Early-detachable complete supporting device for ultra-large-span concrete structure
By designing a support device with reinforcement ribs and hydraulic adjustment system in an overspan concrete structure, the problem of low strength and turnover of existing support devices is solved, and efficient construction progress and material turnover is achieved.
Patent Information
- Application Number
- CN202420525142.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-03-19
AI Technical Summary
The existing support devices have low strength and turnover rates in ultra-large span concrete structures, resulting in slow turnover of materials during construction and affecting the work progress.
A complete support device for early disassembly of an ultra-large span concrete structure was designed, including an early disassembly head and support section. Reinforcement ribs are installed inside the support section, and the height of the support structure is adjusted through hydraulic devices and adjustment mechanisms to improve the overall tightness of the support section. Solidity and bearing capacity.
Through the reinforcement ribs and hydraulic adjustment system, the strength and turnover efficiency of the support structure are improved, the high strength, stiffness and stability of the early dismantling device are achieved, the projection area of the support material is reduced, and the construction progress is improved.
Smart Images

Figure CN222478137U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction, in particular to a complete supporting device of an ultra-large span concrete structure which can be dismantled early. Background Art
[0002] When constructing the floor structure in a building project, it is necessary to support the formwork and support system. After the concrete strength reaches the design requirements, the formwork and support system will be removed. In addition to the concrete design strength, the removal conditions are related to the span of the component. When the component span is ≤2m, it will be removed when the design concrete strength grade value is ≥50%; when the component span is >2m and ≤8m, it will be removed when the design concrete strength grade value is ≥75%; when the component span is >8m, it will be removed when the design concrete strength grade value is ≥100%. Conventional formwork and brackets need to reach 100% before they can be removed. The early formwork removal technology uses the time difference between removing the formwork when it reaches 100% and removing the formwork when it reaches 50% or 75%, realizing the early removal of the bottom formwork and its support system. As a technical measure to accelerate the turnover of the formwork and reduce the investment in the formwork, it is also a measure to reduce costs and speed up the construction speed. It also reflects the advanced nature of the formwork and its support system. The early removal head is the core of the entire early removal device and is one of the important components for realizing early removal of the formwork.
[0003] For example, the Chinese utility model patent with the announcement number CN204081477U discloses an early disassembly device, including a lead screw and a top plate, a clamp, a bracket and an adjustment handle arranged on the lead screw in sequence, wherein: the plate surface boundary line of the top plate is a smooth curve, and the top plate is fixedly connected to the end of the lead screw; the bracket is sleeved on the lead screw, and the bracket can move along the axial direction of the lead screw; the clamp is fixedly installed on the lead screw and is used to limit the movement of the bracket; the adjustment handle is set to two, and the two adjustment handles are respectively screwed on the lead screw;
[0004] The above scheme has the following problems: the early dismantling device provided by the device during use can avoid the situation of empty top of the roof, thereby reducing the accident rate of construction, and has the characteristics of easy operation, good stability and high safety. However, the device cannot ensure that the supporting structure can obtain good strength during use, and cannot improve the turnover rate of the supporting device, so that the turnover of materials used in construction is too slow, affecting the work progress.
[0005] Therefore, we proposed a fully support device for ultra-large span concrete structures that can be dismantled early to solve the problems mentioned above. Utility Model Content
[0006] The purpose of the utility model is to provide a complete supporting device for ultra-large span concrete structures that can be dismantled early, so as to solve the problems of low strength and low turnover rate of supporting devices in the current market raised by the above-mentioned background technology.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a fully support device for an ultra-large span concrete structure that can be dismantled early, comprising an early dismantling head and a support section; the early dismantling head is installed at the top of the support section; the early dismantling head and the support section are detachably connected; reinforcing ribs are arranged inside the support section; the reinforcing ribs are inclined upward from left to right in the support section; the reinforcing ribs are fixedly connected to the support section; the support section is composed of four columns and eight beams; the columns are parallel to each other and two beams are arranged between every two columns; the beams are fixedly connected to the columns; the beams are stacked about the center of the columns; the reinforcing ribs are fixedly installed at the intersection of the columns and the beams.
[0008] The adoption of the above technical solution can increase the overall tightness of the support section by reinforcing the ribs, thereby improving the bearing capacity of the support section.
[0009] As a preferred technical solution of the utility model, the early disassembly head includes an adjustable support, a pillar, an adjustment mechanism, and a support plate.
[0010] The above technical solution can be used to remove the head early, so there is no need to retain more supporting structures to meet the bearing capacity requirements during the early removal process, thereby improving the turnover efficiency of the supporting structure.
[0011] As the preferred technical solution of the utility model, the adjustable support is arranged at the top of the device; the adjustable support is arranged on the support plate; the adjustable support is movably connected to the support plate; a pillar is arranged under the support plate; the pillar is arranged at the center position under the support plate; the pillar is fixedly connected to the support plate.
[0012] By adopting the above technical solution, the concrete structure can be supported by the adjustable support, and the adjustable support can be supported by the pillars and the support plates.
[0013] As a preferred technical solution of the utility model, an adjustment mechanism is provided below the pillar; the adjustment mechanism is sleeved on the pillar; a support section is provided below the pillar; and the pillar and the support section are detachably connected.
[0014] The above technical solution can be easily adjusted through the adjustment mechanism.
[0015] As the preferred technical solution of the utility model, the support sections are connected by means of mounting heads and connecting heads; the mounting heads are arranged at the tops of the columns beside the support sections; the mounting heads are fixedly connected to the columns; the connecting heads are arranged at the bottoms of the columns beside the support sections; the connecting heads are fixedly connected to the support sections; the connecting heads and the mounting heads cooperate with each other.
[0016] The above technical solution enables the support sections to be connected to each other through the cooperation between the installation head and the connection head. The support standard sections constitute the main part of the support structure and are stacked through the upper and lower end connection parts.
[0017] As a preferred technical solution of the utility model, a hydraulic device is provided at the bottom of the support section; the hydraulic device is fixedly connected to the column in the support section; and a hydraulic device is provided below each column.
[0018] By adopting the above technical solution, the height of the supporting structure can be adjusted through the hydraulic system at the bottom of the device and the adjustable support at the top.
[0019] As a preferred technical solution of the utility model, a fastening joint is provided at the middle position of the column; the fastening joint is fixedly installed on the column; and the columns are all provided with a fastening joint.
[0020] The above technical solution can increase the stability of the column by fastening the joint.
[0021] Compared with the prior art, the beneficial effects of the utility model are:
[0022] 1. The utility model is provided with a hydraulic device, an adjustable support and mutually connected support sections. The adjustable support is controlled by the hydraulic device at the bottom to adjust the height of the support structure, so that the device can be applied to various construction environments. The coordination between the support sections can further facilitate the adjustment of the device.
[0023] 2. The utility model is provided with a support section, and through the columns, beams and reinforcing ribs in the support section, the support section does not need to retain a lot of supporting structures to meet the bearing capacity requirements during the early dismantling process, thereby improving the turnover efficiency of the supporting structure; at the same time, the early dismantling device is independently set and has high strength, rigidity and stability, so that the early dismantling support structure can occupy a small projected area, increase the frame dismantling area, and improve the turnover rate of supporting materials during the early dismantling process. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the main structure of the utility model;
[0025] Figure 2 It is a schematic diagram of the planar structure of the support section of the utility model;
[0026] Figure 3 This is a schematic diagram of the main structure of the support section of the utility model;
[0027] Figure 4 This is a schematic diagram of the structure of the early disassembly head of the utility model from a top view;
[0028] Figure 5 It is a schematic diagram of the three-dimensional structure of the support section of the utility model.
[0029] In the figure: 1. hydraulic device; 2. early disassembly head; 3. support section; 4. reinforcing ribs; 5. fastening section; 6. installation head; 7. connecting head; 8. adjustable support; 9. support column; 10. adjustment mechanism; 11. support plate; 12. column; 13. crossbeam. DETAILED DESCRIPTION
[0030] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0031] See also Figure 1-5 The utility model provides a technical solution: a fully support device for an ultra-large span concrete structure that can be dismantled early, comprising an early dismantling head 2 and a support section 3; the early dismantling head 2 is installed at the top of the support section 3; the early dismantling head 2 and the support section 3 are detachably connected; a reinforcing rib 4 is arranged inside the support section 3; the reinforcing rib 4 is designed to be inclined upward from left to right inside the support section 3; the reinforcing rib 4 is fixedly connected to the support section 3; the support section 3 is composed of four columns 12 and eight beams 13; the columns 12 are parallel to each other and every two columns are connected to each other. Two cross beams 13 are arranged between the columns 12; the cross beams 13 are fixedly connected to the columns 12; the cross beams 13 are stacked about the center of the columns 12; the reinforcing ribs 4 are fixedly installed at the intersection of the columns 12 and the cross beams 13; the adjustment is completed when the adjustable support 8 in the early dismantling head 2 contacts the concrete structure; the adjustable support 8 is supported by the support plate 11 and the pillar 9; the tightness of the device is further increased by the columns 12 and the cross beams 13; the overall firmness of the support section 3 is increased by the reinforcing ribs 4 in the support section 3 and the fastening section 5.
[0032] The early disassembly head 2 includes an adjustable support 8, a pillar 9, an adjustment mechanism 10, and a support plate 11; the adjustable support 8 is arranged at the top of the device; the adjustable support 8 is arranged on the support plate 11; the adjustable support 8 is movably connected to the support plate 11; a pillar 9 is arranged below the support plate 11; the pillar 9 is arranged at the center position below the support plate 11; the pillar 9 is fixedly connected to the support plate 11; an adjustment mechanism 10 is arranged below the pillar 9; the adjustment mechanism 10 is sleeved on the pillar 9; the support section 3 is below the pillar 9; the pillar 9 is detachably connected to the support section 3; the adjustable support 8 is supported by the support plate 11 and the pillar 9.
[0033] The support sections 3 are connected via the mounting head 6 and the connecting head 7; the mounting head 6 is arranged at the top of the column 12 next to the support section 3; the mounting head 6 is fixedly connected to the column 12; the connecting head 7 is arranged at the bottom of the column 12 next to the support section 3; the connecting head 7 is fixedly connected to the support section 3; the connecting head 7 and the mounting head 6 cooperate with each other; the support sections 3 are installed via the mounting head 6 and the connecting head 7.
[0034] A hydraulic device 1 is provided at the bottom of the support section 3; the hydraulic device 1 is fixedly connected to the column 12 in the support section 3; a hydraulic device 1 is provided under each column 12; after installation, the height of the early removal head 2 at the top is adjusted by the hydraulic device 1 at the bottom and the adjustment mechanism 10, and the adjustment is completed when the adjustable support 8 in the early removal head 2 contacts the concrete structure.
[0035] A fastening node 5 is provided at the middle of the column 12; the fastening node 5 is fixedly mounted on the column 12; the fastening node 5 is provided on each column 12; the overall firmness of the support node 3 is increased by the reinforcing ribs 4 in the support node 3 and the fastening node 5.
[0036] Working principle: When using the early-detachable complete support device for ultra-large-span concrete structures, first install the support sections 3 through the installation head 6 and the connecting head 7. After the installation is completed, the height of the top early-detachment head 2 is adjusted through the hydraulic device 1 at the bottom and the adjustment mechanism 10. When the adjustable support 8 in the early-detachment head 2 contacts the concrete structure, the adjustment is completed; the adjustable support 8 is supported by the support plate 11 and the pillar 9; the overall firmness of the support section 3 is increased by the reinforcing ribs 4 and the fastening section 5 in the support section 3; the tightness of the device is further increased by the column 12 and the beam 13.
[0037] Thereby completing a series of tasks, the contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0038] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A fully support device for an ultra-large span concrete structure that can be dismantled early, comprising an early dismantling head (2) and a support section (3); the early dismantling head (2) is installed at the top of the support section (3); the early dismantling head (2) and the support section (3) are detachably connected; Features: The support section (3) is provided with a reinforcing rib (4) inside; the reinforcing rib (4) is designed to be inclined upward from left to right inside the support section (3); the reinforcing rib (4) is fixedly connected to the support section (3); the support section (3) is composed of four columns (12) and eight cross beams (13); the columns (12) are parallel to each other and two cross beams (13) are provided between every two columns (12); the cross beams (13) are fixedly connected to the columns (12); the cross beams (13) are stacked about the center of the columns (12); the reinforcing rib (4) is fixedly installed at the intersection of the columns (12) and the cross beams (13).
2. The ultra-large span concrete structure early dismantling complete support device according to claim 1 is characterized in that: The early removal head (2) comprises an adjustable support (8), a support column (9), an adjustment mechanism (10), and a support plate (11).
3. The ultra-large span concrete structure early dismantling complete support device according to claim 2 is characterized in that: The adjustable support (8) is arranged at the top of the device; the adjustable support (8) is arranged on the support plate (11); the adjustable support (8) is movably connected to the support plate (11); a pillar (9) is arranged below the support plate (11); the pillar (9) is arranged at the center position below the support plate (11); the pillar (9) is fixedly connected to the support plate (11).
4. The ultra-large span concrete structure early dismantling complete support device according to claim 3 is characterized in that: An adjustment mechanism (10) is provided below the pillar (9); the adjustment mechanism (10) is sleeved on the pillar (9); a support section (3) is provided below the pillar (9); and the pillar (9) and the support section (3) are detachably connected.
5. The ultra-large span concrete structure early dismantling complete support device according to claim 1 is characterized in that: The support sections (3) are connected via a mounting head (6) and a connecting head (7); the mounting head (6) is arranged at the top of a column (12) beside the support section (3); the mounting head (6) is fixedly connected to the column (12); the connecting head (7) is arranged at the bottom of the column (12) beside the support section (3); the connecting head (7) is fixedly connected to the support section (3); the connecting head (7) and the mounting head (6) cooperate with each other.
6. The ultra-large span concrete structure early dismantling complete support device according to claim 1 is characterized in that: A hydraulic device (1) is provided at the bottom of the support section (3); the hydraulic device (1) is fixedly connected to a column (12) in the support section (3); and a hydraulic device (1) is provided below each column (12).
7. The ultra-large span concrete structure early dismantling complete support device according to claim 1 is characterized in that: A fastening joint (5) is provided at the middle position of the column (12); the fastening joint (5) is fixedly mounted on the column (12); and the fastening joint (5) is provided on each column (12).
Citation Information
Patent Citations
Early removal device
CN204081477U