Steel pipe pole structure for line erection
By designing positioning components, hole slide rods and tensile springs in the steel pipe rods, the problem of difficulty in installing existing steel pipe rods is solved, and the rapid alignment and connection between steel pipes is achieved, and the installation efficiency and connection strength are improved.
Patent Information
- Application Number
- CN202421294454.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-06-07
AI Technical Summary
During the installation process, existing steel pipe rods are difficult to install due to the bulky and inconvenient flange connections, and it is difficult to achieve rapid alignment and connection.
A steel pipe rod structure including a positioning assembly, an opposing slide rod and a tensile spring is designed to achieve rapid alignment of the steel pipe by a positioning sleeve and fixture, and to quickly align the flange holes through the opposing slide rod and a tensile spring.
It realizes rapid alignment and connection between steel pipes, simplifies the installation process, and improves installation efficiency and connection strength.
Smart Images

Figure CN222576295U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electric power transmission line erection, in particular to a steel pipe pole structure for line erection. Background Art
[0002] With the sudden increase in urban electricity consumption, more and more 110kV high-voltage transmission lines will be built in urban areas. Since cable lines are expensive and cannot be widely used at present, overhead lines must be the main ones. The main characteristics of steel tube poles are large conductor cross-section, multiple voltages and circuits share the same pole, narrow corridors, often located beside the street or in isolated flower beds, and small root openings. Because steel tube poles occupy a small area and have beautiful shapes, they can be well integrated into the urban environment, so they are widely used in urban power supply construction. However, the load of transmission lines is getting higher and higher, and many ordinary steel tube poles can no longer withstand the load of high-voltage lines, especially at corners or terminals.
[0003] To improve the above problems, after searching, for example, a four-column steel pipe pole for high-voltage power transmission provided by patent announcement number CN203626360U includes: a pole body, which is formed by four steel pipe columns fixed by multiple horizontally arranged connecting parts; the connecting part is a square or rectangular frame, and its four corners are used to fix the four steel pipe columns of the pole body; a plurality of cross arms are provided at the upper part of the pole body for erecting transmission lines; the four corners of the connecting part are formed by a connecting part cylinder or a plurality of connecting part rings which are sleeved outside the steel pipe column and matched with the outer diameter of the steel pipe column; the steel pipe column is formed by multiple sections of steel pipes fixedly connected; the steel pipe is a seamless steel pipe or a straight seam welded pipe; every two sections of steel pipe can be fixedly connected by flanges; the inside of the square or rectangular frame of the connecting part is a grid structure formed by staggered steel pipes or steel rods; the four-column steel pipe pole can withstand a larger line load and can be used for the corners or terminals of the transmission line;
[0004] Another example is a single open-loop steel pipe pole for erecting power transmission and transformation lines disclosed in patent announcement number CN204663111U, which includes a vertically arranged main pipe, a plurality of cross arms arranged in the horizontal direction and connected to the main pipe at one end, the cross arms are arranged at different heights of the main pipe, each height position includes three cross arms, and the angle between the axes of two cross arms at each height position is 90°. The single open-loop steel pipe pole has a simple structure, beautiful appearance, and small footprint, and can be well applied to the needs of single open-loop lines and meet the needs of erecting power transmission lines.
[0005] Based on the above search, combined with the prior art, it is found that the steel pipe pole structure similar to the above disclosure in the prior art all uses flanges to connect multiple steel pipes. Since the steel pipes are large and heavy, it is difficult to align the flange holes between two steel pipes during installation, resulting in laborious installation. Therefore, a steel pipe pole structure for line erection is proposed to improve the above problem. Utility Model Content
[0006] The purpose of the present application is to provide a steel pipe pole structure for line erection to solve the problems raised in the above-mentioned background technology.
[0007] To achieve the above-mentioned purpose, the present application provides the following technical solution: a steel pipe pole structure for line erection, comprising a steel pipe and a connecting flange fixedly installed at the end of the steel pipe, and further comprising:
[0008] A positioning assembly, the positioning assembly is arranged at one end of the steel pipe, and the positioning assembly includes a fixing piece and a positioning sleeve;
[0009] The fixing piece is fixedly sleeved on the outside of the steel pipe, the positioning sleeve is installed on the side end of the fixing piece close to the connecting flange on that side, and the positioning sleeve extends toward one side of the connecting flange on that side, and the inner diameter of the positioning sleeve is consistent with the outer diameter of the connecting flange.
[0010] As a further supplement to the present solution, an inner edge of an end of the positioning sleeve away from the fixing member is configured as a chamfer.
[0011] As a further supplement to the present solution, the fixing piece is annularly arranged and fixedly sleeved on the outer side of the steel pipe, and the fixing piece is provided with connecting holes corresponding one to one with the flange holes on the connecting flange.
[0012] As a further supplement to this solution, a hole-matching component is installed on the fixing part, which includes a hole-matching slide rod and a tension spring. The hole-matching slide rod slides through one of the connecting holes, and the tension spring is fixed between the hole-matching slide rod and the end face of the fixing part away from the positioning sleeve.
[0013] As a further supplement to the present solution, a second chamfer is provided on the end of the hole slide rod away from the fixing piece.
[0014] As a further supplement to the present solution, bearings are installed on the outer sides of both ends of the steel pipe, and support seats are vertically installed on the outer walls of the bearings.
[0015] In summary, the technical effects and advantages of the utility model are:
[0016] 1. In the utility model, by providing a positioning sleeve, a bearing member and a support seat, during installation, the two steel pipes can be placed flat on the ground using the support seat. At this time, the steel pipes can be flexibly rotated so that the connecting flange on one side of one of the steel pipes is inserted into the positioning sleeve on the other steel pipe, thereby realizing rapid alignment between the two steel pipes.
[0017] 2. In the utility model, by providing a hole-aligning slide rod and a tension spring, after the connecting flange on one side of one of the steel pipes is inserted into the positioning sleeve on the other steel pipe, one of the steel pipes is rotated slightly. When one of the flange holes of the connecting flange on the steel pipe coincides with the hole-aligning slide rod, the hole-aligning slide rod is inserted into the flange hole under the action of the tension spring, so that the flange holes on the two connected connecting flanges are quickly aligned. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without paying any creative work.
[0019] Figure 1 It is a schematic diagram of a partial three-dimensional structure of this embodiment;
[0020] Figure 2 This is a schematic diagram of the structure in the present embodiment when the positioning component is removed;
[0021] Figure 3 It is a schematic diagram of the three-dimensional structure of the positioning component in this embodiment from one side perspective;
[0022] Figure 4 It is a schematic diagram of the three-dimensional structure of the positioning component in this embodiment from another side perspective.
[0023] In the figure: 1. steel pipe; 2. connecting flange; 3. fixing piece; 301. connecting hole; 4. positioning sleeve; 401. chamfer one; 5. hole matching component; 51. hole matching slide rod; 52. tension spring; 53. chamfer two; 6. bearing piece; 7. support seat. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] Example: Reference Figure 1-4A steel pipe pole structure for line erection shown in the figure includes a steel pipe 1 and a connecting flange 2 fixedly installed at the end of the steel pipe 1. The steel pipe pole is formed by connecting multiple steel pipes 1 through the connecting flange 2. In order to facilitate the rapid installation between two steel pipes 1, this solution provides a positioning assembly including a fixing part 3 and a positioning sleeve 4 at one end of the steel pipe 1.
[0026] Specifically, the fixing member 3 is fixedly sleeved on the outer side of the steel pipe 1, the positioning sleeve 4 is installed on the side end of the fixing member 3 close to the connecting flange 2 on that side, and the positioning sleeve 4 extends toward one side of the connecting flange 2 on that side, and the inner diameter of the positioning sleeve 4 is consistent with the outer diameter of the connecting flange 2.
[0027] The positioning sleeve 4 can limit and align the two steel pipes 1, so as to facilitate the quick connection between the two steel pipes 1.
[0028] Among them, the inner edge of the end of the positioning sleeve 4 away from the fixing member 3 is set as a chamfer 401, so that the connecting flange 2 on one side of one steel pipe 1 has a certain fault tolerance during the insertion of the positioning sleeve 4 on the other steel pipe 1, and the insertion is smoother.
[0029] Among them, the fixing member 3 is annularly arranged and fixedly sleeved on the outer side of the steel pipe 1. The fixing member 3 is provided with connecting holes 301 corresponding to the flange holes on the connecting flange 2. The annular fixing member 3 can enhance the connection strength between the two steel pipes 1.
[0030] In addition, in order to facilitate the rapid alignment of the flange holes on the two connected connecting flanges 2, a hole alignment component 5 is installed on the fixing part 3, and the hole alignment component 5 includes a hole alignment slide rod 51 and a tension spring 52. The hole alignment slide rod 51 slides through one of the connecting holes 301, and the tension spring 52 is fixed between the hole alignment slide rod 51 and the end face of the fixing part 3 away from the positioning sleeve 4.
[0031] After the connecting flange 2 on one side of one of the steel pipes 1 is inserted into the positioning sleeve 4, it is rotated slightly. When one of the flange holes of the connecting flange 2 on the steel pipe 1 coincides with the hole-aligning slide rod 51, the hole-aligning slide rod 51 is inserted into the flange hole under the action of the tension spring 52, so that the flange holes on the two connected connecting flanges 2 are quickly aligned.
[0032] Similarly, the end of the hole-matching slide rod 51 away from the fixing member 3 is provided with a chamfer 53, so that the hole-matching slide rod 51 has a certain fault tolerance during the process of being inserted into the flange hole, and the insertion is smoother.
[0033] Furthermore, bearing members 6 are installed on the outer sides of both ends of the steel pipe 1, and support seats 7 are vertically installed on the outer walls of the bearing members 6. The support seats 7 can be used to place the two steel pipes 1 flat on the ground. At this time, the steel pipes 1 can be flexibly rotated, thereby facilitating the rapid alignment and connection operations between the two steel pipes 1.
[0034] The working principle of the utility model is as follows: two steel pipes 1 are placed flat on the ground using a support seat 7. At this time, the steel pipes 1 can be flexibly rotated so that the connecting flange 2 on one side of one of the steel pipes 1 is inserted into the positioning sleeve 4 on the other steel pipe 1, thereby realizing rapid alignment between the two steel pipes 1. Then, one of the steel pipes 1 is rotated slightly. When one of the flange holes of the connecting flange 2 on the steel pipe 1 coincides with the hole-matching slide bar 51, the hole-matching slide bar 51 is inserted into the flange hole under the action of a tension spring 52, thereby realizing rapid alignment of the flange holes on the two connected connecting flanges 2. The above operation is suitable for a construction method in which a plurality of steel pipes 1 are first installed on the ground and then erected and fixed to the ground. In addition, the steel pipe 1 at the bottom can be fixed on the ground first, and then the steel pipes 1 can be installed sequentially from bottom to top, still through the positioning sleeve 4 and the hole-matching slide bar 51 for rapid connection.
[0035] Finally, it should be noted that the above is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims
1. A steel pipe pole structure for line erection, comprising a steel pipe (1) and a connecting flange (2) fixedly mounted on the end of the steel pipe (1), characterized in that: Also includes: A positioning assembly, the positioning assembly being arranged at one end of the steel pipe (1), the positioning assembly comprising a fixing member (3) and a positioning sleeve (4); The fixing member (3) is fixedly sleeved on the outer side of the steel pipe (1), and the positioning sleeve (4) is installed on the side end of the fixing member (3) close to the connecting flange (2) on that side, and the positioning sleeve (4) extends toward one side of the connecting flange (2) on that side, and the inner diameter of the positioning sleeve (4) is consistent with the outer diameter of the connecting flange (2).
2. The steel pipe pole structure for line erection according to claim 1, characterized in that: The inner edge of one end of the positioning sleeve (4) away from the fixing member (3) is arranged as a chamfer (401).
3. The steel pipe pole structure for line erection according to claim 1, characterized in that: The fixing member (3) is annularly arranged and fixedly sleeved on the outer side of the steel pipe (1). The fixing member (3) is provided with connection holes (301) corresponding one-to-one to the flange holes on the connection flange (2).
4. The steel pipe pole structure for line erection according to claim 3, characterized in that: A hole-matching component (5) is mounted on the fixing member (3), and the hole-matching component (5) comprises a hole-matching slide rod (51) and a tension spring (52). The hole-matching slide rod (51) slides through one of the connecting holes (301), and the tension spring (52) is fixed between the hole-matching slide rod (51) and the end surface of the fixing member (3) away from the positioning sleeve (4).
5. The steel pipe pole structure for line erection according to claim 4, characterized in that: The end of the hole-matching slide rod (51) away from the fixing member (3) is provided with a second chamfer (53).
6. The steel pipe pole structure for line erection according to claim 1, characterized in that: Bearings (6) are installed on the outer sides of both ends of the steel pipe (1), and a support seat (7) is vertically installed on the outer wall of the bearing member (6).
Citation Information
Patent Citations
Four-pillar steel tube pole for high voltage transmission
CN203626360U
A single ring -opening steel pipe pole for setting up power transmission and transformation circuit
CN204663111U