Project cost progress management device
By designing a project cost progress management device with both sides, use motor drive screws and skateboards to open the cover, and fix the paper through magnets to solve the problem of the existing device that is easy to collide when multiple people use, improve the experience of the use experience And convenience.
Patent Information
- Application Number
- CN202420963518.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-07
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2034-05-07
AI Technical Summary
When the existing project cost progress management device is used by multiple people, the glass door is prone to collision, which is inconvenient to use, which affects the observation of staff.
Design a management device with engineering cost progress is used on both sides. The motor drives screws and skateboards, which drives the cover to open the cover on the outside of the bracket, reduce the impact on the surrounding staff, and fix the paper through magnets to improve the convenience.
When opening the cover, reduce the impact on the surrounding staff, improve the experience of the device, and fix the paper through magnets to achieve convenient paper replacement and fixation.
Smart Images

Figure CN222421303U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering cost, in particular to an engineering cost progress management device. Background Art
[0002] At present, project cost refers to the total amount of construction costs that are expected or actually spent to complete a project. Therefore, in a certain sense, project cost is the fixed asset investment of the construction project. From the perspective of contracting, project cost refers to the project price, that is, the price of the building and installation project and the total price of the construction project formed through bidding and other transactions in the land, equipment, technical services and contracting markets for the completion of a project; project cost includes project pricing standards related to pricing content, pricing methods and price standards, as well as project pricing quotas and project cost information; project cost is an important indicator for evaluating investment effects and an important project decision-making tool, and its accuracy is directly related to the normal progress of the project. Since the project cost process is cumbersome, relevant supervisors need to supervise and manage the cost progress of cost personnel.
[0003] According to Chinese patent CN214123434U, a construction cost progress management device is provided, firstly, the progress paper is embedded in the accommodating groove, and then the pressure plate is folded and rotated around the hinge point so that the pressure plate is buckled in the installation groove, and when the insert and the fixing piece correspond to each other, the elastic clamping mouth opens under the action of the insert, and the two elastic pieces clamp and fix the insert; when the progress paper needs to be modified or replaced, the pressure plate is pulled to rotate around the hinge point, and the two elastic pieces are elastically deformed, thereby pulling the insert out of the elastic clamping mouth; by arranging the insert and the fixing piece, the opening and closing of the pressure plate is convenient, thereby facilitating the installation and fixation of the progress paper.
[0004] When the above-mentioned device opens and closes the pressure plate, the pressure plate and the progress display board are hinged, and a large opening and closing space is required when opening. In addition, when multiple people are using the construction cost progress management device, it is easy to collide with others when opening the glass door, which is inconvenient to use and affects the staff's observation of the display board. Therefore, a construction cost progress management device is proposed to solve the above problems. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a construction cost progress management device, which has the advantages of adopting a two-side separation method to reduce the influence of the pressure plate on multiple staff members viewing data, and improve the experience when using the device. It solves the problem that the existing construction cost progress display board adopts a hinged flipping method when in use. When multiple people are using the construction cost progress management device, it is easy to collide with others when opening the glass door, which is inconvenient to use and affects reading.
[0006] To achieve the above object, the utility model provides the following technical solutions: a construction cost progress management device, comprising a bracket, a progress display board is fixedly connected to the inside of the bracket, and a protective component is arranged inside the progress display board;
[0007] The protective component includes a motor, which is fixedly connected to the inside of the progress display board, one end of the motor output shaft is fixedly connected to a screw, the outer surface of the screw is threadedly connected to a slide, the top of the slide is fixedly connected to a mounting plate, the inside of the mounting plate is fixedly connected to a cover plate, an exit groove is opened inside the bracket, the outer surface of the exit groove is fixedly connected to a rubber sealing pad, and the top of the bracket is fixedly connected to a rain shield.
[0008] Furthermore, four magnetic suction grooves are provided inside the progress display board, and the four magnetic suction grooves are symmetrically distributed inside the progress display board in groups of two each, and magnets are magnetically attracted inside the four magnetic suction grooves.
[0009] Furthermore, a support block is fixedly connected to the bottom of the motor, and the motor is fixedly connected to the inside of the progress display board through the support block. The progress display board is provided with a rotating groove, and the end of the screw away from the motor is fixedly connected to a rotating block, and the rotating block rotates inside the rotating groove.
[0010] Furthermore, the shape of the slide plate is a T-shaped plate, the shape of the mounting plate is an L-shaped plate, a mounting groove is provided inside the mounting plate, and the cover plate is located inside the mounting plate through the mounting groove.
[0011] Furthermore, a transparent plate is embedded in the interior of the mounting plate, a plurality of bolt holes are opened in the interior of the mounting plate, and the cover plate is fixedly connected to the interior of the mounting plate by bolts.
[0012] Furthermore, the shape of the exit groove is a square groove, and the number of the rubber sealing pads is four, and they are symmetrically distributed on the left and right sides of the bracket in a group of two.
[0013] Furthermore, a clamping column is elastically connected inside the bracket, the cross section of the rain shield is triangular, and the rain shield is fixedly connected to the bracket via the clamping column.
[0014] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0015] 1. The construction cost progress management device, when the construction cost data is printed out and needs to be displayed, when the cover is opened, the motor can be started to drive the screw to rotate and drive the slide plate to rotate inside the progress display board, so that the cover connected to the mounting plate moves to one side, squeezes the rubber sealing cushion to open, moves the cover to the outside of the bracket, and then posts new paper, so as to reduce the impact on surrounding staff when opening the cover and improve the user experience of the device; when the paper is being fixed, the magnet can be pulled off and the paper can be placed on the inner wall of the progress display board. The magnet is magnetically attracted to the inside of the magnetic suction groove to fix the paper, so that the device is more convenient to use.
[0016] 2. The construction cost progress management device opens an exit groove inside the bracket so that the rubber sealing pad can be installed on the inner wall of the exit groove. When the cover plate is used for shielding, the rubber sealing pad can be closed to ensure the sealing effect of the place. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is the main sectional view of the structure of the utility model;
[0018] Figure 2 This is a left side view of the structure of the utility model;
[0019] Figure 3 This is a front view of the structural cover plate of the utility model;
[0020] Figure 4 This is the front view of the structural progress display board of the utility model;
[0021] Figure 5 It is a three-dimensional diagram of the structure of the utility model.
[0022] In the figure: 1. bracket; 2. progress display board; 3. motor; 4. screw; 5. rotating block; 6. slide plate; 7. mounting plate; 8. cover plate; 9. exit slot; 10. rubber sealing pad; 11. rain shield; 12. clamping column; 13. magnetic suction slot; 14. magnet. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1-5In this embodiment, a construction cost progress management device includes a bracket 1, a progress display board 2 is fixedly connected to the inside of the bracket 1, and a protective component is arranged inside the progress display board 2.
[0025] The protection component includes a motor 3, which is fixedly connected to the inside of the progress display board 2. One end of the output shaft of the motor 3 is fixedly connected to a screw 4, and the outer surface of the screw 4 is threadedly connected to a slide plate 6, and the slide plate 6 is in the shape of a T-shaped plate.
[0026] A mounting plate 7 is fixedly connected to the top of the slide plate 6, and a cover plate 8 is fixedly connected to the inside of the mounting plate 7. The mounting plate 7 is in the shape of an L-shaped plate, and a mounting groove is provided inside the mounting plate 7. The cover plate 8 is located inside the mounting plate 7 through the mounting groove. A transparent plate is embedded inside the mounting plate 7, and a plurality of bolt holes are provided inside the mounting plate 7. The cover plate 8 is fixedly connected to the inside of the mounting plate 7 by bolts.
[0027] An exit slot 9 is provided inside the bracket 1, and a rubber sealing pad 10 is fixedly connected to the outer surface of the exit slot 9. The exit slot 9 is in the shape of a square slot. There are four rubber sealing pads 10, which are symmetrically distributed on the left and right sides of the bracket 1 in groups of two.
[0028] A rain shield 11 is fixedly connected to the top of the bracket 1 , and a clamping column 12 is elastically connected inside the bracket 1 . The cross section of the rain shield 11 is triangular, and the rain shield 11 is fixedly connected to the bracket 1 via the clamping column 12 .
[0029] Four magnetic suction grooves 13 are provided inside the progress display board 2 . The four magnetic suction grooves 13 are symmetrically distributed inside the progress display board 2 in groups of two each. Magnets 14 are magnetically attracted inside the four magnetic suction grooves 13 .
[0030] In this embodiment, an exit groove 9 is opened inside the bracket 1 so that the rubber sealing pad 10 can be installed on the inner wall of the exit groove 9. When the cover 8 is used for shielding, the rubber sealing pad 10 can be kept in a closed state to ensure the sealing effect of the area.
[0031] In this embodiment, by providing the mounting plate 7, the cover plate 8 can be disassembled and replaced when damaged during use, thereby increasing the service life of the device.
[0032] It should be noted that the motor 3 is a dual-shaft motor and the screw 4 is a bidirectional screw.
[0033] The working principle of the above embodiment is:
[0034] The construction cost progress management device, when the construction cost data is printed out and needs to be displayed, when the cover plate 8 is opened, the motor 3 can be started to drive the screw 4 to rotate and drive the slide plate 6 to rotate inside the progress display board 2, so that the cover plate 8 connected to the mounting plate 7 moves to one side, squeezes the rubber sealing cushion 10 to open, and moves the cover plate 8 to the outside of the bracket 1, and then new paper is posted, so as to reduce the impact on the surrounding staff when opening the cover plate, and improve the user experience of the device; when the paper is being fixed, the magnet 14 can be pulled down, and the paper can be placed on the inner wall of the progress display board 2, and the magnet 14 can be magnetically attracted to the inside of the magnetic attraction groove 13 to fix the paper, so that the device is more convenient to use.
[0035] It should be noted that the standard parts used in the application can be purchased from the market, special-shaped parts can be customized according to the description in the specification and drawings, and the specific connection methods of each part adopt mature bolts, rivets, welding, etc. in the prior art, and conventional means. Machinery, parts and equipment all adopt conventional models in the prior art; plus the circuit connection adopts the conventional connection method in the prior art, which will not be described in detail here. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0036] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction cost progress management device, comprising a bracket (1), characterized in that: The interior of the bracket (1) is fixedly connected with a progress display board (2), and a protective component is arranged inside the progress display board (2); The protection component comprises a motor (3), the motor (3) is fixedly connected to the inside of the progress display board (2), one end of the output shaft of the motor (3) is fixedly connected to a screw rod (4), the outer surface of the screw rod (4) is threadedly connected to a slide plate (6), the top of the slide plate (6) is fixedly connected to a mounting plate (7), the inside of the mounting plate (7) is fixedly connected to a cover plate (8), the inside of the bracket (1) is provided with an exit groove (9), the outer surface of the exit groove (9) is fixedly connected to a rubber sealing pad (10), and the top of the bracket (1) is fixedly connected to a rain shield (11).
2. A construction cost progress management device according to claim 1, characterized in that: The progress display board (2) is provided with four magnetic suction grooves (13) inside, and the four magnetic suction grooves (13) are symmetrically distributed inside the progress display board (2) in groups of two each, and magnets (14) are magnetically attracted inside the four magnetic suction grooves (13).
3. The construction cost progress management device according to claim 1, characterized in that: A support block is fixedly connected to the bottom of the motor (3), and the motor (3) is fixedly connected to the inside of the progress display board (2) through the support block. The progress display board (2) is provided with a rotation groove, and a rotation block (5) is fixedly connected to one end of the screw rod (4) away from the motor (3), and the rotation block (5) rotates inside the rotation groove.
4. The construction cost progress management device according to claim 1, characterized in that: The slide plate (6) is in the shape of a T-shaped plate, the mounting plate (7) is in the shape of an L-shaped plate, a mounting groove is provided inside the mounting plate (7), and the cover plate (8) is located inside the mounting plate (7) through the mounting groove.
5. The construction cost progress management device according to claim 1, characterized in that: A transparent plate is embedded inside the mounting plate (7), a plurality of bolt holes are opened inside the mounting plate (7), and the cover plate (8) is fixedly connected to the inside of the mounting plate (7) by means of bolts.
6. The construction cost progress management device according to claim 1, characterized in that: The shape of the exit groove (9) is a square groove, and the number of the rubber sealing pads (10) is four, and they are symmetrically distributed on the left and right sides of the bracket (1) in a group of two.
7. The construction cost progress management device according to claim 1, characterized in that: A clamping column (12) is elastically connected inside the bracket (1), the cross section of the rain shield (11) is triangular, and the rain shield (11) is fixedly connected to the bracket (1) via the clamping column (12).