Construction gate capable of being quickly disassembled and conveniently transported for municipal project

By designing door posts composed of detachable segmented units and rotary connected doors, the poor versatility and waste of materials in construction, transportation and reuse of existing construction doors are solved, and rapid installation, disassembly and convenient transportation are achieved, reducing Construction costs.

CN222513477UActive Publication Date: 2025-02-21CHINA HUASHI ENTERPRISES CO LTD (SICHUAN)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421228614.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-02-21
Estimated Expiration
2034-05-31

AI Technical Summary

Technical Problem

The existing municipal construction gates have poor generality, long production cycle, inconvenient transportation and waste of materials in terms of construction, transportation and reuse.

Method used

A construction door that can be quickly disassembled and transported is designed, using door posts composed of multiple square segmented units and a rotary connection door. The segmented unit consists of support posts, connecting rods and masks, through bolts and screws Connect for quick disassembly and assembly.

Benefits of technology

It realizes rapid installation, disassembly and convenient transportation of construction doors, shortens the construction cycle, reduces construction costs, and improves the reuse rate of the doors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222513477U_ABST
    Figure CN222513477U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction gate capable of being quickly disassembled and conveniently transported for municipal projects, and relates to the technical field of building construction. The problems that in the prior art, universality is poor, the construction period is long, transportation is inconvenient, resources are wasted, and cost is high are solved. Comprising a gate post and a gate, trundles are arranged at the bottom end of the gate, the gate post is composed of at least two square subsection units, the adjacent subsection units are detachably connected, each subsection unit is composed of supporting columns, a connecting transverse rod and a panel, and the four supporting columns are vertically arranged to form a side prism of the subsection unit; the top prisms and the bottom prisms which are connected with the cross rods and form the segmented units respectively are detachably arranged between the upper ends and the lower ends of the adjacent supporting columns, and the panels are detachably arranged between the adjacent supporting columns to form the side wall faces of the segmented units. The construction gate capable of being rapidly disassembled and conveniently transported for the municipal project is used for gate construction, rapid to assemble and disassemble, convenient to transport, capable of being repeatedly used, short in construction period and low in construction cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a construction gate for a municipal project which can be quickly disassembled and conveniently transported. Background Art

[0002] Municipal project gates are usually installed at the entrance and exit of the construction site. They are temporary buildings that control and manage the entry and exit of personnel, vehicles and materials. They are usually made of metal structures with a certain height and width to meet the needs of construction projects of various types and sizes. Generally, this type of gate is welded on-site according to the actual situation on site. Before making a welded gate, design planning is required. This involves determining the shape, size, material and structure of the gate, and adjusting them according to the needs and project requirements before preparing the materials. According to the design plan, prepare the required materials, including metal pipes, steel plates, etc. Ensure that the quality of the materials meets the requirements and process the materials according to the size requirements. Then, according to the design drawings, use welding equipment to weld the metal materials and assemble them into the structural frame of the gate. This may involve cutting, bending and connecting the metal materials to ensure the stability of the structure. After the welding structure is completed, the accessories required for the gate, such as door wheels, door handles, etc., are installed and then painted. After welding and structural assembly are completed, surface treatment is carried out, including rust removal, grinding and spraying.

[0003] After the installation is completed, debug and install the welded gate to the designated location, debug and test. Ensure that the gate opens and closes smoothly, the accessories function normally, and make necessary adjustments and corrections. The general production and installation technology of ordinary construction gates will have the following disadvantages: 1. On-site construction and on-site production require special equipment such as cutting machines and welding machines for production, and also require painting, etc., with a long production cycle and time-consuming; 2. Poor versatility. After the project is completed, it cannot be transported as a whole, and most of them will be cut and dismantled; 3. The reuse rate is extremely low. In general, the construction of ordinary construction gates is not easy, the labor cost is high, the transportation is inconvenient, the versatility is poor, and there is a lot of material waste. Utility Model Content

[0004] The utility model provides a construction gate for a municipal project which can be quickly disassembled and conveniently transported. The gate has the advantages of quick installation and disassembly, convenient transportation and repeated use, short construction period and low construction cost.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] The utility model discloses a construction gate for a municipal project which can be quickly disassembled and conveniently transported, comprising a doorpost and a door rotatably connected to the doorpost, wherein casters are arranged at the bottom end of the doorpost away from the doorpost, the doorpost is composed of at least two square segmented units, and adjacent segmented units are detachably connected, the segmented unit is composed of pillars, connecting cross bars and panels, four pillars are vertically arranged to form side prisms of the segmented unit, the connecting cross bars are detachably arranged between the upper ends and lower ends of adjacent pillars to respectively form the top prism and the bottom prism of the segmented unit, and the panel is detachably arranged between adjacent pillars to form the side wall surface of the segmented unit.

[0007] Furthermore, the pillar and the connecting cross bar are fixedly connected by bolts, and the panel and the pillar are fixedly connected by screws.

[0008] Furthermore, the door post is composed of three, four or five square segment units.

[0009] Furthermore, a top plate is provided at the top end of the pillar of the top segment unit, and a bottom plate is provided at the bottom end of the pillar of the bottom segment unit.

[0010] Furthermore, the support is a square steel pipe, and the edges of the steel pipe are chamfered.

[0011] Furthermore, the panel is an iron panel, and the connecting cross bar is a round steel pipe.

[0012] Furthermore, the outer side walls of the support, connecting crossbar and panel are all provided with a hot-dip galvanized layer.

[0013] Furthermore, the connecting cross bar is evenly spaced between two adjacent pillars on one opposite side wall surface of the door post, the door is rotatably arranged on the side wall surface on which the connecting cross bar is evenly spaced, and a connecting diagonal bar is arranged between two adjacent pillars on another opposite side wall surface of the door post.

[0014] Furthermore, the connecting parts between the pillar and the connecting cross bar, and the connecting parts between the pillar and the connecting diagonal bar are both provided with fixing plates.

[0015] Furthermore, the top plate is provided with a top light.

[0016] The beneficial effects of the utility model are as follows: a construction gate for a municipal project of the present application can be quickly disassembled and conveniently transported, which is used for the construction of construction gates. The gate is rotatably connected to the gate post, and the gate post is composed of a detachable segmented unit, and the segmented unit is composed of a pillar, a connecting cross bar and a detachable assembled mask. During the construction of the gate, the construction personnel assemble the pillar, the connecting cross bar and the mask into segmented units, and the segmented units are assembled into gate posts, and the gate and the gate post are assembled to achieve the rapid construction of the construction gate. After the construction of the construction site is completed, the construction personnel will move to the next construction site for construction. The construction personnel will remove the gate, remove the segmented unit, load and transport it to the next construction destination. On the basis of the construction gate, the segmented unit is directly assembled into a gate post, and the gate and the gate post are assembled to quickly build the construction gate. The gate and the gate post composed of the segmented unit can be reused many times, without the need to rebuild a new construction gate, shortening the construction period of the construction gate, thereby greatly reducing the construction cost. The gate post is disassembled into multiple segmented units for easy loading and transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 This is a schematic diagram of the structure of a construction gate for a municipal project that can be quickly disassembled and conveniently transported;

[0019] Figure 2 It is a front view of a construction gate of a municipal project that can be quickly disassembled and easily transported in an embodiment;

[0020] Figure 3 is a schematic structural diagram of a segmentation unit in an embodiment;

[0021] Figure 4 It is a schematic diagram of the structure of a construction gate for a municipal project which is composed of four or five segmented units and can be quickly disassembled and conveniently transported.

[0022] Reference numerals: door post 1, support column 101, connecting cross bar 102, cover plate 103, connecting diagonal bar 104, door 2, ceiling light 3, caster 4. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the utility model.

[0024] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0025] like Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown, the utility model is a construction gate for municipal projects that can be quickly disassembled and conveniently transported, comprising a gate post 1 and a gate 2 rotatably connected to the gate post 1, wherein the gate 2 is provided with casters 4 at the bottom end away from the gate post 1, wherein the gate post 1 is composed of at least two square segmented units, and adjacent segmented units are detachably connected, wherein the segmented unit is composed of a pillar 101, a connecting cross bar 102 and a mask 103, wherein four pillars 101 are vertically arranged to form side prisms of the segmented unit, wherein the connecting cross bars 102 are detachably arranged between the upper ends and the lower ends of adjacent pillars 101 to form the top prism and the bottom prism of the segmented unit respectively, and the mask 103 is detachably arranged between the adjacent pillars 101 to form the side wall surface of the segmented unit. The gate 2 and the gate post 1 are rotatably connected by a door pivot.

[0026] A construction gate for a municipal project based on the above structure can be quickly disassembled and conveniently transported. It is used for the construction of construction gates. The gate 2 is rotatably connected to the gate post 1. The gate post 1 is composed of a detachable segmented unit. The segmented unit is composed of a pillar 101, a connecting cross bar 102 and a mask 103. During the construction of the gate, the construction personnel assemble the pillar 101, the connecting cross bar 102 and the mask 103 into a segmented unit, and the segmented unit is assembled into a gate post 1. The gate 2 is assembled with the gate post 1 to achieve the rapid construction of the construction gate. After the construction of the construction site is completed, the construction personnel will move to the next construction site for construction. The construction personnel will remove the gate 2, remove the segmented unit, load and transport it to the next construction destination. On the basis of the construction gate, the segmented unit is directly assembled into a gate post 1. The gate 2 is assembled with the gate post 1 to quickly build the construction gate. The gate 2 and the gate post 1 composed of the segmented unit can be reused many times, without the need to rebuild a new construction gate, shortening the construction period of the construction gate, thereby greatly reducing the construction cost. The gate post is disassembled into multiple segmented units for easy loading and transportation.

[0027] Specifically, the support column 101 and the connecting cross bar 102 are fixedly connected by bolts, and the cover plate 103 and the support column 101 are fixedly connected by screws.

[0028] Bolt connection and screw connection facilitate quick installation and disassembly, and also facilitate later maintenance and replacement, thus improving the efficiency of installation and disassembly and replacement.

[0029] Preferably, the door post 1 is composed of three, four or five square segment units.

[0030] The number of segmented units of the gate post 1 is set according to the height of the construction gate. For example, if the number of segmented units is three, four or five, the gate post 1 is split into segmented units, which is convenient for handling, stacking and transporting to the next construction destination, and is also convenient for assembling into a gate post 1 of appropriate height.

[0031] The top ends of the pillars 101 of the top segment units are provided with a top plate, and the bottom ends of the pillars 101 of the bottom segment units are provided with a bottom plate.

[0032] The top support 101 is provided with a top plate to provide an installation platform, which is convenient for installing warning lights, etc., and prevents foreign matter or rainwater from entering the support 101. The bottom support 101 is provided with a bottom plate to play a better supporting role.

[0033] As an implementable embodiment, the support 101 is a square steel pipe, and the edges of the steel pipe are chamfered.

[0034] The support 101 is a square steel pipe with good versatility and is easy to install, disassemble and replace. The edges of the steel pipe are rounded to reduce damage to external personnel, improve safety, reduce stress concentration, increase resistance, and increase service life.

[0035] As a possible implementation method, the panel 103 is an iron panel, and the connecting cross bar 102 is a round steel pipe.

[0036] The panel 103 is a standard iron panel part, which has good versatility and is easy to install, disassemble, maintain and replace.

[0037] As an implementable embodiment, the outer side walls of the support 101, the connecting crossbar 102 and the cover 103 are all provided with a hot-dip galvanized layer.

[0038] The hot-dip galvanized layer of the outer wall of the pillar 101, the connecting crossbar 102 and the mask 103 is passivated to prevent corrosion and rust and extend the service life. The outer wall of the pillar 101, the connecting crossbar 102 and the mask 103 can also be sprayed with an anti-corrosion coating such as anti-rust paint.

[0039] As an implementation method, Figure 3As shown, the connecting cross bar 102 is evenly spaced between two adjacent pillars 101 on one opposite side wall surface of the door column 1, the gate 2 is rotatably arranged on the side wall surface where the connecting cross bar 102 is evenly spaced, and a connecting diagonal rod 104 is arranged between two adjacent pillars 101 on the other opposite side wall surface of the door column 1.

[0040] The connecting crossbar 102 facilitates the installation of the gate 2 .

[0041] As an implementation method, Figure 3 As shown, the connection parts of the pillar 101 and the connecting cross bar 102 and the connection parts of the pillar 101 and the connecting diagonal bar 104 are both provided with fixing plates.

[0042] The fixing plate is used for fixing the pillar 101 and the connecting diagonal rod 104. The fixing plate is welded to the pillar 101, and screw holes are provided on the fixing plate and the connecting diagonal rod 104 to be connected by bolts.

[0043] As an implementation method, Figure 1 , Figure 2 , Figure 4 As shown, the top plate is provided with a top light 3.

[0044] The ceiling light 3 serves as a warning lighting, and the power supply of the ceiling light 3 is provided by an external power supply.

[0045] The above description is only a specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention.

Claims

1. A construction gate for a municipal project that can be quickly disassembled and conveniently transported, comprising a gate post (1) and a gate (2) rotatably connected to the gate post (1), wherein a caster (4) is provided at the bottom end of the gate (2) away from the gate post (1), wherein: The door post (1) is composed of at least two square segmented units, and adjacent segmented units are detachably connected. The segmented unit is composed of a pillar (101), a connecting cross bar (102) and a cover plate (103). Four pillars (101) are vertically arranged to form side prisms of the segmented unit. The connecting cross bars (102) are detachably arranged between the upper ends and lower ends of adjacent pillars (101) to respectively form the top prism and the bottom prism of the segmented unit. The cover plate (103) is detachably arranged between adjacent pillars (101) to form the side wall surface of the segmented unit.

2. According to claim 1, a construction gate for municipal projects that can be quickly disassembled and easily transported is characterized in that: The support column (101) and the connecting cross bar (102) are fixedly connected by bolts, and the cover plate (103) and the support column (101) are fixedly connected by screws.

3. According to claim 1, a construction gate for municipal projects that can be quickly disassembled and easily transported is characterized in that: The door post (1) is composed of three, four or five square segment units.

4. According to claim 3, a construction gate for municipal projects that can be quickly disassembled and easily transported is characterized in that: The top ends of the pillars (101) of the top segment units are provided with a top plate, and the bottom ends of the pillars (101) of the bottom segment units are provided with a bottom plate.

5. According to claim 1, a construction gate for municipal projects that can be quickly disassembled and easily transported is characterized in that: The support (101) is a square steel pipe, and the edges of the steel pipe are chamfered.

6. The construction gate for municipal projects that can be quickly disassembled and easily transported according to claim 5 is characterized in that: The cover plate (103) is an iron cover plate, and the connecting cross bar (102) is a circular steel pipe.

7. The construction gate for municipal projects that can be quickly disassembled and easily transported according to claim 6 is characterized in that: The outer side walls of the support (101), the connecting crossbar (102) and the cover plate (103) are all provided with a hot-dip galvanized layer.

8. The construction gate for municipal projects that can be quickly disassembled and easily transported according to claim 1 is characterized in that: The connecting cross bars (102) are arranged at equal intervals between two adjacent pillars (101) on one opposite side wall surface of the door column (1); the gate (2) is rotatably arranged on the side wall surface on which the connecting cross bars (102) are arranged at equal intervals; and a connecting oblique bar (104) is arranged between two adjacent pillars (101) on the other opposite side wall surface of the door column (1).

9. The construction gate for municipal projects that can be quickly disassembled and easily transported according to claim 8 is characterized in that: The connecting portion between the support column (101) and the connecting cross bar (102), and the connecting portion between the support column (101) and the connecting diagonal bar (104) are both provided with fixing plates.

10. The construction gate for municipal projects that can be quickly disassembled and easily transported according to claim 4 is characterized in that: The top plate is provided with a top light (3).