Flood control system structure

By designing a flood control architecture including additional platform for piled sandbags and recyclable temporary flood control devices, the problem of difficult to remove the stone filling platform is solved, convenient construction and post-cleaning is achieved, and ship safety is ensured.

CN222525296UActive Publication Date: 2025-02-25CCCC FOURTH HARBOR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520156389.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-23
Publication Date
2025-02-25
Estimated Expiration
2035-01-23

AI Technical Summary

Technical Problem

During the immersed pipe construction in urban inland rivers, the temporary construction platform for filling and forming of stones is difficult to dig later, and the remaining stones are not conducive to ship safety.

Method used

Design a flood control system, including temporary flood control devices between existing platforms and additional platforms. The additional platforms are piled up by sandbags and include soil structures and slope structures. The temporary flood control devices can be recycled.

Benefits of technology

This structure can effectively prevent river water from eroding, prevent soil structure from being washed away, facilitate later excavation, and reduce construction difficulty and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222525296U_ABST
    Figure CN222525296U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of inland river flood control systems, in particular to a flood control system structure which comprises a soil body platform and additional platforms, a temporary flood control device is arranged between the soil body platform and the additional platforms, the top of the temporary flood control device extends out of the soil body platform, and the additional platforms comprise the first additional platform and the second additional platform. The upper portion of the first additional platform is filled with a soil body structure, a second additional platform is arranged on the outer side of the soil body structure, the outer side face of the second additional platform and the outer side face of the first additional platform form a continuous side slope, and the first additional platform and the second additional platform are both formed by piling up sand bags. According to the flood control system structure, the temporary flood control device is arranged between the soil body platform and the additional platforms and used for temporary flood control, the first additional platform and the second additional platform are both formed by piling up sand bags, scouring can be prevented, the soil body structure is prevented from being washed away, later excavation is further facilitated, and therefore the construction difficulty and the construction cost are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of flood control system construction and conversion construction method, in particular to a flood control system structure. Background Art

[0002] At present, immersed tube construction in urban rivers is increasingly used as a municipal river crossing channel. During the construction of immersed tubes in urban rivers, it is necessary to partially demolish the existing flood embankment on the installation path of the immersed tubes. Therefore, it is necessary to fill the part of the river close to the shore with a temporary construction platform and install a temporary flood control structure. The temporary construction platform is generally filled with stones to prevent scouring and damage by water in the river. However, it is very difficult to dig it out in the later stage. If it is not dug out cleanly, a hard obstacle will be formed, which is not conducive to the safety of navigation. Utility Model Content

[0003] The utility model aims to provide a flood control system structure to overcome the problems in the background technology that a temporary construction platform formed by filling stones is very difficult to remove in the later stage and if the remaining stones are not conducive to the safety of navigation.

[0004] The utility model provides a flood control system structure, comprising an existing platform and an additional platform, a temporary flood control device is arranged between the existing platform and the additional platform, the top of the temporary flood control device extends out of the existing platform, the additional platform comprises a first stacking structure, the upper part of the first stacking structure is filled with a soil structure and a second stacking structure, the soil structure is located between the temporary flood control device and the second stacking structure, the outer side surface of the second stacking structure forms a continuous slope with the outer side surface of the first stacking structure, and the first stacking structure and the second stacking structure are both formed by stacking sandbags.

[0005] The utility model provides a flood control system structure. A temporary flood control device is arranged between the existing platform and the additional platform for temporary flood control needs. The first stacking structure and the second stacking structure are both made of sandbags, which can prevent scouring and avoid the soil structure being washed away. It is also convenient for subsequent excavation, thereby reducing construction difficulty and construction cost.

[0006] Furthermore, the upper part of the first stacking structure is filled with a soil structure, so that the additional platform contains a soil structure and is not entirely made of sandbags, further reducing the construction cost. On this basis, a second stacking structure is arranged outside the soil structure, and the outer side surface of the second stacking structure forms a continuous slope with the outer side surface of the first stacking structure to prevent the soil structure from being washed away by river water, so that the soil structure meets the use requirements.

[0007] Preferably, the temporary flood control device comprises a steel sheet pile assembly, the top of which extends out of the existing platform, and the steel sheet pile assembly comprises a plurality of steel sheet piles which are sealed and matched in sequence. The steel sheet piles can be recycled and reused after being dismantled later, further reducing the material cost of the construction.

[0008] Preferably, the distance from the top of the first stacking structure to the temporary flood protection device is greater than the distance from the bottom of the first stacking structure to the temporary flood protection device, so that an empty groove is formed between the first stacking structure and the temporary flood protection device, and a part of the soil structure is filled in the empty groove.

[0009] To further reduce costs, an empty groove is formed between the first stacking structure and the temporary flood prevention device, and a part of the soil structure is filled in the empty groove, which can prevent at least part of the soil structure from being washed away by river water.

[0010] Preferably, a supporting and reinforcing structure is provided on the existing platform, and the supporting and reinforcing structure abuts against a portion of the temporary flood prevention device extending out of the existing platform.

[0011] Preferably, the supporting reinforcement structure is made of piled sandbags, which can be easily removed later.

[0012] Preferably, reinforcement piles are provided in the existing platform.

[0013] Preferably, at least part of the reinforcement piles abut against the temporary flood protection device.

[0014] Preferably, the tops of the reinforcement piles abutting against the temporary flood protection device extend upwardly from the existing platform.

[0015] Preferably, a revetment ground connection wall is provided on a side of the existing platform away from the temporary flood prevention device.

[0016] Preferably, the revetment ground-connecting wall comprises vertical walls arranged at intervals, the tops of adjacent vertical walls are supported and connected with top plates, some of the reinforcement piles support the top plates, and the reinforcement piles are arranged on both sides of the vertical walls. When constructing the revetment ground-connecting wall, a groove is first excavated using a construction machine, and then cast in the groove to form the revetment ground-connecting wall. The reinforcement piles are arranged on both sides of the vertical walls to prevent the hole from collapsing when the groove is excavated for the ground-connecting wall.

[0017] Preferably, a vertical concrete wall is provided on the top of the revetment ground connection wall protruding upward.

[0018] Compared with the prior art, the utility model has the following beneficial effects:

[0019] The utility model provides a flood control system structure, wherein a temporary flood control device is arranged between an existing platform and an additional platform, which is used for temporary flood control needs, wherein a first stacking structure and a second stacking structure are both formed by stacking sandbags, which can prevent scouring, prevent the soil structure from being washed away, and facilitate subsequent excavation, thereby reducing construction difficulty and construction cost, and an upper portion of the first stacking structure is filled with a soil structure, so that the additional platform contains a soil structure, which is not entirely formed by stacking sandbags, further reducing construction cost, and on this basis, a second stacking structure is arranged outside the soil structure, and an outer side surface of the second stacking structure forms a continuous slope with an outer side surface of the first stacking structure, so as to prevent the soil structure from being washed away by river water, thereby enabling the soil structure to meet use requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the structural longitudinal section of a flood control system of the present application.

[0021] Figure 2 This is a schematic longitudinal section diagram of the empty slot position of a flood control system structure of the present application.

[0022] Figure 3 This is a schematic diagram of the longitudinal section of the structure in which the top of the reinforcement pile adjacent to the temporary flood prevention device of the present application protrudes upward from the top surface of the existing platform.

[0023] Figure 4 This is a schematic diagram of the structural longitudinal section of the soil structure covering the upper part of the second stacking structure of the present application.

[0024] Figure numerals: 1-existing platform, 2-additional platform, 3-temporary flood control device, 31-reinforcement piles, 32-first stacking structure, 33-empty trench, 34-soil structure, 35-second stacking structure, 36-slope, 4-bank protection ground-connected wall, 41-vertical wall, 42-top plate, 5-vertical concrete wall, 6-river channel, 7-support reinforcement structure. DETAILED DESCRIPTION

[0025] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0026] Example 1

[0027] like Figure 1 and Figure 2As shown, this embodiment provides a flood control system structure, which is based on an existing platform 1. A temporary flood control device 3 is arranged on one side of the existing platform 1, and an additional platform 2 is arranged outside the temporary flood control device 3. The existing platform 1 and the additional platform 2 clamp and fix the temporary flood control device 3. The water side (the side close to the river) of the additional platform 2 has a slope 36, and the top of the temporary flood control device 3 extends upward from the existing platform 1. The additional platform 2 includes a first stacking structure 32, and the upper part of the first stacking structure 32 is filled with a soil structure 34. A second stacking structure 35 is arranged outside the soil structure 34. The outer side surface of the second stacking structure 35 and the outer side surface of the first stacking structure 32 form a continuous slope 36, and no cliff-like changes are formed between them. The first stacking structure 32 and the second stacking structure 35 are both made of sandbags.

[0028] The utility model provides a flood control system structure, wherein a temporary flood control device 3 is arranged between the existing platform 1 and the additional platform 2 for temporary flood control needs, and the first stacking structure 32 and the second stacking structure 35 are both made of sandbags, which can prevent scouring and avoid the soil structure 34 being washed away, and are also convenient for subsequent excavation, thereby reducing construction difficulty and construction cost.

[0029] Furthermore, the upper part of the first stacking structure 32 is filled with a soil structure 34, so that the additional platform 2 includes the soil structure 34, which is not entirely made of sandbags, further reducing the construction cost. Since the cost of sandbag stacking is higher than that of soil dumping construction, this can also reduce the construction difficulty of the additional platform 2. On this basis, a second stacking structure 35 is arranged on the outside of the soil structure 34, and the outer side surface of the second stacking structure 35 and the outer side surface of the first stacking structure 32 form a continuous slope 36 to prevent the soil structure 34 from being washed away by river water, so that the soil structure 34 meets the use requirements.

[0030] like Figure 4 As shown, in some preferred cases, the upper part of the second stacking structure 35 completely covers the top of the soil structure 34 to prevent the top of the soil structure 34 from being exposed and causing dust to fly, so as to reduce environmental pollution at the construction site.

[0031] In a preferred manner, the temporary flood prevention device 3 includes a steel sheet pile assembly, the top of the steel sheet pile assembly extends out of the existing platform 1, and the steel sheet pile assembly includes a plurality of steel sheet piles that are sealed and matched in sequence. For example, preferably, adjacent steel sheet piles are interlocked with each other, and the steel sheet piles can be recycled and reused after being dismantled at a later stage, thereby further reducing the material cost of construction.

[0032] In a preferred manner, the distance from the top of the first stacking structure 32 to the temporary flood protection device 3 is greater than the distance from the bottom of the first stacking structure 32 to the temporary flood protection device 3, so that an empty groove 33 is formed between the first stacking structure 32 and the temporary flood protection device 3, and a part of the soil structure 34 is filled in the empty groove 33.

[0033] To further reduce costs, an empty groove 33 is formed between the first stacking structure 32 and the temporary flood prevention device 3, and a part of the soil structure 34 is filled in the empty groove 33, which can prevent at least part of the soil structure 34 from being washed away by river water.

[0034] In a preferred manner, a support reinforcement structure 7 is provided on the existing platform 1 , and the support reinforcement structure 7 abuts against a portion of the steel sheet pile assembly extending out of the existing platform 1 .

[0035] In a preferred manner, the supporting reinforcement structure is formed by casting concrete.

[0036] In another preferred embodiment, the support reinforcement structure 7 is made of piled sandbags, which can be easily removed later.

[0037] In a preferred embodiment, reinforcement piles 31 are provided in the existing platform 1 .

[0038] In a preferred manner, at least part of the reinforcement piles 31 abut against the temporary flood protection device 3 .

[0039] like Figure 3 As shown, in a preferred manner, the top of the reinforcement pile 31 against the temporary flood prevention device 3 extends upwardly from the existing platform 1 .

[0040] In a preferred embodiment, a bank protection ground connecting wall 4 is provided on a side of the existing platform 1 away from the temporary flood protection device 3 .

[0041] In a preferred embodiment, a vertical concrete wall 5 is provided on the top of the revetment ground connecting wall 4 protruding upward.

[0042] In a preferred embodiment, the revetment ground-connecting wall 4 includes vertical walls 41 arranged at intervals, the tops of adjacent vertical walls 41 are supported and connected with top plates 42, some of the reinforcement piles 31 support the top plates 42, and the reinforcement piles 31 are arranged on both sides of the vertical walls 41. When the revetment ground-connecting wall 4 is constructed, a trench is first excavated using a construction machine, and then cast in the trench to form the revetment ground-connecting wall 4, and the reinforcement piles 31 are arranged on both sides of the vertical walls 41 to prevent the hole collapse problem when the trench is excavated for the ground-connecting wall.

[0043] A specific preferred solution: A flood control system structure described in this embodiment includes an existing platform 1 and an additional platform 2, a steel sheet pile assembly is arranged between the existing platform 1 and the additional platform 2, the top of the steel sheet pile assembly extends out of the existing platform 1, and the additional platform 2 includes a first stacking structure 32, the upper part of the first stacking structure 32 is filled with a soil structure 34, and a second stacking structure 35 is arranged on the side of the soil structure 34 away from the steel sheet pile assembly, and the outer side surface of the second stacking structure 35 forms a continuous slope 36 with the outer side surface of the first stacking structure 32, and the first stacking structure 32 and the second stacking structure 35 are both made of sandbags. The steel sheet pile assembly is formed by stacking; the top of the steel sheet pile assembly extends out of the existing platform 1, and the steel sheet pile assembly includes a plurality of steel sheet piles that are sealed and matched in sequence; the distance from the top of the first stacking structure 32 to the steel sheet pile assembly is greater than the distance from the bottom of the first stacking structure 32 to the steel sheet pile assembly, so that an empty groove 33 is formed between the first stacking structure 32 and the steel sheet pile assembly, and a part of the soil structure 34 is filled in the empty groove 33; a support reinforcement structure 7 is provided on the existing platform 1, and the support reinforcement structure 7 abuts against the part of the steel sheet pile assembly extending out of the existing platform 1, and the support reinforcement structure 7 is preferably formed by stacking sandbags. The existing platform 1 is provided with reinforcement piles 31, at least one of mixing piles and rotary jet piles. A revetment ground connection wall 4 is provided on the side of the existing platform 1 away from the steel sheet pile assembly. A vertical concrete wall 5 is provided on the top of the revetment ground connection wall 4 protruding upward.

[0044] There are several characteristics of the above flood control system architecture:

[0045] The first stacking structure 32 and the second stacking structure 35 are both made of sandbags, which can prevent scouring and prevent the soil structure 34 from being washed away, and are also convenient for later excavation. If stones are filled, scouring can also be prevented, but excavation is difficult. If they are not excavated cleanly, hard obstacles will be formed, which is not conducive to the safety of navigation.

[0046] The temporary flood prevention device 3 includes steel sheet piles. The steel sheet piles serve as flood prevention structures, which are convenient for later dismantling and recycling, thus saving construction costs.

[0047] The support reinforcement structure 7 is used for temporary support reinforcement to prevent the temporary flood prevention device 3 from tipping over to the existing platform 1 due to excessively high water levels in extreme cases.

[0048] The supporting reinforcement structure 7 is made of piled sandbags, which is convenient for later excavation.

[0049] Because part of the soil of the existing platform 1 is filled during construction, and the ground-connected wall construction equipment is heavy, the equipment will be unstable if it goes directly on it, so the existing platform 1 is reinforced with reinforcement piles 31, and the reinforcement piles 31 are preferably at least one of mixing piles and rotary jet piles. If the existing platform 1 is filled with stones, it will cause stones to be encountered when the bank protection ground-connected wall 4 is constructed into a groove, which greatly increases the difficulty of construction. The reinforcement measures of the reinforcement piles 31 can further enhance the resistance of the temporary flood control device 3 and prevent the temporary flood control device 3 from tipping over.

[0050] The part of the existing flood embankment located on the existing platform 1 will be demolished, and the additional platform 2 will be built on the water side of the existing platform 1, and a temporary flood prevention device 3 will be constructed. Both ends of the temporary flood prevention device 3 are sealed and connected to the remaining part of the existing flood embankment to form a temporary flood prevention system;

[0051] Use construction machinery to remove part of the existing flood embankment and construct at least part of the revetment ground-connected wall 4, because the additional platform 2 is set up to prevent the existing platform 1 from shifting and collapsing due to the deadweight of the construction machinery during construction;

[0052] Along the length direction of the existing flood embankment, the additional platform 2, the temporary flood protection device 3 and the revetment ground connection wall 4 all pass through the immersed tube installation path.

[0053] In a preferred embodiment, the top height of the additional platform 2 is lower than the top height of the existing flood embankment; the existing flood embankment can then be excavated to be flush with the top of the additional platform 2, and the soil excavated from the existing flood embankment can be used as a component of the additional platform 2.

[0054] The top height of the additional platform 2 is lower than the top height of the existing flood embankment. Compared with the case where the top height of the additional platform 2 is equal to or higher than the top height of the existing flood embankment, the water area occupied by the additional platform 2 is reduced, and the construction cost of dismantling the additional platform 2 at a later stage is also effectively reduced.

[0055] In a preferred embodiment, the top height of the temporary flood protection device 3 is equal to or higher than the top height of the existing flood protection embankment.

[0056] When the top height of the additional platform 2 is lower than the top height of the existing flood levee, in order to ensure the flood control effect in the area of ​​the existing flood levee to be destroyed, the top height of the temporary flood control device 3 is constructed to be equal to or higher than the top height of the existing flood levee.

[0057] In a preferred manner, the bank protection ground-connected wall 4 includes a ground-connected wall structure and a vertical concrete wall 5 sealed to the upper part of the ground-connected wall structure, so that the two ends of the bank protection ground-connected wall 4 and the vertical concrete wall 5 are sealed to the existing flood embankment, the top height of the ground-connected wall structure is lower than the top height of the existing flood embankment, and the top height of the vertical concrete wall 5 is equal to or greater than the top height of the existing flood embankment.

[0058] In a preferred manner, the top of the ground-connected wall structure is integrally constructed with the upright concrete wall 5 .

[0059] In the above scheme, the area of ​​the existing flood control embankment to be destroyed must first be reinforced. The reinforced boundary line is preferably the same as the river bank. Direct reinforcement poses the risk of construction machinery falling into the river channel 6, so an additional platform 2 is filled in the river channel 6 as an additional platform 2 for construction machinery. The higher the height of the additional platform 2 is filled, the greater the slope of the additional platform 2 facing the water, and the more the filled soil will occupy the river channel, which will affect the width of the river channel and further affect the navigation of ships.

[0060] If the top of the additional platform 2 is made the same height as the top of the existing flood embankment, the water area occupied will increase under the same slope conditions. Therefore, the top of the additional platform 2 to be built will be lower than the top of the existing flood embankment, and the existing flood embankment will be dug lower so that the top of the area to be destroyed in the existing flood embankment is flush with the top of the additional platform 2 to facilitate construction machinery construction. However, this will affect flood control.

[0061] Filling the lowered additional platform 2 can reduce the water area occupied by the additional platform 2, and the amount of filled soil will also be less, because the filled additional platform 2 is only a temporary measure and will be demolished later, so less filled soil is also conducive to the later demolition work. Specifically, a low additional platform 2 is constructed and filled, and the original existing flood embankment area to be destroyed is flattened, so that the top of the existing flood embankment area to be destroyed is flush with the top of the additional platform 2.

[0062] Steel sheet piles are driven on one side of the additional platform 2, and the top of the steel sheet piles is at least 6m above the ground to ensure flood control. In this way, the area of ​​the existing flood embankment to be destroyed can be dug down to the same height as the additional platform 2, which is convenient for construction machinery to construct on the existing platform 1, and the same is true for the other side of the river.

[0063] When constructing an immersed tube tunnel in an inland river, both sides of the river are embankments. The embankments have flood control functions, but when constructing an immersed tube, the embankments at both ends will be temporarily demolished, which will affect flood control. This application mainly provides a flood control system structure and makes full use of existing structures to reduce the cost as much as possible and simplify the construction on the basis of ensuring effective flood control. Combining the prefabricated construction of immersed tubes can achieve flood control and facilitate construction.

[0064] The temporary flood control device 3 uses steel sheet piles, which can be recycled after construction, reduce costs, and achieve short-term use. The vertical concrete wall 5 can achieve long-term flood control, and the demolition stage is relatively easy, so it can be used in the medium term.

[0065] In this embodiment, the construction machinery is preferably a slotting machine or a double-wheel milling machine.

[0066] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A flood control system, characterized in that: The invention comprises an existing platform (1) and an additional platform (2), wherein a temporary flood prevention device (3) is arranged between the existing platform (1) and the additional platform (2), the top of the temporary flood prevention device (3) protrudes from the existing platform (1), and the additional platform (2) comprises a first stacking structure (32), the upper part of the first stacking structure (32) is filled with a soil structure (34) and a second stacking structure (35), the soil structure (34) is located between the temporary flood prevention device (3) and the second stacking structure (35), the outer side surface of the second stacking structure (35) forms a continuous slope with the outer side surface of the first stacking structure (32), and the first stacking structure (32) and the second stacking structure (35) are both made of sandbags.

2. A flood protection system according to claim 1, characterized in that: The temporary flood prevention device (3) comprises a steel sheet pile assembly, the top of which extends out of the existing platform (1), and the steel sheet pile assembly comprises a plurality of steel sheet piles which are sealed and matched in sequence.

3. A flood protection system according to claim 1, characterized in that: The distance from the top of the first stacking structure (32) to the temporary flood protection device (3) is greater than the distance from the bottom of the first stacking structure (32) to the temporary flood protection device (3), so that an empty groove (33) is formed between the first stacking structure (32) and the temporary flood protection device (3), and a part of the soil structure (34) is filled in the empty groove (33).

4. A flood protection system according to claim 1, characterized in that: A supporting reinforcement structure (7) is provided on the existing platform (1), and the supporting reinforcement structure (7) abuts against a portion of the temporary flood prevention device (3) extending out of the existing platform (1).

5. A flood protection system according to claim 4, characterized in that: The supporting reinforcement structure (7) is made of stacked sandbags.

6. A flood protection system according to claim 2, characterized in that: Reinforcement piles (31) are arranged in the existing platform (1).

7. A flood protection system according to claim 6, characterized in that: At least part of the reinforcement piles (31) abut against the temporary flood prevention device (3); the tops of the reinforcement piles (31) abutting against the temporary flood prevention device (3) extend upward from the existing platform (1).

8. The flood protection system according to claim 6, characterized in that: A revetment ground connection wall (4) is arranged on the existing platform (1).

9. A flood protection system according to claim 8, characterized in that: The revetment ground connection wall (4) comprises vertical walls (41) arranged at intervals, the tops of adjacent vertical walls (41) are supported and connected with top plates (42), some of the reinforcement piles (31) support the top plates (42), and the reinforcement piles (31) are arranged on both sides of the vertical walls (41).

10. The flood protection system according to claim 8, characterized in that: The top of the revetment ground connection wall (4) is protruding upward and is provided with a vertical concrete wall (5).