Measuring device for constructional engineering management

By designing a liftable and lowered measurement device for construction engineering management, the problem of difficult to adjust the overall height of the existing device and difficulty in moving and installing is solved, and the convenience of replacing communication equipment and regional use is achieved.

CN222527308UActive Publication Date: 2025-02-25HEILONGJIANG COLLEGE OF CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421399152.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2025-02-25
Estimated Expiration
2034-06-18

AI Technical Summary

Technical Problem

The overall height of the existing construction engineering management measurement device is not easy to adjust, it is difficult to adjust and replace communication equipment, and it is not easy to move and install, resulting in only designated areas for measurement and use.

Method used

A measurement device for construction engineering management including support rods, control boxes, LED screen display frames and measurement components was designed. The hydraulic cylinder drives the hydraulic rods and fixed columns for lifting and lowering to achieve overall height adjustment, and through the ground fixed disk and Pre-installed bolts for mobile installation.

Benefits of technology

The overall height adjustment of the construction project management measurement device is realized, which is convenient for replacing communication equipment, supports regional use, and avoids the problem of device dumping caused by soil erosion on the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222527308U_ABST
    Figure CN222527308U_ABST
Patent Text Reader

Abstract

The utility model relates to the related technical field of constructional engineering management measurement, in particular to a measuring device for constructional engineering management, which comprises a support rod, a control box, an LED screen display frame and a measuring component, the control box is fixedly mounted in the middle of the support rod, the LED screen display frame is arranged at the joint of the control box, and the measuring component is fixedly mounted on the support rod. A supporting rod is installed at the supporting position of the measuring assembly, and the lifting assembly is installed on the supporting rod; according to the LED screen display device, the hydraulic rod and the fixing column can be driven to ascend and descend through power of the hydraulic cylinder, the LED screen display frame is driven to ascend and descend at the same time, the overall height can be conveniently adjusted when the LED screen display device is used for building engineering management measurement, and a communication installation frame on the LED screen display frame is convenient to use. And the communication equipment is adjusted and replaced, so that the lifted communication mounting frame can be used according to the constructional engineering management regionalization height space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to construction engineering management measurement, in particular to a measurement device for construction engineering management. Background Art

[0002] The construction project management measurement has its own pollution source purification equipment and integrated video monitoring system. It can remotely view the real-time video images of the monitoring points and perform corresponding control. The system can analyze and process the data and display it to users in a variety of different forms. It provides map positioning, real-time query, mean query, statistical analysis, comparative analysis and other functions. It can monitor all day long and has real-time, multi-parameter, intelligent, automatic alarm and other characteristics. It can monitor data in different time periods and different areas. It has a large storage space, which is convenient for the management bureau to carry out its work in an orderly manner and promote the long-term management of air pollution. It supports multiple communication methods: RS485 communication, Ethernet, wireless communication. The system can be linked with other dust reduction equipment to achieve the purpose of automatic control.

[0003] When the existing construction project management measurement is used, the overall height is not easy to adjust, and it is difficult to adjust and replace the communication equipment. Construction project management can only be used in a regional manner and is not easy to move and install. As a result, the construction project management measurement can only be used for measurement in designated areas. Utility Model Content

[0004] The purpose of the utility model is to provide a measuring device for construction engineering management to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A measuring device for construction engineering management, comprising a support rod, a control box, an LED screen display frame and a measuring component, wherein the control box is fixedly installed in the middle of the support rod, the LED screen display frame is arranged at the connection of the control box, the support of the measuring component is installed with a support rod, and further comprising:

[0007] A lifting assembly is mounted on the support rod;

[0008] A position fixing component, arranged on the support rod;

[0009] Among them, a fixed column is movably installed on the top of the control box, a communication mounting frame is fixed on the top of the LED screen display frame, a supporting seat is fixed on the bottom end of the support rod, a line groove tube passes through the rear end of the supporting seat, and the bottom end of the supporting seat is threadedly connected to a mounting base.

[0010] The measuring device for construction engineering management as described above: the support rod and the control box are threadedly connected, and the control box and the fixed column are movably connected.

[0011] The measuring device for construction engineering management as described above: the support seat is fastened to the installation line trough pipe through the installation base.

[0012] The measuring device for construction engineering management as described above: the lifting assembly includes a hydraulic rod fixedly mounted on a fixed column, and a hydraulic cylinder is movably mounted on the bottom end of the hydraulic rod.

[0013] The measuring device for construction project management as described above: the hydraulic cylinder drives the hydraulic rod to rise and fall, and the hydraulic rod drives the LED screen display frame on the fixed column to rise and fall.

[0014] The measuring device for construction engineering management as described above: the position fixing component includes a ground fixing plate threadedly mounted on a mounting base, the ground fixing plate is threadedly penetrated by pre-installed bolts, and a snap-fit ​​support column is fixedly connected to the middle of the ground fixing plate.

[0015] The measuring device for construction engineering management as described above: the ground fixing plate is installed on the installation base through the engaging support column, and the ground fixing plate and the engaging support column are fastened to the ground through pre-installed bolts.

[0016] Compared with the prior art, the beneficial effects of the utility model are: relying on the power of the hydraulic cylinder to drive the hydraulic rod and the fixed column to perform lifting and lowering, and at the same time drive the LED screen display frame to perform lifting and lowering, which is beneficial for the overall height adjustment when used for construction project management and measurement, and the communication mounting frame on the LED screen display frame can be adjusted to replace the communication equipment, so that the communication mounting frame after lifting can be used according to the regional height space of the construction project management.

[0017] Construction project management is used according to regionalization, and is movably installed through support seats and mounting bases. It uses ground fixing plates and pre-installed bolts for pre-embedded positioning to prevent the measuring devices used for construction project management from being tipped over by soil erosion on the construction site. Construction project management measurements can be moved and used according to designated areas. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the structure of the lifting assembly of the utility model;

[0020] Figure 3 It is a structural schematic diagram of the position fixing component of the utility model.

[0021] In the figure: 1. Support rod; 2. Control box; 3. Fixed column; 4. LED screen display frame; 5. Communication mounting frame; 6. Support seat; 7. Line trough; 8. Mounting base; 9. Hydraulic rod; 10. Hydraulic cylinder; 11. Ground fixing plate; 12. Pre-installed bolt; 13. Snap-fit ​​support column. DETAILED DESCRIPTION

[0022] Various exemplary embodiments, features and aspects of the present application will be described in detail below with reference to the accompanying drawings. The same reference numerals in the accompanying drawings represent elements with the same or similar functions. Although various aspects of the embodiments are shown in the accompanying drawings, the drawings are not necessarily drawn to scale unless otherwise specified.

[0023] The word “exemplary” is used exclusively herein to mean “serving as an example, example, or illustration.” Any embodiment described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments.

[0024] In addition, in order to better illustrate the present application, numerous specific details are provided in the specific embodiments below. It should be understood by those skilled in the art that the present application can also be implemented without certain specific details. In some examples, methods, means, and elements well known to those skilled in the art are not described in detail in order to highlight the subject matter of the present application.

[0025] See also Figures 1 to 3 , a measuring device for construction engineering management is proposed, including a support rod 1, a control box 2, an LED screen display frame 4 and a measuring component.

[0026] A control box 2 is fixedly installed in the middle of the support rod 1, and an LED screen display frame 4 is arranged at the connection of the control box 2. The support of the measuring component is installed with the support rod 1, and the lifting component is installed on the support rod 1; the position fixing component is arranged on the support rod 1;

[0027] The control box 2 is movably mounted on the top of the support rod 1, so that the LED screen display frame 4 is connected to the control box 2, which is convenient for the user to operate the control box 2;

[0028] Among them, a fixed column 3 is movably installed on the top of the control box 2, a communication mounting frame 5 is fixed on the top of the LED screen display frame 4, a supporting seat 6 is fixed at the bottom of the support rod 1, a line groove tube 7 passes through the rear end of the supporting seat 6, and a mounting base 8 is threadedly connected to the bottom of the supporting seat 6.

[0029] In this embodiment, the communication mounting frame 5 is movably installed on the top of the LED screen display frame 4. The communication mounting frame 5 can support multiple communication methods: RS485 communication, Ethernet, and wireless communication. The LED screen display frame 4 is installed on the ground through the support seat 6 at the bottom of the support rod 1. The mounting base 8 can be pre-buried in the ground to facilitate the movement of the support rod 1 and the support seat 6.

[0030] Preferably, the support rod 1 and the control box 2 are threadedly connected, and the control box 2 and the fixed column 3 are movably connected. The control box 2 is threadedly fastened to the support rod 1, and the fixed column 3 runs through the inside of the control box 2 without affecting the use, installation and positioning of the control box 2.

[0031] Preferably, the support seat 6 is fastened with the line trough 7 via the mounting base 8, and the line trough 7 is fixedly mounted inside the support seat 6 and the mounting base 8, so that line protection can be performed on the measuring equipment used for construction project management.

[0032] Please refer to Figure 1 and Figure 2 In this embodiment, the lifting assembly includes a hydraulic rod 9 fixedly mounted on the fixed column 3, and a hydraulic cylinder 10 is movably mounted at the bottom end of the hydraulic rod 9.

[0033] The hydraulic cylinder 10 is fixedly mounted on the support rod 1, and the control box 2 is mounted at the connection between the hydraulic cylinder 10 and the support rod 1 for protection and concealment to prevent outdoor rainwater from entering the connection between the hydraulic cylinder 10 and the support rod 1, which facilitates the movable installation of the hydraulic rod 9 in the hydraulic cylinder 10. The hydraulic cylinder 10 can hydraulically drive the hydraulic rod 9 for lifting and lowering.

[0034] Preferably, the hydraulic cylinder 10 drives the hydraulic rod 9 to rise and fall, and the hydraulic rod 9 drives the LED screen display frame 4 on the fixed column 3 to rise and fall. When the hydraulic rod 9 is movably installed in the hydraulic cylinder 10, the hydraulic cylinder 10 can hydraulically drive the hydraulic rod 9 to rise and fall, so that the LED screen display frame 4 is installed on the hydraulic rod 9 through the fixed column 3. Relying on the power of the hydraulic cylinder 10, the hydraulic rod 9 and the fixed column 3 can be driven to rise and fall, and at the same time, the LED screen display frame 4 is driven to rise and fall.

[0035] Please refer to Figure 1 and Figure 3 In this embodiment, the position fixing component includes a ground fixing plate 11 threadedly mounted on the mounting base 8, the ground fixing plate 11 is threadedly penetrated by pre-installed bolts 12, and the middle of the ground fixing plate 11 is fixedly connected to a snap-fit ​​support column 13.

[0036] The ground fixing plate 11 is fixedly installed on the ground, and then the pre-installed bolt 12 on the ground fixing plate 11 is penetrated into the ground for positioning and installation, so that the support seat 6 is movably installed in the engaging support column 13, and the support seat 6 is rotated and tightened through the thread on the ground fixing plate 11.

[0037] Preferably, the ground fixing plate 11 is installed on the mounting base 8 through the snap-fit ​​support column 13, and the ground fixing plate 11 and the snap-fit ​​support column 13 are fastened to the ground through the pre-installed bolts 12. When the ground measured by the construction project management is not flat enough, the ground fixing plate 11 can be fixed through the ground to facilitate the mobile installation of equipment such as the LED screen display frame 4 and the communication mounting frame 5 on the support seat 6 and the mounting base 8.

[0038] As can be seen from the above, the hydraulic cylinder 10 can hydraulically drive the hydraulic rod 9 to lift and lower, so that the LED screen display frame 4 is installed on the hydraulic rod 9 through the fixed column 3. The hydraulic cylinder 10 power can drive the hydraulic rod 9 and the fixed column 3 to lift and lower. The communication mounting frame 5 is movably installed on the top of the LED screen display frame 4. The communication mounting frame 5 can support multiple communication methods: RS485 communication, Ethernet, wireless communication. The LED screen display frame 4 is installed on the ground through the support seat 6 at the bottom of the support rod 1.

[0039] The pre-installed bolt 12 on the ground fixing plate 11 penetrates the ground for positioning and installation, so that the support seat 6 is movably installed in the engaging support column 13, and the support seat 6 and the mounting base 8 are rotated and fastened through the threads on the ground fixing plate 11.

[0040] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0041] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A measuring device for construction engineering management, comprising a support rod (1), a control box (2), an LED screen display frame (4) and a measuring component, wherein the control box (2) is fixedly mounted on the middle part of the support rod (1), the LED screen display frame (4) is arranged at the connection part on the control box (2), and the support part on the measuring component is mounted with the support rod (1), characterized in that: It also includes the following: A lifting assembly, mounted on the support rod (1); A position fixing component, arranged on the support rod (1); The control box (2) has a fixed column (3) movably mounted on the top, the LED screen display frame (4) has a communication mounting frame (5) fixed on the top, the support rod (1) has a support seat (6) fixed on the bottom, a line trough (7) penetrates the rear end of the support seat (6), and the bottom end of the support seat (6) is threadedly connected to a mounting base (8).

2. A construction engineering management measuring device according to claim 1, characterized in that: The support rod (1) and the control box (2) are threadedly connected, and the control box (2) and the fixing column (3) are movably connected.

3. A construction engineering management measuring device according to claim 1, characterized in that: The support seat (6) is fastened to the installation line trough tube (7) via the installation base (8).

4. A construction engineering management measuring device according to claim 1, characterized in that: The lifting assembly comprises a hydraulic rod (9) fixedly mounted on a fixed column (3), and a hydraulic cylinder (10) is movably mounted on the bottom end of the hydraulic rod (9).

5. A construction engineering management measuring device according to claim 4, characterized in that: The hydraulic cylinder (10) drives the hydraulic rod (9) to move up and down, and the hydraulic rod (9) drives the LED screen display frame (4) on the fixed column (3) to move up and down.

6. A construction engineering management measuring device according to claim 1, characterized in that: The position fixing assembly comprises a ground fixing plate (11) threadedly mounted on a mounting base (8), a pre-installed bolt (12) threadedly penetrates the periphery of the ground fixing plate (11), and a snap-fit ​​support column (13) is fixedly connected to the middle of the ground fixing plate (11).

7. A construction engineering management measuring device according to claim 6, characterized in that: The ground fixing plate (11) is installed on the installation base (8) via a snap-fit ​​support column (13), and the ground fixing plate (11) and the snap-fit ​​support column (13) are fastened to the ground via a pre-installed bolt (12).