Building structure coating device
By designing the residual material recycling mechanism and fastening mechanism in the architectural structure coating device, the problem of difficulty in recycling excess coatings in existing devices is solved, and efficient recycling of raw materials and rapid fixation of equipment is achieved, making it easy to use.
Patent Information
- Application Number
- CN202420691207.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-04-07
AI Technical Summary
It is difficult for existing building structural adhesive spraying devices to recover excess paint during use, resulting in waste of raw materials.
A building structure coating device is designed, including a residual material recycling mechanism and a fastening mechanism. The residual material recovery mechanism uses the action of the piston and the connecting pipe to achieve multiple quantitative recovery of the residual material in the storage barrel through the coordination of the electric telescopic rod and the screw. The fastening mechanism quickly fixes the spraying equipment through the threaded action of the threaded rod and the threaded sleeve column.
The device can recover residual materials in multiple quantities, reduce waste of raw materials, and quickly fix the spraying equipment through a fastening mechanism, which facilitates the placement and use of the equipment.
Smart Images

Figure CN222595426U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building spraying devices, in particular to a building structure painting device. Background Art
[0002] Building structure refers to a spatial force-bearing system made of building materials in a building that is used to bear various loads or effects and acts as a skeleton. Building structures can be divided into concrete structures, masonry structures, steel structures, light steel structures, wooden structures and composite structures, depending on the different building materials used. During the production of various structural accessories, they need to be sprayed with anti-corrosion treatment to avoid structural corrosion during long-term use.
[0003] Publication No. CN215088343U discloses a construction structure adhesive spraying device. By setting a rotating worm, the worm drives the meshing worm wheel to rotate, and the two worm wheels drive the screw inside to rotate. By setting a limit sleeve, the two fixing plates drive the connecting pipe to move upward, and the hose is stretched, so that the height of the glue spraying hose can be flexibly adjusted. The rotating shaft is driven by rotating the handle, and the driving gear drives the driven gear to rotate. The driven gear drives the rotating tube inside to rotate, so that the angle of the glue spraying hose can be easily adjusted, which enhances the practicality of the device. The pump body is started, and the glue hose is drawn to pass the glue inside the glue tank through the glue discharge hose and the connecting pipe, and finally the glue spraying hose is sprayed, which is more convenient to use. However, the patent still has the following problems in actual use:
[0004] Although the construction structure adhesive spraying device uses a pump body and a glue extraction hose to move the glue in the glue bin through a glue discharge hose and a connecting pipe, and finally sprays it through a glue spray hose, it is not convenient to recycle excess paint in the device, thus causing a waste of raw materials.
[0005] A building structure painting device is proposed to solve the above problems. Utility Model Content
[0006] The utility model aims to provide a building structure painting device to solve the problem raised in the above-mentioned background technology that the glue in the glue bin is currently sprayed by a pump body and a glue extraction hose through a glue discharge hose and a connecting pipe, but it is not convenient to recycle the excess paint in the device, thereby causing a waste of raw materials.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a building structure coating device, comprising a residual material recovery mechanism, and an electric telescopic rod installed on one side of the residual material recovery mechanism;
[0008] A fastening mechanism is provided on one side of the top of the residual material recovery mechanism, and one side of the fastening mechanism is fixedly connected to one side of the material storage barrel;
[0009] Also includes:
[0010] The residual material recovery mechanism comprises a cart, one side of the top of the cart is fixedly connected to the electric telescopic rod, the output end of the electric telescopic rod is rotatably connected to a screw rod, the outer side of the screw rod is threadedly connected to a positioning sleeve, and the outer side of the positioning sleeve is provided with a sleeve;
[0011] The outer side of the sleeve is slidably connected to a container, one side of the container is fixedly connected to the cart, the inside of the container is fitted with a piston, one side of the piston is rotatably connected to the screw, and one end of the container away from the positioning sleeve is fixedly connected to a first connecting pipe;
[0012] A limiting groove is provided inside the first connecting tube, a spring is arranged inside the limiting groove, one end of the spring is fitted with a rubber ball, and the side of the rubber ball away from the spring is fitted with the limiting groove.
[0013] Preferably, the end of the first connecting tube away from the container is fixedly connected to a first hose, the end of the first hose away from the first connecting tube is fixedly connected to a water storage bottle, and the side of the container close to the first connecting tube is fixedly connected to a second connecting tube.
[0014] Preferably, one end of the second connecting pipe is fixedly connected to a second hose, one end of the second hose away from the second connecting pipe is fixedly connected to a material storage barrel, and a bottom end of the material storage barrel is fixedly connected to the cart.
[0015] Preferably, the fastening mechanism includes a support rod, one end of which is fixedly connected to a first cylinder, an outer side of the first cylinder is rotatably connected to a first clamping block, an end of the support rod away from the first cylinder is fixedly connected to a second cylinder, and an outer side of the second cylinder is rotatably connected to a connecting rod.
[0016] Preferably, one end of the connecting rod away from the second cylinder is fixedly connected to the third cylinder, the outer side of the third cylinder is rotatably connected to the second clamping block, one side of the second clamping block is fit-connected to the spraying equipment, and the side of the spraying equipment away from the second clamping block is fit-connected to the first clamping block.
[0017] Preferably, the connecting rod is fixedly connected to a fourth cylinder on one side close to the third cylinder, a connecting block is rotatably connected to the outer side of the fourth cylinder, and a threaded rod is rotatably connected to one side of the connecting block.
[0018] Preferably, the outer side of the threaded rod is threadedly connected with a threaded sleeve, and the outer side of the threaded sleeve is rotatably connected to the support rod.
[0019] Compared with the prior art, the beneficial effects of the utility model are as follows: the building structure coating device can quantitatively recover the residual materials multiple times by setting the residual material recovery mechanism, and can quickly clamp and fix the spraying equipment by setting the fastening mechanism, which is convenient for placing the spraying equipment. The specific contents are as follows:
[0020] 1. By setting a residual material recovery mechanism, the residual material can be quantitatively recovered multiple times. The threaded action between the positioning sleeve and the screw rod is used to drive the piston to move in the container. The maximum position of the piston in the container, that is, the maximum capacity of one recovery, can be determined by observing the scale on the surface of the container. The maximum position of the piston in the container, that is, the maximum capacity of one recovery, can be adjusted according to actual conditions. The electric telescopic rod drives the screw rod to move left and right, and the piston can be quickly pushed to move in the container. When the piston moves to the left, the pressure in the container is used to drive the rubber ball in the second connecting pipe to compress the spring so that the limiting groove in the second connecting pipe is connected, and the residual material in the storage barrel can be sucked into the container. At the same time, the pressure in the container is used to drive the rubber ball in the first connecting pipe to move downward and stretch the spring, so that the limiting groove in the first connecting pipe is disconnected, and the residual material in the first hose is prevented from flowing back into the container. When the piston moves to the right, the pressure in the container is used to drive the rubber ball in the second connecting pipe to move and block the limiting groove to prevent the residual material from flowing back into the storage barrel. At the same time, the pressure is used to drive the rubber ball in the first connecting pipe to move so that the internal limiting groove is connected, and multiple recovery of residual materials can be completed;
[0021] 2. By setting up a fastening mechanism, the spraying equipment can be quickly clamped and fixed, which is convenient for placing the spraying equipment. The threaded action between the threaded rod and the threaded sleeve is utilized to drive the connecting rod to rotate around the second cylinder, thereby changing the distance between the first clamping block and the second clamping block, and the position of the spraying equipment can be fixed. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 This is a schematic diagram of the front structure of the utility model;
[0023] Figure 2 For this utility model Figure 1 A schematic diagram of the enlarged structure of the residual material recovery mechanism;
[0024] Figure 3 For this utility model Figure 2 The enlarged structural diagram at A in the middle;
[0025] Figure 4 For this utility model Figure 2 The enlarged structural diagram at B in the middle;
[0026] Figure 5 This is a schematic diagram of the top view of the fastening mechanism of the utility model;
[0027] Figure 6It is a schematic diagram of the structure of the utility model in the separated state of the first clamping block and the second clamping block.
[0028] In the figure: 1. residual material recovery mechanism; 101. cart; 102. electric telescopic rod; 103. screw rod; 104. positioning sleeve; 105. sleeve; 106. container; 107. piston; 108. first connecting pipe; 109. limiting groove; 110. spring; 111. rubber ball; 112. first hose; 113. water storage bottle; 114. second connecting pipe; 115. second hose; 116. storage barrel; 2. fastening mechanism; 201. support rod; 202. first cylinder; 203. first clamping block; 204. second cylinder; 205. connecting rod; 206. third cylinder; 207. second clamping block; 208. fourth cylinder; 209. connecting block; 210. threaded rod; 211. threaded sleeve column; 212. spraying equipment. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the implementation regulations described are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0030] See also Figure 1-6 The utility model provides a technical solution: a building structure coating device, comprising a residual material recovery mechanism 1, and an electric telescopic rod 102 installed on one side of the residual material recovery mechanism 1; a fastening mechanism 2 is provided on one side of the top of the residual material recovery mechanism 1, and one side of the fastening mechanism 2 is fixedly connected to one side of the material storage barrel 116; the residual material recovery mechanism 1 comprises a trolley 101, one side of the top of the trolley 101 is fixedly connected to the electric telescopic rod 102, the output end of the electric telescopic rod 102 is rotatably connected to a screw rod 103, the outer side of the screw rod 103 is threadedly connected to a positioning sleeve 104, the outer side of the positioning sleeve 104 is sleeved with a sleeve 105, the threaded action between the positioning sleeve 104 and the screw rod 103 is utilized to drive the piston 107 to move in the container 106, and the maximum position of the piston 107 in the container 106, that is, the maximum capacity of one recovery, can be determined by observing the scale on the surface of the container 106;
[0031] The outer side of the sleeve 105 is slidably connected with a container 106, one side of the container 106 is fixedly connected to the cart 101, the interior of the container 106 is fitted with a piston 107, one side of the piston 107 is rotatably connected to the screw 103, and one end of the container 106 away from the positioning sleeve 104 is fixedly connected to a first connecting pipe 108, and the piston 107 is driven to move by an electric telescopic rod;
[0032] A limiting groove 109 is provided inside the first connecting tube 108, a spring 110 is arranged inside the limiting groove 109, one end of the spring 110 is closely connected to a rubber ball 111, and a side of the rubber ball 111 away from the spring 110 is closely connected to the limiting groove 109, and the limiting groove 109 can be blocked by controlling the position of the rubber ball 111;
[0033] A first hose 112 is fixedly connected to one end of the first connecting tube 108 away from the container 106, a water storage bottle 113 is fixedly connected to one end of the first hose 112 away from the first connecting tube 108, and a second connecting tube 114 is fixedly connected to one side of the container 106 close to the first connecting tube 108, and the internal structure of the second connecting tube 114 is consistent with that of the first connecting tube 108;
[0034] One end of the second connecting pipe 114 is fixedly connected to a second hose 115, and one end of the second hose 115 away from the second connecting pipe 114 is fixedly connected to a storage barrel 116, and the bottom end of the storage barrel 116 is fixedly connected to the cart 101. By providing the storage barrel 116, it is convenient to store the paint;
[0035] The fastening mechanism 2 includes a support rod 201, one end of the support rod 201 is fixedly connected to a first cylinder 202, the outer side of the first cylinder 202 is rotatably connected to a first clamping block 203, one end of the support rod 201 away from the first cylinder 202 is fixedly connected to a second cylinder 204, the outer side of the second cylinder 204 is rotatably connected to a connecting rod 205, and the second cylinder 204 is provided to facilitate limiting the position of the connecting rod 205;
[0036] One end of the connecting rod 205 away from the second cylinder 204 is fixedly connected to the third cylinder 206, the outer side of the third cylinder 206 is rotatably connected to the second clamping block 207, one side of the second clamping block 207 is fitted with a spraying device 212, the side of the spraying device 212 away from the second clamping block 207 is fitted with the first clamping block 203, and one end of the spraying device 212 is connected to the storage barrel 116;
[0037] The connecting rod 205 is fixedly connected to the fourth cylinder 208 on one side close to the third cylinder 206, and the outer side of the fourth cylinder 208 is rotatably connected to the connecting block 209, and one side of the connecting block 209 is rotatably connected to the threaded rod 210, and the outer side of the threaded rod 210 is threadedly connected to the threaded sleeve 211, and the outer side of the threaded sleeve 211 is rotatably connected to the support rod 201. The threaded action between the threaded rod 210 and the threaded sleeve 211 is utilized to drive the connecting rod 205 to rotate around the second cylinder 204, thereby changing the distance between the first clamping block 203 and the second clamping block 207.
[0038] Working principle: Before using this kind of building structure coating device, you need to check the overall condition of the device to make sure it can work normally. Figure 1 - Figure 6 As shown, when the spraying device 212 is not needed, it is placed between the first clamping block 203 and the second clamping block 207, and then the threaded rod 210 is rotated, and the threaded action between the threaded rod 210 and the threaded sleeve 211 is utilized to drive the connecting rod 205 to rotate around the second cylinder 204, thereby changing the distance between the first clamping block 203 and the second clamping block 207, and the position of the spraying device 212 can be fixed;
[0039] Secondly, when there is too much raw material in the storage barrel 116, the electric telescopic rod 102 is started to drive the screw rod 103 to move left and right, which can quickly push the piston 107 to move in the container 106. When the piston 107 moves to the left, the pressure in the container 106 drives the rubber ball 111 in the second connecting tube 114 to compress the spring 110 so that the limiting groove 109 in the second connecting tube 114 is connected, and the remaining material in the storage barrel 116 can be sucked into the container 106. At the same time, the pressure in the container 106 drives the rubber ball in the first connecting tube 108 111 moves downward and stretches the spring 110, so that the limiting groove 109 in the first connecting tube 108 is disconnected, preventing the residual material in the first hose 112 from flowing back into the container 106. When the piston 107 moves to the right, the pressure in the container 106 drives the rubber ball 111 in the second connecting tube 114 to move and block the limiting groove 109 to prevent the residual material from flowing back into the storage barrel 116. At the same time, the pressure drives the rubber ball 111 in the first connecting tube 108 to move, so that the internal limiting groove 109 is connected, and multiple recovery of the residual material can be completed.
[0040] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A building structure coating device, comprising a residual material recovery mechanism (1), and an electric telescopic rod (102) installed on one side of the residual material recovery mechanism (1); A fastening mechanism (2) is provided on one side of the top of the residual material recovery mechanism (1), and one side of the fastening mechanism (2) is fixedly connected to one side of the material storage barrel (116); It is characterized in that Also includes: The residual material recovery mechanism (1) comprises a trolley (101), one side of the top of the trolley (101) is fixedly connected to an electric telescopic rod (102), the output end of the electric telescopic rod (102) is rotatably connected to a screw rod (103), the outer side of the screw rod (103) is threadedly connected to a positioning sleeve (104), and the outer side of the positioning sleeve (104) is provided with a sleeve (105); The outer side of the sleeve (105) is slidably connected to a container (106), one side of the container (106) is fixedly connected to the trolley (101), the interior of the container (106) is fitted with a piston (107), one side of the piston (107) is rotatably connected to the screw rod (103), and one end of the container (106) away from the positioning sleeve (104) is fixedly connected to a first connecting pipe (108); A limiting groove (109) is provided inside the first connecting tube (108), a spring (110) is arranged inside the limiting groove (109), one end of the spring (110) is fitted and connected with a rubber ball (111), and the side of the rubber ball (111) away from the spring (110) is fitted and connected with the limiting groove (109).
2. A building structure coating device according to claim 1, characterized in that: The end of the first connecting tube (108) away from the container (106) is fixedly connected to a first hose (112), the end of the first hose (112) away from the first connecting tube (108) is fixedly connected to a water storage bottle (113), and the side of the container (106) close to the first connecting tube (108) is fixedly connected to a second connecting tube (114).
3. A building structure painting device according to claim 2, characterized in that: One end of the second connecting pipe (114) is fixedly connected to a second hose (115), and one end of the second hose (115) away from the second connecting pipe (114) is fixedly connected to a material storage barrel (116), and the bottom end of the material storage barrel (116) is fixedly connected to the trolley (101).
4. A building structure coating device according to claim 1, characterized in that: The fastening mechanism (2) comprises a support rod (201), one end of the support rod (201) is fixedly connected to a first cylinder (202), the outer side of the first cylinder (202) is rotatably connected to a first clamping block (203), one end of the support rod (201) away from the first cylinder (202) is fixedly connected to a second cylinder (204), and the outer side of the second cylinder (204) is rotatably connected to a connecting rod (205).
5. A building structure painting device according to claim 4, characterized in that: One end of the connecting rod (205) away from the second cylinder (204) is fixedly connected to the third cylinder (206), the outer side of the third cylinder (206) is rotatably connected to the second clamping block (207), one side of the second clamping block (207) is fittedly connected to the spraying device (212), and the side of the spraying device (212) away from the second clamping block (207) is fittedly connected to the first clamping block (203).
6. A building structure painting device according to claim 5, characterized in that: The connecting rod (205) is fixedly connected to a fourth cylinder (208) on one side close to the third cylinder (206), a connecting block (209) is rotatably connected to the outer side of the fourth cylinder (208), and a threaded rod (210) is rotatably connected to one side of the connecting block (209).
7. A building structure painting device according to claim 6, characterized in that: The outer side of the threaded rod (210) is threadedly connected to a threaded sleeve (211), and the outer side of the threaded sleeve (211) is rotatably connected to the support rod (201).
Citation Information
Patent Citations
Building structural adhesive spraying device
CN215088343U