Segmented construction hanging basket mounting bracket for corridor structure
By designing a sectional construction hanging basket installation bracket for the corridor structure, the construction problem of multi-layer corridor structure in super high-rise buildings is solved, and the effect of efficient construction of the facade and shortening the construction period is achieved.
Patent Information
- Application Number
- CN202421309445.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-11
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2034-06-11
AI Technical Summary
In super-high-rise buildings, the traditional hanging basket installation method cannot meet the construction needs of multi-layer corridor structures, resulting in extended construction period and inefficient hanging basket installation.
A sectional construction hanging basket installation bracket for the corridor structure is designed. Through the combination of riser, front support arm, rear support arm and connecting rod, the hanging basket is fixed in the corridor structure to meet the efficient construction of the exterior facade.
Through the use of this bracket, the exterior wall construction can be divided into multiple vertical sections in the multi-layer corridor, shortening the exterior wall decoration period and improving construction efficiency.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a segmented construction hanging basket mounting bracket for a corridor structure. Background Art
[0002] The hanging basket is a construction tool for high-altitude operations in construction projects. It is lifted and lowered by a winch. With the completion of the main structure of the building, it is necessary to use the hanging basket on the facade for construction. The prior art 202123226165.5 discloses a hanging basket cantilever device with a steel wire anti-slip function, including a steel wire cable, a bottom fixing plate, a hanging basket cantilever arm, a rear support, an upper support and a front support. The bottom fixing plate is installed on the upper side of the wall top, the rear support is installed on the upper side of the bottom fixing plate, the hanging basket cantilever arm is installed on the upper side of the rear support, the front support is installed on the right side of the lower end surface of the hanging basket cantilever arm, a limited top pressure block is arranged on the lower side of the front support, the upper support is installed on the upper side of the hanging basket cantilever arm, the first steel wire pulley is installed on the upper side of the upper support, the second steel wire pulley is installed on the right end surface of the hanging basket cantilever arm, and the steel wire anti-slip assembly is arranged on the right side of the annular side of the second steel wire pulley. Although the structural support strength is high and the hanging basket is cantilevered and stable in the public documents; but with the increasing number of super-high-rise main structures, traditional There are the following problems with installing a suspended basket on the roof to construct the exterior wall after the main structure is capped: in super-high-rise buildings, due to the high height of the building, the construction time of the main body and the exterior facade decoration is relatively long. If a suspended basket is installed on the roof after the main body of the building is capped, the exterior facade construction cannot be inserted in advance, resulting in an extension of the construction period, which is not conducive to schedule control. At the same time, if a suspended basket is hung on the roof at one time, the efficiency of the suspended basket construction will be reduced due to the high floors. In addition, when encountering multi-story corridors, the conventional suspended basket installation method cannot meet the requirements. Although the front side of the suspended basket cantilever arm can extend outward through the upper part of the corridor protective wall, due to the limited width of the corridor, the rear side of the suspended basket cantilever arm is blocked by the shear wall on the back side of the corridor and cannot be installed normally. Utility Model Content
[0003] The utility model aims to solve the above-mentioned problem, thereby providing a segmented construction hanging basket installation bracket for a corridor structure which can be inserted into the construction in advance.
[0004] The utility model solves the above problems and adopts the following technical solutions:
[0005] A segmented construction hanging basket mounting bracket for a corridor structure comprises a riser, two sides of an upper portion of the riser are respectively connected with a front support arm and a rear support arm along the same horizontal line, the hanging basket is connected to the front end of the front support arm through a steel wire rope on a winch, the riser is located in the corridor, a connecting rod is provided between the middle portion of the riser and a protective wall of the corridor, and the end of the rear support arm is vertically connected to the shear wall.
[0006] Compared with the prior art, the utility model adopting the above technical solution has the following outstanding features:
[0007] By fixing the rear support arm to the shear wall and the riser to the corridor protective wall, the mounting bracket of the hanging basket can be installed in the corridor structure, which meets the requirements of efficient facade construction and shortens the construction period of exterior wall decoration. The bracket is used to optimize the construction structure of the traditional exterior wall construction in which the hanging basket is installed on the roof after the main body is capped, so that the exterior wall during the main construction stage can be divided vertically into multiple construction sections for construction in the multi-story corridor.
[0008] As a preferred embodiment, a further technical solution of the utility model is:
[0009] Furthermore, a seat is provided at the bottom end of the vertical pipe.
[0010] Furthermore, connecting plates are arranged opposite to each other on both sides of the middle part of the vertical pipe, and the outer ends of the connecting plates are commonly connected to a first tension plate opposite to the inner side of the corridor protection wall. A number of tension bolts are commonly passed through the first tension plate and the corridor protection wall, and a second tension plate connected to the tension bolts is arranged on the outer side of the corridor protection wall.
[0011] Furthermore, a fixing plate is provided on the end of the rear support arm, and the fixing plate is attached to the shear wall and fixed by bolts.
[0012] Furthermore, ribs are arranged around the end of the rear support arm and between the fixing plate.
[0013] Furthermore, an oblique rope is connected to the end of the rear support arm and the front end of the front support arm, and the oblique rope passes through the top end of the riser. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic diagram of the main structure of an embodiment of the utility model;
[0015] Marked in the figure are: riser 1, front support arm 2, rear support arm 3, hanging basket 4, corridor protection wall 5, shear wall 6, cushion 7, connecting plate 8, fixing plate 9, inclined rope 10, second tension plate 11, first tension plate 12, tension bolt 13. DETAILED DESCRIPTION
[0016] The present invention is further described below in conjunction with embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.
[0017] A segmented construction hanging basket installation bracket for a corridor structure includes a riser 1, wherein the riser 1 has a front support arm 2 and a rear support arm 3 respectively connected to both sides of the upper portion of the riser along the same horizontal line, a hanging basket 4 is connected to the front end of the front support arm 2 through a steel wire rope on a winch, the riser 1 is located in the corridor, a connecting rod 8 is provided between the middle portion of the riser 1 and a corridor protective wall 5, a railing is provided above the corridor protective wall 5, and the end of the rear support arm 3 is vertically connected to a shear wall 6.
[0018] Furthermore, a cushion seat 7 is provided at the bottom end of the vertical pipe 1 to prevent the vertical pipe 1 from crushing the ground.
[0019] Furthermore, the connecting plates 8 are relatively arranged on both sides of the middle part of the riser 1, and the outer ends of the connecting plates 8 are commonly connected to a first tension plate 12 opposite to the inner side of the corridor protection wall 5. A plurality of tension bolts 13 are commonly penetrated through the first tension plate 12 and the corridor protection wall 5. A second tension plate 11 connected to the tension bolts 13 is arranged on the outer side of the corridor protection wall 5. The stability of the riser 1 is ensured by the tension bolts 13 and the two tension plates.
[0020] Furthermore, a fixing plate 9 is provided on the end of the rear support arm 3 , and the fixing plate 9 is in contact with the shear wall 6 and fixed by bolts, and the rear support arm 3 is fixed to the shear wall 6 by the fixing plate 9 and the bolts.
[0021] Furthermore, ribs are provided around the end of the rear support arm 3 and between the fixing plate 9 to increase stability.
[0022] Furthermore, an inclined rope 10 is connected between the end of the rear support arm 3 and the front end of the front support arm 2. The inclined rope 10 passes through the top of the riser 1. The inclined rope 10 increases stability and prevents tilting.
[0023] By fixing the rear support arm to the shear wall and the riser to the corridor protective wall, the mounting bracket of the hanging basket can be installed in the corridor structure, which meets the requirements of efficient facade construction and shortens the construction period of exterior wall decoration. The bracket is used to optimize the construction structure of the traditional exterior wall construction in which the hanging basket is installed on the roof after the main body is capped, so that the exterior wall during the main construction stage can be divided vertically into multiple construction sections for construction in the multi-story corridor.
[0024] The above description is only a preferred feasible embodiment of the present utility model, and does not limit the scope of rights of the present utility model. All equivalent changes made using the contents of the present utility model specification and its drawings are included in the scope of rights of the present utility model.
Claims
1. A sectional construction hanging basket mounting bracket for a corridor structure, comprising a riser, two sides of the upper part of the riser are respectively connected with a front arm and a rear arm along the same horizontal line, and the hanging basket is connected to the front end of the front arm through a steel wire rope on a winch, characterized in that: The riser is located in the corridor, and a connecting rod is arranged between the middle of the riser and the corridor protection wall, and the end of the rear support arm is vertically connected to the shear wall.
2. The segmented construction hanging basket mounting bracket for the corridor structure according to claim 1 is characterized in that: A cushion is arranged at the bottom end of the vertical pipe.
3. The segmented construction hanging basket mounting bracket for the corridor structure according to claim 1 is characterized in that: The connecting plates are arranged opposite to each other on both sides of the middle of the vertical pipe, and the outer ends of the connecting plates are commonly connected to the first tension plate opposite to the inner side of the corridor protection wall. A number of tension bolts are passed through the first tension plate and the corridor protection wall, and a second tension plate connected to the tension bolts is arranged on the outer side of the corridor protection wall.
4. The segmented construction hanging basket mounting bracket for the corridor structure according to claim 1 is characterized in that: A fixing plate is arranged on the end of the rear support arm, and the fixing plate is attached to the shear wall and fixed by bolts.
5. The segmented construction hanging basket mounting bracket for the corridor structure according to claim 4 is characterized in that: Ribs are arranged around the end of the rear support arm and between the fixing plate.
6. The segmented construction hanging basket mounting bracket for the corridor structure according to claim 1 is characterized in that: The end of the rear support arm and the front end of the front support arm are connected with an oblique rope, and the oblique rope passes through the top end of the riser.