Bagged cement storage device for construction site

By designing a bagged cement storage device including a waterproof bottom bag, a high-strength sideband and a waterproof top cover, the problem of insufficient shading and waterproof and wind resistance in the construction site in the prior art is solved, and cement is achieved Effective waterproofing and wind resistance avoid waste of resources.

CN222523303UActive Publication Date: 2025-02-25YANGTZE THREE GORGES EQUIPMENT & MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421084533.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-02-25
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

The prior art is used for bagged cement at construction sites with insufficient shading and waterproofing and wind resistance, and is easily blown away by strong winds, resulting in moisture and decomposition of cement and waste of resources.

Method used

A bagged cement storage device is designed including a waterproof bottom bag, a high tough sideband arranged on the edge of the waterproof bottom bag and a round waterproof top cover. By tightening the rope, the high-strength sideband pulls the waterproof bottom bag to cover the bag cement, and use the tying rope to tie the waterproof top cover to the high-strength sideband to form a fully covered structure.

Benefits of technology

Effectively prevent cement from getting damp, enhance waterproof and wind resistance, avoid waste of cement resources, and ensure that cement can remain dry and available in extreme weather conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222523303U_ABST
    Figure CN222523303U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction site bagged cement storage device which comprises a waterproof bottom bag, a high-toughness side belt and a round waterproof top cover, the high-toughness side belt and the round waterproof top cover are arranged on the edge of the waterproof bottom bag, open holes are formed in the high-toughness side belt at equal intervals, tightening ropes are arranged in the open holes in a stringing mode, the tightening ropes are connected with the high-toughness side belt in an S shape, and a connecting block is fixedly arranged in the middle of the round waterproof top cover. Binding ropes are fixedly connected to the connecting blocks, the middle portions of the binding ropes are fixedly connected with the edge of the waterproof top cover, and the binding ropes are arranged along the center of the waterproof top cover at equal angles. The effect of improving the arrangement efficiency and the waterproof performance of the bagged cement waterproof structure is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cement storage, in particular to a bagged cement storage device at a construction site. Background Art

[0002] In the early stages of the project, it was difficult to build a bagged cement warehouse due to site conditions. Usually, simple moisture-proof treatment would be carried out on the temporary storage points for bagged cement at the construction site, and the bagged cement would be covered with tarpaulins. However, in extreme weather such as storms, the tarpaulins used to cover the cement would be easily blown away by strong winds, and the rain would wet the cement, causing it to become damp and hardened, making it impossible to use the cement normally, resulting in a waste of resources. Summary of the invention

[0003] The technical problem to be solved by the utility model is that the bagged cement is shielded by rain cloth on site, but the waterproof and windproof ability is weak and the cement resource is wasted after being easily wetted.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a bagged cement storage device at a construction site, comprising a waterproof bottom bag, a high-toughness side band arranged on the edge of the waterproof bottom bag and a circular waterproof top cover, the high-toughness side band is equidistantly provided with openings, tightening ropes are strung in the openings, the tightening ropes are connected to the high-toughness side bands in an S shape, a connecting block is fixedly provided in the middle of the circular waterproof top cover, a tying rope is fixedly connected to the connecting block, the middle part of the tying rope is fixedly connected to the edge of the waterproof top cover, and the tying ropes are arranged at equal angles along the center of the waterproof top cover.

[0005] Preferably, the end of the tightening rope is located at the end corner of the high-tenacity side band, and each straight line segment of the high-tenacity side band is correspondingly provided with an independent tightening rope.

[0006] Preferably, a metal ring is fixedly disposed in the opening.

[0007] Preferably, a limit head is fixedly provided at the movable end of the lashing rope, and the outer diameter of the limit head is larger than the outer diameter of the lashing rope.

[0008] Preferably, a connecting buckle is fixedly provided on the waterproof top cover, and the connecting buckle is provided with a through hole for the binding rope to pass through.

[0009] 1. The utility model provides a bagged cement storage device at a construction site, which contains bagged cement in a waterproof bottom bag, and by tightening the tightening rope, the high-toughness side band pulls the waterproof bottom bag to cover the bagged cement. Then, the part of the tightening rope exposed outside the high-toughness side band is connected to the binding rope, and the waterproof top cover is fastened to the high-toughness side band, and the gap on the top of the tightened waterproof bottom bag is covered, so as to realize the waterproof packaging of the bagged cement on the waterproof bottom bag.

[0010] 2. The bagged cement is packed with a waterproof bottom bag and a water-retaining top cover, which are convenient to carry and pack. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0012] Figure 1 It is a schematic structural diagram of the waterproof bottom bag in the embodiment of the utility model in an open state.

[0013] Figure 2 It is a structural schematic diagram of the waterproof top cover in the embodiment of the utility model in an open state.

[0014] Figure 3 It is a schematic structural diagram of the waterproof bottom bag in the embodiment of the utility model in a tightened state.

[0015] Figure 4 It is a structural schematic diagram of the packaging state of an embodiment of the utility model.

[0016] In the figure: 1. Bag cement; 2. High-toughness edge band; 3. Waterproof bottom bag; 4. Metal ring; 5. Tightening rope; 6. Waterproof top cover; 7. Connecting block; 8. Binding rope; 9. Connecting buckle; 10. Limit head. DETAILED DESCRIPTION

[0017] like Figure 1-4 As shown, the utility model provides a bagged cement storage device at a construction site, comprising a waterproof bottom bag 3, a high-toughness side band 2 arranged on the edge of the waterproof bottom bag 3, and a circular waterproof top cover 6, the high-toughness side band 2 is equidistantly provided with openings, tightening ropes 5 are strung in the openings, the tightening ropes 5 are connected to the high-toughness side band 2 in an S shape, a connecting block 7 is fixedly provided in the middle of the circular waterproof top cover 6, a tying rope 8 is fixedly connected to the connecting block 7, the middle part of the tying rope 8 is fixedly connected to the edge of the waterproof top cover 6, and the tying rope 8 is arranged at equal angles along the center of the waterproof top cover 6.

[0018] The waterproof bottom bag 3 is laid flat on the ground, and the bagged cement 1 is tightly laid in the center of the waterproof bottom bag 3. The tightening rope 5 is tightened by pulling the two ends of the tightening rope 5, so that the high-toughness side band 2 drives the waterproof bottom bag 3 to roll up, and the bagged cement 1 is covered by the high-toughness side band 2 and the waterproof bottom bag 3. After covering, a pocket-like structure is formed to accommodate the bagged cement 1. Then, the waterproof top cover 6 is laid on the high-toughness side band 2 to cover the empty space above the bagged cement 1; the tightening rope 5 connected to the high-toughness side band 2 in an S shape is used to pass the binding rope 8 through the gap between the tightening rope 5 and the high-toughness side band 2, and the tightening rope 5 is tightened and then knotted together, so that the waterproof top cover 6 is stably connected to the high-toughness side band 2, and the bagged cement is fully covered by the waterproof bottom bag 3 and the waterproof top cover 6.

[0019] like Figure 1As shown, it is convenient for the staff to tighten the high-toughness side band 2. The ends of the tightening ropes 5 are located at the end corners of the high-toughness side band 2, and each straight section of the high-toughness side band 2 is provided with an independent tightening rope 5. By pulling the two ends of the tightening ropes 5, the middle of the high-toughness side band 2 is tightened, driving the edge of the waterproof bottom bag 3 to tighten, and then the high-toughness side band 2 can be easily folded up, and the adjacent tightening ropes 5 are connected to make the waterproof bottom bag 3 as a whole into a pocket shape.

[0020] like Figure 1 As shown, in order to improve the strength of the high-tenacity side band 2 and avoid damage to the high-tenacity side band 2 during the process of tightening the rope 5, a metal ring 4 is fixedly arranged in the opening.

[0021] like Figure 2 As shown. The movable end of the lashing rope 8 is fixedly provided with a limit head 10, and the outer diameter of the limit head 10 is larger than the outer diameter of the lashing rope 8. When connecting the lashing ropes 8, by tying a knot loop at the end of one lashing rope 8, the adjacent lashing ropes 8 are passed through the knot loop and tightened, so that the connection of the adjacent lashing ropes 8 can be completed. The adjacent lashing ropes 8 pass through different positions of the tightening rope 5, that is, the connection between the lashing rope 8 and the tightening rope 5 is realized.

[0022] like Figure 2 As shown. The waterproof top cover 6 is fixedly provided with a connecting buckle 9, and the connecting buckle 9 is provided with a through hole for the tying rope 8 to pass through. Connecting buckles 9 are arranged at the edge and near the middle of the waterproof top cover 6. After the tying rope 8 passes through two corresponding connecting buckles 9 in succession, the tying rope 8 is stably connected to the waterproof top cover 6, so as to avoid the waterproof top cover 6 and the tying rope 8 being separated in a storm, causing rainwater to enter.

Claims

1. A bagged cement storage device for a construction site, characterized in that: The invention comprises a waterproof bottom bag (3), a high-toughness side band (2) arranged at the edge of the waterproof bottom bag (3), and a circular waterproof top cover (6); the high-toughness side band (2) is provided with openings at equal intervals, a tightening rope (5) is strung in the opening, the tightening rope (5) is connected to the high-toughness side band (2) in an S shape, a connecting block (7) is fixedly provided in the middle of the circular waterproof top cover (6), a tying rope (8) is fixedly connected to the connecting block (7), the middle of the tying rope (8) is fixedly connected to the edge of the waterproof top cover (6), and the tying rope (8) is arranged at equal angles along the center of the waterproof top cover (6).

2. A construction site bagged cement storage device as claimed in claim 1, characterized in that: The end of the tightening rope (5) is located at the end corner of the high-tenacity side band (2), and each straight line segment of the high-tenacity side band (2) is correspondingly provided with an independent tightening rope (5).

3. A construction site bagged cement storage device as claimed in claim 1, characterized in that: A metal ring (4) is fixedly arranged in the opening.

4. A construction site bagged cement storage device as claimed in claim 1, characterized in that: A limit head (10) is fixedly provided at the movable end of the lashing rope (8), and the outer diameter of the limit head (10) is greater than the outer diameter of the lashing rope (8).

5. A construction site bagged cement storage device as claimed in claim 4, characterized in that: A connecting buckle (9) is fixedly provided on the waterproof top cover (6), and a through hole is provided on the connecting buckle (9) for the binding rope (8) to pass through.