Template for building engineering construction
By designing a template that includes a defined top rod, a break-out pin rod, an upper connecting rod, a threaded rod, a lower connecting rod, a control bracket and a control grip, the problem of poor grip stability of the traditional aluminum alloy template disassembly rod is solved. Efficient and accurate template disassembly operation is achieved.
Patent Information
- Application Number
- CN202421153712.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-24
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2034-05-24
AI Technical Summary
The rod body diameter of the traditional aluminum alloy template disassembly is small and the grip stability is poor, which is not conducive to the long-term disassembly of the template.
A template including a defined top rod, a break-out pin rod, an upper connecting rod, a threaded rod, a lower connecting rod, a control bracket and a control grip were designed. The control bracket and grip were assembled through horizontal positioning welding and thread docking. The operation accuracy and efficiency of disassembly are improved.
During the mold removal process, the movable sleeve is pulled by manually operating the rectangular grip, and the cushioning spring provides a cushioning effect, achieving up and down swing of the entire connecting rod, improving the accuracy and efficiency of disassembly.
Smart Images

Figure CN222525862U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a template for building engineering construction, belonging to the technical field of building equipment. Background Art
[0002] Aluminum alloy formwork is a formwork suitable for concrete engineering, which is made of aluminum alloy profiles through mechanical processing and welding. The design and construction application of aluminum alloy formwork is an innovation in the formwork technology of concrete engineering, a promotion of prefabricated concrete technology, and a manifestation of the industrialization of construction technology. It has been widely used in the field of engineering construction. The application of aluminum formwork system in the construction industry has improved the construction efficiency of housing construction projects, including greatly saving a lot of building materials and labor arrangements. The traditional aluminum alloy formwork disassembly rod has a small diameter and poor holding stability, which is not conducive to long-term formwork disassembly work. Utility Model Content
[0003] The purpose of the utility model is to provide a template for construction engineering to solve the problems raised in the above background technology.
[0004] To achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a template for construction engineering, characterized in that it includes a limiting push rod, a demolition pin rod, an upper connecting rod, an installation threaded rod, a lower connecting rod, a control bracket, and a control handle. The limiting push rod and the upper connecting rod are horizontally positioned and welded and installed, the demolition pin rod and the upper connecting rod are vertically positioned and welded and installed, the installation threaded rod welded at the end of the limiting push rod is threadedly docked and installed with the lower connecting rod, the outer diameter of the lower connecting rod is equipped with a control bracket, and the control handle is threadedly installed at the end of the lower connecting rod.
[0005] Preferably, the control bracket consists of a mounting sleeve, a buffer spring, a movable sleeve, a positioning block and a rectangular handle. The outer diameter of the mounting sleeve is positioned with the movable sleeve by the buffer spring, the center position of the movable sleeve is positioned with the positioning block, and the positioning block is positioned with a rectangular handle.
[0006] Preferably, the control handle is composed of a threaded connecting rod, a second positioning block and a control cross bar. The second positioning block is welded and installed at the center of the threaded connecting rod body, and the control cross bar is installed horizontally on the second positioning block.
[0007] Preferably, the outer diameter of the rectangular handle is covered with a non-slip rubber sleeve.
[0008] Compared with the prior art, the beneficial effects of the utility model are:
[0009] During the demoulding process, the rectangular handle is manually operated to pull the movable sleeve forward and backward a certain distance. The buffer spring has a certain shock-absorbing effect. Pulling the rectangular handle can realize the up and down swing of the entire connecting rod, and the control accuracy is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 This is a schematic diagram of the structure of the template used for construction engineering of the utility model;
[0011] Figure 2 This is a schematic diagram of the installation structure of the template for construction engineering of the utility model;
[0012] Figure 3 This is a schematic diagram of the structure of the control bracket of the utility model;
[0013] Figure 4 It is a structural schematic diagram of the control handle of the utility model.
[0014] In the figure: 1. limiting push rod, 2. demolition pin rod, 3. upper connecting rod, 4. installing threaded rod, 5. lower connecting rod, 6. control bracket, 7. control handle, 8. installing sleeve, 9. buffer spring, 10. movable sleeve, 11. positioning block one, 12. rectangular handle, 13. threaded connecting rod, 14. positioning block two, 15. control cross bar. DETAILED DESCRIPTION
[0015] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0016] like Figure 1-Figure 4 As shown, a template for construction engineering includes a limiting push rod 1, a demolition pin rod 2, an upper connecting rod 3, an installation threaded rod 4, a lower connecting rod 5, a control bracket 6, and a control handle 7. The limiting push rod 1 and the upper connecting rod 3 are horizontally positioned and welded and installed, the demolition pin rod 2 and the upper connecting rod 3 are vertically positioned and welded and installed, the installation threaded rod 4 welded at the end of the limiting push rod 1 is threadedly connected to the lower connecting rod 5, the outer diameter of the lower connecting rod 5 is covered with a control bracket 6, and the control handle 7 is threadedly installed at the end of the lower connecting rod 5.
[0017] The control bracket 6 consists of a mounting sleeve 8, a buffer spring 9, a movable sleeve 10, a positioning block 11 and a rectangular handle 12. The outer diameter of the mounting sleeve 8 is positioned and installed with the movable sleeve 10 through the buffer spring 9. The center position of the movable sleeve 10 is positioned and installed with a positioning block 11. The positioning block 11 is positioned and installed with a rectangular handle 12. The position of the mounting sleeve 8 is adjustable. The buffer spring 9 acts as an elastic buffer for the movable sleeve 10. Pulling the rectangular handle 12 can realize the up and down swing of the entire connecting rod, and the control accuracy is high and the demolition efficiency is high.
[0018] The control handle 7 is composed of a threaded connecting rod 13, a second positioning block 14 and a control cross bar 15. The threaded connecting rod 13 is centrally positioned and welded with a second positioning block 14, and the second positioning block 14 is horizontally installed with the control cross bar 15. The control handle 7 is designed as an auxiliary grip of the connecting rod template.
[0019] The outer diameter of the rectangular handle 12 is covered with an anti-skid rubber sleeve, which has good anti-skid performance.
[0020] Specific usage: A template for construction engineering. This device is designed for the rapid disassembly of aluminum templates for construction engineering. The upper and lower connecting rods are installed in combination, the demolition pin rod is inserted into the through hole of the aluminum template, the top rod is limited to support the top of the concrete, and the demolition template is pried. During the demolding process, the rectangular handle is manually operated to pull the movable sleeve to move forward and backward a certain distance. The buffer spring has a certain shock-absorbing effect. Pulling the rectangular handle can realize the up and down swing of the entire connecting rod, and the control accuracy is high.
[0021] The above is a preferred embodiment of the present invention. For ordinary technicians in this field, according to the teachings of the present invention, without departing from the principles and spirit of the present invention, changes, modifications, substitutions and variations made to the implementation methods are still within the scope of protection of the present invention.
Claims
1. A template for construction engineering, characterized in that: The utility model comprises a limiting push rod (1), a demolition pin rod (2), an upper connecting rod (3), a mounting threaded rod (4), a lower connecting rod (5), a control bracket (6), and a control handle (7); the limiting push rod (1) and the upper connecting rod (3) are horizontally positioned and welded, the demolition pin rod (2) and the upper connecting rod (3) are vertically positioned and welded, the mounting threaded rod (4) welded at the end of the limiting push rod (1) and the lower connecting rod (5) are threadedly butt-jointed and installed, the outer diameter of the lower connecting rod (5) is sleeved with the control bracket (6), and the control handle (7) is threadedly installed at the end of the lower connecting rod (5).
2. A construction template for construction according to claim 1, characterized in that: The control bracket (6) comprises a mounting sleeve (8), a buffer spring (9), a movable sleeve (10), a positioning block (11) and a rectangular handle (12); the outer diameter of the mounting sleeve (8) is positioned and installed with the movable sleeve (10) through the buffer spring (9); the center position of the movable sleeve (10) is positioned and installed with the positioning block (11); and the rectangular handle (12) is positioned and installed on the positioning block (11).
3. A construction template for construction according to claim 1, characterized in that: The control handle (7) is composed of a threaded connecting rod (13), a second positioning block (14) and a control cross bar (15); the threaded connecting rod (13) is centrally positioned and welded with the second positioning block (14); and the control cross bar (15) is horizontally mounted on the second positioning block (14).
4. A construction template for construction according to claim 2, characterized in that: The outer diameter of the rectangular handle (12) is covered with an anti-slip rubber sleeve.