Construction operation platform floating on water

By designing an adjustable water floating construction platform, using hollow containers and detachable support frames, the existing construction mobile platform is solved, and the flexibility and cost-effectiveness are improved.

CN222474400UActive Publication Date: 2025-02-14POWERCHINA SEPCO1 ELECTRIC POWER CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421282946.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2025-02-14
Estimated Expiration
2034-06-05

AI Technical Summary

Technical Problem

The existing water construction mobile platform is large inconvenient to move and cannot be resized, resulting in high construction costs.

Method used

A water floating construction platform was designed, using multiple sets of floating mechanisms and a detachable support frame, and using hollow containers as the floating mechanism. The support frame is composed of horizontal rods and vertical rods connected by fasteners. The size of the platform can be adjusted according to needs. .

Benefits of technology

It realizes the flexibility and adaptability of the platform, reduces construction costs, and can float in the diving area to meet diving construction needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222474400U_ABST
    Figure CN222474400U_ABST
Patent Text Reader

Abstract

The utility model relates to a water floating type construction operation platform which comprises a plurality of floating mechanisms, each floating mechanism is composed of a plurality of hollow containers arranged in parallel, the floating mechanisms are matched with the bottom of a supporting frame to support the supporting frame, and the supporting frame comprises a bottom frame and a top frame. The bottom frame and the top frame are both defined by a plurality of horizontal rods, the adjacent horizontal rods are detachably connected through fasteners, a plurality of vertical rods are arranged between the top frame and the bottom frame, the vertical rods are detachably connected with the top frame and the bottom frame through fasteners, and a construction platform is installed on the top frame. At least one vertical rod is fixed to one end of a positioning rod, the other end of the positioning rod is provided with a fixing piece used for being fixed to a stationary object on the water, and the construction operation platform is high in applicability and flexibility.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water construction operations, in particular to a water floating construction operation platform. Background Art

[0002] The statements herein merely provide background art related to the present invention and do not necessarily constitute prior art.

[0003] At present, when carrying out construction work on water, it is necessary to use ships as mobile platforms for construction on water. During construction, a construction platform matching the height of the construction work is set up on the ship, and construction workers carry out construction on the construction platform. The inventors have found that when using ships as mobile platforms for construction on water, the construction ship is large in size and inconvenient to move in the diving area, and the size of the ship cannot be adjusted. When platforms of different sizes are needed, ships of different sizes need to be prepared, which increases the construction cost and the construction fee is high. Utility Model Content

[0004] The purpose of the utility model is to overcome the deficiencies of the prior art and to provide a floating construction platform on water, which can maintain good adaptability and flexibility under various shallow water conditions and reduce construction costs.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] An embodiment of the utility model provides a floating construction work platform on water, comprising a plurality of floating mechanisms, wherein the floating mechanisms are composed of a plurality of hollow containers arranged in parallel, and the plurality of floating mechanisms cooperate with the bottom of a support frame to support the support frame, and the support frame comprises a bottom frame and a top frame, wherein the bottom frame and the top frame are both assembled from a plurality of horizontal rods, and adjacent horizontal rods are detachably connected by fasteners, and a plurality of vertical rods are arranged between the top frame and the bottom frame, and the vertical rods are detachably connected to the top frame and the bottom frame by fasteners, and a construction platform is installed on the top frame, and at least one vertical rod is fixed to one end of a positioning rod, and the other end of the positioning rod is provided with a fixing member for fixing to a stationary object on water.

[0007] Optionally, the floating mechanism is composed of a plurality of hollow containers arranged in parallel and tied together by wires into a whole.

[0008] Optionally, the hollow container is a cylindrical metal oil drum or a plastic drum.

[0009] Optionally, the length of the hollow container is 900-960 mm, the diameter is 560-600 mm, and the number of hollow containers included in the floating mechanism is 6-10.

[0010] Optionally, the rod section below the connection position between the vertical rod and the bottom frame serves as a limiting portion and contacts the outer side surface of the floating mechanism.

[0011] Optionally, a plurality of anti-collision components are arranged on the outer periphery of the bottom frame, and the plurality of anti-collision components are arranged along the outer edge of the bottom frame.

[0012] Optionally, the anti-collision component is a tire, and the tire is fixed to the horizontal rod of the bottom frame by wire binding.

[0013] Optionally, the fixing member is made of iron wire or steel wire rope.

[0014] Optionally, the construction platform adopts a bamboo springboard, and bamboo strips are laid on the top frame.

[0015] Optionally, the bottom frame and the top frame are rectangular frames, and diagonal bars are provided between the diagonals of the bottom frame, and the diagonal bars are detachably connected to the bottom frame via fasteners.

[0016] The beneficial effects of the above utility model are as follows:

[0017] 1. The construction work platform of the utility model utilizes a hollow container as a floating mechanism, and the supporting frame is composed of horizontal rods and vertical rods detachably connected by fasteners. The size of the supporting frame can be adjusted according to actual needs, and the number of hollow containers can also be adjusted according to actual needs, so that the volume of the entire construction work platform can be adjusted according to actual construction conditions. Compared with larger construction ships, the hollow containers can also float in the diving area to meet the needs of diving construction operations. It has high adaptability and flexibility. When adjusting, it only needs to adjust the number of horizontal rods, vertical rods and hollow containers, and then assemble them. The size of the construction operation is easy to adjust, which reduces the construction cost.

[0018] 2. The construction work platform of the utility model is provided with a positioning rod and a fixing part, and the fixing part can be fixed to a stationary object on the water. When the construction platform is small in size to adapt to the construction environment, it can prevent the entire construction work platform from drifting away from the construction position due to wind and waves. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings in the specification, which constitute a part of the present application, are used to provide a further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute a limitation on the present application.

[0020] Figure 1 This is a schematic diagram of the overall structure of Embodiment 1 of the present utility model;

[0021] Among them, 1. hollow container, 2. first horizontal rod, 3. second horizontal rod, 4. third horizontal rod, 5. fourth horizontal rod, 6. fifth horizontal rod, 7. sixth horizontal rod, 8. oblique rod, 9. seventh horizontal rod, 10. eighth horizontal rod, 11. ninth horizontal rod, 12. tenth horizontal rod, 13. vertical rod, 14. positioning rod, 15. fixing part, 16. bamboo springboard, 17. anti-collision tire. DETAILED DESCRIPTION

[0022] Example 1

[0023] This embodiment provides a floating construction platform. Figure 1 As shown, it includes multiple groups of floating mechanisms, which are used to float on the horizontal surface and provide supporting force through buoyancy. The multiple groups of floating mechanisms are arranged in parallel, and the multiple groups of floating mechanisms are in contact and cooperate with the bottom of the supporting frame to support the supporting frame. A construction platform is installed on the supporting frame.

[0024] In this embodiment, two groups of floating mechanisms are provided, and the two groups of floating mechanisms are arranged in parallel. It can be understood that three groups or four groups or more groups of floating mechanisms can be provided according to actual needs.

[0025] The floating mechanism is composed of a plurality of hollow containers 1 arranged in parallel. Preferably, the hollow container 1 is a cylindrical metal oil drum or a plastic drum, which can realize the utilization of waste materials and save costs.

[0026] In this embodiment, the hollow container 1 is a metal oil drum, the length of the metal oil drum is 900-960 mm, preferably 930 mm, and the outer diameter of the metal oil drum is 560-600 mm, preferably 580 mm.

[0027] Furthermore, the number of metal oil drums in a group of floating mechanisms is 6-10, and those skilled in the art can set it according to actual needs. In this embodiment, the number of metal oil drums is 6, and the 6 metal oil drums are tied into a whole by wire.

[0028] Two groups of metal oil drums are in contact with and cooperate with the bottom of the support frame to support the support frame.

[0029] The supporting frame adopts a steel pipe scaffolding structure, including a rectangular bottom frame and a rectangular top frame. The rectangular bottom frame and the rectangular top frame are both surrounded by multiple horizontal bars. The size is 6000mmX4000mm. It can be understood that technical personnel in this field can determine its size according to actual needs.

[0030] Furthermore, the distance between the bottom frame and the top frame is 2200 mm. It is understandable that those skilled in the art can set the distance between the top frame and the bottom frame according to actual needs, which will not be described in detail here.

[0031] In this embodiment, the horizontal rod is made of a φ48x3.2mm steel pipe.

[0032] Specifically, the bottom frame includes a first horizontal rod 2 and a second horizontal rod 3 arranged along the width direction of the supporting frame. A third horizontal rod 4 is vertically arranged between the ends of the first horizontal rod 2 and the second horizontal rod 3 on the same side. The third horizontal rod 4 is arranged along the length direction of the bottom frame, and its two ends are detachably connected to the ends of the first horizontal rod 2 and the second horizontal rod 3 by fasteners.

[0033] A fourth horizontal bar 5 is vertically disposed between the other ends of the first horizontal bar 2 and the second horizontal bar 3. The fourth horizontal bar 5 is disposed along the length direction of the bottom frame, and its two ends are respectively connected to the first horizontal bar 2 and the second horizontal bar 3 by fasteners.

[0034] The ends of the second horizontal rod 3 are detachably connected.

[0035] A fifth horizontal rod 6 and a sixth horizontal rod 7 are also arranged between the first horizontal rod 2 and the second horizontal rod 3 in parallel and along the length direction of the bottom frame. The two ends of the fifth horizontal rod 6 and the sixth horizontal rod 7 are detachably fixedly connected to the first horizontal rod 2 and the second horizontal rod 3 through fasteners respectively, and the fifth horizontal rod 6 is arranged close to the third horizontal rod 4.

[0036] The third horizontal rod 4 and the fifth horizontal rod 6 are respectively supported on two ends of a metal oil drum of one group of floating mechanisms, and the fourth horizontal rod 5 and the sixth horizontal rod 7 are respectively supported on two ends of a metal oil drum of another group of floating mechanisms.

[0037] Diagonal bars 8 are provided between the diagonals of the rectangular structure formed by the first, second, third and fourth horizontal bars. The diagonal bars are made of steel pipes of the same specifications as the horizontal bars. The diagonal bars 8 are connected to the corners of the rectangular structure through fasteners.

[0038] The top frame includes a seventh horizontal rod 9 and an eighth horizontal rod 10 arranged along the length direction of the top frame, a ninth horizontal rod 11 and a tenth horizontal rod 12 are vertically arranged between the two ends of the seventh horizontal rod 9 and the eighth horizontal rod 10, respectively, the seventh, eighth, ninth and tenth horizontal rods form a rectangular structure, and the ninth horizontal rod 11, the tenth horizontal rod 12 are detachably connected to the seventh horizontal rod 9 and the eighth horizontal rod 10 by fasteners.

[0039] A plurality of horizontal rods parallel to the ninth horizontal rod 11 and the tenth horizontal rod 12 are also provided between them, and two ends of the horizontal rods are detachably connected to the seventh horizontal rod 9 and the eighth horizontal rod 10 through fasteners, respectively.

[0040] A plurality of vertical rods 13 are also provided between the bottom frame and the top frame, and the vertical rods 13 connect the top frame and the bottom frame into a whole.

[0041] The vertical rod 13 is made of a φ48x3.2mm steel pipe.

[0042] In this embodiment, a vertical rod 13 is provided between the corners of the bottom frame and the top frame, and the vertical rod 13 is detachably connected to the top frame and the bottom frame via fasteners.

[0043] A plurality of vertical rods 13 are detachably arranged between the third horizontal rod 4 and the seventh horizontal rod 9, and between the fourth horizontal rod 5 and the eighth horizontal rod 10 via fasteners, with a spacing of 2000 mm between adjacent vertical rods 13, and the rod section of the vertical rod 13 located below the bottom frame contacts the outer end surface of the metal oil drum of the floating mechanism to form a limiting component for the floating mechanism.

[0044] Two vertical rods 13 are detachably provided between the first horizontal rod 2 and the ninth horizontal rod 11, the second horizontal rod 3 and the tenth horizontal rod 12 via fasteners so that both ends of the circumference of the outermost metal oil drums of the two groups of floating mechanisms can contact the parts of the vertical rods 13 located below the bottom frame.

[0045] The part of the vertical rod 13 below the bottom frame contacts the outer side of the floating mechanism, thereby preventing the floating mechanism and the ruler frame from moving relative to each other and becoming separated.

[0046] Preferably, the floating mechanism is tied and fixed to the bottom frame by iron wire to further prevent the support frame from separating from the floating mechanism.

[0047] In this embodiment, the fasteners may be existing fasteners for scaffolding, and their specific structures are not described in detail here.

[0048] In this embodiment, the vertical rod 13 located at a corner of the bottom frame and the top frame is detachably fixed to one end of the positioning rod 14 via a fastener, and the other end of the positioning rod 14 is provided with a fixing member 15, which can be detachably fixed to a stationary object on the water, thereby preventing the entire construction work platform from drifting with the wind and waves, and allowing the entire construction work platform to remain in the construction position.

[0049] In this embodiment, the fixing member 15 is made of iron wire or steel wire rope, which can be tied and fixed to a stationary object on the water.

[0050] A construction platform is laid on the top frame. In this embodiment, the construction platform adopts a plurality of bamboo springboards 16 laid on the top frame.

[0051] Preferably, the bamboo springboard 16 is tied and fixed to the top frame by iron wire, which ensures the stability of the bamboo springboard 16 laid on the top frame, thereby ensuring the safety of the construction workers.

[0052] Furthermore, a plurality of anti-collision components are provided at the four edges of the bottom frame (only the anti-collision components on one edge are shown in the figure). Preferably, the anti-collision components are anti-collision tires 17, which are fastened to the horizontal bars of the bottom frame by wires to prevent the construction platform from having a hard collision with engineering entities such as the photovoltaic pile foundation on the water.

[0053] The method of using the construction work platform of this embodiment is as follows:

[0054] The dimensions of the floating mechanism and the supporting frame are determined according to the actual construction situation, and then the floating mechanism and the supporting frame are assembled according to the determined dimensions. After the bamboo springboard is laid, the production of the entire construction platform is completed.

[0055] When construction work is required, the entire construction work platform is manually moved to the work position.

[0056] The fixing rod is fixed to a stationary object on the water, such as an engineering entity on the water, through a fixing piece to prevent the construction platform from drifting with wind and waves.

[0057] At this time, construction workers were carrying out construction work on the bamboo springboard.

[0058] After the construction is completed, loosen the fixings and move the entire construction platform to the next work location for construction.

[0059] The construction work platform of this embodiment is composed of horizontal rods and vertical rods that are detachably connected by fasteners. The size of the support frame can be adjusted according to actual needs, and the number of hollow containers can also be adjusted according to actual needs. Therefore, the volume of the entire construction work platform can be adjusted according to the actual construction situation. Compared with larger construction ships, the hollow containers can also float in the diving area to meet the needs of diving construction operations. It has high adaptability and flexibility. When adjusting, it is only necessary to adjust the number of horizontal rods, vertical rods and hollow containers, and then assemble them. The size of the construction operation is easy to adjust, which reduces the construction cost.

[0060] Although the above describes the specific implementation methods of the utility model in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the utility model. Technical personnel in the relevant field should understand that on the basis of the technical solution of the utility model, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the scope of protection of the utility model.

Claims

1. A floating construction platform, characterized in that: The invention comprises a plurality of floating mechanisms, which are composed of a plurality of hollow containers arranged in parallel. The plurality of floating mechanisms cooperate with the bottom of a supporting frame to support the supporting frame. The supporting frame comprises a bottom frame and a top frame, which are both surrounded by a plurality of horizontal bars. Adjacent horizontal bars are detachably connected by fasteners. A plurality of vertical bars are arranged between the top frame and the bottom frame. The vertical bars are detachably connected to the top frame and the bottom frame by fasteners. A construction platform is installed on the top frame. At least one vertical bar is fixed to one end of a positioning bar. The other end of the positioning bar is provided with a fixing part for fixing to a stationary object on the water.

2. The floating construction platform as claimed in claim 1, characterized in that: The floating mechanism is composed of a plurality of hollow containers arranged in parallel and tied together by iron wires to form a whole.

3. The floating construction platform as claimed in claim 1, characterized in that: The hollow container is a cylindrical metal oil drum or a plastic drum.

4. The floating construction platform as claimed in claim 3, characterized in that: The length of the hollow container is 900-960 mm, the diameter is 560-600 mm, and the number of the hollow containers included in the floating mechanism is 6-10.

5. The floating construction platform as claimed in claim 1, characterized in that: The rod section below the connection position between the vertical rod and the bottom frame serves as a limiting portion in contact with the outer side surface of the floating mechanism.

6. The floating construction platform as claimed in claim 1, characterized in that: A plurality of anti-collision components are arranged on the outer periphery of the bottom frame, and the plurality of anti-collision components are arranged along the outer edge of the bottom frame.

7. The floating construction platform as claimed in claim 6, characterized in that: The anti-collision component is a tire, and the tire is fixed to the horizontal rod of the bottom frame by binding with iron wire.

8. The floating construction platform as claimed in claim 1, characterized in that: The fixing piece is made of iron wire or steel wire rope.

9. The floating construction platform as claimed in claim 1, characterized in that: The construction platform adopts a bamboo springboard, and bamboo strips are laid on the top frame.

10. The floating construction platform as claimed in claim 1, characterized in that: The bottom frame and the top frame are rectangular frames, and diagonal bars are arranged between the diagonals of the bottom frame. The diagonal bars are detachably connected to the bottom frame through fasteners.