Electrolytic manganese two-stage acid leaching and filter pressing integrated equipment
By designing an integrated electrolytic manganese two-stage acid-impregnated filtration equipment including a drying box and a drying motor, the problems of high moisture content and low production efficiency caused by the lack of drying function of existing equipment are solved, and drying on the production line is realized processing improves production efficiency.
Patent Information
- Application Number
- CN202323309153.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-06
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2033-12-06
AI Technical Summary
The existing electrolytic manganese dioxide production equipment lacks the drying function, resulting in a high moisture content of the produced products and requires additional time to dry the products, thereby increasing the production cycle and reducing the production efficiency.
An integrated electrolytic manganese two-stage acid-immersion filter equipment is designed, including a drying box, a drying motor, a drying fan blade and a heating wire. The drying motor is started by the controller to drive the drying fan blade to rotate and blow the heated air out of the material. Perform drying treatment.
The equipment reduces additional drying steps by drying on the production line, saving time and improving production efficiency.
Smart Images

Figure CN222434583U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electrolytic manganese, in particular to two-stage acid leaching and filter pressing integrated equipment for electrolytic manganese. Background Art
[0002] In the production process of electrolytic manganese dioxide, after the electrolysis is completed, the product usually contains some electrolyte or other impurities, so it needs to be washed to remove the residual impurities and electrolyte, and then dried to ensure that the product meets the specified moisture content requirements. Therefore, washing and drying are common subsequent processing steps.
[0003] However, the existing equipment lacks a drying function. After the electrolysis products are washed, they will contain a large amount of water. The lack of drying function may cause the output products to have a high moisture content, requiring additional time for drying, thereby increasing the production cycle and greatly reducing production efficiency.
[0004] Therefore, it is necessary to provide an integrated electrolytic manganese two-stage acid leaching and filter pressing equipment to solve the above technical problems. Utility Model Content
[0005] The utility model provides electrolytic manganese two-stage acid leaching and filter pressing integrated equipment, which solves the problem of low working efficiency due to lack of drying function.
[0006] In order to solve the above technical problems, the utility model provides an integrated two-stage acid leaching and filtration-pressing device for electrolytic manganese, comprising: a device main body, a drying support rod fixedly connected to the device main body, a drying box fixedly connected to the drying support rod, a motor fixing frame fixedly connected to the inside of the drying box, a drying motor fixedly connected to the motor fixing frame, a motor shaft rotatably connected to the drying motor, a drying fan blade fixedly connected to the motor shaft, an anti-falling block fixedly connected to the motor shaft, a heating wire is arranged inside the drying box, an air intake grille is arranged on the drying box, an air outlet grille is arranged on the drying box, a washing and drying tank is arranged on the device main body, a drain pipe is fixedly connected to the washing and drying tank, a solenoid valve is arranged on the drain pipe, a washing wastewater tank is fixedly connected to the drain pipe, and a controller is arranged on the device main body.
[0007] Preferably, an acid immersion tank is provided on the device body, a filter screen is provided inside the acid immersion tank, acid immersion liquid is provided inside the acid immersion tank, a vertical support rod is fixedly connected to the device body, and a horizontal support rod is fixedly connected to the vertical support rod.
[0008] Preferably, the transverse support rod is fixedly connected to a telescopic rod base, an electric telescopic rod is installed on the telescopic rod base, a pressure plate is fixedly connected to the electric telescopic rod, a drain pipe is provided on the acid leaching tank, a box base is fixedly connected to the inside of the device body, an acid leaching waste liquid tank is fixedly connected to the box base, and the acid leaching waste liquid tank.
[0009] Preferably, the device body is provided with an electrolytic cell, an electrolyte is provided inside the electrolytic cell, a card slot is provided on the device body, a collecting cover is provided on the device body, a card block is fixedly connected to the collecting cover, and the card block is slidably connected to the card slot.
[0010] Preferably, an electrolytic rod is arranged inside the electrolytic cell, a collecting tube is fixedly connected to the collecting cover, a hydrogen collecting box is fixedly connected to the collecting tube, a pressure detector is installed inside the hydrogen collecting box, an electrolytic waste liquid tank is arranged inside the device body, and a solenoid valve is arranged on the collecting tube.
[0011] Preferably, a control panel is provided on the controller, and a device switch is provided on the controller.
[0012] Preferably, an observation window is provided on the device body.
[0013] Compared with the related art, the electrolytic manganese two-stage acid leaching and filter pressing integrated equipment provided by the utility model has the following beneficial effects:
[0014] The utility model provides an integrated two-stage acid leaching and filter pressing device for electrolytic manganese, which is provided with a drying box. When using the device, a drying motor can be started by a controller, and the drying motor drives the drying fan blades to rotate, and the air heated by the electric heating wire is blown out from the air outlet grille to dry the material. The device has an additional drying function, and since the product can be dried on the production line without additional processing steps, time can be saved, thereby achieving the effect of improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 A schematic structural diagram of a preferred embodiment of the electrolytic manganese two-stage acid leaching and filter pressing integrated equipment provided by the utility model;
[0016] Figure 2 for Figure 1 The schematic cross-sectional view shown;
[0017] Figure 3 for Figure 1 The schematic diagram of the interior of the drying box shown;
[0018] Figure 4 for Figure 2 An enlarged schematic diagram of part A is shown.
[0019] Numbers in the figure: 1, device body, 2, observation window, 3, vertical support rod, 4, hydrogen collection box, 5, controller, 6, control panel, 7, device switch, 8, solenoid valve, 9, collection tube, 10, collection cover, 11, drying box, 12, drying support rod, 13, telescopic rod base, 14, horizontal support rod, 15, electric telescopic rod, 16, pressure plate, 17, electrolyte, 18, pressure detector, 19, motor waste liquid tank, 20, Washing wastewater tank, 21. Box base, 22. Acid leaching waste liquid tank, 23. Drain pipe, 24. Acid leaching liquid, 25. Washing and drying tank, 26. Acid leaching tank, 27. Electrolytic tank, 28. Air intake grille, 29. Motor fixing bracket, 30. Motor shaft, 31. Anti-falling block, 32. Heating wire, 33. Drying fan blades, 34. Drying motor, 35. Card slot, 36. Filter, 37. Air outlet grille, 38. Card block, 39. Electrolytic rod. DETAILED DESCRIPTION
[0020] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.
[0021] Please refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 ,in, Figure 1 A schematic structural diagram of a preferred embodiment of the electrolytic manganese two-stage acid leaching and filter pressing integrated equipment provided by the utility model; Figure 2 for Figure 1 The schematic cross-sectional view shown; Figure 3 for Figure 1 The schematic diagram of the interior of the drying box shown; Figure 4 for Figure 2 The enlarged schematic diagram of part A is shown. The electrolytic manganese two-stage acid leaching and filter pressing integrated equipment includes: a device body 1, a drying support rod 12 is fixedly connected to the device body 1, a drying box 11 is fixedly connected to the drying box 11, a motor fixing frame 29 is fixedly connected to the motor fixing frame 29, a drying motor 34 is fixedly connected to the drying motor 34, a motor shaft 30 is rotatably connected to the drying motor 34, a drying fan blade 33 is fixedly connected to the motor shaft 30, an anti-dropping block 31 is fixedly connected to the motor shaft 30, and the drying A heating wire 32 is provided inside the box 11, an air inlet grille 28 is provided on the drying box 11, an air outlet grille 37 is provided on the drying box 11, a washing and drying tank 25 is provided on the device body 1, a drain pipe 23 is fixedly connected to the washing and drying tank 25, a solenoid valve 8 is provided on the drain pipe 23, a washing waste water tank 20 is fixedly connected to the drain pipe 23, a controller 5 is provided on the device body 1, and the washing waste water tank 20 has the function of collecting waste water after washing the electrolytic product.
[0022] The device body 1 is provided with an acid leaching tank 26, a filter screen 36 is provided inside the acid leaching tank 26, and an acid leaching liquid 24 is provided inside the acid leaching tank 26. The device body 1 is fixedly connected with a vertical support rod 3, and a horizontal support rod 14 is fixedly connected with the vertical support rod 3. The vertical support rod 3 has the function of supporting the horizontal support rod 14.
[0023] The transverse support rod 14 is fixedly connected to a telescopic rod base 13, an electric telescopic rod 15 is installed on the telescopic rod base 13, a pressing plate 16 is fixedly connected to the electric telescopic rod 15, a drain pipe 23 is provided on the acid leaching tank 26, a box base 21 is fixedly connected inside the device body 1, an acid leaching waste liquid tank 22 is fixedly connected to the box base 21, and the box base 21 has the function of fixing the acid leaching waste liquid tank 22.
[0024] The device body 1 is provided with an electrolytic tank 27, the motor tank 27 is provided with an electrolyte 17, the device body 1 is provided with a card slot 35, the device body 1 is provided with a collection cover 10, the collection cover 10 is fixedly connected with a card block 38, the card block 38 is slidably connected to the card slot 35, and the collection cover 10 has the function of collecting hydrogen generated by electrolysis.
[0025] An electrolytic rod 39 is arranged inside the electrolytic cell 27, a collecting tube 9 is fixedly connected to the collecting cover 10, a hydrogen collecting box 4 is fixedly connected to the collecting tube 9, a pressure detector 18 is installed inside the hydrogen collecting box 4, an electrolytic waste liquid tank 19 is arranged inside the device body 1, a solenoid valve 8 is arranged on the collecting tube 9, and the hydrogen collecting box 4 has the function of storing hydrogen generated by electrolysis.
[0026] The controller 5 is provided with a control panel 6 , and the controller 5 is provided with a device switch 7 , and the device switch 7 has the function of controlling the device to be turned on and off.
[0027] The device body 1 is provided with an observation window 2, and the observation window 2 has the function of observing the reaction situation inside the acid leaching tank 26.
[0028] The working principle of the electrolytic manganese two-stage acid leaching and filter pressing integrated equipment provided by the utility model is as follows:
[0029] When using this device, the product after electrolysis needs to be washed and then dried. First, the controller 5 controls the drying motor 34 to start. At this time, the drying motor 34 starts to drive the motor shaft 30 to rotate, and the motor shaft 30 drives the drying blades 33 to rotate. At this time, the heating wire 32 starts to be energized, the heating wire 32 starts to heat, and the drying blades 33 blow the hot air heated by the heating wire 32 to the washing and drying tank 25 through the air outlet grille 37 to start drying the material. This device has a drying function.
[0030] Compared with the related art, the electrolytic manganese two-stage acid leaching and filter pressing integrated equipment provided by the utility model has the following beneficial effects:
[0031] The utility model provides an electrolytic manganese two-stage acid leaching and filter pressing integrated equipment, which is provided with a drying box 11. When using the device, a drying motor 34 can be started by a controller 5, and the drying motor 34 drives a drying fan blade 33 to rotate, and the air heated by the electric heating wire 32 is blown out from an air outlet grille 37 to dry the material. The device adds a drying function. Since the product can be dried on the production line without additional processing steps, time can be saved, thereby achieving the effect of improving production efficiency.
[0032] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. An integrated equipment for two-stage acid leaching and filter pressing of electrolytic manganese, characterized in that: include: The main body of the device is fixedly connected with a drying support rod, the drying support rod is fixedly connected with a drying box, the drying box is fixedly connected with a motor fixing frame inside, the motor fixing frame is fixedly connected with a drying motor, the drying motor is rotatably connected with a motor shaft, the motor shaft is fixedly connected with a drying fan blade, the motor shaft is fixedly connected with an anti-falling block, a heating wire is arranged inside the drying box, the drying box is provided with an air inlet grille, the drying box is provided with an air outlet grille, a washing and drying tank is arranged on the main body of the device, a drain pipe is fixedly connected to the washing and drying tank, a solenoid valve is arranged on the drain pipe, a washing wastewater tank is fixedly connected to the drain pipe, and a controller is arranged on the main body of the device.
2. The electrolytic manganese two-stage acid leaching and filter pressing integrated equipment according to claim 1, characterized in that: The device body is provided with an acid immersion tank, a filter screen is provided inside the acid immersion tank, and acid immersion liquid is provided inside the acid immersion tank. The device body is fixedly connected with a vertical support rod, and a horizontal support rod is fixedly connected with the vertical support rod.
3. The electrolytic manganese two-stage acid leaching and filter pressing integrated equipment according to claim 2, characterized in that: The transverse support rod is fixedly connected to a telescopic rod base, an electric telescopic rod is installed on the telescopic rod base, a pressure plate is fixedly connected to the electric telescopic rod, a drain pipe is provided on the acid leaching tank, a box base is fixedly connected to the inside of the device body, an acid leaching waste liquid tank is fixedly connected to the box base, and the acid leaching waste liquid tank.
4. The electrolytic manganese two-stage acid leaching and filter pressing integrated equipment according to claim 1, characterized in that: The device body is provided with an electrolytic cell, an electrolyte is provided inside the electrolytic cell, a card slot is provided on the device body, a collecting cover is provided on the device body, a card block is fixedly connected to the collecting cover, and the card block is slidably connected to the card slot.
5. The electrolytic manganese two-stage acid leaching and filter pressing integrated equipment according to claim 4, characterized in that: An electrolytic rod is arranged inside the electrolytic cell, a collecting tube is fixedly connected to the collecting cover, a hydrogen collecting box is fixedly connected to the collecting tube, a pressure detector is installed inside the hydrogen collecting box, an electrolytic waste liquid tank is arranged inside the device body, and a solenoid valve is arranged on the collecting tube.
6. The electrolytic manganese two-stage acid leaching and filtration-pressing integrated equipment according to claim 1, characterized in that: The controller is provided with a control panel, and the controller is provided with a device switch.
7. The electrolytic manganese two-stage acid leaching and filtration-pressing integrated equipment according to claim 1, characterized in that: An observation window is arranged on the device body.