Pipeline inspection well

Through the design of pipeline inspection wells with split structures, the sealant pack breaking mechanism of storage grooves and protrusions is used to solve the problems of difficult and low efficiency in construction of the existing riding well chamber, and the construction difficulty and efficiency are reduced. Improved effect.

CN222435345UInactive Publication Date: 2025-02-07BINZHOU MUNICIPAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420973061.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2025-02-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Due to its large size and heavy weight, the existing horse riding well chambers are difficult to construct, low working efficiency and high construction costs.

Method used

The pipeline inspection well design adopts a split structure, including the upper well chamber and the lower well chamber, can quickly splice through the sealant pack breaking mechanism of the storage grooves and protrusions, reducing construction difficulty.

Benefits of technology

It effectively reduces the difficulty of construction, improves work efficiency, saves manpower and material resources, and is suitable for promotion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222435345U_ABST
    Figure CN222435345U_ABST
Patent Text Reader

Abstract

A pipeline inspection well belongs to the technical field of pipeline construction and comprises a riding well chamber mounted on an underground water pipe, the riding well chamber comprises an upper well chamber and a lower well chamber, and the upper well chamber and the lower well chamber are in butt joint up and down to form a complete riding well chamber; a well lid is arranged at the top end of the upper well chamber, a storage groove is formed in the bottom end of the upper well chamber, and a sealing rubber bag is arranged in the storage groove; the top end of the lower well chamber is provided with a protruding part corresponding to the storage groove, the protruding part is inserted into the storage groove and can break the sealing rubber bag, and the bottom end of the lower well chamber is provided with a semicircular opening corresponding to the underground water pipe. The pipeline inspection well is reasonable in design, simple and ingenious in structure, convenient to install, capable of effectively reducing construction difficulty, high in working efficiency, capable of saving manpower and material resources and suitable for popularization, and a split type structure is adopted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline construction, in particular to a pipeline inspection well. Background Art

[0002] The riding well is a special inspection well built on the pipeline, which is mainly used to facilitate the maintenance and installation of urban underground infrastructure such as power supply, water supply, drainage, sewage, communication, cable TV, gas pipes, street light lines, etc. During the construction process, it is only necessary to drill a hole on the top of the main pipe and add a well without taking any flow interruption measures.

[0003] The construction principle of the riding well is mainly based on the construction principle of manually dug piles, combined with the relevant provisions of the "Drainage Inspection Well Atlas". The upper part (well wall and well shaft) adopts the construction principle of manually dug piles, digging holes and then pouring reinforced concrete retaining walls. The lower part (well chamber) is constructed in accordance with the provisions of the "Drainage Inspection Well Atlas". The size design of the wellhead, well shaft and well chamber should be convenient for maintenance and repair, and the size and position of the ladder and footrest should also be convenient for maintenance and safety.

[0004] The horse-riding well is a common inspection well method in the pipe-jacking construction process. After the pipe-jacking is completed, a concrete sinking pipe with saddle-shaped ends is dug next to the location of the inspection well, and then the concrete sinking pipe is slowly lowered. When the concrete sinking pipe descends to the position where it connects to the pipe-jacking, it looks like sitting on a saddle, hence the name horse-riding well. In general, the design and construction of the horse-riding well fully considers practicality and convenience, and provides effective support for the maintenance and management of urban underground pipe networks.

[0005] Although the riding well has many advantages mentioned above, there are still the following shortcomings in actual use: the riding well chamber is generally a prefabricated concrete casting, which is large in size and heavy in weight, greatly increases the difficulty of construction, requires a lot of manpower and material resources, has low work efficiency and high construction cost. Utility Model Content

[0006] The purpose of the utility model is to overcome the shortcomings of the prior art of great construction difficulty and low work efficiency, and to provide a pipeline inspection well with reasonable design, simple and ingenious structure, a split structure, easy installation, which can effectively reduce the construction difficulty, high work efficiency, saving manpower and material resources, and suitable for promotion.

[0007] The utility model is realized through the following technical scheme: a pipeline inspection well, including a riding well chamber installed on an underground water pipe, the riding well chamber including an upper well chamber and a lower well chamber, the upper well chamber and the lower well chamber are butted up and down to form a complete riding well chamber; a well cover is arranged at the top of the upper well chamber, a storage groove is opened at the bottom end of the upper well chamber, a sealing rubber bag is arranged inside the storage groove; a protrusion corresponding to the storage groove is arranged at the top end of the lower well chamber, the protrusion is inserted in the storage groove and can break the sealing rubber bag, and a semicircular opening corresponding to the underground water pipe is arranged at the bottom end of the lower well chamber.

[0008] A further improvement of the utility model is that the storage groove is arranged along the bottom periphery of the upper well chamber, thereby forming a closed annular groove; and the protrusion is arranged along the top periphery of the lower well chamber, thereby forming a closed annular convex strip.

[0009] A further improvement of the utility model is that the cross sections of the storage groove and the protrusion are both conical structures.

[0010] A further improvement of the utility model is that positioning slots are arranged on both sides of the upper well chamber, and positioning plug plates corresponding to the positioning slots are arranged on both sides of the lower well chamber.

[0011] A further improvement of the utility model is that the positioning slot is arranged on the outside of the storage groove, and the outer side surface of the positioning slot is an open structure.

[0012] A further improvement of the utility model is that the top end of the positioning plug plate is an arc structure.

[0013] From the above technical scheme, it can be seen that the beneficial effects of the utility model are: the design of the inspection well is reasonable, the structure is simple and ingenious, the riding well chamber adopts a split structure, which is easy to install, greatly reduces the difficulty of construction, has high work efficiency, saves manpower and material resources, and is suitable for promotion. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solution of the utility model, the drawings required for use in the description will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 It is a structural schematic diagram of a specific embodiment of the utility model.

[0016] Figure 2 It is a structural schematic diagram of a storage groove and a positioning slot in a specific embodiment of the utility model.

[0017] Figure 3It is a cross-sectional view of the lower well chamber of a specific embodiment of the utility model.

[0018] 1. Upper well chamber; 2. Lower well chamber; 3. Well cover; 4. Underground water pipe; 5. Concrete layer; 6. Storage groove; 7. Positioning slot; 8. Protrusion; 9. Positioning plug plate. DETAILED DESCRIPTION

[0019] In order to make the purpose, features and advantages of the utility model more obvious and easy to understand, the technical scheme of the utility model will be clearly and completely described below in conjunction with the drawings in the specific embodiment. Obviously, the embodiments described below are only part of the embodiments of the utility model, not all of them. Based on the embodiments in this patent, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this patent.

[0020] Please refer to the attached Figure 1 —3, combined with a specific embodiment, it is explained as follows: A pipeline inspection well described in the utility model includes a riding well chamber installed on an underground water pipe 4, and the riding well chamber includes an upper well chamber 1 and a lower well chamber 2, and the upper well chamber 1 and the lower well chamber 2 are connected up and down to form a complete riding well chamber; a well cover 3 is provided at the top of the upper well chamber 1, and a storage groove 6 is opened at the bottom end of the upper well chamber 1, and a sealing rubber bag is provided inside the storage groove 6; specifically, the storage groove 6 is arranged along the periphery of the bottom end of the upper well chamber 1 to form a closed annular groove; a protrusion 8 corresponding to the storage groove 6 is provided at the top of the lower well chamber 2, that is, the protrusion 8 is arranged along the periphery of the top end of the lower well chamber 2 to form a closed annular convex strip; the protrusion 8 is inserted in the storage groove 6 and can break the sealing rubber bag, and the bottom end of the lower well chamber 2 is provided with a semicircular opening corresponding to the underground water pipe 4.

[0021] The use principle of the utility model: an underground water pipe 4 is set with reference to the existing construction process, and a concrete layer 5 for installing the riding well chamber is set at the bottom of the underground water pipe 4. The staff uses the lifting equipment to first install the lower well chamber 2 on the prefabricated lower well chamber 2, and then uses the lifting equipment to dock the upper well chamber 1 with the lower well chamber 2. During the docking process, the protrusion 8 is inserted into the storage groove 6, and the protrusion 8 will also break the sealant bag. After the sealant bag is broken, the concrete joint glue in the sealant bag is squeezed out under the action of the protrusion 8, and the concrete joint glue can seal the joint between the upper well chamber 1 and the lower well chamber 2. After the docking is completed, the staff installs the manhole cover 3 on the top of the upper well chamber 1, that is, the riding well chamber is installed. It can be seen that the riding well chamber is divided into two, which is a split splicing structure. This structure effectively reduces the volume and weight of the components, thereby reducing the difficulty of construction.

[0022] In one embodiment, the cross-sections of the storage groove 6 and the protrusion 8 are both conical structures. With the above structure, the protrusion 8 can better break the sealant bag; at the same time, the protrusion 8 can also better squeeze out the concrete sealant in the sealant bag and squeeze the concrete sealant out of the storage groove 6.

[0023] In one embodiment, positioning slots 7 are provided on both sides of the upper well chamber 1, and positioning plugs 9 corresponding to the positioning slots 7 are provided on both sides of the lower well chamber 2. With the above structure, it is convenient for the staff to dock the upper well chamber 1 with the lower well chamber 2.

[0024] In one embodiment, the positioning slot 7 is arranged outside the storage groove 6, and the outer side of the positioning slot 7 is an open structure; the top of the positioning plug plate 9 is an arc structure. Through the above structure, the positioning plug plate 9 can be easily inserted into the positioning slot 7.

[0025] The terms "upper", "lower", "outer side", "inner side", etc. in the specification and claims of the utility model and the above-mentioned drawings are used to distinguish the relative relationship in position if they exist, and do not need to be qualitative. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the utility model described here can be implemented in an order other than those illustrated or described here. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.

[0026] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A pipeline inspection well, comprising a riding well chamber installed on an underground water pipe (4), characterized in that: The riding well chamber comprises an upper well chamber (1) and a lower well chamber (2), wherein the upper well chamber (1) and the lower well chamber (2) are butted against each other up and down, thereby forming a complete riding well chamber; a well cover (3) is arranged at the top of the upper well chamber (1), a storage groove (6) is provided at the bottom of the upper well chamber (1), and a sealing rubber bag is arranged inside the storage groove (6); a protrusion (8) corresponding to the storage groove (6) is arranged at the top of the lower well chamber (2), the protrusion (8) is inserted into the storage groove (6) and can break the sealing rubber bag, and a semicircular opening corresponding to the underground water pipe (4) is arranged at the bottom of the lower well chamber (2).

2. A pipeline inspection well according to claim 1, characterized in that: The storage groove (6) is arranged along the bottom periphery of the upper well chamber (1), thereby forming a closed annular groove; the protrusion (8) is arranged along the top periphery of the lower well chamber (2), thereby forming a closed annular convex strip.

3. A pipeline inspection well according to claim 2, characterized in that: The cross sections of the storage groove (6) and the protruding portion (8) are both conical structures.

4. A pipeline inspection well according to claim 3, characterized in that: Positioning slots (7) are arranged on both sides of the upper well chamber (1), and positioning plug plates (9) corresponding to the positioning slots (7) are arranged on both sides of the lower well chamber (2).

5. A pipeline inspection well according to claim 4, characterized in that: The positioning slot (7) is arranged on the outside of the storage groove (6), and the outer side surface of the positioning slot (7) is an open structure.

6. A pipeline inspection well according to claim 5, characterized in that: The top end of the positioning plug plate (9) is an arc structure.