Water conservancy project building foundation pile
By opening vortex troughs inside the pile body of the foundation pile of the water conservancy project construction and using an extended vortex extension body for clamping, the problem of poor connection caused by soil vibration when the foundation pile is nailed into the ground is solved, and a more stable foundation pile fixing and connection effect is achieved.
Patent Information
- Application Number
- CN202421619692.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2025-02-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing water conservancy construction foundation piles will cause soil vibration when nailed into the ground, resulting in poor connection between the soil and the foundation piles, affecting the fixation of the foundation piles and posing safety hazards.
A water conservancy engineering building foundation pile is designed, using a vortex trough inside the pile body, and a vortex extending body with suitable ductility and hardness is arranged in the vortex trough. By rotating the cylindrical rotating body by rotating the handle, the narrower rolling part of the vortex extending body extends out and is inserted into the external soil to help the foundation pile fix and connect nearby soil.
Through this design, the fixity and connectivity of the foundation piles are improved, which reduces safety risks and ensures a stable connection between the foundation piles and the soil.
Smart Images

Figure CN222541515U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building foundation piles, in particular to a water conservancy engineering building foundation pile. Background Art
[0002] The Chinese patent document with the existing announcement number CN211621553U discloses a water conservancy project construction foundation pile, which proposes that a water conservancy project is a project built for controlling and allocating natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits, also known as a water project; water is a valuable resource indispensable to human production and life, but its natural state does not fully meet human needs; only by building water conservancy projects can the flow of water be controlled, floods and waterlogging disasters be prevented, and the amount of water be regulated and distributed to meet the needs of people's life and production for water resources.
[0003] However, in the above scheme and the prior art, when the foundation piles are driven into the ground, it will inevitably cause vibration of the soil, resulting in poor connection and adhesion between the soil and the foundation piles, affecting the fixation of the foundation piles and posing a safety hazard.
[0004] Therefore, the utility model proposes a water conservancy engineering building foundation pile for solving the above problems. Utility Model Content
[0005] The utility model aims to provide a foundation pile for a water conservancy project building to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a foundation pile of a water conservancy project building comprises an upper plate, a through hole, a pile body, a pile body head and an auxiliary component, one end of the upper plate is fixedly provided with a through hole, one end of the upper plate is fixedly provided with a pile body at equal intervals, one end of the pile body is fixedly provided with a pile body head, and the auxiliary component is movably clamped inside the pile body.
[0007] Preferably, the auxiliary component includes an internal hollow cylindrical groove, a clamping block, an eddy current groove, a cylindrical rotating body, a clamping groove, a rotating handle, an extended handle, a handle clamping hole, an eddy current extension body, a soil discharge tip and a stopper. The internal hollow cylindrical groove is fixedly opened inside the pile body, one end of the internal hollow cylindrical groove is fixedly provided with a clamping block, the eddy current grooves are fixedly opened inside the pile body at equal intervals, one end of the cylindrical rotating body is fixedly provided with a clamping groove, one end of the cylindrical rotating body is fixedly provided with a rotating handle, one end of the extended handle is fixedly provided with a handle clamping hole, one end of the eddy current extension body is fixedly provided with a soil discharge tip, and one end of the soil discharge tip is fixedly provided with a stopper.
[0008] Preferably, the through holes are arranged at positions corresponding to those at the top of the cylindrical rotating body, are arranged in the same groups, and the two are adapted to be movably connected.
[0009] Preferably, the hollow cylindrical groove and the cylindrical rotating body are arranged at corresponding positions and have the same number of groups, and the two are adapted to be movably engaged, and the engaging block and the engaging groove are also adapted to be movably engaged.
[0010] Preferably, the rotating handle and the handle engaging hole are arranged at corresponding positions, and the two are adapted to be movably engaged.
[0011] Preferably, the vortex groove and the vortex extension body are set in corresponding positions and have the same number of groups, the two are adapted to be movably connected, and one end of the vortex extension body is set with a narrower and equidistant movably connected inside the cylindrical rotating body, that is, the vortex extension body can be extended, and the narrower end coil is set inside the cylindrical rotating body.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] An eddy current groove is opened inside the pile body and an eddy current extension body with suitable ductility and hardness is movably clamped in the eddy current groove. The cylindrical rotating body is rotated by rotating the handle to extend the narrower coiled part of the eddy current extension body, so that the eddy current extension body is extended and inserted into the external soil, which helps to fix the foundation pile and connect the nearby soil, ensure the fixation of the foundation pile, and reduce safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] Figure 2 This is a schematic diagram of the pile structure of the utility model;
[0016] Figure 3 This is a cross-sectional view of the foundation pile of the utility model;
[0017] Figure 4 This is a schematic diagram of the auxiliary component structure of the utility model;
[0018] Figure 5 For this utility model Figure 4 Enlarged view of point A in the middle.
[0019] In the figure: upper plate 1, through hole 2, pile body 3, pile body head 4, internal hollow cylindrical groove 5, clamping block 6, eddy current groove 7, cylindrical rotating body 8, clamping groove 9, rotating handle 10, extended handle 11, handle clamping hole 12, eddy current extension body 13, soil discharge tip 14, stopper 15. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the utility model are described clearly and completely below. The embodiments of the utility model and all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1-Figure 5 The present invention provides the following three preferred embodiments:
[0022] Embodiment 1: A foundation pile for a water conservancy project comprises an upper plate 1, a through hole 2, a pile body 3, a pile body head 4 and an auxiliary component. A through hole 2 is fixedly provided at one end of the upper plate 1, and the through hole 2 corresponds to the position of the top of the cylindrical rotating body 8 and is provided in the same number of groups, and the two are adapted and movably connected; a pile body 3 is fixedly provided at one end of the upper plate 1 at an equal distance, a pile body head 4 is fixedly provided at one end of the pile body 3, and the auxiliary component is movably connected and arranged inside the pile body 3.
[0023] When in use, the pile body 3 and the pile head 4 are fixed in the soil by hammering the upper plate 1, and the foundation pile is fixed more firmly with the help of auxiliary components, ensuring better connection and adhesion between the foundation pile and the soil, thereby ensuring effective protection of the foundation pile.
[0024] Embodiment 2, based on embodiment 1:
[0025] The auxiliary components include an internal hollow cylindrical groove 5, a clamping block 6, an eddy current groove 7, a cylindrical rotating body 8, a clamping groove 9, a rotating handle 10, an extended handle 11, a handle clamping hole 12, an eddy current extension body 13, a soil discharge tip 14 and a stopper 15. The internal hollow cylindrical groove 5 is fixedly opened inside the pile body 3, one end of the internal hollow cylindrical groove 5 is fixedly provided with a clamping block 6, the eddy current groove 7 is equidistantly fixedly opened inside the pile body 3, one end of the cylindrical rotating body 8 is fixedly provided with a clamping groove 9, the hollow cylindrical groove 5 and the cylindrical rotating body 8 are set at corresponding positions and have the same number of groups, the two are adapted to be movably clamped, and the clamping block 6 and the clamping groove 9 are also adapted to be movably clamped; A rotating handle 10 is fixedly provided at one end of the column rotating body 8, and a handle clamping hole 12 is fixedly opened at one end of the extended handle 11. The rotating handle 10 and the handle clamping hole 12 are set at corresponding positions, and the two are adapted to be movably clamped; the eddy current groove 7 and the eddy current extension body 13 are set at corresponding positions and have the same number of groups, and the two are adapted to be movably clamped, and one end of the eddy current extension body 13 is provided with a narrower equidistant movably clamped inside the cylindrical rotating body 8, that is, the eddy current extension body 13 can be extended, and the narrower end is rolled and set inside the cylindrical rotating body 8; a soil discharge tip 14 is fixedly provided at one end of the eddy current extension body 13, and a stopper 15 is fixedly provided at one end of the soil discharge tip 14.
[0026] When in use, an eddy current groove 7 is opened inside the pile body 3 and an eddy current extension body 13 with suitable ductility and hardness is movably clamped and set in the eddy current groove 7, and the cylindrical rotating body 8 is rotated by rotating the handle 10 to make the narrower coiled part of the eddy current extension body 13 extend, so that the eddy current extension body 13 is extended and inserted into the external soil, which helps to fix the foundation pile and connect the nearby soil, ensure the fixation of the foundation pile, and reduce safety hazards; when the rotation is difficult, the handle clamping hole 12 can be clamped on the rotating handle 10 with the help of the extension handle 11 to assist the rotation, ensure that the eddy current extension body 13 is longer when it is screwed out, and ensure the stability of the entire foundation pile; at the same time, the soil discharge tip 14 helps the eddy current extension body 13 to be screwed out more easily, and the block 15 ensures the recovery stroke to prevent the foundation pile from being pulled out when the recovery is not complete, thereby damaging the auxiliary components.
[0027] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A foundation pile for a water conservancy project, characterized in that: The utility model comprises an upper plate (1), a through hole (2), a pile body (3), a pile body head (4) and an auxiliary component, wherein one end of the upper plate (1) is fixedly provided with a through hole (2), one end of the upper plate (1) is fixedly provided with a pile body (3) at an equal distance, one end of the pile body (3) is fixedly provided with a pile body head (4), and the auxiliary component is movably clamped and arranged inside the pile body (3).
2. A foundation pile for a hydraulic engineering building according to claim 1, characterized in that: The auxiliary component comprises an internal hollow cylindrical groove (5), a clamping block (6), an eddy current groove (7), a cylindrical rotating body (8), a clamping groove (9), a rotating handle (10), an extended handle (11), a handle clamping hole (12), an eddy current extension body (13), a soil discharge tip (14) and a stopper (15). The internal hollow cylindrical groove (5) is fixedly provided inside the pile body (3); one end of the internal hollow cylindrical groove (5) is fixedly provided with a clamping block (6); the eddy current groove (7) is fixedly provided inside the pile body (3) at an equal distance; one end of the cylindrical rotating body (8) is fixedly provided with a clamping groove (9); one end of the cylindrical rotating body (8) is fixedly provided with a rotating handle (10); one end of the extended handle (11) is fixedly provided with a handle clamping hole (12); one end of the eddy current extension body (13) is fixedly provided with a soil discharge tip (14); and one end of the soil discharge tip (14) is fixedly provided with a stopper (15).
3. A foundation pile for a hydraulic engineering building according to claim 1, characterized in that: The through holes (2) are arranged at corresponding positions to the top of the cylindrical rotating body (8), and are arranged in the same number of groups, and the two are adapted to be movably engaged.
4. A foundation pile for a hydraulic engineering building according to claim 2, characterized in that: The internal hollow cylindrical groove (5) and the cylindrical rotating body (8) are arranged at corresponding positions and have the same number of groups, and the two are adapted to be movably engaged, and the engaging block (6) and the engaging groove (9) are also adapted to be movably engaged.
5. A foundation pile for a hydraulic engineering building according to claim 2, characterized in that: The rotating handle (10) and the handle engaging hole (12) are arranged at corresponding positions, and the two are adapted to be movably engaged.
6. A foundation pile for a hydraulic engineering building according to claim 2, characterized in that: The eddy current grooves (7) and the eddy current extension bodies (13) are arranged at corresponding positions and have the same number of groups, and the two are adapted to be movably engaged, and one end of the eddy current extension body (13) is arranged to be movably engaged and equidistantly engaged inside the cylindrical rotating body (8), that is, the eddy current extension body (13) is extendable, and the narrower end portion is rolled up and arranged inside the cylindrical rotating body (8).
Citation Information
Patent Citations
Hydraulic engineering building foundation pile
CN211621553U