Discharging platform for constructional engineering
By designing a construction engineering unloading platform including motor drive, induction plate control and telescopic rod sliding groove, the problems of unloading and inconvenient storage of the equipment in the prior art are solved, and stable, multifunctional, safe and efficient Unloading operation.
Patent Information
- Application Number
- CN202421252291.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-04
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-06-04
AI Technical Summary
The existing cantilever unloading platform cannot be lifted and lowered during use, resulting in inconvenient unloading, inconvenient storage of the device and inconvenient use.
A discharge platform including the device body, a receiving box, a motor, a drum, a discharge plate, an induction plate, a support rod, an adjustment switch and a telescopic rod are designed. The lifting and transfer of materials is achieved through motor drive and induction plate control; the telescopic rod and sliding groove design can adjust the height and width of the platform to suit different sizes of goods.
It realizes the stability and versatility of the unloading platform, facilitates construction personnel to transport and handle goods, improves the comfort and safety of the working environment, and is easy to maintain and saves space.
Smart Images

Figure CN222501116U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of unloading of construction projects, and more specifically, to an unloading platform used in construction projects. Background Art
[0002] Unloading platforms are various temporary operating tables and operating frames often set up at construction sites, generally used for material turnover. Unloading platforms are divided into mobile unloading platforms, floor-standing unloading platforms, and cantilever unloading platforms. Among them, cantilever unloading platforms are more widely used. Existing cantilever unloading platforms are also divided into two types, one is telescopic and the other is fixed. The advantage of the telescopic unloading platform is that the platform can be moved to the inside of the building, and loading and unloading materials is safer and more convenient. However, the disadvantage is that the platform cannot be fixed with ropes, and the installation is not as stable as the fixed unloading platform. Although the fixed unloading platform is more stable to install, loading and unloading materials is not as convenient as the telescopic unloading platform. Therefore, a unloading platform with stable installation and convenient loading and unloading of materials is needed.
[0003] After searching, the existing patent (publication number: CN 210659327 U) discloses a material unloading platform for construction engineering, including a fixed beam, two hooks are installed on the side of the fixed beam, a guardrail is fixedly installed on the top of the fixed beam, a sliding platform located inside the guardrail is clamped on the side of the fixed beam, a baffle is rotatably connected to the bottom of the front of the sliding platform, a fixing device is fixedly installed on the inner wall on both sides of the sliding platform, the bottom of the fixing device is pinned to the top of the baffle, a connecting block is fixedly installed at one end of the fixed beam, a supporting device is rotatably connected inside the connecting block, and the support device is located above the fixed beam. In the process of realizing the utility model, the inventor found that the prior art has the following problems:
[0004] An existing unloading platform used in construction projects has poor functionality. It cannot be raised or lowered during use and cannot store the device, making the device inconvenient to use.
[0005] Therefore, in view of the above problems, a discharging platform for construction engineering is proposed. Utility Model Content
[0006] In order to overcome the above defects of the prior art, the utility model provides a material unloading platform for construction engineering to solve the problems raised in the above background technology.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a unloading platform for construction projects, comprising a device main body, a receiving box is installed on one side of the device main body; a motor is installed inside the receiving box, one side of the motor is connected to an electric wire, a roller is provided in the middle of the device main body, a unloading plate is installed in front of the roller, an induction plate is installed at the lower end of the unloading plate, support rods are installed on both sides of the device main body, an adjusting switch is installed on the outside of the support rod, a control switch is provided on the outside of the support rod, a sliding groove is installed behind the adjusting switch, a limiting hole is installed on the inside of the support rod, a limiting pin is installed above the limiting hole, and a telescopic rod is installed above the support rod.
[0008] Preferably, an isolation plate is installed above the device body.
[0009] Preferably, a telescopic plate is installed on the outer side of the isolation plate.
[0010] Preferably, a convex plate is installed below the telescopic plate, forming an up-and-down structure.
[0011] Preferably, a fixing bolt is installed on the inner side of the telescopic plate, and the fixing bolt is embedded in the fixing block.
[0012] Preferably, a sliding groove is installed on the outer side of the support rod, and the sliding groove is embedded in the support rod.
[0013] Preferably, a limit pin is provided on the outer side of the telescopic rod, and the limit pin is embedded in the limit hole.
[0014] Preferably, a telescopic rod is installed above the sliding groove, forming an up and down structure.
[0015] Technical effects and advantages of the utility model:
[0016] Compared with the prior art, when the unloading platform for construction engineering is in use, the main body of the device is the main part of the whole equipment, which improves the overall stability of the nursing rack. When the unloading work is in progress, the material to be unloaded will be conveyed by the roller, and the material will be placed on the induction plate through the unloading plate. A control switch is installed on the outside of the support rod. The control switch provides power through the wire on one side of the motor. When the material falls on the induction plate, the induction plate will provide power provided by the motor and the adjustment switch will move horizontally through the sliding groove, so that the goods can be raised, which is convenient for the construction personnel to transport the goods. When the telescopic rod is adjusted to the appropriate position, the limit pin can be embedded in the limit hole to fix the position of the telescopic rod to prevent it from sliding accidentally. This design ensures the stability of the unloading platform during use, and the isolation plate can block the splashing of construction waste and dust, reducing the pollution to the staff and the surrounding environment. The telescopic plate can adjust the length as needed to adapt to goods of different sizes. This design not only improves the comfort of the working environment, but also enhances the safety of the unloading platform. In summary, the unloading platform design for construction projects has the advantages of versatility, easy operation, high safety, strong adjustability, good stability, strong expansibility, easy maintenance and space saving. It is an efficient, practical and reliable construction engineering equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0018] Figure 2 It is a schematic diagram of the internal structure of the parts of the utility model.
[0019] Figure 3 It is a schematic diagram of the enlarged structure of point A of the utility model.
[0020] Figure 4 This is an enlarged structural diagram of point B of the utility model.
[0021] The accompanying drawings are marked as follows: 1. device body; 2. receiving box; 3. motor; 4. electric wire; 5. isolation plate; 6. telescopic plate; 7. convex plate; 8. fixing block; 9. fixing bolt; 10. roller; 11. unloading plate; 12. support rod; 13. adjustment switch; 14. sliding groove; 15. limit hole; 16. limit pin; 17. induction plate; 18. telescopic rod; 19. control switch. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Embodiment 1
[0024] As attached Figure 1-4 A discharging platform for construction projects shown in the figure includes a device body 1, a receiving box 2 is installed on one side of the device body 1; a motor 3 is installed inside the receiving box 2, and a wire 4 is connected to one side of the motor 3, a roller 10 is provided in the middle of the device body 1, a discharging plate 11 is installed in front of the roller 10, and a sensing plate 17 is installed at the lower end of the discharging plate 11, support rods 12 are installed on both sides of the device body 1, an adjusting switch 13 is installed on the outer side of the support rod 12, a control switch 19 is provided on the outer side of the support rod 12, a sliding groove 14 is installed behind the adjusting switch 13, a limiting hole 15 is installed on the inner side of the support rod 12, a limiting pin 16 is installed above the limiting hole 15, and a telescopic rod 18 is installed above the support rod 12.
[0025] Among them: when the unloading platform for construction engineering is in use, the device body 1 is the main part of the whole equipment, which improves the overall stability of the nursing rack. When the unloading work is in progress, the material to be unloaded will be transmitted by the roller 10, and the material will be placed on the induction plate 17 by the unloading plate 11. A control switch 19 is installed on the outside of the support rod 12. The control switch 19 provides power through the wire 4 on one side of the motor 3. When the material falls on the induction plate 17, the induction plate 17 will provide the power provided by the motor 3 and the adjustment switch 14 will move horizontally through the sliding groove 14, so that the goods can be raised, which is convenient for the construction personnel to transport the goods. When the telescopic rod 18 is adjusted to a suitable position, the limit pin 16 can be embedded in the limit hole 15 to fix the position of the telescopic rod 18 to prevent it from sliding accidentally. This design ensures the stability of the unloading platform during use, and the isolation plate 5 can block the splashing of construction waste and dust, reducing the pollution to the staff and the surrounding environment. The telescopic plate 6 can adjust the length as needed to adapt to goods of different sizes. This design not only improves the comfort of the working environment, but also enhances the safety of the unloading platform. In summary, the unloading platform design for construction projects has the advantages of versatility, easy operation, high safety, strong adjustability, good stability, strong expansibility, easy maintenance and space saving. It is an efficient, practical and reliable construction engineering equipment.
[0026] Embodiment 2
[0027] Based on the first embodiment, the solution in the first embodiment is further detailed in combination with the following specific working method, as described below:
[0028] like Figure 3 As shown in the figure, as a preferred embodiment, the height and width of the unloading platform can be adjusted as needed through the design of the telescopic rod 18 and the sliding groove 14. The telescopic rod 18 can slide in the sliding groove 14 and be fixed by the cooperation of the limit pin 16 and the limit hole 15, so as to realize the flexible adjustment of the platform.
[0029] The working process of the utility model is as follows:
[0030] When the unloading platform for construction engineering is in use, the device body 1 is the main part of the whole equipment, which improves the overall stability of the nursing rack. When the unloading work is in progress, the material to be unloaded will be transmitted by the roller 10, and the material will be placed on the induction plate 17 by the unloading plate 11. A control switch 19 is installed on the outside of the support rod 12. The control switch 19 provides power through the wire 4 on one side of the motor 3. When the material falls on the induction plate 17, the induction plate 17 will provide the power provided by the motor 3 and the adjustment switch 14 will move horizontally through the sliding groove 14, so that the goods can be raised, which is convenient for the construction personnel to transport the goods. When the telescopic rod 18 is adjusted to a suitable position, the limit pin 16 can be embedded in the limit hole 15 to fix the position of the telescopic rod 18 to prevent it from accidentally sliding. This design ensures the stability of the unloading platform during use, and the isolation plate 5 can block the splashing of construction waste and dust, reducing the pollution to the staff and the surrounding environment. The telescopic plate 6 can adjust the length as needed to adapt to goods of different sizes. This design not only improves the comfort of the working environment, but also enhances the safety of the unloading platform. In summary, the unloading platform design for construction projects has the advantages of versatility, easy operation, high safety, strong adjustability, good stability, strong scalability, easy maintenance and space saving. It is an efficient, practical and reliable construction engineering equipment. This is the working process and working principle of the device.
[0031] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0032] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;
[0033] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A material unloading platform for construction engineering, comprising a device body (1), characterized in that: A receiving box (2) is installed on one side of the device body (1); A motor (3) is installed inside the receiving box (2), and a wire (4) is connected to one side of the motor (3). A roller (10) is provided in the middle of the device body (1), and a discharge plate (11) is installed in front of the roller (10). A sensing plate (17) is installed at the lower end of the discharge plate (11). Support rods (12) are installed on both sides of the device body (1), and an adjustment switch (13) is installed on the outer side of the support rod (12). A control switch (19) is provided on the outer side of the support rod (12), and a sliding groove (14) is installed behind the adjustment switch (13). A limit hole (15) is installed on the inner side of the support rod (12), and a limit pin (16) is installed above the limit hole (15). A telescopic rod (18) is installed above the support rod (12).
2. A material unloading platform for construction engineering according to claim 1, characterized in that: An isolation plate (5) is installed above the device body (1).
3. A material unloading platform for construction engineering according to claim 2, characterized in that: A telescopic plate (6) is installed on the outer side of the isolation plate (5).
4. A material unloading platform for construction engineering according to claim 3, characterized in that: A convex plate (7) is installed below the telescopic plate (6), forming an up-and-down structure.
5. A material unloading platform for construction engineering according to claim 4, characterized in that: A fixing bolt (9) is installed on the inner side of the telescopic plate (6), and the fixing bolt (9) is embedded in the fixing block (8).
6. A material unloading platform for construction engineering according to claim 1, characterized in that: A sliding groove (14) is installed on the outer side of the support rod (12), and the sliding groove (14) is embedded in the interior of the support rod (12).
7. A material unloading platform for construction engineering according to claim 1, characterized in that: A limiting pin (16) is provided on the outside of the telescopic rod (18), and the limiting pin (16) is embedded in the limiting hole (15).
8. The unloading platform for construction engineering according to claim 1, characterized in that: A telescopic rod (18) is installed above the sliding groove (14) to form an up-and-down structure.
Citation Information
Patent Citations
Discharging platform applied to constructional engineering
CN210659327U
Cited By
Discharging platform for constructional engineering
CN223964189U