Slag removal device for boiler of thermal power plant
By designing a thermal power plant boiler slag removal device including a slag removal box, push rack, rotating drum, slag removal rack, slag blowing tube and sealing plate, the problems of long cleaning time and low efficiency in the prior art are solved, and fast and efficient cleaning of coal ash on the inner wall of the boiler is achieved.
Patent Information
- Application Number
- CN202421034675.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-13
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-05-13
AI Technical Summary
The existing boiler slag removal device of thermal power plants needs to be disassembled and installed during cleaning, resulting in a long cleaning time and affecting the efficiency of slag removal.
A thermal power plant boiler slag removal device is designed, including a slag removal box, push rack, rotary drum, slag removal rack, slag blowing tube and sealing plate. By driving the push rack and rotating tube, the blowing air component and slag blowing tube are used to achieve rapid scraping and blowing cleaning of coal ash on the inner wall of the boiler by driving the push rack and the rotating tube, and combined with the blowing air component and slag blowing tube, it is possible to achieve rapid scraping and blowing cleaning of coal ash on the inner wall of the boiler.
The device can quickly clean coal ash from the inner side wall of the boiler, reduce cleaning time, improve slag removal efficiency, and avoid waste of time and efficiency due to disassembly and installation.
Smart Images

Figure CN222616922U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of slag removal devices, in particular to a slag removal device for a boiler in a thermal power plant. Background Art
[0002] Boiler refers to a medium-sized or large boiler in a power plant that provides a specified amount and quality of steam to the steam turbine. It is one of the main thermal equipment in a thermal power plant. After working for a long time, the boiler in a thermal power plant needs to use a slag removal device to clean the coal ash on the inner wall. However, the current slag removal device has a high cleaning cost and requires a lot of investment.
[0003] In order to reduce the cost of slag removal, after searching, the utility model with patent publication number CN219640283U discloses a slag removal device for a thermal power plant boiler. By setting a first ear sleeve, a ring seat, a driving motor, a transmission screw, a circular plate, an I-shaped slide rail, a sliding sleeve, a slag removal knife, a spiral sleeve, a connecting seat, a movable plate, a first L-shaped rod, a threaded sleeve and a second L-shaped rod and other structures, the spiral sleeve is rotated in cooperation with the connecting seat and the movable plate to make the sliding sleeves on both sides move to both sides along the I-shaped slide rail, thereby adjusting the slag removal knife to fit the inner wall of the boiler. Subsequently, the slag removal knife can be driven by the driving motor to scrape the coal slag on the inner wall of the boiler from bottom to top. Although it is convenient to clean the coal ash on the inside of the boiler, it is necessary to disassemble the furnace mesh first during cleaning and then install the furnace mesh after cleaning. The disassembly and installation are likely to waste a certain amount of time, which is easy to prolong the cleaning time and is likely to affect the subsequent slag removal efficiency of the thermal power plant boiler. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the deficiencies of the prior art, the utility model provides a boiler slag removal device for a thermal power plant to solve the problem in the background art that the cleaning time is long and the subsequent slag removal efficiency is easily affected.
[0006] (II) Technical solution
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a boiler slag removal device for a thermal power plant, comprising a slag removal box, a push frame, a rotating cylinder, a slag removal frame, a slag blowing pipe and a sealing plate;
[0008] The deslagging box is connected through one side of the boiler;
[0009] The pushing frame is slidably arranged in the slag removal box through a pushing seat;
[0010] The rotating cylinder is rotatably mounted on the pushing frame;
[0011] The slag removal rack is provided with two, and the two slag removal racks are symmetrically connected to the rotating cylinder;
[0012] The slag blowing pipes are arranged in a plurality, and the plurality of slag blowing pipes are respectively connected between the rotating cylinder and the two slag removing racks, and a blowing assembly is arranged on the pushing rack;
[0013] The number of the sealing plates is two, both of which are located on one side of the pushing frame, and the boiler is provided with a sealing opening matching the sealing plates.
[0014] Preferably, the push seat comprises:
[0015] An electric cylinder, wherein the electric cylinder is mounted on the outer wall of the slag removal box through a mounting plate, and an output end of the electric cylinder is connected through the slag removal box;
[0016] A connecting frame, the connecting frame is fixedly connected between the output end of the electric cylinder and the pushing frame;
[0017] The sliding plate is provided in two pieces, the two sliding plates are symmetrically connected to the connecting frame, and a sliding groove for the sliding plates to slide is provided on the inner side wall of the slag removal box.
[0018] Furthermore, the blowing assembly comprises:
[0019] A fan, the fan is installed on the pushing frame, the pushing frame is provided with a mounting slot matching the fan, and the output end of the fan is located in the rotating cylinder;
[0020] A sealing gasket is connected through the output end of the fan and is in rotational contact with the inner side wall of the rotating cylinder.
[0021] As a further solution of the present application, a motor is installed on the pushing frame, and the output end of the motor is fixedly connected to the rotating cylinder.
[0022] On the basis of the above-mentioned solution, the two slag removal frames are fixedly connected with anti-wear pads, and the two anti-wear pads are provided with a plurality of through openings matching the slag blowing pipes.
[0023] It should also be noted that two connecting rods are fixedly connected between the pushing frame and the adjacent sealing plates, and two connecting strips are fixedly connected between the two sealing plates.
[0024] (III) Beneficial effects
[0025] Compared with the prior art, the utility model provides a boiler slag removal device for a thermal power plant, which has the following
[0026] Beneficial effects:
[0027] 1. In the utility model, the pushing seat facilitates the pushing frame to be pushed in the slag removal box, so as to facilitate the pushing frame to be pushed into the boiler;
[0028] 2. In the utility model, when the push frame is moved to a suitable position in the boiler, the two slag removal frames are rotated by the rotating cylinder, so that the two slag removal frames drive the two anti-wear pads to rotate, thereby facilitating the scraping and cleaning of the coal ash on the inner wall of the boiler;
[0029] 3. In the utility model, while the slag removal rack is cleaning the coal ash on the inner wall of the boiler, the blowing assembly and the plurality of slag blowing pipes are used to blow and clean the coal ash on the inner wall of the boiler. At the same time, the scraping and blowing are used to vibrate and clean the coal ash on the inner wall of the boiler.
[0030] 4. Therefore, compared with the prior art, the cleaning time of the boiler slag removal device of the thermal power plant is longer, which is easy to affect the subsequent slag removal efficiency. It is convenient to quickly clean the coal ash on the inner wall of the boiler through the cooperation of the slag removal box, the pushing frame, the rotating cylinder, the slag removal frame, the slag blowing pipe and the sealing plate, so as to improve the slag removal efficiency of the thermal power plant boiler. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A schematic diagram of a three-dimensional structure cutaway of the present application;
[0032] Figure 2 It is a schematic diagram of the overall three-dimensional structure of this application;
[0033] Figure 3 This is a schematic diagram of the three-dimensional structure of the push frame, slag removal frame and slag blowing pipe in this application;
[0034] Figure 4 For this application Figure 3 Schematic diagram of the local enlarged structure at point A in the middle.
[0035] In the figure: 1. slag removal box; 2. boiler; 3. pushing frame; 4. rotating cylinder; 5. slag removal frame; 6. slag blowing pipe; 7. sealing plate; 8. electric cylinder; 9. mounting plate; 10. connecting frame; 11. sliding plate; 12. fan; 13. sealing pad; 14. motor; 15. anti-wear pad; 16. connecting rod; 17. connecting strip. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0037] See also Figures 1 to 4 A deslagging device for a boiler in a thermal power plant comprises a deslagging box 1, a pushing frame 3, a rotating drum 4, a deslagging frame 5, a slag blowing pipe 6 and a sealing plate 7. The deslagging box 1 is connected to one side of a boiler 2 through a push frame 3, a furnace net is installed in the boiler 2, the pushing frame 3 is slidably arranged in the deslagging box 1 through a pushing seat, and the pushing frame 3 is located on the upper side of the furnace net after moving into the boiler 2, the rotating drum 4 is rotatably installed on the pushing frame 3, two deslagging frames 5 are arranged, and the two deslagging frames 5 are symmetrically connected to the rotating drum 4, and a plurality of slag blowing pipes 6 are arranged, and the plurality of slag blowing pipes 6 are respectively connected between the rotating drum 4 and the Between the two slag removal frames 5, a blowing assembly is arranged on the pushing frame 3, two sealing plates 7 are arranged, the two sealing plates 7 are both located on one side of the pushing frame 3, and a sealing port matching the sealing plate 7 is opened on the boiler 2, and a sealing ring is fixedly connected at the sealing port to facilitate sealing the boiler 2, two connecting rods 16 are fixedly connected between the pushing frame 3 and the adjacent sealing plates 7, and two connecting strips 17 are fixedly connected between the two sealing plates 7, and the cooperation of the two connecting rods 16 and the two connecting strips 17 facilitates the simultaneous movement of the two sealing plates 7.
[0038] See also Figures 1 to 4 The push seat includes an electric cylinder 8, a connecting frame 10 and a sliding plate 11. The electric cylinder 8 is installed on the outer wall of the slag removal box 1 through the mounting plate 9, and the output end of the electric cylinder 8 is connected to the slag removal box 1 through the connecting frame 10. The connecting frame 10 is fixedly connected between the output end of the electric cylinder 8 and the push frame 3. The sliding plates 11 are provided in two numbers. The two sliding plates 11 are symmetrically connected to the connecting frame 10, and a sliding groove for the sliding plate 11 to slide is provided on the inner wall of the slag removal box 1, so as to increase the sliding stability of the connecting frame 10 in the slag removal box 1;
[0039] By pushing the connecting frame 10 through the electric cylinder 8, the connecting frame 10 can push the pushing frame 3, so that the pushing frame 3 can push the adjacent sealing plate 7 through the two connecting rods 16, thereby facilitating the pushing of another sealing plate 7 through the two connecting strips 17.
[0040] See also Figures 1 to 4 The blowing assembly includes a fan 12 and a sealing gasket 13. The fan 12 is installed on the pushing frame 3. The pushing frame 3 is provided with a mounting groove matching the fan 12. The output end of the fan 12 is located in the rotating cylinder 4. The sealing gasket 13 is connected to the output end of the fan 12 through and through, and the sealing gasket 13 is in rotational contact with the inner side wall of the rotating cylinder 4, which can reduce leakage of the fan 12 when blowing.
[0041] By blowing air into the rotating cylinder 4 through the fan 12 , the wind can be blown toward the inner wall of the boiler 2 through the multiple slag blowing pipes 6 , so as to blow and clean the coal ash on the inner wall of the boiler 2 .
[0042] See also Figures 1 to 4 A motor 14 is installed on the push frame 3, and the output end of the motor 14 is fixedly connected to the rotating cylinder 4. Anti-wear pads 15 are fixedly connected to the two slag removal frames 5, and the two anti-wear pads 15 are provided with multiple through holes matching the slag blowing pipe;
[0043] By rotating the rotating drum 4 through the motor 14, the rotating drum 4 can rotate the two slag removal racks 5, so that the coal ash on the inner wall of the boiler 2 can be scraped and cleaned by the two slag removal racks 5 and the two anti-wear pads 15, and it is also convenient to vibrate and clean other parts of the inner wall of the boiler 2.
[0044] To sum up, when it is necessary to clean the coal ash on the inner wall of the boiler 2 of the thermal power plant boiler slag removal device, the electric cylinder 8 pushes the connecting frame 10, so that the connecting frame 10 pushes the pushing frame 3, so that the pushing frame 3 pushes the two sealing plates 7 through the two connecting rods 16 and the two connecting strips 17, so that the sealing port can be exposed. When the pushing frame 3 moves into the boiler 2 through the sealing port and is adjusted to a suitable position, the motor 14 and the fan 12 are started at the same time, and the rotating cylinder 4 is rotated by the motor 14, so that the rotating cylinder 4 can rotate the two slag removal frames 5, so that the coal ash on the inner wall of the boiler 2 can be scraped and cleaned through the cooperation of the two slag removal frames 5 and the two anti-wear pads 15. At the same time, the hair dryer 12 blows air to the multiple slag blowing pipes 6, so that the coal ash on the inner wall of the boiler 2 can be blown and cleaned in all directions, thereby facilitating the improvement of the slag removal efficiency of the boiler 2.
[0045] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A boiler slag removal device for a thermal power plant, characterized in that: include: A slag removal box (1), wherein the slag removal box (1) is connected through one side of the boiler (2); A pushing frame (3), wherein the pushing frame (3) is slidably arranged in the slag removal box (1) via a pushing seat; A rotating cylinder (4), wherein the rotating cylinder (4) is rotatably mounted on the pushing frame (3); A slag removal rack (5), wherein two slag removal racks (5) are provided, and the two slag removal racks (5) are symmetrically connected to the rotating cylinder (4); A slag blowing pipe (6), wherein the slag blowing pipe (6) is provided in plurality, the plurality of slag blowing pipes (6) are respectively connected between the rotating cylinder (4) and the two slag removal racks (5), and a blowing assembly is provided on the pushing rack (3); A sealing plate (7), wherein two sealing plates (7) are provided, and both sealing plates (7) are located on one side of the pushing frame (3), and a sealing opening matching the sealing plates (7) is opened on the boiler (2).
2. A slag removal device for a thermal power plant boiler according to claim 1, characterized in that: The push seat comprises: An electric cylinder (8), wherein the electric cylinder (8) is mounted on the outer wall of the slag removal box (1) via a mounting plate (9), and an output end of the electric cylinder (8) is connected through the slag removal box (1); A connecting frame (10), wherein the connecting frame (10) is fixedly connected between the output end of the electric cylinder (8) and the pushing frame (3); A sliding plate (11), wherein two sliding plates (11) are provided, the two sliding plates (11) are symmetrically connected to the connecting frame (10), and a sliding groove for the sliding plates (11) to slide is provided on the inner side wall of the slag removal box (1).
3. A slag removal device for a thermal power plant boiler according to claim 2, characterized in that: The blowing assembly comprises: a fan (12), the fan (12) being mounted on the pushing frame (3), the pushing frame (3) being provided with a mounting slot matching the fan (12), and the output end of the fan (12) being located in the rotating cylinder (4); A sealing gasket (13), wherein the sealing gasket (13) is connected through the output end of the fan (12), and the sealing gasket (13) is in rotational contact with the inner wall of the rotating cylinder (4).
4. A boiler slag removal device for a thermal power plant according to claim 3, characterized in that: A motor (14) is installed on the pushing frame (3), and an output end of the motor (14) is fixedly connected to the rotating cylinder (4).
5. A boiler slag removal device for a thermal power plant according to claim 4, characterized in that: The two slag removal frames (5) are both fixedly connected with anti-wear pads (15), and the two anti-wear pads (15) are both provided with a plurality of through openings matching the slag blowing pipes (6).
6. A boiler slag removal device for a thermal power plant according to claim 5, characterized in that: Two connecting rods (16) are fixedly connected between the pushing frame (3) and the adjacent sealing plates (7), and two connecting strips (17) are fixedly connected between the two sealing plates (7).
Citation Information
Patent Citations
Slag removal device for boiler of thermal power plant
CN219640283U