Steel structure clean workshop double-layer suspended ceiling installation system

By adopting a double-layer ceiling installation system in the steel structure factory, the high air duct and high maintenance problems caused by single-layer ceiling are solved, and the design reduces shaking, achieving a more efficient and safe construction process.

CN222575899UActive Publication Date: 2025-03-07CHINA RAILWAY CONSTR ENG GRP INSTALLATION ENGI +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420916409.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2025-03-07
Estimated Expiration
2034-04-29

AI Technical Summary

Technical Problem

The single-story ceiling of the steel structure factory causes the air duct installation position to be higher, the workers' maintenance position is also higher, and the boom is too long and easily shaken.

Method used

The double-layer ceiling installation system of the steel structure clean factory is adopted, including the upper ceiling panel, a few-shaped connector, the main keel of the conversion layer, the lower hanging rod, the adjustment screw and the lower ceiling panel keel assembly. Through the design and layout of these components, the installation of the double-layer ceiling is realized, and the height of the air duct and workers' maintenance is reduced, and the overall shaking is reduced.

Benefits of technology

It realizes the convenience of installing a double-layer ceiling, reduces the installation height of the air duct and the maintenance height of workers, reduces overall shaking, and improves the efficiency and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222575899U_ABST
    Figure CN222575899U_ABST
Patent Text Reader

Abstract

The utility model relates to a steel structure clean workshop double-layer suspended ceiling installation system which comprises an upper layer suspended ceiling plate and an n-shaped connecting piece with a downward opening. The upper fixing plate is in a U shape, an opening of the upper fixing plate faces downwards, and the conversion layer main keels are horizontal and fixedly arranged on the two inner sides of the upper fixing plate at intervals. The upper end of the lower layer hanging rod penetrates through the upper fixing plate and is screwed on the upper fixing plate through a first nut, and the lower layer hanging rod passes through the space between the two conversion layer main keels and extends downwards; the lower fixing plate is U-shaped, is provided with an upward opening, is tightly attached to the bottom surface and the outer side surface of the transfer layer main keel, is penetrated by the lower suspender, and is screwed down by a second nut; the adjusting screw rod is fixedly connected to the lower end of the lower-layer suspender; the lower-layer ceiling plate keel assembly is fixedly connected to the lower end of the adjusting screw rod; the lower-layer suspended ceiling plate is fixed below the lower-layer suspended ceiling plate keel assembly; and the air pipe is fixedly arranged on the lower layer ceiling plate keel assembly. The double-layer suspended ceiling is convenient to install.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of suspended ceilings in steel structure workshops, in particular to a double-layer suspended ceiling installation system for clean workshops with steel structures. Background Art

[0002] For example, China Utility Model Patent Publication No. CN 219411471 U discloses a detachable ceiling system for a clean room, including: ceiling panels, ceiling keels and aluminum in the middle, the ceiling panels overlap the ceiling keels, and adjacent ceiling panels are connected through the aluminum in the middle; the ceiling keel includes: a keel body, a supporting arm and a connecting arm, the keel body connects the supporting arm and the connecting arm, and the supporting arm overlaps the ceiling panels. In the prior art, a single-layer ceiling of a steel structure factory building will result in a higher installation position for the air duct and a higher maintenance position for workers. If the suspension rod is extended to lower the height, the suspension rod is too long and is more likely to shake. Utility Model Content

[0003] The technical problem to be solved by the utility model is to provide a double-layer ceiling installation system for a steel structure clean workshop, which can facilitate the installation of the double-layer ceiling, lower the installation height of the air duct, reduce the maintenance height of workers, and reduce shaking.

[0004] In order to solve the above problems, a double-layer ceiling installation system for a steel structure clean workshop is adopted, which includes:

[0005] Upper ceiling panels;

[0006] The "X"-shaped connector has its opening facing downward and is fixedly arranged at the four corners of the upper ceiling board;

[0007] The upper fixing plate is U-shaped with the opening facing downwards.

[0008] The main keel of the transfer layer is horizontal and fixed at intervals on both inner sides of the upper fixed plate;

[0009] The lower layer suspension rod, the upper end of which passes through the upper fixing plate and is tightened on the upper fixing plate by a first nut, passes between the two transfer layer main keels and extends downward;

[0010] The lower fixing plate is U-shaped with the opening facing upwards, is closely attached to the bottom and outer side of the main keel of the transfer layer, is passed through by the lower layer suspension rod, and is tightened from below by the second nut;

[0011] An adjusting screw rod is fixedly connected to the lower end of the lower suspension rod;

[0012] A lower ceiling board keel assembly is fixed to the lower end of the adjusting screw;

[0013] A lower ceiling panel is fixed below the keel assembly of the lower ceiling panel;

[0014] The air duct is fixedly arranged on the keel assembly of the lower ceiling panel.

[0015] With such a structure, the upper horizontal surface of the "X"-shaped connector increases the force-bearing area, makes the force uniform, and reduces shaking. The upper fixed plate and the lower fixed plate clamp the transition layer keel in the middle, making the installation of the transition layer keel more stable. The adjusting screw facilitates height adjustment. The air duct is installed on the keel assembly of the lower ceiling panel to reduce the installation height, which reduces the maintenance height and is convenient for workers to inspect.

[0016] As a further improvement of the utility model, a transfer layer main keel filling plate is arranged between two opposite transfer layer main keels respectively fixed on two lower layer suspension rods.

[0017] With such a structure, the main keel filling plate of the transfer layer further limits the lateral displacement relative to the main keel of the transfer layer, further reducing the overall shaking.

[0018] As a further improvement of the utility model, the folded edges on both sides of the "X"-shaped connecting piece are fixed to the upper fixing plate by fixing screws.

[0019] As a further improvement of the utility model, bolts are passed through the four corners of the upper ceiling plate and the "X"-shaped connectors are fixed.

[0020] As a further improvement of the utility model, the lower ceiling panel adopts a steel plate painted blind panel.

[0021] As a further improvement of the utility model, the adjusting screw includes a square tube and a screw rod. The lower end of the lower suspension rod passes through the square tube and is tightened by the third nut; the upper end of the screw rod passes through the square tube and is tightened by the fourth nut.

[0022] As a further improvement of the utility model, a 30° inclined tie rod is provided between the main keel of the conversion layer and the keel assembly of the lower ceiling panel.

[0023] As a further improvement of the utility model, the main keel filler plate of the conversion layer is connected to the purlin on the side.

[0024] As a further improvement of the utility model, a fan filter unit (FFU) is installed at the bottom of the air duct.

[0025] The main beneficial effects of the utility model are: 1. All connecting components are welded without welding, the installation and connection are tight and the installation and disassembly are simple; 2. The overall shaking is small, which can effectively reduce the air leakage rate between the ceiling panels; 3. The double-layer ceiling is convenient for layered construction, which effectively reduces the collision problem of multi-professional construction processes to speed up the overall construction progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is the front view of the embodiment.

[0027] Figure 2 It is a right side view of the upper structure of the embodiment.

[0028] Figure numerals: 1, upper ceiling panel; 2, "J"-shaped connector; 3, upper fixing plate; 4, main keel of transition layer; 5, lower fixing plate; 6, lower suspension rod; 7, main keel filling plate of transition layer; 8, fixing screw; 9, adjusting screw; 91, square tube; 92, screw rod; 93, third nut; 94, fourth nut; 10, keel assembly of lower ceiling panel; 11, lower ceiling panel; 12, first nut; 13, second nut; 14, air duct; 15, bolt; 16, purlin; 17, fan filter unit. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] In the description of the present utility model, it should be noted that the orientations or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0031] Example 1

[0032] A double-layer ceiling installation system for a steel structure clean workshop, comprising:

[0033] Upper ceiling panel 1;

[0034] The "X"-shaped connecting piece 2 has its opening facing downward and is fixedly arranged at the four corners of the upper ceiling plate 1;

[0035] The upper fixing plate 3 is U-shaped with its opening facing downward.

[0036] The main keels 4 of the transfer layer are horizontal and fixedly arranged at intervals on both inner sides of the upper fixed plate 3;

[0037] The lower layer suspension rod 6, the upper end of which passes through the upper fixing plate 3 and is tightened on the upper fixing plate 3 by the first nut 12, passes between the two transfer layer main keels 4 and extends downward;

[0038] The lower fixing plate 5 is U-shaped and has an opening facing upwards. It is in close contact with the bottom and outer side of the main keel 4 of the transfer layer, and is passed through by the lower layer suspension rod 6 and is tightened from below by the second nut 13;

[0039] An adjusting screw rod 9 is fixedly connected to the lower end of the lower suspension rod 6;

[0040] The lower ceiling board keel assembly 10 is fixed to the lower end of the adjusting screw 9;

[0041] A lower ceiling panel 11, which is fixed below the lower ceiling panel keel assembly 10;

[0042] The air duct 14 is fixedly arranged on the keel assembly 10 of the lower ceiling panel.

[0043] With such a structure, the upper horizontal surface of the "X"-shaped connector 2 increases the force-bearing area, makes the force uniform, and reduces shaking. The upper fixed plate 3 and the lower fixed plate 5 clamp the middle conversion layer keel 4, making the conversion layer keel installation more stable. The adjusting screw 9 facilitates height adjustment. The air duct is installed on the lower ceiling panel keel assembly 10 to reduce the installation height, so that the maintenance height is reduced, which is convenient for workers to inspect.

[0044] In this embodiment, a transfer layer main keel filling plate 7 is arranged between two opposite transfer layer main keels 4 respectively fixed on two lower layer suspension rods 6 .

[0045] With such a structure, the transfer layer main keel filling plate 7 further limits the lateral displacement relative to the transfer layer main keel 4, further reduces the overall shaking, and reduces the degree of shaking.

[0046] In this embodiment, the folded edges on both sides of the X-shaped connecting member 2 are fixed to the upper fixing plate 3 by fixing screws 8 .

[0047] In this embodiment, bolts 15 are passed through the four corners of the upper ceiling panel 1 and the X-shaped connectors 2 are fixed.

[0048] In this embodiment, the lower ceiling panel 11 is a steel plate painted blind panel.

[0049] In this embodiment, the adjusting screw 9 includes a square tube 91 and a screw rod 92 . The lower end of the lower suspension rod 6 passes through the square tube 91 and is tightened by the third nut 93 . The upper end of the screw rod 92 passes through the square tube 91 and is tightened by the fourth nut 94 .

[0050] In this embodiment, a 30° inclined tie rod is provided between the main keel 4 of the transfer layer and the keel assembly 10 of the lower ceiling panel.

[0051] In this embodiment, the side of the main keel filling plate 7 of the transfer layer is connected to the purlin 16 .

[0052] In this embodiment, a fan filter unit (FFU) 17 is installed at the bottom of the air duct 14 .

[0053] The assembly method of this embodiment is as follows: the upper ceiling panel 1 is fixed to the top of the main keel 4 of the transfer layer by an "X"-shaped connecting piece 2, and an "X"-shaped connecting piece 2 is placed at each of the four corners of the upper ceiling panel 1 to connect to the main keel 4 of the lower transfer layer, and then connected to the upper ceiling panel by bolts 15; the lower suspension rod 6 is connected to the main keel 4 of the transfer layer by fixing steel plate bolts above and below, the lower suspension rod 6 extends downward and is lengthened by adjusting screw rod 9, and then is connected and fixed to the keel assembly 10 of the lower ceiling panel. In order to prevent the lower ceiling panel 11 from shaking, a 30° inclined tie rod can be made (the suspension rods of electromechanical pipelines can be connected to the transfer layer in this way).

[0054] The main beneficial effects of this embodiment are: 1. All connecting components are welded without welding, the installation connections are tight and the installation and disassembly are simple; 2. The overall shaking is small, which can effectively reduce the air leakage rate between the ceiling panels; 3. The double-layer ceiling is convenient for layered construction, which effectively reduces the collision problem of multi-professional construction processes to speed up the overall construction progress.

[0055] The above contents are further detailed descriptions of the present invention in combination with specific preferred implementations, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For technicians in the technical field to which the present invention belongs, several equivalent substitutions or obvious variations can be made without departing from the concept of the present invention, and the performance or use is the same, which should be regarded as belonging to the protection scope of the present invention.

Claims

1. A double-layer ceiling installation system for a steel structure clean workshop, characterized in that include: Upper ceiling panel (1); A cross-shaped connecting piece (2) with its opening facing downward and fixedly arranged at the four corners of the upper ceiling plate (1); The upper fixing plate (3) is U-shaped with its opening facing downward. The main keels (4) of the transfer layer are horizontal and fixedly arranged at intervals on the two inner sides of the upper fixing plate (3); A lower layer suspension rod (6), the upper end of which passes through the upper fixing plate (3) and is tightened on the upper fixing plate (3) through a first nut (12), and passes between two transfer layer main keels (4) and extends downward; A lower fixing plate (5) is U-shaped and has an opening facing upwards. It is closely attached to the bottom and outer side of the main keel (4) of the transfer layer, and is passed through by the lower layer suspension rod (6) and is tightened from below by a second nut (13); An adjusting screw (9) fixedly connected to the lower end of the lower suspension rod (6); A lower ceiling panel keel assembly (10) fixedly connected to the lower end of the adjusting screw rod (9); A lower ceiling panel (11), which is fixed below the lower ceiling panel keel assembly (10); The air duct (14) is fixedly arranged on the lower ceiling board keel assembly (10).

2. According to claim 1, the double-layer ceiling installation system for a steel structure clean workshop is characterized in that A transfer layer main keel filling plate (7) is arranged between two opposite transfer layer main keels (4) respectively fixed on two lower layer suspension rods (6).

3. According to claim 1, the double-layer ceiling installation system for a steel structure clean workshop is characterized in that The folded edges on both sides of the "X"-shaped connecting member (2) are fixed to the upper fixing plate (3) by means of fixing screws (8).

4. According to claim 1, the double-layer ceiling installation system for a steel structure clean workshop is characterized in that Bolts (15) are passed through the four corners of the upper ceiling plate (1) and the "X"-shaped connecting pieces (2) are fixed thereto.

5. According to claim 1, the double-layer ceiling installation system for a steel structure clean workshop is characterized in that The lower ceiling panel (11) is a steel plate painted blind panel.

6. The double-layer ceiling installation system for a steel structure clean workshop according to claim 1 is characterized in that The adjusting screw (9) comprises a square tube (91) and a screw rod (92); the lower end of the lower suspension rod (6) passes through the upper side of the square tube (91) and is tightened by a third nut (93); the upper end of the screw rod (92) passes through the lower side of the square tube (91) and is tightened by a fourth nut (94).

7. The double-layer ceiling installation system for a steel structure clean workshop according to claim 1 is characterized in that A 30° inclined tie rod is provided between the main keel (4) of the transfer layer and the keel assembly (10) of the lower ceiling panel.

8. The double-layer ceiling installation system for a steel structure clean workshop according to claim 2 is characterized in that The main keel filler plate (7) of the transfer layer is laterally connected to the purlin (16).

9. The double-layer ceiling installation system for a steel structure clean workshop according to claim 1 is characterized in that A fan filter unit (17) is installed at the bottom of the air duct (14).

Citation Information

Patent Citations

  • Detachable suspended ceiling system for clean room

    CN219411471U