Connecting structure of steel structure column and steel structure beam
By designing a connecting structure for steel structure columns and steel structure beams, using the combination of the second connecting block, connecting strip and third connecting column, the problem of supporting and supporting both sides of the bolt connection position in the prior art is solved, and a more stable and efficient connection installation is achieved.
Patent Information
- Application Number
- CN202421407986.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-20
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-06-20
AI Technical Summary
During the connection process of the existing steel structure columns and steel structure beams, users need to support and lift both sides of the bolted connection position, which makes it difficult to install individually and affect installation efficiency.
A connection structure is designed, wherein the second connecting block is inserted into the first mounting cavity while the connecting strip is inserted into the first reserved cavity. After the slot is connected, the third connecting column penetrates the first through hole and the second through hole, avoiding the need for the user to support and lift both sides of the bolt connection position.
The third connecting column replaces the bolts to pre-penetrate the connection position of the two adjacent steel beams, which improves the stability and load-bearing capacity of the connection, simplifies the installation process, and improves the installation efficiency.
Smart Images

Figure CN222614536U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of steel structures, in particular to a connection structure of a steel structure column and a steel structure beam. Background Art
[0002] The connection structure between steel structure columns and steel structure beams is usually achieved by welding, bolting or riveting. These connection methods ensure the stability and bearing capacity between steel structure columns and beams to meet the overall stability and safety requirements of the building structure. Bolt connection uses bolts and nuts to fix the columns and beams together, which is convenient for disassembly and maintenance.
[0003] A Chinese patent with publication number CN220117442U discloses a connection structure between a steel structure column and a steel structure beam, including a steel column, a first steel beam, a support, a second steel beam and a connecting plate. The steel column is the main supporting and installing structure of the whole. The support is fitted inside the steel column. The first steel beam is connected to the outer surface of one end of the support. By setting the connection between the steel structure column and the steel structure beam in a split type, it is easy to disassemble and assemble, and convenient for subsequent maintenance and replacement. The connection between the steel structure column and the steel structure beam is fitted with each other, and a reinforcing rod is provided and inserted into the inside. Not only is the connection end high in strength, but the force is more uniform, thereby improving the strength of the steel structure and increasing the overall practicality.
[0004] During the connection process of the steel structure column and steel structure beam connection structure of the above patent, when using bolts for the final connection and fixing, the user is required to support and lift both sides of the bolt connection position to improve the effect of the bolt connection. Single independent installation is more difficult, which affects the installation efficiency. Utility Model Content
[0005] The purpose of the utility model is to provide a connection structure between a steel structure column and a steel structure beam. When the second connection block is inserted into the first installation cavity, the connection strip will be inserted into the first reserved cavity. After the slot is connected, the third connection column passes through the first through hole and the second through hole, which can avoid the need for the user to support and lift both sides of the bolt connection position, thereby solving the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a connection structure of a steel structure column and a steel structure beam, comprising a steel beam and a steel column for support, a first extension plate welded to one end of the steel beam, a second extension plate welded to the other end of the steel beam, a second connecting block welded to the middle position of the upper end of the first extension plate, four connecting strips are arranged around the lower end of the second extension plate, and a first installation cavity for connection and combination is arranged in the middle position of the four connecting strips.
[0007] Preferably, a first through hole is provided through the middle positions of the four connecting strips, four first reserved cavities are provided around the outside of the second connecting block, second through holes are provided at the lower ends of the four first reserved cavities, and the second through holes pass through the first extension plate and extend to the upper and lower ends.
[0008] Preferably, a recessed second reserved cavity is provided at the lower end inside the first extension plate, a temporary connecting plate for auxiliary connection is provided at the lower end outside the second reserved cavity, and a third connecting column for connection is provided at the temporary connecting plate facing the four second through holes inside the first extension plate.
[0009] Preferably, a rotatable transmission disc is provided at a middle position of the temporary connection plate, and a sliding block is provided on a side of the transmission disc facing the first extension plate.
[0010] Preferably, a second installation cavity is provided in the middle of the second reserved cavity toward the first reserved cavity, and the position of the second installation cavity recessed in the first reserved cavity overlaps with the position of the sliding block.
[0011] Preferably, a sliding rail is arranged around one side of the outside of the second installation cavity, and limiting rings for limiting are arranged on both sides of one end of the sliding rail facing the outside.
[0012] Preferably, the first through hole at the upper end of the second extension plate is fixedly connected to one end of the third connecting column by bolts.
[0013] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0014] The utility model relates to a connection between two adjacent steel beams. First, a connecting strip is inserted into a first reserved cavity around a second connecting block. While being inserted, the second connecting block is inserted into the first installation cavity. Secondly, after being assembled, the temporary connecting plate drives the third connecting column to sequentially penetrate the second through hole in the first extension plate and the first through hole in the connecting strip. While driving the third connecting column to move, the sliding block is driven to be inserted into the second installation cavity, thereby restricting the temporary connecting plate. Finally, a bolt is embedded into the third connecting column through the first through hole, so that the bolt and the temporary connecting plate clamp and fix the connection position of the two adjacent steel beams, thereby improving the stability of the connection and the load-bearing capacity during subsequent use. The third connecting column replaces the bolts for subsequent connection to penetrate the connection position of the two adjacent steel beams in advance, thereby avoiding the generation of gaps between the two adjacent steel beams in the absence of bolt connection, resulting in poor bolt connection effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a three-dimensional diagram of the overall external structure of the utility model;
[0016] Figure 2It is an exploded view of the connection structure between the steel beam and the first installation groove of the utility model;
[0017] Figure 3 It is an exploded view of the connection structure between the steel beam and the second installation groove of the utility model;
[0018] Figure 4 This is a three-dimensional diagram of the external structure of the steel beam of the utility model;
[0019] Figure 5 It is a schematic diagram of the steps of connecting two steel beams of the utility model;
[0020] Figure 6 This is a cross-sectional view of the internal structure of the temporary connection plate of the utility model;
[0021] Figure 7 It is a schematic diagram of the external structure of the second reserved cavity of the utility model.
[0022] In the figure: 1. steel column; 2. steel beam; 3. first installation groove; 4. filling plate; 5. first connecting block; 6. first connecting column; 7. first extension plate; 8. second extension plate; 9. second connecting block; 10. first reserved cavity; 11. connecting strip; 12. first installation cavity; 13. first through hole; 14. second through hole; 15. gasket; 16. second connecting column; 17. pressing plate; 18. second reserved cavity; 19. temporary connecting plate; 20. third connecting column; 21. transmission plate; 22. connecting rod; 23. sliding block; 24. second installation cavity; 25. sliding rail; 26. limiting ring; 27. second installation groove. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] In order to solve the problem that during the connection process of the existing steel structure column and steel structure beam connection structure, when the bolts are used for the final connection and fixing, the user needs to support and hold up both sides of the bolt connection position to improve the effect of the bolt connection, and a single independent installation is difficult, which affects the installation efficiency, this embodiment provides the following technical solutions:
[0025] A connection structure between a steel structure column and a steel structure beam, comprising a steel beam 2 and a steel column 1 for supporting, such as Figure 1 and Figure 4As shown, a first extension plate 7 is welded to one end of the steel beam 2, a second extension plate 8 is welded to the other end of the steel beam 2, a second connection block 9 is welded to the middle position of the upper end of the first extension plate 7, four connection strips 11 are arranged around the lower end of the second extension plate 8, and a first installation cavity 12 for connection and combination is arranged in the middle position of the four connection strips 11. When combining two adjacent steel beams 2, the second connection block 9 is first inserted into the middle of the first installation cavity 12, and at the same time, the connection strip 11 is inserted into the outside of the first reserved cavity 10, and the temporary combination connection is completed through the card slot connection;
[0026] In this embodiment, the middle positions of the four connecting strips 11 are penetrated with a first through hole 13, the outer periphery of the second connecting block 9 is surrounded by four first reserved cavities 10, the lower ends of the four first reserved cavities 10 are all provided with a second through hole 14, and the second through hole 14 penetrates the first extension plate 7 and extends to the upper and lower ends, such as Figure 4 and Figure 5 As shown, when the two steel beams 2 are connected end to end, the center positions of the second through hole 14 and the first through hole 13 overlap, which is convenient for the subsequent rotation installation of the bolts and the connection between the two adjacent steel beams 2;
[0027] In this embodiment, a recessed second reserved cavity 18 is provided at the lower end of the first extension plate 7, a temporary connection plate 19 for auxiliary connection is provided at the lower end outside the second reserved cavity 18, and a third connection column 20 for connection is provided at the position of the temporary connection plate 19 facing the four second through holes 14 inside the first extension plate 7, and the third connection column 20 is welded and fixed to the temporary connection plate 19. Figure 5 and Figure 6 As shown, when the temporary connection plate 19 is installed and embedded in the second reserved cavity 18, the third connection column 20 will sequentially pass through the second through hole 14 and the first through hole 13 to complete the support of the connection position;
[0028] In this embodiment, a rotatable transmission plate 21 is provided in the middle of the temporary connection plate 19, and a sliding block 23 is provided on one side of the transmission plate 21 facing the first extension plate 7. Figure 6 and Figure 7 As shown, the sliding block 23 is welded and fixed to the position of the lower end of the center of the transmission disk 21 by a connecting rod 22. The rotation of the transmission disk 21 can directly drive the sliding block 23 to rotate through the connecting rod 22. A second installation cavity 24 is provided in the middle position of the second reserved cavity 18 toward the first reserved cavity 10. The position of the second installation cavity 24 recessed in the first reserved cavity 10 overlaps with the position of the sliding block 23. In the process of pressing the third connecting column 20, the sliding block 23 will be directly driven to embed into the second installation cavity 24.
[0029] In this embodiment, a sliding rail 25 is disposed around one side of the outside of the second installation cavity 24, and a limiting ring 26 for limiting is disposed on both sides of the end of the sliding rail 25 facing the outside. Figure 6 and Figure 7 As shown, the rotation of the transmission plate 21 can drive the sliding block 23 to slide in the sliding rail 25, and the connecting rod 22 will slide between the two limiting rings 26 while sliding, but the two limiting rings 26 will limit the second installation cavity 24 from being directly taken out, thereby fixing the temporary connecting plate 19 in the second reserved cavity 18;
[0030] In this embodiment, the first through hole 13 at the upper end of the second extension plate 8 is fixedly connected to one end of the third connecting column 20 by bolts. Figure 4 and Figure 5 As shown, the first extension plate 7 and the second extension plate 8 can be clamped by the penetration fixation of the bolts;
[0031] In this embodiment, a second mounting groove 27 is longitudinally arranged on one side of the steel column 1, and a first mounting groove 3 is longitudinally arranged on the other side of the steel column 1. Figure 1 and Figure 2 As shown, a first connection block 5 is provided at the lower end of the first installation groove 3, four first connection columns 6 are provided around the first connection block 5, and the first connection columns 6 and the first connection block 5 are welded and fixed to the steel column 1, and the protruding first connection column 6 and the first connection block 5 are used to connect with the second extension plate 8 at the position of the card slot, and the first connection block 5 is slidably inserted into the first installation cavity 12, and the first connection column 6 is inserted into the position of the first through hole 13 in the connection strip 11. The card slot connection and the subsequent connection can realize the connection between the steel beam 2 and the steel column 1;
[0032] In this embodiment, four second connecting columns 16 are arranged around the lower end of the second mounting groove 27, and the lower ends of the four second connecting columns 16 are welded and fixed to the steel beam 2 through gaskets 15. Figure 1 and Figure 3 As shown, when the first extension plate 7 at one end of the steel beam 2 is inserted into the second installation groove 27, the second connecting column 16 will pass through the second through hole 14 and extend into the first reserved cavity 10, and the gasket 15 will be stuck into the second reserved cavity 18, thereby improving the stability of the connection;
[0033] In this embodiment, a filling plate 4 is provided at the upper end of the first installation groove 3 and the second installation groove 27. Figure 1 , Figure 2 and Figure 3As shown, the filling plate 4 is fixedly connected to the steel column 1 by bolts, and a pressing plate 17 is provided at one end of the filling plate 4 facing the steel beam 2, and the pressing plate 17 is welded and fixed to the filling plate 4. After the filling plate 4 is fixed by bolts, the filling plate 4 will press the upper ends of the second extension plate 8 and the second connecting block 9 respectively through the pressing plate 17, thereby further improving the stability of the connection between the steel beam 2 and the steel column 1.
[0034] Working principle: When using the connecting structure to connect two adjacent steel beams 2, the second connecting block 9 at one end of one of the steel beams 2 is slidably placed in the first installation cavity 12 at the other end of the other steel beam 2. During the sliding combination process, the connecting strip 11 at the other end of the other steel beam 2 will be inserted into the first reserved cavity 10 around the second connecting block 9 at one end of one of the steel beams 2. After the combination, the temporary connecting plate 19 simultaneously drives the third connecting column 20 and the sliding block 23 to move toward the second reserved cavity 18. The temporary connecting plate 19 will be inserted into the second reserved cavity 18. While inserting, the third connecting column 20 will pass through the second through hole 14 and the first through hole 13 in turn, and the temporary connecting plate 19 will drive the connected connecting rod 22 and the sliding block 23 through the transmission disk 21 to be inserted into the second installation cavity 24. The transmission disk 21 is rotated. The rotation of the transmission disk 21 can drive the sliding block 23 to slide in the sliding rail 25 through the connecting rod 22. During the sliding process, Restricted by the limiting ring 26, the bolts are embedded from the first through hole 13 and rotated to the inside of the third connecting column 20, thereby completing the connection between the two adjacent steel beams 2. When one end of the steel beam 2 provided with the second connecting block 9 is installed to the second mounting groove 27 inside the steel column 1, it slides horizontally and longitudinally, so that the gasket 15 is embedded in the second reserved cavity 18, and the second connecting column 16 is embedded in the second through hole 14. When one end of the steel beam 2 provided with the connecting strip 11 is installed to the first mounting groove 3 inside the steel column 1, it also slides horizontally and longitudinally, so that the first connecting block 5 is inserted into the first mounting cavity 12, and the first connecting column 6 passes through the first through hole 13 inside the connecting strip 11. After the two ends of the steel beam 2 are respectively embedded in the first mounting groove 3 and the second mounting groove 27, the filling plate 4 is fixed to the surface of the steel column 1 and to the upper end of the outside of the steel beam 2 by bolts, so as to wrap and protect the exposed first mounting groove 3 and the second mounting groove 27.
[0035] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A connection structure between a steel structure column and a steel structure beam, comprising a steel beam (2) and a steel column (1) for supporting, characterized in that: A first extension plate (7) is welded to one end of the steel beam (2), a second extension plate (8) is welded to the other end of the steel beam (2), a second connection block (9) is welded to the middle position of the upper end of the first extension plate (7), four connection strips (11) are arranged around the lower end of the second extension plate (8), and a first installation cavity (12) for connection and combination is arranged in the middle position of the four connection strips (11).
2. The connection structure of a steel structure column and a steel structure beam according to claim 1, characterized in that: A first through hole (13) is provided through the middle positions of the four connecting strips (11), four first reserved cavities (10) are provided around the outside of the second connecting block (9), and a second through hole (14) is provided at the lower ends of the four first reserved cavities (10), and the second through hole (14) passes through the first extension plate (7) and extends to the upper and lower ends.
3. The connection structure of a steel structure column and a steel structure beam according to claim 2, characterized in that: A recessed second reserved cavity (18) is provided at the lower end inside the first extension plate (7), a temporary connection plate (19) for auxiliary connection is provided at the lower end outside the second reserved cavity (18), and a third connection column (20) for connection is provided on the temporary connection plate (19) facing the four second through holes (14) inside the first extension plate (7).
4. The connection structure of a steel structure column and a steel structure beam according to claim 3, characterized in that: A rotatable transmission disc (21) is arranged at the middle position of the temporary connection plate (19), and a sliding block (23) is arranged on a side of the transmission disc (21) facing the first extension plate (7).
5. The connection structure of a steel structure column and a steel structure beam according to claim 4, characterized in that: A second installation cavity (24) is provided in the middle of the second reserved cavity (18) toward the first reserved cavity (10), and the position of the second installation cavity (24) recessed in the first reserved cavity (10) overlaps with the position of the sliding block (23).
6. The connection structure of a steel structure column and a steel structure beam according to claim 5, characterized in that: A sliding rail (25) is arranged around one side of the outside of the second installation cavity (24), and limiting rings (26) for limiting are arranged on both sides of one end of the sliding rail (25) facing the outside.
7. The connection structure of a steel structure column and a steel structure beam according to claim 3, characterized in that: The first through hole (13) at the upper end of the second extension plate (8) is fixedly connected to one end of the third connecting column (20) by means of bolts.
Citation Information
Patent Citations
Connecting structure of steel structure column and steel structure beam
CN220117442U