Prefabricated concrete cable trench
By designing the cable and coagulation cover installation mechanism in the precast concrete cable trench, the problem of insufficiency of installation of coagulation covers and cables in the prior art is solved, a fast and simple installation process is achieved, and construction efficiency and flexibility are improved.
Patent Information
- Application Number
- CN202421229378.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2034-05-31
AI Technical Summary
Existing precast concrete cable trenches have problems of labor and insimplicity in installation of concrete covers and cables.
A precast concrete cable trench is designed, including a cable mounting mechanism and a concrete cover mounting mechanism. The cable installation mechanism simplifies the installation process of the cable through the cooperation of the telescopic spring rod and the pressure plate; the coagulation cover installation mechanism simplifies the installation process of the coagulation cover through the design of the cover along the groove and roller.
It realizes fast and easy installation of cables and concrete covers, saves manpower and material resources, and improves construction efficiency and installation flexibility.
Smart Images

Figure CN222563488U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of concrete cable trenches, in particular to a prefabricated concrete cable trench. Background Art
[0002] Precast concrete cable trenches are prefabricated in factories and then transported to the site for installation. They are fast to install, have stable quality, and can reduce project cycles and costs. Cable trenches are underground pipelines used to lay and replace power or telecommunication cable facilities. They are also the enclosure structure for the laid cable facilities. They have rectangular, circular, arched and other pipeline structure forms.
[0003] A Chinese patent discloses a prefabricated concrete cable trench (authorization announcement number CN 215498207 U). The patented technology enables the utility model to use a prefabricated integrated U-shaped concrete trench body and a prefabricated concrete cover plate, combined with on-site assembly, to quickly lay the cable trench directly on site, simplifying the construction process and greatly improving the overall construction efficiency. In addition, the laying of the U-shaped concrete trench body at the front and rear ends can be achieved through the docking between the convex portion and the concave docking portion, and the docking between the docking convexity and the docking groove, ensuring that the front and rear two prefabricated U-shaped concrete trench bodies are spliced flat, stable and tight, ensuring the quality of the laying construction; however, the device is somewhat laborious when installing the concrete cover, and is not easy enough for the installation of the cable.
[0004] Therefore, those skilled in the art provide a prefabricated concrete cable trench to solve the problems raised in the above background technology. Utility Model Content
[0005] In order to solve the above technical problems, the utility model provides a prefabricated concrete cable trench, comprising a cable trench body, wherein a drainage trough is installed on the lower side of the interior of the cable trench body;
[0006] The cable trench body is also equipped with a cable installation mechanism; the top of the cable trench body is equipped with a concrete cover;
[0007] A concrete cover installation mechanism is also installed in the cable trench body; and a left-right symmetrical docking groove is opened on the front side of the cable trench body.
[0008] Preferably: the concrete cover mounting mechanism is installed on the top of the cable trench body, the concrete cover mounting mechanism includes a cover edge groove, the cover edge groove is installed on the left and right inner walls below the top of the cable trench body, and symmetrical cover edge grooves are opened, the inner sides of the bottoms of the two cover edge grooves are opened with mounting grooves, and a number of rollers are installed in the two mounting grooves.
[0009] Preferably: a cable installation mechanism is installed at the bottom of the concrete cover installation mechanism, and the cable installation mechanism includes a mounting plate. A mounting plate is installed inside the cable trench body, and four mounting plates are provided which are symmetrical on the left and right; the settings on the four mounting plates are exactly the same.
[0010] Preferably: taking the setting on the left mounting plate as an example, a plurality of bolt holes are installed on the rear side of the mounting plate, three limiting grooves are opened on the front side of the mounting plate, and support rods are installed on the three limiting grooves, so three support rods are also provided.
[0011] Preferably: taking the uppermost support rod as an example, the support rod is embedded in the mounting plate; the support rod and the mounting plate are provided with limiting nuts on the front side and bolts on the rear side.
[0012] Preferably: a groove is formed at the right end of the support rod, a pressure plate is installed on the upper side of the groove, a fixing block is installed at the bottom of the pressure plate, and the fixing block is embedded in the groove; a telescopic spring rod is installed at the bottom of the left end of the pressure plate, and the telescopic spring rod passes through the support rod.
[0013] Technical effects and advantages of the utility model:
[0014] 1. The utility model provides a prefabricated concrete cable trench. When the cable is installed, the telescopic spring rod is squeezed upward, and the pressure plate moves upward under the action of the spring. The cable is placed in the gap between the pressure plate and the support rod, and the telescopic spring rod is released. Under the action of elasticity, the pressure plate presses the cable, thereby completing the installation of the cable. This method saves time and effort and avoids the tediousness of installing the cable.
[0015] 2. In the utility model, when installing the concrete cover, the concrete cover is aligned with the cover edge groove and pushed hard, so that the concrete cover can be moved backward under the action of the roller, and the installation task of the concrete cover can be completed without manual transportation and installation, thus saving manpower and material resources.
[0016] 3. The utility model can achieve the purpose of fixing the support rod by moving the support rod to a suitable position and then fixing it with bolts, thereby fixing the cables on the support rod. This method can adjust the height of the cable installation and the distance between the cables, thereby improving the flexibility during installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of a prefabricated concrete cable trench provided in an embodiment of the present application;
[0018] Figure 2 The present invention provides an explosion-proof method for a prefabricated concrete cable trench. Figure 1 ;
[0019] Figure 3 It is a structural schematic diagram of a cable installation mechanism in a precast concrete cable trench provided in an embodiment of the present application;
[0020] Figure 4 It is a structural schematic diagram of a precast concrete cable trench provided in an embodiment of the present application, in which a cable installation mechanism and a concrete cover are removed;
[0021] Figure 5 The present invention provides a method for exploding a prefabricated concrete cable trench. Figure 2 .
[0022] In the figure: 1. Cable trench body; 2. Concrete cover; 3. Docking groove; 4. Drainage groove; 5. Mounting plate; 6. Cover edge groove; 7. Roller; 9. Limit nut; 10. Support rod; 11. Telescopic spring rod; 12. Pressure plate; 13. Limit groove; 14. Bolt hole; 15. Mounting groove; 16. Fixing block. DETAILED DESCRIPTION
[0023] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations are obvious to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific purposes. Example
[0024] See also Figure 1 to Figure 5 In this embodiment, a prefabricated concrete cable trench is provided, including a cable trench main body 1, wherein a drainage groove 4 is installed on the lower side of the internal installation of the cable trench main body 1, and the drainage groove 4 can collect excess moisture in the cable trench main body 1. When there is a lot of moisture in the cable trench main body 1, it can be discharged through the drainage groove 4 to prevent excessive internal moisture from damaging the cable; the cable trench main body 1 is also equipped with a cable installation mechanism, which can facilitate the installation of cables; a concrete cover 2 is installed on the top of the cable trench main body 1; a concrete cover installation mechanism is also installed in the cable trench main body 1, which is mainly convenient for the installation of the concrete cover 2, and no manual handling and installation are required, saving manpower; the front side of the cable trench main body 1 is provided with left-right symmetrical docking grooves 3, which ensure that the front and rear prefabricated cable trench main bodies 1 are spliced flat, stable and tight, and the laying construction quality is ensured;
[0025] The concrete cover installation mechanism is installed on the top of the cable trench body 1, and the concrete cover installation mechanism includes a cover edge groove 6. The cover edge groove 6 is installed on the inner walls of the left and right sides of the cable trench body 1, which are symmetrical to each other. The bottom inner sides of the two cover edge grooves 6 are provided with installation grooves 15, and a number of rollers 7 are installed in the two installation grooves 15. When installing the concrete cover 2, align the concrete cover 2 with the cover edge groove 6 and push it hard, so that the concrete cover 2 can move to the rear side under the action of the rollers 7, and the installation task of the concrete cover 2 can be completed, without the need for manual transportation and installation, saving manpower and material resources;
[0026] A cable installation mechanism is installed at the bottom of the concrete cover installation mechanism, and the cable installation mechanism includes a mounting plate 5. The cable trench body 1 is internally installed with a mounting plate 5, and the mounting plates 5 are provided with four symmetrical ones; the settings on the four mounting plates 5 are exactly the same;
[0027] Taking the arrangement on the left mounting plate 5 as an example, a plurality of bolt holes 14 are installed on the rear side of the mounting plate 5, and three limiting grooves 13 are opened on the front side of the mounting plate 5. Support rods 10 are installed on the three limiting grooves 13, so there are also three support rods 10;
[0028] Taking the uppermost support rod 10 as an example, the support rod 10 is embedded in the mounting plate 5; the support rod 10 and the front side of the mounting plate 5 are installed with a limit nut 9, and the rear side is installed with a bolt, and the support rod 10 can move up and down in the mounting plate 5, and the limit nut 9 can prevent the support rod 10 from being separated from the mounting plate 5. When the support rod 10 is moved to a suitable position, it is fixed with bolts to achieve the purpose of fixing the support rod 10, and then fix the cables on the support rod 10. This method can adjust the height of the cable installation and the distance between the cables, thereby improving the flexibility during installation;
[0029] The right end of the support rod 10 is provided with a groove, a pressing plate 12 is installed on the upper side of the groove, a fixing block 16 is installed at the bottom of the pressing plate 12, and the fixing block 16 is embedded in the groove. When the pressing plate 12 is pressed downward, the fixing block 16 is embedded in the groove to prevent the pressing plate 12 from moving and increase stability.
[0030] A telescopic spring rod 11 is installed at the bottom of the left end of the pressing plate 12. The telescopic spring rod 11 passes through the supporting rod 10. When the cable is installed, the telescopic spring rod 11 is squeezed upward. Under the action of the spring, the pressing plate 12 moves upward, and the cable is placed in the gap between the pressing plate 12 and the supporting rod 10. When the telescopic spring rod 11 is released, the pressing plate 12 presses the cable under the action of elasticity, thereby completing the installation of the cable. This method saves time and effort and avoids the tediousness of installing the cable.
[0031] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. Structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to conventional means in the field unless otherwise specified and limited.
Claims
1. A prefabricated concrete cable trench, comprising a cable trench body (1), characterized in that: A drainage groove (4) is installed on the lower side of the interior of the cable trench body (1); The cable trench body (1) is also equipped with a cable installation mechanism; the top of the cable trench body (1) is equipped with a concrete cover (2); A concrete cover installation mechanism is also installed in the cable trench body (1); and a bilaterally symmetrical docking groove (3) is provided on the front side of the cable trench body (1).
2. A prefabricated concrete cable trench according to claim 1, characterized in that: The concrete cover installation mechanism is installed on the top of the cable trench body (1), and the concrete cover installation mechanism comprises a cover edge groove (6). The cover edge groove (6) is installed on the left and right inner walls below the top of the cable trench body (1), and symmetrical cover edge grooves (6) are opened. The bottom inner sides of the two cover edge grooves (6) are opened with installation grooves (15), and a plurality of rollers (7) are installed in the two installation grooves (15).
3. A prefabricated concrete cable trench according to claim 2, characterized in that: A cable installation mechanism is installed at the bottom of the concrete cover installation mechanism, and the cable installation mechanism comprises a mounting plate (5). The cable trench body (1) has a mounting plate (5) installed inside, and four mounting plates (5) are provided that are symmetrical on the left and right; the structural settings on the four mounting plates (5) are the same.
4. A prefabricated concrete cable trench according to claim 3, characterized in that: Taking the arrangement on the left mounting plate (5) as an example, a plurality of bolt holes (14) are installed on the rear side of the mounting plate (5), and three limiting grooves (13) are opened on the front side of the mounting plate (5). Support rods (10) are installed on the three limiting grooves (13), so three support rods (10) are also provided.
5. A prefabricated concrete cable trench according to claim 4, characterized in that: Taking the uppermost support rod (10) as an example, the support rod (10) is embedded in the mounting plate (5); a limiting nut (9) is installed on the front side of the support rod (10) and the mounting plate (5), and a bolt is installed on the rear side.
6. A prefabricated concrete cable trench according to claim 5, characterized in that: A groove is formed at the right end of the support rod (10), a pressing plate (12) is mounted on the upper side of the groove, a fixing block (16) is mounted on the bottom of the pressing plate (12), and the fixing block (16) is embedded in the groove; a telescopic spring rod (11) is mounted on the bottom of the left end of the pressing plate (12), and the telescopic spring rod (11) passes through the support rod (10).