Formwork reinforcing structure at construction joint position
By designing a construction joint position formwork reinforcement structure including wooden squares and fasteners in the narrow space of the prefabricated building, the problem of inability to enter for formwork reinforcement is solved, and the formwork reinforcement in the narrow space is realized, and the material use is flexible and economical.
Patent Information
- Application Number
- CN202421229892.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-05-31
AI Technical Summary
In prefabricated buildings, especially in the design of affordable housing and resettlement housing, the formwork reinforcement cannot be entered for narrow spaces caused by uneven settlement of the foundation, making it difficult to achieve formwork reinforcement at the construction joints.
A construction joint position formwork reinforcement structure is designed, including wooden squares and fasteners. The fasteners are composed of two steel bars, pulling screws and mountain-shaped snaps. The tightening is achieved by pulling screws passing through the formwork, and the wooden squares are arranged horizontally at the upper and lower ports of the formwork for reinforcement.
Through this structure, personnel can perform installation operations on the inside of the construction wall, solving the problem of reinforcement of formwork in narrow spaces, and the materials used can be taken as they are used, which is economical and practical at the construction site.
Smart Images

Figure CN222595516U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, in particular to a template reinforcement structure at a construction joint position. Background Art
[0002] With the development of prefabricated buildings in the country, more and more residential projects adopt prefabricated methods. Especially in the design of affordable housing and resettlement housing, two buildings are often built close together. In order to prevent the damage of the building due to uneven settlement of the foundation, vertical settlement joints need to be set. Because it is a prefabricated building, in order to meet the local assembly rate requirements during the design, two prefabricated shear walls were set at this location, which will cause a construction joint between the two prefabricated walls. Because it is at the settlement joint (200mm) position, the space is small and personnel cannot enter to reinforce the formwork. Utility Model Content
[0003] The utility model aims to overcome the defects of the prior art, provide a template reinforcement structure at the construction joint position, and solve the problem of reinforcing the template of a wall in a narrow space.
[0004] In order to solve the above technical problems, the utility model is achieved as follows:
[0005] A template reinforcement structure at a construction joint position is characterized in that it comprises wooden strips and fasteners; the wooden strips are longitudinally arranged at intervals on the template surface, the fasteners are transversely arranged on the upper part of the longitudinal wooden strips, and wooden strips are also transversely arranged at the upper and lower ports of the template.
[0006] The template reinforcement structure at the construction joint position is characterized in that the fastener is a pressure strip arranged on the longitudinal wooden strip.
[0007] The template reinforcement structure at the construction joint position is characterized in that the fasteners include two steel bars, a tension screw and a mountain-shaped clip, the two steel bars are transversely arranged on the upper part of the longitudinal wooden strips, the mountain-shaped clip is fixed on the two steel bars, and the tension screw is passed through the template to achieve fastening.
[0008] The template reinforcement structure at the construction joint position is characterized in that it also includes a plurality of reinforcement members, which are vertically welded at intervals on two steel bars for template reinforcement.
[0009] The template reinforcement structure at the construction joint position is characterized in that the reinforcement member is a φ10 steel bar.
[0010] The template reinforcement structure at the construction joint position is characterized in that steel pipes are welded to the two ends of the two steel bars for hanging the template and fixing the template.
[0011] The template reinforcement structure at the construction joint position is characterized in that triangular keys are arranged at intervals on the upper parts of the wooden squares arranged transversely at the upper and lower ends of the template.
[0012] The beneficial effects of the utility model are as follows: It can be seen from the above technical solution that the application provides a template reinforcement structure at the construction joint position, and the mountain-shaped buckle of the tension screw is directly welded to the steel bar and fixed with the template by screws, so that personnel can perform installation work on the inside of the construction wall, solving the problem of template reinforcement in a narrow space. And the materials used can be taken as needed at the construction site, which is economical and practical, and can be used in projects for template reinforcement in a narrow space. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The present invention is further described in detail below in conjunction with the accompanying drawings and implementation examples:
[0014] Figure 1 This is a schematic diagram of the structure of this application;
[0015] Figure 2 for Figure 1 Schematic diagram of the middle AA direction.
[0016] Figure 3 A schematic diagram of fasteners.
[0017] Figure 4 This is a schematic diagram of a mountain-shaped buckle. DETAILED DESCRIPTION
[0018] The technical solutions of the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments in the embodiments of the present application are within the scope of protection requested by the present application.
[0019] According to GB50007-2011 "Code for Design of Building Foundations", Table 7.3.2 stipulates that the width of settlement joints of buildings above five floors shall not be less than 120mm, and the minimum spacing for formwork reinforcement construction is also 120mm. Therefore, this construction method is suitable for formwork reinforcement in construction joints in narrow spaces (inaccessible to personnel) of buildings with five floors or more.
[0020] like Figure 1-4 As shown: a template reinforcement structure at a construction joint position, which includes wooden strips 1 and fasteners; the wooden strips are longitudinally arranged at intervals on the surface of a template 2, the fasteners are transversely arranged on the upper part of the longitudinal wooden strips, and wooden strips are also transversely arranged at the upper and lower port positions of the template.
[0021] Furthermore, the fastener is a pressure strip arranged on the longitudinal wooden strip.
[0022] Furthermore, the fastener includes two steel bars 3, a tension screw 4 and a mountain-shaped clip 5. The two steel bars are transversely arranged on the upper part of the longitudinal wooden strips. The mountain-shaped clip is fixed on the two steel bars, and fastening is achieved by passing the tension screw through the template.
[0023] Furthermore, it also includes a plurality of reinforcement members, which are vertically welded to two steel bars at intervals for template reinforcement.
[0024] Furthermore, the reinforcement member is a φ10 steel bar.
[0025] Furthermore, steel pipes 7 are welded to both ends of the two steel bars for hanging the formwork and fixing the formwork.
[0026] Furthermore, triangular keys 6 are provided at intervals on the upper parts of the wooden blocks arranged transversely at the upper and lower ends of the template.
[0027] Specifically, the device components used in the present application are composed of a template, a mountain-shaped clip for the tension screw, an ordinary steel pipe, steel bars and nuts.
[0028] The specific construction methods are as follows:
[0029] (1) The first step is preparation. The glued template (915*1830) is molded according to the design drawings.
[0030] (2) The second step is to splice the wood and the formwork. Use 40*90 wood, use the 90mm surface, and arrange it horizontally with a spacing of 200mm to strengthen the formwork. Use horizontal wood at the upper and lower ports to reinforce the formwork.
[0031] (3) The third step is to process the standardized steel pipe fastener. This device consists of two upper and lower φ22 steel bars, a mountain-shaped clip of a φ12 tension screw and a hexagonal nut. The upper and lower points of the concave and convex surface of the mountain-shaped clip are spot welded to the upper and lower two steel bars, and the hexagonal nut 8 is spot welded to the upper and lower straight surface of the mountain-shaped clip 9.
[0032] (4) The fourth step is to fix the fasteners to the formwork. Use the tension screws to tie and fasten the formwork. The fasteners and the formwork must fit tightly without shaking. Use φ10 steel bars and two φ22 steel bars to spot weld vertically for formwork reinforcement. Weld φ48 short steel pipes at the left and right ends for hanging the formwork and fixing the formwork.
[0033] (5) The fifth step is to use a wooden square to process a triangular key at the upper end of the template. The size is determined according to the spacing of the settlement joints, and the horizontal spacing range is 300~500. Function: Make the inner side of the template fit closely with the wall surface 10 and control the verticality of the template.
[0034] (6) The sixth step is to hoist the formwork. Use a tower crane to hoist the processed outer wall formwork to the construction site.
[0035] (7) The seventh step is to tighten the inner screw. On the inner side of the wall construction joint, first use the pre-processed template to close the mold, and then use the tension screw rod to find the outer fasteners from the inside and tighten them.
[0036] The above are only embodiments provided for the present application and are not intended to limit the present application. Although the present application is described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A construction joint position template reinforcement structure, characterized in that: It comprises wooden strips and fasteners; the wooden strips are longitudinally arranged on the template surface at intervals, the fasteners are transversely arranged on the upper part of the longitudinal wooden strips, and wooden strips are also transversely arranged at the upper and lower ports of the template.
2. A construction joint position template reinforcement structure according to claim 1, characterized in that: The fastener is a batten arranged on the longitudinal wood strip.
3. A construction joint position template reinforcement structure according to claim 1, characterized in that: The fastener comprises two steel bars, a tension screw and a mountain-shaped clip. The two steel bars are transversely arranged on the upper part of the longitudinal wooden strips. The mountain-shaped clip is fixed on the two steel bars and fastened by passing the tension screw through the template.
4. A construction joint position template reinforcement structure according to claim 1, characterized in that: The utility model also comprises a plurality of reinforcing members, which are vertically welded to two steel bars at intervals for reinforcing the formwork.
5. A construction joint position template reinforcement structure according to claim 1, characterized in that: The fastener is a φ10 steel bar.
6. A construction joint position template reinforcement structure according to claim 1, characterized in that: Steel pipes are welded to both ends of the two steel bars for hanging the formwork and fixing the template.
7. A construction joint position template reinforcement structure according to claim 1, characterized in that: Triangular keys are set at intervals on the upper part of the wooden planks arranged horizontally at the upper and lower ends of the template.