Hydraulic engineering foundation pile

By designing control mechanisms, support plates and fixing mechanisms in foundation piles of water conservancy projects, the problem of poor fixing effect of foundation piles is solved, and higher stability and firm soil layer connection are achieved.

CN222614273UActive Publication Date: 2025-03-14HENAN DONGHENG MUNICIPAL ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420728610.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2025-03-14
Estimated Expiration
2034-04-10

AI Technical Summary

Technical Problem

The existing foundation piles of water conservancy projects have insufficient fixing effect, which are easy to shake and difficult to ensure perpendicularity to the ground during pile driving, resulting in a risk of inclination.

Method used

A water conservancy project foundation pile is designed, and a control mechanism is used to drive the turntable and insert rod movement through a rotating control rod, combining the support plate and the fixing mechanism to ensure that the pile body remains perpendicular during the pile driving process, and the pile body is fixed through the locking mechanism and the reciprocating mechanism to enhance stability.

Benefits of technology

It effectively improves the stability and fixing effect of the foundation pile, avoids shaking and inclination, and ensures the firm connection of the pile body in the soil layer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222614273U_ABST
    Figure CN222614273U_ABST
Patent Text Reader

Abstract

The hydraulic engineering foundation pile comprises a pile body, a supporting plate, a fixing mechanism, a sealing cover, an auxiliary mechanism, a locking mechanism, a reciprocating mechanism and a control mechanism, the supporting plate is arranged on the outer wall of the pile body, the fixing mechanism used in cooperation with the supporting plate is arranged on the upper side of the outer wall of the pile body, and the sealing cover is arranged at the upper end of the outer portion of the pile body. Two auxiliary mechanisms distributed up and down are arranged in the pile body, four locking mechanisms penetrating through the supporting plate are arranged on the supporting plate, four reciprocating mechanisms used in cooperation with the locking mechanisms are arranged above the supporting plate, and a control mechanism used in cooperation with the auxiliary mechanisms is arranged in the pile body. Compared with the prior art, the utility model has the advantages that the fixing mechanism is arranged, so that the pile body is prevented from inclining when being inserted into a soil layer and can be detached after being fixed, and the occupied area is saved; and the control mechanism is arranged, the stability of the pile body can be improved, and shaking is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy projects, in particular to a water conservancy project foundation pile. Background Art

[0002] A water conservancy engineering foundation pile is a foundation pile used for water conservancy engineering construction. When the upper soil layer is weak and cannot meet the bearing capacity and deformation requirements of the water conservancy engineering construction, and there is a good soil layer at the bottom, the pile is used to penetrate the weak soil layer to transfer the load of the water conservancy engineering construction to the lower soil layer with stronger bearing capacity, so as to improve the rigidity of the foundation. A water conservancy engineering construction foundation pile described in publication number CN217998138U is used to stably connect the pile body and the foundation through friction convex points and triangular wedge blocks to increase friction performance. The arc-shaped connecting plate will drive the reinforcing side rod to push out of the reinforcing hole, so that the reinforcing side rod enters the foundation soil, realizes the support and fixation of the pile body around the body, and avoids loosening and displacement. However, the prior art still has the following defects:

[0003] 1. In the prior art, fixed slide rails are provided on both sides of the top of the fixed plate, and fixed sliders are slidably connected to the fixed slide rails. An arc-shaped connecting plate is welded and fixed to one side of the top of the fixed slider, and a reinforcing side rod is welded and fixed to one side of the top of the arc-shaped connecting plate. The foundation pile is fixed by pushing the reinforcing side rod out of the pile body, but the running stroke of the side rod is limited, the fixing effect is general, and the foundation pile has the risk of shaking.

[0004] 2. In the prior art, a number of triangular wedge-shaped blocks are evenly welded and fixed on the top side of the pile tip on the outside of the pile body, and uneven friction bumps are evenly arranged on the outside of the pile tip to enhance the friction when the pile is inserted. However, when piling, the pile is not fixed properly and cannot be guaranteed to be perpendicular to the ground, so the pile may tilt. Utility Model Content

[0005] The technical problem to be solved by the utility model is to overcome the above-mentioned defects and provide a foundation pile for a water conservancy project.

[0006] In order to solve the above technical problems, the technical solution provided by the utility model is: a water conservancy project foundation pile, including a pile body, the outer wall of the pile body is provided with a support plate, the upper side of the pile body wall is provided with a fixing mechanism used in conjunction with the support plate, the upper end of the pile body is provided with a closing cover, two auxiliary mechanisms distributed up and down are provided inside the pile body, four locking mechanisms penetrating therethrough are provided on the support plate, four reciprocating mechanisms used in conjunction with the locking mechanisms are provided above the support plate, a control mechanism used in conjunction with the auxiliary mechanism is provided inside the pile body, the control mechanism includes a control rod, the control rod is rotatably connected to the bottom end of the pile body, a handle is provided on the top of the control rod, two turntables are sleeved on the control rod, four arc-shaped guide holes are opened on the turntable, four insertion rods are provided at the bottom end of the turntable, and a guide rod used in conjunction with the guide holes is provided on one side of the upper end of the insertion rod.

[0007] As an improvement, the fixing mechanism includes a fixing frame, which is movably connected to the outer side wall of the pile body, and four fixing rods are arranged at the bottom end of the fixing frame. The fixing frame and the support plate are provided with four limiting grooves on one side close to the pile body, and the outer side wall of the pile body is provided with four limiting strips used in conjunction with the limiting grooves.

[0008] As an improvement, the auxiliary mechanism includes a chassis, which is fixedly connected to the inner side wall of the pile body and sleeved on the control rod. The upper end of the chassis is provided with eight limit plates for cooperating with the insertion rod, and the outer side wall of the pile body is provided with eight through holes for cooperating with the insertion rod.

[0009] As an improvement, the locking mechanism includes a sleeve, which passes through the support plate and is movably connected thereto, an axle rod is arranged inside the sleeve, and the side walls of the axle rod are slidably connected to the reciprocating mechanism, fixed balls passing through the side walls are arranged on both sides of the outside of the sleeve, and a groove is opened at the lower end of the axle rod for cooperating with the fixed balls.

[0010] As an improvement, the reciprocating mechanism includes a fixed sleeve, which is sleeved on the shaft and fixedly connected to the sleeve, a baffle used in conjunction with the shaft is arranged inside the fixed sleeve, and springs used in conjunction with the shaft are arranged on the upper and lower sides of the baffle.

[0011] The advantages of the utility model compared with the prior art are: 1. The utility model is provided with a control mechanism inside the pile body, and the turntable can be driven to move by rotating the control rod, so that the insertion rod is pushed out of the pile body and inserted into the soil under the cooperation of the guide hole and the guide rod. Under the pressure of the soil layer, the position of the insertion rod is fixed, so that the pile body becomes firm and the stability is increased.

[0012] 2. The utility model has a support plate slidably connected to the outer side wall of the pile body. Before driving the pile body, the fixing rod on the lower side of the fixing frame is hammered into the soil layer. After ensuring that the fixing frame is parallel to the soil layer, the fixing frame is fixedly connected to the support plate through the cooperation of the locking mechanism and the reciprocating mechanism, so that the pile body is perpendicular to the soil layer. At the same time, the closing cover is hammered to move the limit strip along the fixing frame and the support plate, so that the pile body is vertically driven into the soil layer to prevent the pile body from tilting. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 The utility model is a three-dimensional schematic diagram of a foundation pile of a water conservancy project.

[0014] Figure 2 The utility model is a schematic top view of a foundation pile of a water conservancy project.

[0015] Figure 3 yes Figure 2 Cross-sectional view along the AA direction.

[0016] Figure 4 yes Figure 3 A magnified schematic diagram of center A.

[0017] Figure 5 The utility model is an exploded diagram of the internal structure of a foundation pile body of a water conservancy project.

[0018] Figure 6 The utility model is an exploded diagram of the external structure of a foundation pile body of a water conservancy project.

[0019] As shown in the figure: 1. Pile body; 2. Support plate; 3. Fixing mechanism; 31. Fixing frame; 32. Fixing rod; 33. Limiting groove; 34. Limiting strip; 4. Closing cover; 5. Auxiliary mechanism; 51. Chassis; 52. Limiting plate; 53. Through hole; 6. Locking mechanism; 61. Sleeve; 62. Shaft; 63. Fixed ball; 64. Groove; 7. Reciprocating mechanism; 71. Fixed sleeve; 72. Baffle; 73. Spring; 8. Control mechanism; 81. Control rod; 82. Handle; 83. Turntable; 84. Guide hole; 85. Insert rod; 86. Guide rod. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] In the description of the utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to specific circumstances.

[0022] Combined with Figure 1-6 , the utility model is further described in detail. A water conservancy project foundation pile comprises a pile body 1, and an annular support plate 2 is slidably connected to the outer side wall of the pile body 1, which can provide support force for the pile body 1 during movement. In order to prevent the pile body 1 from tilting during insertion into the soil layer, a fixing mechanism 3 used in conjunction with the support plate 2 is arranged on the upper side of the outer wall of the pile body 1. The fixing mechanism 3 comprises a fixing frame 31, which is movably connected to the outer side wall of the pile body 1, and four fixing rods 32 are fixedly connected to the bottom end of the fixing frame 31. The bottom end of the fixing rod 32 is conical, which is convenient for fixing it in the soil layer by hammering, and fixing the fixing frame 31 is fixed. Four limiting strips 34 are provided on the outer side wall of the pile body 1, and four limiting grooves 33 used in conjunction with the limiting strips 34 are provided on the inner walls of the fixing frame 31 and the support plate 2, which are used to limit the movement of the fixing frame 31 and the support plate 2 and improve the stability of the device.

[0023] A closing cover 4 is threadedly connected to the outer upper end of the pile body 1, so that the user can insert the pile body 1 into the deep soil layer by hammering the closing cover 4. The closing cover 4 is made of high-strength stainless steel to improve the durability of the device. At the same time, anti-slip grooves are provided on the upper side of the outer wall of the closing cover 4 to increase friction, so that the user can easily detach the pile body 1 by rotating it. In order to ensure that the pile body 1 can remain stable after being inserted into the soil layer and will not shake, which will affect subsequent projects, two auxiliary mechanisms 5 distributed up and down are fixedly connected inside the pile body 1. A control mechanism 8 used in conjunction with the auxiliary mechanism 5 is provided inside the pile body 1. The control mechanism 8 includes a control rod 81, which is rotatably connected to the bottom end of the pile body 1. When the control rod 81 is in the control A handle 82 is fixedly connected to the top of the rod 81, which is convenient for the user to adjust the movement of the control rod 81 by turning it. Two turntables 83 are sleeved on the control rod 81. The turntable 83 is fixedly connected to the control rod 81 and can rotate synchronously with the control rod 81. Four arc-shaped guide holes 84 are opened on the turntable 83. Four plug rods 85 are slidably connected to the bottom end of the turntable 83. The end of the plug rod 85 away from the control rod 81 is a pointed head, which is convenient for reducing the resistance encountered when inserted into the soil layer. In order to drive the plug rod 85 to move, a guide rod 86 is fixedly connected to one side of the upper end of the plug rod 85. The guide rod 86 is slidably connected to the inner wall of the guide hole 84, so that when the turntable 83 moves, the guide rod 86 can be pushed to move through the guide hole 84.

[0024] The auxiliary mechanism 5 can support the insertion rod 85 and at the same time limit its movement to a certain extent. The auxiliary mechanism 5 includes a chassis 51. The side wall of the chassis 51 is fixedly connected to the inner wall of the pile body 1. The chassis 51 is penetrated by the control rod 81 and is rotatably connected thereto. Eight limit plates 52 are provided at the upper end of the chassis 51. The limit plates 52 are grouped in pairs and evenly distributed on the upper side of the chassis 51. The opposite sides of two limit plates 52 in a group are slidably connected to the insertion rod 85 to prevent the insertion rod 85 from shifting during movement and affecting the fixation of the pile body 1. Eight through holes 53 are provided on the outer side wall of the pile body 1. There are four through holes 53 distributed on the upper and lower outer walls of the pile body 1, which are used in conjunction with the insertion rod 85 to facilitate its extension from the inside of the pile body 1.

[0025] In order to be able to dismantle the fixing frame 31 and the fixing rod 32 after the pile body 1 is fixed, so as to reduce the surface area occupied by the device, four locking mechanisms 6 are movably connected to the support plate 2 and penetrated therethrough, and the locking mechanism 6 includes a sleeve 61, which penetrates the support plate 2 and the fixing frame 31, and the side wall of the sleeve 61 is movably connected to the two, and a shaft rod 62 is slidably connected inside the sleeve 61, and a round cover is fixedly connected to the top end of the shaft rod 62 to facilitate the control of the movement of the shaft rod 62, and fixing balls 63 penetrating its side wall are movably connected to the outer ends of the sleeve 61, and the fixing balls 63 can be stuck in the bottom end of the support plate 2 when a part of the fixing balls 63 are extended out of the sleeve 61, thereby limiting the movement of the sleeve 61, and a groove 64 is provided at the lower end of the shaft rod 62, and the groove 64 can be used to temporarily store the fixing balls 63, so that they are retracted into the sleeve 61, so that the sleeve 61 can be inserted into or pulled out of the support plate 2 and the fixing frame 31.

[0026] In order to facilitate the control of the movement of the shaft 62, four reciprocating mechanisms 7 are movably connected above the support plate 2. The reciprocating mechanism 7 includes a fixed sleeve 71, which is sleeved on the shaft 62 and fixedly connected to the sleeve 61, and the bottom end of the fixed sleeve 71 is fixedly connected to the top of the fixed frame 31. A baffle 72 is fixedly connected inside the fixed sleeve 71. The baffle 72 is sleeved on the shaft 62 and slidably connected to it. Springs 73 are fixedly connected to the upper and lower sides of the baffle 72. The upper and lower ends of the spring 73 are respectively fixedly connected to the baffle 72 and the shaft 62, so as to provide a reaction force to push the shaft 62 to move.

[0027] When the utility model is implemented, the pile body 1 is first taken out, and its upper end is inserted from the bottom end of the fixing frame 31 along the limit strip 34. In this process, the support plate 2 is slid so that its upper end fits with the bottom end of the fixing frame 31, so that the fixing frame 31 corresponds to the fixing hole on the support plate 2, and then the shaft rod 62 is pressed to retract the fixing ball 63 into the sleeve 61, and then the sleeve 61 is inserted into the fixing hole to make it pass through the support plate 2 and the fixing frame 31. After the bottom end of the fixing sleeve 71 contacts the fixing frame 31, the shaft rod 62 is released. Under the action of the spring 73, the fixing ball 63 will be pushed to extend a part of the sleeve 61 again and be stuck at the bottom end of the support plate 2, so that the support plate 2 and the fixing frame 31 are fixed together, and then the pile body 1 is moved to the specified position so that the bottom end of the fixing rod 32 is in contact with the soil layer. Contact, then hammer the four corners of the fixing frame 31 respectively, insert the fixing rod 32 into the soil layer, in this process, keep the fixing frame 31 parallel to the soil layer, then hammer the closing cover 4, insert the pile body 1 into it in a state of vertical soil layer, after the insertion depth of the pile body 1 is appropriate, rotate the closing cover 4 to remove it, and then rotate the handle 82 to make the control rod 81 drive the turntable 83 to move, and push the insertion rod 85 to move through the guide hole 84, so that the insertion rod 85 extends out of the pile body 1 through the through hole opened on the side wall of the pile body 1, and is inserted into the surrounding soil layer, so that the pile body 1 is firmly fixed. After completion, pull the shaft 62 in the opposite direction to retract the fixing ball 63 into the sleeve 61, drive the sleeve 61 and the fixing sleeve 71 away from the support plate 2, and remove the fixing frame 31 from the pile body 1, and the use process of the device can be completed.

[0028] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.

Claims

1. A foundation pile for a hydraulic engineering project, comprising a pile body (1), characterized in that: The outer wall of the pile body (1) is provided with a support plate (2), the upper side of the outer wall of the pile body (1) is provided with a fixing mechanism (3) used in conjunction with the support plate (2), the upper end of the outer side of the pile body (1) is provided with a closing cover (4), the interior of the pile body (1) is provided with two auxiliary mechanisms (5) distributed up and down, the support plate (2) is provided with four locking mechanisms (6) passing through it, the upper part of the support plate (2) is provided with four reciprocating mechanisms (7) used in conjunction with the locking mechanisms (6), the interior of the pile body (1) is provided with a locking mechanism (8) used in conjunction with the auxiliary mechanisms (9), and the interior of the pile body (1) is provided with a locking mechanism (9) used in conjunction with the auxiliary mechanisms (10). A control mechanism (8) used in a pile structure (5), the control mechanism (8) comprising a control rod (81), the control rod (81) being rotatably connected to the bottom end of the pile body (1), a handle (82) being arranged at the top of the control rod (81), two rotating disks (83) being sleeved on the control rod (81), four arc-shaped guide holes (84) being opened on the rotating disk (83), four insertion rods (85) being arranged at the bottom end of the rotating disk (83), and a guide rod (86) being arranged at one side of the upper end of the insertion rod (85) for matching with the guide hole (84).

2. A water conservancy engineering foundation pile according to claim 1, characterized in that: The fixing mechanism (3) comprises a fixing frame (31), the fixing frame (31) being movably connected to the outer side wall of the pile body (1), four fixing rods (32) being arranged at the bottom end of the fixing frame (31), four limiting grooves (33) being arranged on the side of the fixing frame (31) and the supporting plate (2) close to the pile body (1), and four limiting strips (34) being arranged on the outer side wall of the pile body (1) for use with the limiting grooves (33).

3. A water conservancy engineering foundation pile according to claim 1, characterized in that: The auxiliary mechanism (5) comprises a chassis (51) which is fixedly connected to the inner side wall of the pile body (1) and sleeved on the control rod (81); the upper end of the chassis (51) is provided with eight limit plates (52) for use with the insertion rod (85); the outer side wall of the pile body (1) is provided with eight through holes (53) for use with the insertion rod (85).

4. A water conservancy engineering foundation pile according to claim 1, characterized in that: The locking mechanism (6) comprises a sleeve (61) which passes through the support plate (2) and is movably connected thereto; a shaft rod (62) is arranged inside the sleeve (61); a side wall of the shaft rod (62) is slidably connected to the reciprocating mechanism (7); fixed balls (63) passing through the side walls of the sleeve (61) are arranged on both sides of the outside; a groove (64) for cooperating with the fixed balls (63) is provided at the lower end of the shaft rod (62).

5. A water conservancy engineering foundation pile according to claim 1, characterized in that: The reciprocating mechanism (7) comprises a fixed sleeve (71), the fixed sleeve (71) is sleeved on the shaft (62) and fixedly connected to the sleeve (61), a baffle (72) for cooperating with the shaft (62) is arranged inside the fixed sleeve (71), and springs (73) for cooperating with the shaft (62) are arranged on the upper and lower sides of the baffle (72).

Citation Information

Patent Citations

  • Water conservancy project building foundation pile

    CN217998138U