Monitoring equipment for intelligent construction site

By introducing storage hard disks and processors into the monitoring equipment for smart construction sites, the problem of monitoring information cannot be backed up and lost in real time is solved, the secure data storage and compliance detection of personnel and vehicles are realized, and the informatization level of construction site management is improved.

CN222464670UActive Publication Date: 2025-02-11HUI LINDA TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421185929.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2025-02-11
Estimated Expiration
2034-05-28

AI Technical Summary

Technical Problem

The large amount of image information generated by the existing smart construction site monitoring equipment during use cannot be backed up and saved in real time. The information will be lost after a short period of time. The information cannot be saved in time when the monitoring equipment is abnormal, resulting in the loss of monitoring data and the situation cannot be carried out. Verify.

Method used

A smart construction site monitoring device is designed, including storage mechanism, processing mechanism and monitoring mechanism. The image information is saved to the storage hard disk through memory, real-time backup and storage, and the processing of personnel and vehicle information is carried out through the processor to detect whether it is Comply with work regulations.

Benefits of technology

Through the use of storage hard disks, real-time backup and storage of large amounts of data is achieved, avoiding the loss of monitoring information, and through the analysis function of the processor, the compliance of personnel and vehicles is ensured and the level of management informationization of construction sites is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222464670U_ABST
    Figure CN222464670U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of monitoring equipment, in particular to intelligent monitoring equipment for a construction site, which comprises a storage mechanism, a processing mechanism and a monitoring mechanism, the processing mechanism is positioned at the left end of the storage mechanism, the monitoring mechanism is positioned at the front end of the storage mechanism, and the storage mechanism comprises a memory. A transmission line is fixedly mounted on the left side above the front end of the memory, a first indicator light is fixedly mounted in the middle above the front end of the memory, a first power interface is formed in the right side above the front end of the memory, a first heat dissipation window is fixedly mounted at the left end of the memory, and a storage hard disk is movably mounted at the front end of the memory; according to the utility model, images are stored in the storage hard disk through the memory, the storage hard disk can carry out real-time backup and storage of a large amount of data, monitoring information loss is avoided, personnel and vehicle information processing can be carried out through the processor, foreign personnel and vehicles are prevented from entering, and meanwhile, whether personnel and vehicles accord with work regulations or not can be detected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of monitoring equipment, in particular to a monitoring equipment for a smart construction site. Background Art

[0002] Smart construction sites are the embodiment of the smart earth concept in the engineering field. They are a brand-new concept for the management of the entire life cycle of projects. Smart construction sites refer to the use of information technology to accurately design and simulate construction projects through a three-dimensional design platform. Focusing on construction process management, an information ecosystem for construction projects with interconnected collaboration, intelligent production, and scientific management is established. This data is combined with engineering information collected by the Internet of Things in a virtual reality environment for data mining and analysis. Process trend forecasts and expert plans are provided to achieve visual and intelligent management of engineering construction, thereby improving the level of information technology in engineering management and gradually realizing green construction and ecological construction.

[0003] For example, the authorization announcement number CN215981634U discloses a smart construction site monitoring device, including: an equipment cabin, a column, a rotating unit, a top plate, a camera, a speaker, and a protection unit. The smart construction site monitoring device is provided with a pole above the equipment cabin, and a battery for powering the equipment is provided in the equipment cabin, as well as an electric control unit, an inverter unit, a communication unit, and a posture sensor; a rotating unit is provided in the pole, which can drive the top plate above the pole to rotate, and a camera and a speaker are fixedly installed on the lower surface of the top plate, so that the staff can monitor the nearby area through the camera and transmit voice information through the speaker; the posture sensor in the device can sense the posture of the device, and when the posture of the device is abnormal, the electric control unit can control the speaker to send an alarm message. The smart construction site monitoring device is easy to install, does not require additional power transmission lines, and has a good anti-theft effect.

[0004] However, the large amount of image information generated by the existing smart construction site monitoring equipment cannot be backed up and saved in real time. The information will be lost after being stored for a short time, and the information cannot be saved in time when the monitoring equipment is abnormal. Due to the large differences in working environment on the construction site, items are often lost. The loss of monitoring data will make it impossible to verify the situation, which will cause certain troubles. Utility Model Content

[0005] The purpose of the present invention is to provide a smart construction site monitoring device to solve the problems raised in the above-mentioned background technology.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A monitoring device for a smart construction site includes a storage mechanism, a processing mechanism and a monitoring mechanism, wherein the processing mechanism is located at the left end of the storage mechanism, and the monitoring mechanism is located at the front end of the storage mechanism. The storage mechanism includes a memory, a transmission line is fixedly installed on the left side above the front end of the memory, a first indicator light is fixedly installed in the middle above the front end of the memory, a first power supply interface is provided on the right side above the front end of the memory, a first heat dissipation window is fixedly installed on the left end of the memory, and a storage hard disk is movably installed at the front end of the memory.

[0008] Preferably, the storage mechanism further comprises a connecting plate, the connecting plate is fixedly mounted at the bottom end of the storage device, and a connecting groove is formed on the connecting plate.

[0009] Preferably, the processing mechanism includes a processor, a transmission line is fixedly installed on the upper side of the rear end of the processor, a network port is opened on the left side of the rear end of the processor, a second power supply interface is opened on the lower side of the rear end of the processor, and a second indicator light is fixedly installed in the middle of the right side of the rear end of the processor.

[0010] Preferably, a transmission antenna is fixedly mounted on the front side of the top of the processor, a mounting plate is fixedly mounted on the bottom of the processor, a mounting groove is provided on the mounting plate, and a second heat dissipation window is provided on the left end of the processor.

[0011] Preferably, the monitoring mechanism comprises a control box, a conveyor line is fixedly installed on the left side of the top of the control box, the left end of the conveyor line is movably installed on the lower side of the rear end of the processor, and a power connection line is fixedly installed on the right side of the top of the control box.

[0012] Preferably, a speaker slot is provided at the right end of the control box, a support block is fixedly installed at the rear end of the control box, a support hole is provided on the support block, and a rotating camera is fixedly installed at the bottom end of the control box.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. This kind of intelligent construction site monitoring equipment saves images to a storage hard disk through a memory. The storage hard disk can back up and save a large amount of data in real time to avoid the loss of monitoring information.

[0015] 2. This is a kind of smart construction site monitoring equipment, which can process personnel and vehicle information through the processor to prevent the entry of outsiders and vehicles, and can also detect whether the personnel and vehicles comply with work regulations. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 It is a structural schematic diagram of the storage mechanism of the utility model;

[0018] Figure 3 It is a structural schematic diagram of the processing mechanism of the utility model;

[0019] Figure 4 It is a structural schematic diagram of the monitoring mechanism of the utility model.

[0020] In the figure: 101, storage mechanism; 102, processing mechanism; 103, monitoring mechanism; 104, transmission line; 105, first indicator light; 106, first power interface; 201, first heat dissipation window; 202, storage hard disk; 203, connecting plate; 204, connecting slot; 205, processor; 301, network port; 302, second power interface; 303, second indicator light; 304, transmission antenna; 305, mounting plate; 306, mounting slot; 401, second heat dissipation window; 402, control box; 403, transmission line; 404, power connection line; 405, speaker slot; 406, support block; 501, support hole; 502, rotating camera; 503, memory. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-Figure 4 As shown, a technical solution provided by the utility model:

[0023] A monitoring device for a smart construction site includes a storage mechanism 101, a processing mechanism 102 and a monitoring mechanism 103, wherein the processing mechanism 102 is located at the left end of the storage mechanism 101, and the monitoring mechanism 103 is located at the front end of the storage mechanism 101. The storage mechanism 101 includes a memory 503, a transmission line 104 is fixedly installed on the left side above the front end of the memory 503, a first indicator light 105 is fixedly installed in the middle above the front end of the memory 503, a first power interface 106 is provided on the right side above the front end of the memory 503, a first heat dissipation window 201 is fixedly installed on the left end of the memory 503, and a storage hard disk 202 is movably installed at the front end of the memory.

[0024] Through the above scheme, image information can be received through the transmission line, the installation status of the storage hard disk can be detected through the first indicator light, power can be connected through the first power interface, the memory can be cooled through the first heat dissipation window, a large amount of data can be backed up and stored through the storage hard disk, and real-time backup can be achieved through the memory.

[0025] In this embodiment, preferably, the storage mechanism 101 further includes a connecting plate 203 , and the connecting plate 203 is fixedly mounted on the bottom end of the storage 503 , and a connecting groove 204 is formed on the connecting plate 203 .

[0026] Through the above solution, the connection plate can be fixed through the connection groove, so that the storage and the monitoring room or the control cabinet can be installed.

[0027] In this embodiment, preferably, the processing mechanism 102 includes a processor 205, a transmission line 104 is fixedly installed on the upper side of the rear end of the processor 205, a network port 301 is opened on the left side of the rear end of the processor 205, a second power supply interface 302 is opened on the lower side of the rear end of the processor 205, and a second indicator light 303 is fixedly installed in the middle of the right side of the rear end of the processor 205.

[0028] Through the above solution, the processor can be connected to the network through the network port, the network port can be detected through the second indicator light, and the processor can be powered on through the second power interface.

[0029] In this embodiment, preferably, a transmission antenna 304 is fixedly installed on the front side of the top of the processor 205, a mounting plate 305 is fixedly installed on the bottom of the processor 205, a mounting groove 306 is opened on the mounting plate 305, and a second heat dissipation window 401 is opened on the left end of the processor 205.

[0030] Through the above solution, the signal can be transmitted to the monitoring room through the transmission antenna, and the mounting plate can be fixed through the mounting groove, so that the processor is fixed in the control cabinet.

[0031] In this embodiment, preferably, the monitoring mechanism 103 includes a control box 402, a conveyor line 403 is fixedly installed on the left side of the top of the control box 402, the left end of the conveyor line 403 is movably installed on the lower side of the rear end of the processor 205, and a power connection line 404 is fixedly installed on the right side of the top of the control box 402.

[0032] Through the above scheme, the image information captured by the rotating camera can be transmitted to the processor for processing through the transmission line, and the rotating camera can be powered on through the power connection line.

[0033] In this embodiment, preferably, a speaker groove 405 is opened at the right end of the control box 402, a support block 406 is fixedly installed at the rear end of the control box 402, a support hole 501 is opened on the support block 406, and a rotating camera 502 is fixedly installed at the bottom end of the control box 402.

[0034] Through the above scheme, artificial shouting can be carried out through the speaker groove, and the support block can be installed through the support hole, so that the rotating camera can be fixed on the support device, and all-round shooting can be carried out through the rotation of the rotating camera.

[0035] When using a smart construction site monitoring device of this embodiment, the user installs the support block 406 through the support hole 501, so that the rotating camera 502 is fixed on the supporting device, and fixes the mounting plate 305 through the mounting groove 306, so that the processor 205 is fixed in the control cabinet, and then fixes the connecting plate 203 through the connecting groove 204, so that the memory 503 is fixed in the control cabinet or the monitoring room. After fixation, the memory 503 and the processor 205 are connected through the transmission line 104, and the processor 205 and the rotating camera 502 are connected through the transmission line 403. After the overall connection and assembly is completed, the whole is powered on through the power connection line 404, the first power interface 106 and the second power interface 302. After power-on, the rotating camera 502 starts shooting, and its rotatability is used for All-round shooting, when people are flowing and vehicles are driving, the camera 502 is rotated to record and transmit the picture information to the processor 205 through the conveyor line 403, and the image information is analyzed and processed. The processor 205 can analyze whether the personnel are wearing safety helmets and work clothes, etc., to ensure that the personnel are wearing compliance, and can analyze the face of the personnel, and identify whether they are outsiders by comparison. At the same time, the vehicle information is identified to prevent foreign vehicles from entering. When the processor 205 identifies an abnormal signal, it sends a warning signal to the monitoring room through the transmission antenna 304, and the monitoring room quickly dispatches personnel to deal with it. After the image signal is recognized, the image information is transmitted to the memory 503 through the conveyor line 403, and the memory 503 saves the data to the storage hard disk 202. The storage hard disk 202 can perform real-time backup and preservation of a large amount of data to avoid the loss of monitoring information.

[0036] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A monitoring device for a smart construction site, characterized in that: The invention comprises a storage mechanism (101), a processing mechanism (102) and a monitoring mechanism (103), wherein the processing mechanism (102) is located at the left end of the storage mechanism (101), and the monitoring mechanism (103) is located at the front end of the storage mechanism (101). The storage mechanism (101) comprises a storage device (503), a transmission line (104) is fixedly installed on the left side above the front end of the storage device (503), a first indicator light (105) is fixedly installed in the middle above the front end of the storage device (503), a first power supply interface (106) is provided on the right side above the front end of the storage device, a first heat dissipation window (201) is fixedly installed on the left end of the storage device (503), and a storage hard disk (202) is movably installed on the front end of the storage device (503).

2. The intelligent construction site monitoring device according to claim 1, characterized in that: The storage mechanism (101) further comprises a connecting plate (203), wherein the connecting plate (203) is fixedly mounted on the bottom end of the storage device (503), and a connecting groove (204) is formed on the connecting plate (203).

3. The intelligent construction site monitoring device according to claim 1, characterized in that: The processing mechanism (102) comprises a processor (205), a transmission line (104) is fixedly mounted on the upper side of the rear end of the processor (205), a network port (301) is provided on the left side of the rear end of the processor (205), a second power supply interface (302) is provided on the lower side of the rear end of the processor (205), and a second indicator light (303) is fixedly mounted in the middle of the right side of the rear end of the processor (205).

4. The intelligent construction site monitoring device according to claim 3 is characterized in that: A transmission antenna (304) is fixedly mounted on the front side of the top of the processor (205), a mounting plate (305) is fixedly mounted on the bottom of the processor (205), a mounting groove (306) is provided on the mounting plate (305), and a second heat dissipation window (401) is provided on the left end of the processor (205).

5. The intelligent construction site monitoring device according to claim 1, characterized in that: The monitoring mechanism (103) comprises a control box (402), a conveyor line (403) is fixedly installed on the left side of the top of the control box (402), the left end of the conveyor line (403) is movably installed on the lower side of the rear end of the processor (205), and a power connection line (404) is fixedly installed on the right side of the top of the control box (402).

6. The intelligent construction site monitoring device according to claim 5, characterized in that: The right end of the control box (402) is provided with a speaker slot (405), the rear end of the control box (402) is fixedly mounted with a support block (406), the support block (406) is provided with a support hole (501), and the bottom end of the control box (402) is fixedly mounted with a rotating camera (502).

Citation Information

Patent Citations

  • Monitoring equipment for intelligent construction site

    CN215981634U