Highway engineering drainage channel
By designing a road drainage channel with removable cover plate and inclined filter plate, combined with the feeding component, the problems of blockage and inconvenience in cleaning of existing drainage channels are solved, effective debris filtration and collection are achieved, and drainage effect is maintained.
Patent Information
- Application Number
- CN202420885117.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2025-02-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing road drainage channels are prone to blockage of debris under rainwater, which will affect the drainage effect and be inconvenient to clean.
A highway engineering drainage channel is designed, using a detachable cover plate and an inclined filter plate, combining the first and second feeding components to achieve filtering and collecting debris.
Effectively filter and collect debris, maintain the drainage effect of the drainage channel, facilitate regular cleaning of the staff, and improve the practicality of the drainage channel.
Smart Images

Figure CN222455730U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of highway drainage, and specifically to a highway engineering drainage channel. Background Art
[0002] At present, drainage channels are usually set up on the side of highways. Highway drainage channels can drain the slope water of the slope above the road intercepted by the roadbed, quickly collect them and introduce them into a smooth drainage channel.
[0003] In actual use of existing highway drainage channels, rainwater will wash leaves, gravel, branches and other debris into the interior of the drainage channel. After the debris enters the drainage channel and accumulates for a long time, it may cause blockage to the drainage channel and affect the drainage effect. It is inconvenient to clean the interior when it needs to be cleaned.
[0004] Based on this, the present application proposes a highway engineering drainage channel. Utility Model Content
[0005] In view of the deficiencies of the prior art, the present application provides a highway engineering drainage channel to solve the problems mentioned in the above background technology.
[0006] To achieve the above objectives, this application provides the following technical solutions:
[0007] The present application embodiment provides a highway engineering drainage channel, the drainage channel comprising:
[0008] A drainage rack, wherein a cover plate is detachably mounted on the top of the drainage rack; a plurality of grille holes are formed on the cover plate;
[0009] The inner surfaces of the left and right sides of the drainage frame are both fixedly connected with an inclined filter plate, and the outer surface of the filter plate is provided with a plurality of filter holes for filtering the debris entering the drainage frame;
[0010] A first material receiving assembly, the first material receiving assembly comprising a first material receiving box and at least two first connecting members;
[0011] One end of the two first connecting members is fixedly connected to the bottom of the cover plate, and the other end is fixedly connected to the top of the first material receiving box;
[0012] A plurality of first drainage holes are provided at the bottom of the first material receiving box.
[0013] As an embodiment, the drainage channel further includes a second material receiving assembly;
[0014] The second material receiving component comprises:
[0015] A second material receiving box, the second material receiving box is located below the filter plate, and a plurality of second drainage holes are opened in the second material receiving box;
[0016] Two fixing plates, the two fixing plates are symmetrically installed on both sides of the filter plate in the horizontal direction;
[0017] Two second connecting members, one end of the two second connecting members is detachably connected to the two fixing plates respectively, and the other end of the two second connecting members is fixedly connected to the second material receiving box.
[0018] As an implementation mode, positioning grooves are provided at the four end points of the top of the drainage frame, and positioning blocks are fixedly connected to the four end points of the bottom of the cover plate, and the four positioning blocks are respectively engaged with the four positioning grooves in a one-to-one correspondence.
[0019] As an embodiment, a support column is provided at the bottom of the first receiving box.
[0020] As an embodiment, the first material receiving assembly includes four first connecting members; one end of the four first connecting members is fixedly connected to the bottom of the cover plate, and the other end is fixedly connected to four end points on the top of the first material receiving box.
[0021] As an embodiment, the first connecting member is a steel rope.
[0022] As an implementation manner, the second connecting member is a connecting rod.
[0023] The embodiments of the present application have at least the following beneficial effects:
[0024] The present application is provided with a filter plate and a receiving box, and rainwater, pebbles, leaves and other debris will enter the drainage frame through the grille holes on the cover plate. Among them, water will flow away from the first filter holes on the two filter plates to achieve the purpose of drainage; and pebbles, leaves and other debris will move from the inclined filter plate to the first receiving box under their own gravity or the flushing force of water. The first drainage holes at the bottom of the first receiving box can also maintain the drainage effect of the drainage channel, thereby achieving the collection of debris and maintaining the drainage effect; the staff can regularly open the cover plate, take out the first receiving box and remove the debris. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 For this application, look at the structural diagram;
[0026] Figure 2 This is a schematic diagram of the explosion structure of the cover plate and its related structures and the drainage frame of this application;
[0027] Figure 3 This is a schematic diagram of the cross-sectional structure of the present application from top view;
[0028] Figure 4 This is a schematic diagram of the aggregate box structure for this application.
[0029] In the figure: 10, drainage channel; 11, drainage frame; 12, cover plate; 13, grille hole; 14, filter plate; 15, filter hole; 16, first material receiving assembly; 161, first material receiving box; 162, first connecting piece; 163, first drainage hole; 17, second material receiving assembly; 171, second material receiving box; 172, second drainage hole; 173, fixing plate; 174, second connecting piece; 18, positioning groove; 19, positioning block; 20, support column. DETAILED DESCRIPTION
[0030] In order to more fully understand the technical content of the present application, the present application will be further introduced and explained in conjunction with the drawings and specific embodiments below; it should be noted that the terms "upper", "lower", "front", "back", "inside", "outside", etc. indicate directions or positional relationships that are not given the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", etc. are used to distinguish different components, etc., and do not represent a sequence, nor do they limit "first" and "second" to being different types.
[0031] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments; based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without making any creative work shall fall within the scope of protection of the present application.
[0032] Example
[0033] See also Figure 1-Figure 4 The embodiment of the present application proposes a highway engineering drainage channel, which includes: a drainage frame 11, a cover plate 12 is detachably installed on the top of the drainage frame 11; a plurality of grille holes 13 are provided on the cover plate 12; the inner surfaces of the left and right sides of the drainage frame 11 are fixedly connected with an inclined filter plate 14, and the outer surface of the filter plate 14 is provided with a plurality of filter holes 15 for filtering the debris entering the drainage frame 11; a first material receiving component 16, the first material receiving component 16 includes a first material receiving box 161 and at least two first connecting members 162; one end of the two first connecting members 162 is fixedly connected to the bottom of the cover plate 12, and the other end is fixedly connected to the top of the material receiving box; the bottom of the first material receiving box 161 is provided with a plurality of first drainage holes 163 for discharging water entering the first material receiving box 161.
[0034] It can be understood that the inclined filter plate 14 has a highest point and a lowest point, and the first material receiving box 161 has a cavity. The first material receiving box 161 is located in the middle position of the lowest points of the two filter plates 14, and a gap is left between the first material receiving box 161 and the bottom of the drainage frame 11 to facilitate rainwater entering the first material receiving box 161 to be discharged from the first drainage hole 163.
[0035] During the use of the drainage channel 10, rainwater, pebbles, leaves and other debris will enter the drainage frame 11 through the grille holes 13 on the cover plate 12. The debris entering the drainage frame 11 may directly enter the cavity of the first receiving box 161, or may fall on the two filter plates 14 together with the rainwater; the rainwater will flow away from the first filter holes 15 on the two filter plates 14 to achieve the purpose of drainage; and the pebbles, leaves and other debris will move from the inclined filter plates 14 to the first receiving box 161 by their own gravity or under the flushing force of water. Therefore, the first receiving box 161 can achieve the purpose of collecting the debris entering the drainage frame 11.
[0036] The plurality of first drainage holes 163 at the bottom of the first material receiving box 161 can also maintain the drainage effect of the drainage channel 10, thereby collecting debris and maintaining the drainage effect.
[0037] In order to ensure that the first receiving box 161 can better collect the debris, the aperture of the first drainage hole 163 is smaller than the aperture of the filter hole 15, that is, the debris that cannot pass through the filter hole 15 cannot pass through the first drainage hole 163 with a smaller aperture.
[0038] Based on this, the staff can regularly open the cover plate 12. Since the first material receiving box 161 is connected to the cover plate 12 through the first connecting member 162, the staff can directly take out the cover plate 12 and the first material receiving box 161 and clear the debris in their cavities, and then install the cover plate 12.
[0039] Therefore, the drainage channel 10 of the embodiment of the present application can not only achieve effective filtering of debris, but also facilitate the operation of cleaning the debris by the staff, and is more practical.
[0040] In order to further improve the connection strength between the cover plate 12 and the first receiving box 161; as a preferred implementation of the embodiment of the present application, please continue to refer to Figure 1 and Figure 2 The first material receiving assembly 16 includes four first connecting members 162 , one end of each of the four first connecting members 162 is fixedly connected to the bottom of the cover plate 12 , and the other end is fixedly connected to four end points on the top of the first material receiving box 161 .
[0041] The four first connecting members 162 work together to further improve the connection strength between the cover plate 12 and the first material receiving box 161 , and provide stability for the first material receiving box 161 during operation.
[0042] As a preferred implementation of the embodiment of the present application, the first connecting member 162 is preferably a steel rope (wire rope). The steel rope has the advantages of long service life and good corrosion resistance, and can be suitable for the environment of the drainage channel 10.
[0043] In order to further improve the stability of the first material receiving box 161 during operation and facilitate the first material receiving box 161 to better discharge the rainwater entering its cavity; please continue to refer to Figure 1 In the embodiment of the present application, a support column 20 is provided at the bottom of the first material receiving box 161 , and preferably, the support columns 20 are fixedly installed at the four end points of the bottom of the first material receiving box 161 .
[0044] Among them, the support column 20 can serve as a support to improve the stability of the first material receiving box 161 during operation. At the same time, the support column 20 can also separate the bottom of the first material receiving box 161 from the bottom of the drainage frame 11, so that rainwater entering the bottom of the first material receiving box 161 can be better discharged from the first drainage hole 163.
[0045] As mentioned above, under the action of rainwater, debris and rainwater will fall onto the two filter plates 14 together; wherein, fine particle debris may enter into the drainage channel 10 through the filter holes 15 .
[0046] In view of this, please continue to read Figure 1 , Figure 2 and Figure 4 The drainage channel 10 of the embodiment of the present application also includes a second material receiving component 17; the second material receiving component 17 includes a second material receiving box 171, the second material receiving box 171 is located below the filter plate 14, and a plurality of second drainage holes 172 are opened in the second material receiving box 171; two fixing plates 173, the two fixing plates 173 are symmetrically installed on both sides of the filter plate 14 along the horizontal direction; two second connecting members 174, one end of the two second connecting members 174 is detachably connected to the two fixing plates 173 respectively, and the other end is fixedly connected to the second material receiving box 171.
[0047] It can be understood that the second material receiving box 171 also has a cavity; the aperture of the second drainage hole 172 is smaller than the aperture of the filter hole 15, that is, the fine particles and debris that may pass through the filter hole 15 can be further effectively filtered through the second drainage hole 172 to reduce the number of fine particles and debris entering the drainage rack 11.
[0048] Therefore, the drainage channel 10 of the embodiment of the present application can further effectively filter the debris.
[0049] Among them, the second connecting member 174 can be installed on the fixing plate 173 with the help of fasteners such as screws and screws; when it is necessary to clean the debris in the second material receiving box 171, it can be cleaned directly; or the fasteners can be removed from the fixing plate 173, and the second connecting member 174 and the second material receiving box 171 can be taken out from the inside of the drainage channel 10, and the debris in the cavity can be cleared, and then the second connecting member 174 can be connected to the fixing plate 173 to complete the installation.
[0050] As a preferred implementation of the embodiment of the present application, the second connecting member 174 is preferably a connecting rod.
[0051] It can be understood that in the embodiment of the present application, the number of second material receiving components 17 and filter plates 14 are set correspondingly, that is, two filter plates 14 correspond to two second material receiving components 17.
[0052] In the embodiment of the present application, a conventional detachable connection scheme in the art can be adopted between the cover plate 12 and the drain frame 11; specifically, the connection relationship between the cover plate 12 and the drain frame 11 is a snap connection.
[0053] Please continue reading Figure 2 , positioning grooves 18 are provided at the four ends of the top of the drain frame 11, and positioning blocks 19 are fixedly connected at the four ends of the bottom of the cover plate 12, and the four positioning blocks 19 are respectively connected with the four positioning grooves 18 in a one-to-one correspondence. The embodiment of the present application can realize the installation between the cover plate 12 and the drain frame 11 through the connection relationship between the positioning blocks 19 and the positioning grooves 18, and the connection relationship also has good stability.
[0054] In summary, during the use of the drainage channel 10, rainwater, pebbles, leaves and other debris will enter the drainage frame 11 through the grille holes 13 on the cover plate 12. The debris entering the drainage frame 11 may directly enter the cavity of the first receiving box 161, or may fall on the two filter plates 14 together with the rainwater; the rainwater will flow away from the first filter holes 15 on the two filter plates 14 to achieve the purpose of drainage; and the pebbles, leaves and other debris will move from the inclined filter plates 14 to the first receiving box 161 by their own gravity or under the flushing force of water. Therefore, the first receiving box 161 can achieve the purpose of collecting the debris entering the drainage frame 11.
[0055] In the embodiment of the present application, the staff can periodically open the cover plate 12, take out the first receiving box 161 and remove the debris. Therefore, the drainage channel 10 of the embodiment of the present application can not only effectively filter the debris, but also facilitate the staff to clean the debris, and is more practical.
[0056] The technical solutions provided in the embodiments of the present application are introduced in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the embodiments of the present application. The description of the above embodiments is only applicable to help understand the principles of the embodiments of the present application. At the same time, for those skilled in the art, according to the embodiments of the present application, there will be changes in the specific implementation methods and application scopes. In summary, the contents of this specification should not be understood as limiting the present application.
Claims
1. A highway engineering drainage channel, characterized in that: The drainage channel (10) comprises: A drainage frame (11), wherein a cover plate (12) is detachably mounted on the top of the drainage frame (11); a plurality of grille holes (13) are provided on the cover plate (12); The inner surfaces of the left and right sides of the drainage frame (11) are both fixedly connected with an inclined filter plate (14), and the outer surface of the filter plate (14) is provided with a plurality of filter holes (15) for filtering debris entering the drainage frame (11); A first material receiving assembly (16), the first material receiving assembly (16) comprising a first material receiving box (161) and at least two first connecting members (162); One end of the two first connecting members (162) is fixedly connected to the bottom of the cover plate (12), and the other end is fixedly connected to the top of the first material receiving box (161); A plurality of first drainage holes (163) are provided at the bottom of the first material receiving box (161).
2. The highway engineering drainage channel according to claim 1, characterized in that: The drainage channel (10) further comprises a second material receiving assembly (17); The second material receiving component (17) comprises: A second material receiving box (171), the second material receiving box (171) is located below the filter plate (14), and a plurality of second drainage holes (172) are provided in the second material receiving box (171); Two fixing plates (173), the two fixing plates (173) being symmetrically mounted on both sides of the filter plate (14) in a horizontal direction; Two second connecting members (174), one end of the two second connecting members (174) is detachably connected to the two fixing plates (173) respectively, and the other end is fixedly connected to the second material receiving box (171).
3. The highway engineering drainage channel according to claim 1, characterized in that: Positioning grooves (18) are provided at the four end points of the top of the drainage frame (11), and positioning blocks (19) are fixedly connected at the four end points of the bottom of the cover plate (12), and the four positioning blocks (19) are respectively connected to the four positioning grooves (18) in a one-to-one corresponding manner.
4. The highway engineering drainage channel according to claim 1, characterized in that: A support column (20) is provided at the bottom of the first material receiving box (161).
5. The highway engineering drainage channel according to claim 1, characterized in that: The first material receiving assembly (16) comprises four first connecting members (162); one end of each of the four first connecting members (162) is fixedly connected to the bottom of the cover plate (12), and the other end is fixedly connected to four end points at the top of the first material receiving box (161).
6. The highway engineering drainage channel according to claim 1 or 5, characterized in that: The first connecting member (162) is a steel rope.
7. The highway engineering drainage channel (10) according to claim 2, characterized in that: The second connecting member (174) is a connecting rod.