliability of the quality acceptance of water conservancy construction.
Smart Images

Figure CN222419743U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, in particular to a quality acceptance device for water conservancy construction projects. Background Art
[0002] A water conservancy project refers to a project built to control, regulate and utilize natural water resources to achieve the purpose of eliminating harm and promoting benefits. It aims to rationally utilize, develop and manage water resources to meet human needs. After a period of time, the river will scour the riverbed. If the quality of the water conservancy construction is poor, the concrete surface layer of the riverbed will crack and break, affecting the use of the river. Therefore, it is necessary to use acceptance devices to inspect the quality of the water conservancy construction.
[0003] At present, in the process of quality acceptance, most of the time, cameras and other equipment are used to take photos at different positions on the riverbed to determine whether the quality meets the standards. However, after the river has been flowing for a period of time, a lot of impurities and sludge will remain on the riverbed, covering some parts of the riverbed, affecting the lighting effect of the camera and affecting the quality inspection, which has certain limitations.
[0004] Therefore, we proposed a quality acceptance device for water conservancy construction projects in order to solve the problems raised above. Utility Model Content
[0005] The purpose of the utility model is to provide a quality acceptance device for water conservancy construction projects to solve the problem proposed in the above-mentioned background technology that after a river has been flowing for a period of time, a lot of impurities and sludge will remain on the riverbed, covering some parts of the riverbed, affecting the lighting effect of the camera and affecting the quality inspection.
[0006] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a quality acceptance device for water conservancy construction projects comprises a mounting seat and a support plate, the top of the support plate is fixedly connected to an adjusting plate, the top of the adjusting plate is symmetrically provided with a first slide groove and a second slide groove, a horizontal adjustment component is installed inside the first slide groove, a movable plate is slidably connected through the side wall of the second slide groove, the horizontal adjustment component is fixedly connected to one end of the movable plate, a first hydraulic push rod is fixedly connected to the top of the other end of the movable plate, the movable end of the first hydraulic push rod passes through the side wall of the movable plate and is fixedly connected to a cleaning component, the cleaning component comprises a first mounting plate, the side wall of the first mounting plate is fixedly connected to a fixing plate, the top of one end of the fixing plate is fixedly connected to the second hydraulic push rod, and the movable end of the second hydraulic push rod passes through the side wall of the fixing plate and is fixedly connected to an inspection component.
[0007] Preferably, the horizontal adjustment component includes a first motor, which is fixedly connected to the side wall of the adjustment plate, and the output end of the first motor is fixedly connected to a lead screw, one end of the lead screw penetrates the side wall of the adjustment plate and is rotatably connected to the inner wall of the first slide groove, the side wall of the lead screw is threadedly connected to a slider, the slider is in contact with the inner wall of the first slide groove, and the side wall of the slider is symmetrically fixedly connected to connecting rods, each of the connecting rods penetrates the first slide groove and extends to the inside of the second slide groove, and is fixedly connected to the side wall of one end of the movable plate.
[0008] Preferably, the cleaning component includes a second motor, the first mounting plate is an inverted U-shaped structure, the second motor is fixedly connected to the side wall of the first mounting plate, the output end of the second motor is fixedly connected to the first roller, one end of the first roller passes through the two side walls of the first mounting plate, the side wall of the first mounting plate passes through a rotating rod connected for rotation, the rotating rod and the side wall of the first roller located on the same side are fixedly connected to sprockets, the two sprockets are connected by a synchronous belt, the side wall of the rotating rod is fixedly connected to a cleaning roller, and the side wall of the cleaning roller is fixedly connected to a plurality of brushes.
[0009] Preferably, the inner side wall of the first mounting plate is rotatably connected to a second roller, the second roller is connected to the first roller via a conveyor belt, the inner side wall of the first mounting plate is fixedly connected to a connecting plate, the top of the connecting plate is fixedly connected to a plurality of teeth, each of the teeth is in contact with the side wall of the conveyor belt.
[0010] Preferably, a collecting box is fixedly connected to the side wall of the first mounting plate, an inclined block is fixedly connected to the opening of the collecting box, and the inclined block is in contact with the side wall of the conveyor belt.
[0011] Preferably, the inspection assembly includes a second mounting plate, the second mounting plate is fixedly connected to the movable end of the second hydraulic push rod, the side wall of the second mounting plate is fixedly connected to the third motor, the inner side wall of the second mounting plate is symmetrically penetrated and rotatably connected to a turntable, one of the turntables is fixedly connected to the output end of the third motor, and the two turntables are connected by a marking belt.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. The impurities and sludge are cleaned by rotating the brush to expose the river bottom, and the impurities and sludge on the brush are filtered through multiple teeth, and transported upward by the conveyor belt to the collection box. The impurities and sludge adsorbed on the conveyor belt are scraped off by the inclined block and enter the collection box to collect the impurities and sludge. This solves the problem that after the river has been flowing for a period of time, a lot of impurities and sludge will remain on the river bottom, covering some parts of the river bottom, affecting the lighting effect of the camera, and affecting the quality inspection. The sludge and impurities on the river bottom are cleaned and collected to avoid the impurities and sludge floating back to the original place after the riverbed is cleaned, affecting the detection effect, thereby improving the inspection quality.
[0014] 2. After cleaning the concrete surface layer of the riverbed with a brush, the concrete surface layer of the riverbed can be directly imprinted with the imprint tape, which can more intuitively reflect the quality of the concrete surface layer of the riverbed and improve the quality inspection effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0016] Figure 2 It is a three-dimensional structural schematic diagram of the level adjustment component in the utility model;
[0017] Figure 3 It is a schematic diagram of the three-dimensional structure of the first mounting plate in the cleaning assembly of the utility model;
[0018] Figure 4 It is a three-dimensional structural schematic diagram of the cleaning component in the utility model;
[0019] Figure 5 It is a schematic diagram of the three-dimensional structure of the collection box in the cleaning component of the utility model;
[0020] Figure 6 It is a three-dimensional structural schematic diagram of the inspection component in the utility model;
[0021] Figure 7 It is a three-dimensional appearance schematic diagram of the utility model.
[0022] In the figure: 1. mounting base; 2. supporting plate; 3. adjusting plate; 31. first slide; 32. second slide; 4. moving plate; 5. horizontal adjustment assembly; 51. first motor; 52. lead screw; 53. slider; 54. connecting rod; 6. first hydraulic push rod; 7. cleaning assembly; 71. first mounting plate; 72. collecting box; 73. second motor; 74. first roller; 75. second roller; 76. conveyor belt; 77. connecting plate; 78. rotating rod; 79. cleaning roller; 710. brush; 711. sprocket; 712. synchronous belt; 713. tooth; 714. inclined block; 8. fixing plate; 9. second hydraulic push rod; 10. inspection assembly; 101. second mounting plate; 102. third motor; 103. turntable; 104. imprint belt. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] Example 1: Please refer to Figure 1-3 The quality acceptance device for water conservancy construction projects includes a mounting seat 1 and a supporting plate 2. The top of the supporting plate 2 is fixedly connected with an adjusting plate 3. The top of the adjusting plate 3 is symmetrically provided with a first slide groove 31 and a second slide groove 32. A horizontal adjustment component 5 is installed inside the first slide groove 31. The side wall of the second slide groove 32 is penetrated by a movable plate 4 that is slidably connected. The horizontal adjustment component 5 is fixedly connected to one end of the adjusting plate 3. The top of the other end of the movable plate 4 is fixedly connected with a first hydraulic push rod 6. The movable end of the first hydraulic push rod 6 penetrates the side wall of the movable plate 4 and is fixedly connected with a cleaning component 7. The cleaning component 7 includes a first mounting plate 71. The side wall of the first mounting plate 71 is fixedly connected with a fixed plate 8. The top of one end of the fixed plate 8 is fixedly connected with a second hydraulic push rod 9. The movable end of the second hydraulic push rod 9 penetrates the side wall of the fixed plate 8 and is fixedly connected with an inspection component 10.
[0025] The horizontal adjustment component 5 includes a first motor 51, which is fixedly connected to the side wall of the adjustment plate 3. The output end of the first motor 51 is fixedly connected to a lead screw 52. One end of the lead screw 52 penetrates the side wall of the adjustment plate 3 and is rotatably connected to the inner wall of the first slide groove 31. The side wall of the lead screw 52 is threadedly connected to a slider 53. The slider 53 is in contact with the inner wall of the first slide groove 31. The side wall of the slider 53 is symmetrically fixedly connected with connecting rods 54. Each connecting rod 54 penetrates the first slide groove 31 and extends to the inside of the second slide groove 32. They are all fixedly connected to the side wall of one end of the movable plate 4. The slider 53 is in contact with the first slide groove 31 to prevent self-rotation.
[0026] The cleaning assembly 7 includes a second motor 73, and the first mounting plate 71 is an inverted U-shaped structure. The second motor 73 is fixedly connected to the side wall of the first mounting plate 71, and the output end of the second motor 73 is fixedly connected to the first roller 74. One end of the first roller 74 passes through the two side walls of the first mounting plate 71, and the side wall of the first mounting plate 71 passes through a rotating rod 78 that is rotatably connected. The rotating rod 78 and the side wall of the first roller 74 on the same side are fixedly connected to a sprocket 711, and the two sprockets 711 are connected by a synchronous belt 712. The side wall of the rotating rod 78 is fixedly connected to a cleaning roller 79, and the side wall of the cleaning roller 79 is fixedly connected to a plurality of brushes 710. The brushes 710 are made of plastic material. The brushes 710 clean impurities and sludge on the riverbed concrete to expose the riverbed, so as to facilitate quality inspection of the concrete surface layer of the riverbed.
[0027] In this embodiment: when in use, firstly, the mounting base 1 is installed and fixed by using external bolts, and then the first motor 51 is started. The first motor 51 rotates forward and backward, so that the lead screw 52 drives the slider 53 to adjust the left and right position, thereby adjusting the position of the brush 710 and the mark belt 104 through the movable plate 4, so as to facilitate the quality inspection of the riverbed concrete at different positions in the river; after the position is determined, the first mounting plate 71 is driven to descend by the first hydraulic push rod 6 until the brush 710 contacts the riverbed concrete, and then the second motor 73 is started, and the second motor 73 works to drive the first roller 74 and the sprocket 711 to rotate, and the synchronous belt 712 drives the rotating rod 78 and the cleaning roller 79 to rotate, so that the impurities and sludge on the riverbed concrete are cleaned by the brush 710 to expose the riverbed, so as to facilitate the quality inspection of the concrete surface layer of the riverbed.
[0028] Embodiment 2: This embodiment is an improvement made on the basis of embodiment 1. For details, please refer to Figure 4-7 The inner wall of the first mounting plate 71 is rotatably connected to a second roller 75, and the second roller 75 is connected to the first roller 74 via a conveyor belt 76. The inner wall of the first mounting plate 71 is fixedly connected to a connecting plate 77, and a plurality of latch teeth 713 are fixedly connected to the top of the connecting plate 77, and each latch tooth 713 is in contact with the side wall of the conveyor belt 76.
[0029] A collecting box 72 is fixedly connected to the side wall of the first mounting plate 71 , and an inclined block 714 is fixedly connected to the opening of the collecting box 72 . The inclined block 714 contacts the side wall of the conveyor belt 76 .
[0030] The inspection component 10 includes a second mounting plate 101, which is fixedly connected to the movable end of the second hydraulic push rod 9, and the side wall of the second mounting plate 101 is fixedly connected to the third motor 102, and the inner wall of the second mounting plate 101 is symmetrically penetrated and rotatably connected to a turntable 103, one of which is fixedly connected to the output end of the third motor 102, and the two turntables 103 are connected by a marking belt 104, wherein the first motor 51, the second motor 73 and the third motor 102 are all waterproof motors.
[0031] In this embodiment, impurities and sludge are carried to the connecting plate 77 and the latch teeth 713 by the brush 710, and the impurities and sludge on the brush 710 are filtered by the multiple latch teeth 713. Then, the brush 710 passes through the gap between the connecting plate 77 and the cleaning roller 79, and is restored under the plastic action of the brush 710, and continues to clean; the impurities and sludge filtered by the latch teeth 713 will stay on the surface of the conveyor belt 76. During the rotation of the cleaning roller 79, the conveyor belt 76 is transported upward by the rotation of the first roller 74, so that the impurities and sludge are transported to the collecting box 72, and the inclined block 714 is fixed at the opening of the collecting box 72, and the conveyor belt 76 is adjusted by the inclined block 714. The impurities and sludge adsorbed on the surface are scraped off and enter the collecting box 72, where they are collected to avoid the impurities and sludge floating back to their original places after the cleaning of the riverbed, which affects the detection effect. After the cleaning is completed, the position is adjusted by the first motor 51 to move the inspection component 10 to the cleaned riverbed, and the second night-pressing push rod 9 is moved downward to make the imprint belt 104 contact with the riverbed concrete, and then the third motor 102 is started to rotate the two turntables 103, so that the imprint belt 104 can be used to directly print the concrete on the riverbed. Compared with using cameras and other equipment to inspect the riverbed, the imprint belt 104 can better intuitively display the quality of the riverbed construction.
[0032] Working principle: the mounting base 1 is fixed by using external bolts, and then the first motor 51 is started. The first motor 51 rotates forward and backward, so that the lead screw 52 drives the slider 53 to adjust the left and right positions, thereby adjusting the positions of the brush 710 and the marking belt 104 of the movable plate 4; after the position is determined, the first mounting plate 71 is driven to descend by the first hydraulic push rod 6 until the brush 710 contacts the riverbed concrete, and then the second motor 73 is started. The second motor 73 works to drive the first roller 74 and the sprocket 711 to rotate, and the synchronous belt 712 drives the rotating rod 78 and the cleaning roller 79 to rotate; the brush 710 is used to clean the impurities and sludge on the riverbed concrete to expose the riverbed; the brush 710 carries the impurities and sludge to the connecting plate 77 and the latch teeth 713, and the impurities and sludge on the brush 710 are filtered by the multiple latch teeth 713, and then the brush 710 passes through the connecting plate 77 and the cleaning roller The gap of 79 is turned and restored under the plastic action of the brush 710, and the cleaning is continued. The impurities and sludge filtered by the card teeth 713 will remain on the surface of the conveyor belt 76. During the rotation of the cleaning roller 79, the first wheel roller 74 rotates to transport the conveyor belt 76 upward, thereby transporting the impurities and sludge to the collecting box 72, and fixing the inclined block 714 at the opening of the collecting box 72. The inclined block 714 is used to scrape the impurities and sludge adsorbed on the conveyor belt 76 and enter the collecting box 72 to collect the impurities and sludge. The first motor 51 is used to adjust the position to move the inspection component 10 to the cleaned riverbed, and the second night pressing push rod 9 is moved downward to make the mark belt 104 contact with the riverbed concrete, and then the third motor 102 is started to rotate the two turntables 103, so that the concrete on the riverbed is directly imprinted by the mark belt 104, so that the construction quality is inspected according to the mark belt 104.
[0033] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0034] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A quality acceptance device for a water conservancy construction project, comprising a mounting seat (1) and a support plate (2), characterized in that: The top of the support plate (2) is fixedly connected to an adjustment plate (3), the top of the adjustment plate (3) is symmetrically provided with a first slide groove (31) and a second slide groove (32), a horizontal adjustment component (5) is installed inside the first slide groove (31), the side wall of the second slide groove (32) is penetrated by a movable plate (4) for sliding connection, the horizontal adjustment component (5) is fixedly connected to one end of the movable plate (4), the top of the other end of the movable plate (4) is fixedly connected to a first hydraulic push rod (6), the movable end of the first hydraulic push rod (6) penetrates the side wall of the movable plate (4) and is fixedly connected to a cleaning component (7), the cleaning component (7) comprises a first mounting plate (71), the side wall of the first mounting plate (71) is fixedly connected to a fixed plate (8), the top of one end of the fixed plate (8) is fixedly connected to a second hydraulic push rod (9), the movable end of the second hydraulic push rod (9) penetrates the side wall of the fixed plate (8) and is fixedly connected to an inspection component (10).
2. The quality inspection device for water conservancy construction projects according to claim 1 is characterized in that: The horizontal adjustment component (5) comprises a first motor (51), the first motor (51) is fixedly connected to the side wall of the adjustment plate (3), the output end of the first motor (51) is fixedly connected to a lead screw (52), one end of the lead screw (52) penetrates the side wall of the adjustment plate (3) and is rotatably connected to the inner wall of the first slide groove (31), the side wall of the lead screw (52) is threadedly connected to a slider (53), the slider (53) is in contact with the inner wall of the first slide groove (31), the side wall of the slider (53) is symmetrically fixedly connected to connecting rods (54), each of the connecting rods (54) penetrates the first slide groove (31) and extends to the inside of the second slide groove (32), and is fixedly connected to the side wall of one end of the movable plate (4).
3. The quality inspection device for water conservancy construction projects according to claim 1 is characterized in that: The cleaning assembly (7) comprises a second motor (73); the first mounting plate (71) is an inverted U-shaped structure; the second motor (73) is fixedly connected to the side wall of the first mounting plate (71); the output end of the second motor (73) is fixedly connected to a first roller (74); one end of the first roller (74) passes through the two side walls of the first mounting plate (71); a rotating rod (78) passes through the side wall of the first mounting plate (71) and is rotatably connected; the rotating rod (78) and the side wall of the first roller (74) located on the same side are both fixedly connected to a sprocket (711); the two sprockets (711) are connected via a synchronous belt (712); the side wall of the rotating rod (78) is fixedly connected to a cleaning roller (79); the side wall of the cleaning roller (79) is fixedly connected to a plurality of brushes (710).
4. The quality inspection device for water conservancy construction projects according to claim 3 is characterized in that: The inner wall of the first mounting plate (71) is rotatably connected to a second roller (75), and the second roller (75) is connected to the first roller (74) via a conveyor belt (76). The inner wall of the first mounting plate (71) is fixedly connected to a connecting plate (77), and a plurality of latching teeth (713) are fixedly connected to the top of the connecting plate (77), and each of the latching teeth (713) is in contact with the side wall of the conveyor belt (76).
5. The quality inspection device for water conservancy construction projects according to claim 4 is characterized in that: The side wall of the first mounting plate (71) is fixedly connected to a collecting box (72), the opening of the collecting box (72) is fixedly connected to an inclined block (714), and the inclined block (714) is in contact with the side wall of the conveyor belt (76).
6. The quality inspection device for water conservancy construction projects according to claim 5 is characterized in that: The inspection component (10) comprises a second mounting plate (101), the second mounting plate (101) is fixedly connected to the movable end of the second hydraulic push rod (9), the side wall of the second mounting plate (101) is fixedly connected to the third motor (102), the inner wall of the second mounting plate (101) is symmetrically penetrated and rotatably connected to a turntable (103), one of the turntables (103) is fixedly connected to the output end of the third motor (102), and the two turntables (103) are connected via a marking belt (104).