Water resource detection box with test tube protection mechanism

By designing a test tube protection mechanism in the water resource testing box, and fixing the sample test tubes with a rotary handle, a bidirectional screw and a mobile plywood structure, the problem of easy damage in the test tubes in the existing testing box is solved, and the safety and working efficiency of the testing box are improved.

CN222611759UActive Publication Date: 2025-03-14NANTONG IVERSON DETECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421305942.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2025-03-14
Estimated Expiration
2034-06-11

AI Technical Summary

Technical Problem

The existing water resource testing chamber lacks a test tube protection structure, which causes the sample test tubes to jitter, disengage or break during transportation and inspection.

Method used

A water resource detection box with test tube protection mechanism is designed, using a box body, box door, hinge, equipment storage groove, installation plate, fixed ply, bidirectional screw, rotary handle, mobile ply and arc-shaped groove structure. The two-way screw and mobile ply are driven to move through the rotary handle, and three rows of sample test tubes are fixed to avoid the test tube breaking out or friction.

Benefits of technology

It effectively avoids the risk of sample test tubes being disengaged, rubbed and dropped in the detection box, and improves the safety and working efficiency of the water resource detection box.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222611759U_ABST
    Figure CN222611759U_ABST
Patent Text Reader

Abstract

The utility model provides a water resource detection box with a test tube protection mechanism, and relates to the technical field of water resource detection boxes, the water resource detection box comprises a box body and a box door, the box body is internally provided with an apparatus storage groove, the box body is internally provided with a placing plate, the surface of the placing plate is provided with a placing notch, and the placing notch is provided with a test tube protection mechanism. By arranging the box body, the box door, the hinge, the equipment storage groove, the placing plate, the placing groove opening, the fixed clamping plate, the two-way lead screw, the rotating handle, the first movable clamping plate, the second movable clamping plate and the arc-shaped groove structure, when the rotating handle is rotated, the two-way lead screw can be driven to rotate, and the two-way lead screw drives the first movable clamping plate and the second movable clamping plate to move; the two groups of first movable clamping plates and second movable clamping plates can be matched with the fixed clamping plates to fix three rows of sample test tubes, so that the situation that the sample test tubes are separated from or rubbed with the test tube rack and are damaged due to the fact that the sample test tubes fall onto the ground can be effectively avoided, and the safety of the water resource detection box is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water resource detection boxes, in particular to a water resource detection box with a test tube protection mechanism. Background Art

[0002] Water resource testing refers to the measurement and investigation of the quantity, quality and changing laws of water resources. It is a scientific and technological means to study the distribution, changes, laws, development, utilization and protection conditions of water resources. When testing water resources, a water resource testing box is needed. Most of the existing water resource testing boxes directly place sample test tubes in test tube racks, and the test tube racks lack some structures to protect the test tubes. In the process of taking the sample test tubes to the inspection department for inspection, the sample test tubes are prone to shaking, which causes the sample test tubes to separate from or rub against the test tube racks, causing the sample test tubes to fall to the ground and cause the sample test tubes to be damaged. Improvements are needed. Utility Model Content

[0003] The purpose of the utility model is to solve the technical problems raised in the above background technology.

[0004] The utility model adopts the following technical scheme: a water resource detection box with a test tube protection mechanism, comprising a box body and a box door, an equipment storage slot is provided inside the box body, a placement plate is placed inside the box body, a placement slot is provided on the surface of the placement plate, a fixed splint is fixedly installed inside the box body, a two-way screw rod is rotatably connected inside the box body, a turning handle is fixedly installed on the surface of the two-way screw rod, a first movable splint and a second movable splint are threadedly connected on the surface of the two-way screw rod, arc grooves are provided on the surfaces of the first movable splint and the second movable splint, and a handle is rotatably connected to the surface of the box body.

[0005] Preferably, the number of the first movable splint and the second movable splint are both two groups, and the two groups of the first movable splint and the second movable splint are symmetrically distributed on the surface of the bidirectional screw. Here, when the handle is turned, the bidirectional screw can be driven to rotate, and the bidirectional screw drives the first movable splint and the second movable splint to move. The two groups of the first movable splint and the second movable splint can cooperate with the fixed splint to fix the three rows of sample test tubes, which can effectively prevent the sample test tubes from being separated from or rubbed against the test tube rack, and the sample test tubes from falling to the ground and causing the sample test tubes to be damaged, thereby improving the safety of the water resource detection box.

[0006] Preferably, the handle is in the shape of a valve, and the surface of the handle is provided with anti-skid patterns. Here, the anti-skid patterns can increase the friction between the hand and the handle, so that the staff can save time and effort when fixing the sample tube, and the valve-shaped handle further facilitates the staff to rotate the bidirectional screw.

[0007] Preferably, a hinge is rotatably connected between the box body and the box door, and a handle is fixedly installed on the surface of the box door. Here, the box door and the box body are connected by a hinge, and the handle is used to facilitate personnel to open the box door and use the water resource detection box, thereby improving work efficiency.

[0008] Preferably, the first movable splint and the second movable splint slide inside the box. Here, when the first movable splint and the second movable splint move, the box can just limit the first movable splint and the second movable splint, so that the first movable splint and the second movable splint are more stable.

[0009] Preferably, a fixing plate is fixedly installed inside the box, a spring is fixedly installed between the fixing plate and the placement plate, and a corner sleeve is fixedly installed on the surface of the box. Here, when the sample tube is placed in the water resource detection box, pressure will be generated on the placement plate, and the spring can absorb part of the pressure, effectively preventing the reaction force of the placement plate from damaging the sample tube. The installation of the corner sleeve can protect the water resource detection box and prevent the box from being damaged due to collision.

[0010] Preferably, the number of the corner sleeves is four groups, and the four groups of corner sleeves are symmetrically distributed in pairs at the four corners of the box body, and pads are fixedly installed on the surface of the corner sleeves. Here, the four groups of corner sleeves can protect the water resource detection box in four directions, and the installed pads can play an anti-slip role to prevent the water resource detection box from sliding when in use, causing the sample to spill.

[0011] Compared with the prior art, the advantages and positive effects of the utility model are:

[0012] The utility model discloses a box body, a box door, a hinge, an equipment storage slot, a placement plate, a placement notch, a fixed splint, a two-way screw rod, a turning handle, a first movable splint, a second movable splint, and an arc groove structure are provided. When the turning handle is turned, the two-way screw rod can be driven to rotate, and the two-way screw rod drives the first movable splint and the second movable splint to move. The two groups of the first movable splint and the second movable splint can cooperate with the fixed splint to fix the three rows of sample test tubes. This can effectively prevent the sample test tubes from being separated or rubbed from the test tube rack, and the sample test tubes from falling to the ground and causing the sample test tubes to be damaged, thereby improving the safety of the water resource detection box. By arranging anti-skid patterns, handles, and handle structures, the anti-skid patterns can increase the friction between the personnel's hands and the turning handle, so that the personnel can save time and effort when fixing the sample test tubes. The valve-shaped turning handle further facilitates the personnel to rotate the two-way screw rod. The box door is connected to the box body by a hinge, and then cooperates with the handle, which can facilitate the personnel to open the box door and use the water resource detection box, thereby improving work efficiency.

[0013] 2. In the utility model, by setting the corner sleeves, fixed plates, springs and pad strip structures, when the sample test tube is placed in the water resource detection box, pressure will be generated on the placement plate. The spring can absorb part of the pressure, effectively preventing the reaction force of the placement plate from damaging the sample test tube. The installation of the corner sleeves can protect the water resource detection box to avoid collisions that may cause damage to the box body. The four sets of corner sleeves can protect the water resource detection box in four opposite directions. The installed pad strips can play an anti-slip role to prevent the water resource detection box from sliding during use, causing the sample to spill. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A schematic diagram of a water resource detection box with a test tube protection mechanism is proposed for the utility model;

[0015] Figure 2 The utility model provides an internal schematic diagram of a water resource detection box with a test tube protection mechanism;

[0016] Figure 3 A schematic diagram of a bidirectional screw rod of a water resource detection box with a test tube protection mechanism is provided for the utility model;

[0017] Figure 4 A cross-sectional view of a water resource detection box with a test tube protection mechanism is proposed for the utility model;

[0018] Figure 5 The utility model provides a bottom view of a water resource detection box with a test tube protection mechanism.

[0019] Legend:

[0020] 1. Box body; 2. Box door; 3. Hinge; 4. Equipment storage slot; 5. Mounting plate; 6. Mounting notch; 7. Fixed splint; 8. Bidirectional screw rod; 9. Turning handle; 10. First movable splint; 11. Second movable splint; 12. Arc groove; 13. Anti-slip pattern; 14. Carrying handle; 15. Handle; 16. Corner sleeve; 17. Fixed plate; 18. Spring; 19. Pad strip. DETAILED DESCRIPTION

[0021] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0022] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0023] Embodiment 1

[0024] See also Figure 1-5 The utility model provides a technical solution: a water resource detection box with a test tube protection mechanism, including a box body 1 and a box door 2, an equipment storage slot 4 is provided inside the box body 1, a placement plate 5 is placed inside the box body 1, and a placement notch 6 is provided on the surface of the placement plate 5, a fixed clamping plate 7 is fixedly installed inside the box body 1, a bidirectional screw rod 8 is rotatably connected inside the box body 1, a turning handle 9 is fixedly installed on the surface of the bidirectional screw rod 8, a first movable clamping plate 10 and a second movable clamping plate 11 are threadedly connected on the surface of the bidirectional screw rod 8, and the first movable clamping plate 7 is fixedly installed inside the box body 1. The surfaces of the plate 10 and the second movable splint 11 are both provided with an arc groove 12, and the surface of the box body 1 is rotatably connected with a handle 14. The number of the first movable splint 10 and the second movable splint 11 is two groups, and the two groups of the first movable splint 10 and the second movable splint 11 are symmetrically distributed on the surface of the bidirectional screw rod 8. When the handle 9 is turned, the bidirectional screw rod 8 can be driven to rotate, and the bidirectional screw rod 8 drives the first movable splint 10 and the second movable plate to move. The two groups of the first movable splint 10 and the second movable splint 11 can cooperate with the fixed splint 7 to The three rows of sample test tubes are fixed, which can effectively prevent the sample test tubes from being separated or rubbed from the test tube rack, and the sample test tubes from falling to the ground and causing the sample test tubes to be damaged, thereby improving the safety of the water resource detection box. The shape of the turning handle 9 is valve-shaped, and the surface of the turning handle 9 is provided with anti-skid grooves 13. The anti-skid grooves 13 can increase the friction between the personnel's hands and the turning handle 9, making it more time-saving and labor-saving for personnel to fix the sample test tubes. The valve-shaped turning handle 9 further facilitates personnel to rotate the two-way screw rod 8, and the rotating connection between the box body 1 and the box door 2 There is a hinge 3, and a handle 15 is fixedly installed on the surface of the box door 2. The box door 2 is connected to the box body 1 through the hinge 3. Combined with the handle 15, it is convenient for people to open the box door 2 to use the water resource detection box, which improves work efficiency. The first movable splint 10 and the second movable splint 11 slide inside the box body 1. When the first movable splint 10 and the second movable splint 11 move, the box body 1 can just limit the first movable splint 10 and the second movable splint 11, so that the first movable splint 10 and the second movable splint 11 are more stable.

[0025] Embodiment 2

[0026] See also Figure 4-5A fixing plate 17 is fixedly installed inside the box body 1, and a spring 18 is fixedly installed between the fixing plate 17 and the placement plate 5. A corner sleeve 16 is fixedly installed on the surface of the box body 1. When the sample tube is placed in the water resource detection box, pressure will be generated on the placement plate 5. The spring 18 can absorb part of the pressure, effectively preventing the reaction force of the placement plate 5 from damaging the sample tube. The installation of the corner sleeve 16 can protect the water resource detection box to prevent collision from causing damage to the box body 1. There are four groups of corner sleeves 16, and the four groups of corner sleeves 16 are symmetrically distributed in pairs at the four corners of the box body 1. Pads 19 are fixedly installed on the surface of the corner sleeves 16. The four groups of corner sleeves 16 can protect the water resource detection box in four reverse directions. The installed pads 19 can play an anti-slip role to prevent the water resource detection box from sliding during use, causing the sample to spill.

[0027] Working principle: First, hold the handle 14 and place the water resource detection box on the ground of the platform, then open the box door 2, the box door 2 is connected to the box body 1 through the hinge 3, and then cooperate with the handle 15, it is convenient for personnel to open the box door 2 to use the water resource detection box, which improves work efficiency. Place the sample test tube on the surface of the placement plate 5, and then turn the handle 9. When the handle 9 is turned, it can drive the bidirectional screw rod 8 to rotate, and the bidirectional screw rod 8 drives the first movable splint 10 and the second movable splint 11 to move. The two sets of first movable splints 10 and second movable splints 11 can cooperate The fixed splint 7 is used to fix the three rows of sample test tubes. The anti-slip pattern 13 can increase the friction between the personnel's hands and the turning handle 9, making it more time-saving and labor-saving for the personnel to fix the sample test tubes. The valve-shaped turning handle 9 further facilitates the personnel to rotate the two-way screw rod 8. When the sample test tubes are placed in the water resource detection box, pressure will be generated on the placement plate 5. The spring 18 can absorb part of the pressure, effectively preventing the reaction force of the placement plate 5 from causing damage to the sample test tubes. The pad 19 at the bottom of the corner sleeve 16 can play an anti-slip role to prevent the water resource detection box from sliding during use, causing the sample to spill.

[0028] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A water resource detection box with a test tube protection mechanism, comprising a box body (1) and a box door (2), characterized in that: The box body (1) is provided with an equipment storage slot (4) inside, a placement plate (5) is placed inside the box body (1), a placement slot (6) is provided on the surface of the placement plate (5), a fixed clamping plate (7) is fixedly installed inside the box body (1), a bidirectional screw rod (8) is rotatably connected inside the box body (1), a turning handle (9) is fixedly installed on the surface of the bidirectional screw rod (8), a first movable clamping plate (10) and a second movable clamping plate (11) are threadedly connected on the surface of the bidirectional screw rod (8), an arc groove (12) is provided on the surface of the first movable clamping plate (10) and the second movable clamping plate (11), and a handle (14) is rotatably connected to the surface of the box body (1).

2. The water resource detection box with a test tube protection mechanism according to claim 1, characterized in that: The number of the first movable clamping plates (10) and the number of the second movable clamping plates (11) are both two groups, and the two groups of the first movable clamping plates (10) and the second movable clamping plates (11) are symmetrically distributed on the surface of the bidirectional screw rod (8).

3. The water resource detection box with a test tube protection mechanism according to claim 1, characterized in that: The shape of the turning handle (9) is valve-shaped, and the surface of the turning handle (9) is provided with anti-slip grooves (13).

4. The water resource detection box with a test tube protection mechanism according to claim 1, characterized in that: A hinge (3) is rotatably connected between the box body (1) and the box door (2), and a handle (15) is fixedly mounted on the surface of the box door (2).

5. The water resource detection box with a test tube protection mechanism according to claim 1, characterized in that: The first movable clamping plate (10) and the second movable clamping plate (11) slide inside the box body (1).

6. The water resource detection box with a test tube protection mechanism according to claim 1, characterized in that: A fixing plate (17) is fixedly installed inside the box body (1), a spring (18) is fixedly installed between the fixing plate (17) and the placement plate (5), and an angle sleeve (16) is fixedly installed on the surface of the box body (1).

7. The water resource detection box with a test tube protection mechanism according to claim 6, characterized in that: The number of the corner sleeves (16) is four groups, and the four groups of corner sleeves (16) are symmetrically distributed in pairs at the four corners of the box body (1), and pad strips (19) are fixedly installed on the surfaces of the corner sleeves (16).