Pier beam connecting structure

By placing the single column pier into the fixed hole of the steel box chamber and welding it with its top plate and bottom plate in the factory, combined with the bridge structure design of the second steel box chamber, the problem of unstable connection between the single column pier and the steel box chamber is solved, and higher structural stability and safety are achieved.

CN222632026UActive Publication Date: 2025-03-18POWER CHINA KUNMING ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420607929.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2025-03-18
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

In the prior art, the connection method between the single-column piers and the steel box chamber floor is unstable, resulting in curved (small radius) steel structure bridges that are prone to overturn, and welding quality and anti-corrosion coating are difficult to ensure the safety of pedestrians.

Method used

A pier beam connecting structure is adopted, wherein the single column pier is arranged in the fixing hole of the first steel box chamber and is welded in the factory with its top plate and bottom plate. The second steel box chamber is located on both sides of the first steel box chamber and is connected to it, forming a bridge-like structure, and the structural strength is enhanced by concrete pouring.

Benefits of technology

The stability and reliability of the connection between the single-column piers and the steel box chamber is improved, and the on-site backweld welds are avoided, ensuring the overall strength and safety of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222632026U_ABST
    Figure CN222632026U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridges, and discloses a pier-beam connecting structure which comprises a single-column pier, a first steel box chamber and a second steel box chamber. The single-column pier is arranged on the ground, a fixing hole is formed in the first steel box chamber, and the single-column pier is arranged in the first steel box chamber in a penetrating mode through the fixing hole and connected with a top plate and a bottom plate of the first steel box chamber; the second steel box chambers are located on the two sides of the first steel box chamber and connected with the first steel box chamber. The single-column pier is arranged in the fixing hole in the bottom plate of the first steel box chamber in a penetrating manner, so that the first steel box chamber and the single-column pier can be connected with each other, and the purpose of fixing the first steel box chamber on the single-column pier is achieved; and through welding connection of the single-column piers, the top plate and the bottom plate in a factory, the structure can be firmer, and on-site overhead welding seams are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridges, in particular to a pier-beam connection structure. Background Art

[0002] When designing pedestrian landscape bridges, curved steel structure bridges are often designed to make the structure more beautiful and adapt to the terrain to reduce the project cost. However, there is a problem of overturning for curved (small radius) steel box pedestrian bridges. To prevent the above problem, it is necessary to set a consolidation pier at the mid-span position. The current method is to weld the top of the single-column pier to the bottom surface of the steel box floor, and weld a stiffening plate at the interface to prevent local stress concentration.

[0003] Welding the top of the single-column pier to the bottom of the steel box chamber floor and welding a stiffening plate at the interface can solve the overturning problem of curved (small radius) steel structure bridges to a certain extent. However, the connection between the steel structure box girder and the steel pipe single-column pier is welded on site, and the quality of the weld is not easy to guarantee. In addition, the anti-corrosion coating can only be applied on site. Once the weld quality does not meet the requirements or the weld position is corroded by the environment, resulting in a decrease in the weld bearing capacity, the safety of pedestrians cannot be guaranteed. Utility Model Content

[0004] The embodiment of the utility model aims to provide a pier-beam connection structure to solve the technical problem of unstable connection between a single-column pier and a bottom plate of a steel box chamber in the prior art.

[0005] The utility model embodiment solves its technical problems by adopting the following technical solutions:

[0006] A pier-beam connection structure is provided, comprising:

[0007] A single-column pier, wherein the single-column pier is arranged on the ground;

[0008] A first steel box chamber, wherein the first steel box chamber is provided with a fixing hole, and the single column pier is passed through the fixing hole and is arranged in the first steel box chamber and connected to the top plate of the first steel box chamber;

[0009] The second steel box chamber is located at both sides of the first steel box chamber and is connected to the first steel box chamber.

[0010] In some embodiments, the single column pier includes a main body portion and a connecting portion, and the main body portion and the connecting portion are fixedly connected;

[0011] The main body is disposed on the ground, and the connecting portion is penetrated into the first steel box chamber through the fixing hole and connected to the top plate of the first steel box chamber.

[0012] In some embodiments, the connecting portion and the main body are both steel pipes, and the connecting portion and the main body are hollow and interconnected;

[0013] A casting hole is opened on the top plate of the first steel box chamber, and the position of the casting hole corresponds to the position of the single column pier. External concrete can enter the connecting part and the main body of the single column pier through the casting hole.

[0014] In some embodiments, a third stiffening plate and a fourth stiffening plate are disposed inside the first steel box chamber, and the third stiffening plate and the fourth stiffening plate are disposed perpendicular to each other.

[0015] In some embodiments, the top plate includes a steel plate, the steel plate is detachably connected to the top plate, and the steel plate can be covered on the casting hole.

[0016] In some embodiments, the pier-beam connection structure further includes a first stiffening plate, the first steel box chamber includes a first partition plate, and the first partition plate and the connection portion are connected in the longitudinal direction of the bridge via the first stiffening plate.

[0017] In some embodiments, the pier-beam connection structure further includes a second stiffening plate, the first steel box chamber includes a web, and the web and the connection portion are connected in the transverse bridge direction via the second stiffening plate.

[0018] In some embodiments, the pier-beam connection structure further includes a heightened stiffening plate, the second steel box chamber includes a fifth stiffening plate, and the fifth stiffening plate and the first stiffening plate are connected via the heightened stiffening plate.

[0019] In some embodiments, the second steel box chamber is provided with a second partition, and through holes are provided on the first partition and the second partition;

[0020] The first stiffening plate, the height-changing stiffening plate and the fifth stiffening plate are continuously and sequentially arranged in the first steel box chamber and the second steel box chamber;

[0021] The first stiffening plate, the height-changing stiffening plate and the fifth stiffening plate are inserted into the through hole.

[0022] In some embodiments, a sixth stiffening plate is welded to the outer side of the bottom plate of the first steel box chamber, and the sixth stiffening plate is connected to the single column pier.

[0023] Compared with the prior art, in a pier-beam connection structure provided by an embodiment of the utility model, the first steel box chamber and the second steel box chamber are connected to each other, specifically, the second steel box chamber is located on both sides of the first steel box chamber, and a plurality of first steel box chambers and a plurality of second steel box chambers are connected in sequence, so that a bridge-like structure is formed. The single-column pier is set on the ground, the first steel box chamber is provided with a fixing hole, the single-column pier is passed through the fixing hole in the first steel box chamber and is respectively connected to the top plate and the bottom plate of the first steel box chamber; the second steel box chamber is located on both sides of the first steel box chamber and is connected to the first steel box chamber. By passing the single-column pier through the fixing hole on the bottom plate of the first steel box chamber, the first steel box chamber and the single-column pier can be connected to each other, thereby achieving the purpose of fixing the first steel box chamber on the single-column pier; and by welding the single-column pier to the top plate and the bottom plate in the factory, the structure can be made more reliable and the overhead welding seam on site can be avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] One or more embodiments are exemplarily described by pictures in the corresponding drawings, and these exemplified descriptions do not constitute limitations on the embodiments. Elements with the same reference numerals in the drawings represent similar elements, and unless otherwise stated, the figures in the drawings do not constitute proportional limitations.

[0025] Figure 1 It is a schematic diagram of the connection between the first steel box chamber and the second steel box chamber in the pier-beam connection structure provided by one embodiment of the utility model;

[0026] Figure 2 It is a structural schematic diagram of a pier-beam connection structure provided by one embodiment of the utility model;

[0027] Figure 3 It is a cross-sectional schematic diagram of a pier-beam connection structure provided by one embodiment of the utility model;

[0028] Figure 4 It is a plan view of a pier-beam connection structure provided by one embodiment of the utility model;

[0029] Figure 5 It is a structural schematic diagram of a top plate provided by one embodiment of the utility model;

[0030] Figure 6 It is a structural schematic diagram of a first partition provided by one embodiment of the utility model;

[0031] Figure 7 It is a structural schematic diagram of a second partition provided in one embodiment of the utility model.

[0032] Reference numerals:

[0033] 100. Pier-beam connection structure; 10. Single-column pier; 11. Main body; 12. Connection part; 20. First steel box chamber; 21. Bottom plate; 211. Fixing hole; 22. Top plate; 221. Steel plate; 222. Casting hole; 23. Third stiffening plate; 24. Fourth stiffening plate; 25. First partition plate; 26. Web plate; 30. Second steel box chamber; 31. Fifth stiffening plate; 32. Second partition plate; 40. First stiffening plate; 50. Second stiffening plate; 60. Variable height stiffening plate; 70. Sixth stiffening plate. DETAILED DESCRIPTION

[0034] In order to facilitate the understanding of the utility model, the utility model is described in more detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that when an element is described as "connecting" another element, it can be directly on another element, or there can be one or more centered elements therebetween. The orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", "upper end", "lower end", "top" and "bottom" used in this specification is based on the orientation or positional relationship shown in the accompanying drawings, only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0035] Unless otherwise defined, all technical and scientific terms used in this specification have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention.

[0036] In the embodiment of the utility model, the pier-beam connection structure can be used to connect the single-column pier and the first steel box chamber.

[0037] Combine the following Figures 1 to 7 , the pier-beam connection structure and the fruit and vegetable sorting machine provided in the embodiments of the present application are described in detail through specific embodiments.

[0038] The pier-beam connection structure 100 provided in one embodiment of the present invention comprises a single-column pier 10, a first steel box chamber 20 and a second steel box chamber 30. The single-column pier 10 is arranged on the ground; the first steel box chamber 20 is provided with a fixing hole 211, and the single-column pier 10 is passed through the first steel box chamber 20 through the fixing hole 211 and connected to the top plate 22 of the first steel box chamber 20; the second steel box chamber 30 is located on both sides of the first steel box chamber 20 and connected to the first steel box chamber 20.

[0039] Among them, regarding the above-mentioned first steel box chamber 20 and second steel box chamber 30, the first steel box chamber 20 and second steel box chamber 30 are a structural form for bearing bridge beams (beams), which are made of steel to form a box-shaped section, and its shape is usually similar to a box. The first steel box chamber 20 and the second steel box chamber 30 are made of steel, have high strength and rigidity, and can withstand the load requirements of long-span bridges. And by setting the first steel box chamber 20 and the second steel box as a box-shaped structure, the deformation of the bridge during use and the stress caused by the deformation can be effectively resisted.

[0040] In this embodiment, the first steel box chamber 20 and the second steel box chamber 30 are connected to each other, specifically, the second steel box chamber 30 is located on both sides of the first steel box chamber 20, and a plurality of first steel box chambers 20 and a plurality of second steel box chambers 30 are connected in sequence, so that a bridge-like structure is formed. The single column pier 10 is set on the ground, and a fixing hole 211 is opened on the first steel box chamber 20. The fixing hole 211 is opened on the bottom plate 21 of the first steel box chamber 20, so that the single column pier 10 can pass through the fixing hole 211 on the bottom plate 21 of the first steel box chamber 20 to enter the interior of the first steel box chamber 20 and connect with the top plate 22 of the first steel box chamber 20. Through such an arrangement, the single-column pier 10 is inserted into the fixing hole 211 on the bottom plate 21 of the first steel box chamber 20, so that the first steel box chamber 20 and the single-column pier 10 can be connected to each other, thereby achieving the purpose of fixing the first steel box chamber 20 on the single-column pier 10; and through the welding connection of the single-column pier 10 with the top plate 22 and the bottom plate 21 in the factory, the structure can be made more reliable and the overhead welding seams on site can be avoided. Specifically, during the welding process in the factory, the bottom plate can be rotated so that it is set upward, so that the single-column pier 10 is welded with the top plate 22 and the bottom plate 21, which can avoid the overhead welding connection of the single-column pier 10 with the top plate 22 and the bottom plate 21 after the installation process.

[0041] In some embodiments, the single-column pier 10 includes a main body 11 and a connecting portion 12, which are fixedly connected; the main body 11 is set on the ground, and the connecting portion 12 is passed through the fixing hole 211 in the first steel box chamber 20 and connected to the top plate 22 of the first steel box chamber 20.

[0042] The main body 11 and the connecting part 12 are connected, and the connecting part 12 can be inserted into the first steel box chamber 20 through the fixing hole 211 on the bottom plate 21 of the first steel box chamber 20, and the connecting part 12 abuts against the top plate 22 of the first steel box chamber 20 when in the first steel box chamber 20, so that the first steel box chamber 20 can be installed on the single column pier 10. More specifically, the diameter of the connecting part 12 is the same as the diameter of the main body 11, and the diameter of the connecting part 12 is the same as the diameter of the fixing hole 211, so as to prevent the first steel box chamber 20 from shaking under force after the single column pier 10 is inserted into the fixing hole 211.

[0043] The main body 11 is installed on the ground to support the first steel box chamber 20 above it.

[0044] In some embodiments, the connecting portion 12 and the main body 11 are both steel pipes, and the interiors of the connecting portion 12 and the main body 11 are hollow and interconnected; a casting hole 222 is opened on the top plate 22 of the first steel box chamber 20, and the position of the casting hole 222 corresponds to the position of the single-column pier 10, and external concrete can enter the connecting portion 12 and the main body 11 of the single-column pier 10 through the casting hole 222.

[0045] The main body 11 and the connecting part 12 are both made of steel pipe, so the single-column pier 10 is made of steel pipe. By using the single-column pier 10 made of steel pipe, it has high strength and rigidity, and can effectively bear the load of the bridge. And the hollow single-column pier 10 can make it lighter. A pouring hole 222 is opened on the top plate 22 of the first steel box chamber 20, and the position of the pouring hole 222 corresponds to the position of the single-column pier 10. External concrete can be poured into the single-column pier 10 through the pouring hole 222 to enhance the concrete filling inside the single-column pier 10 and further increase the strength. Through such a setting, on the one hand, through the pouring hole 222, external concrete can enter the single-column pier 10 to achieve uniform filling of concrete. In this way, it can ensure that the concrete inside the pier is evenly distributed and enhance the overall stability and durability of the structure. On the other hand, the pouring hole 222 provides convenience for the injection of concrete, and conventional pouring methods and equipment can be used for construction. This simplifies the construction process and improves construction efficiency.

[0046] In some embodiments, a third stiffening plate 23 and a fourth stiffening plate 24 are disposed inside the first steel box chamber 20 , and the third stiffening plate 23 and the fourth stiffening plate 24 are disposed perpendicular to each other.

[0047] Specifically, the third stiffening plate 23 is arranged on the side of the first steel box chamber 20, and the fourth stiffening plate 24 is arranged on the top surface of the first steel box chamber 20; or the third stiffening plate 23 is arranged on the top surface of the first steel box chamber 20, and the fourth stiffening plate 24 is arranged on the side of the first steel box chamber 20. By arranging the third stiffening plate 23 and the fourth stiffening plate 24 in the first steel box chamber 20, the rigidity and stability of the structure of the first steel box chamber 20 can be increased. The third stiffening plate 23 and the fourth stiffening plate 24 can withstand the tensile pressure between the components, reduce the deformation and displacement of the structure, and improve the overall strength of the structure. And the third stiffening plate 23 and the fourth stiffening plate 24 can disperse the load and stress to the adjacent components to reduce the situation of local stress concentration. Thereby, it plays a role in sharing the load and increasing the bearing capacity of the structure in the first steel box chamber 20. In addition, the third stiffening plate 23 and the fourth stiffening plate 24 connect and support each component in the steel box chamber, so that they can work together to form an integral structure. It provides support and connection under stress and load, ensuring the stability and safety of the structure.

[0048] In some embodiments, the top plate 22 includes a steel plate 221, which is detachably connected to the top plate 22, and the steel plate 221 can be covered on the casting hole 222. When it is necessary to cast the single-column pier 10, the steel plate 221 can be opened to expose the casting hole 222 to the outside, so that concrete can enter the single-column pier 10 through the casting hole 222, thereby filling the inside of the single-column pier 10 with concrete to enhance the structural strength of the single-column pier 10. When it is not necessary to cast the single-column pier 10, the steel plate 221 can be covered on the casting hole 222, so that the casting hole 222 is closed.

[0049] When the steel plate 221 is covered on the casting hole 222, the top plate 22 can be patched. Specifically, the steel plate 221 can be embedded in the top plate 22 as a part of the top plate 22 after the concrete is filled, providing additional strength and stability. It can increase the bearing capacity of the top plate 22 and make the single-column pier 10 more solid as a whole. In addition, the patching of the steel plate 221 can protect the top plate 22 and prevent the expansion and generation of concrete cracks. It can disperse the stress on the top plate 22, reduce stress concentration, and improve the durability and service life of the top plate 22. In addition, the steel plate 221 can be used to compensate for defects or uneven surfaces of the top plate 22. If the filled concrete has an uneven surface or unevenness, the use of the steel plate 221 for patching can make the surface of the top plate 22 smoother and more beautiful, and provide better conditions for use.

[0050] In some embodiments, the first stiffening plate 40 can be used as a structural element to increase the rigidity and strength between the connection portion 12 and the first steel box chamber 20, so that the structure of the single-column pier 10 and the first steel box chamber 20 in the direction along the bridge is more stable. The first stiffening plate 40 is located in the direction along the bridge (the direction along the bridge refers to the direction of the central axis of the bridge, which can also be understood as the direction of the water flow or the route direction), between the connection portion 12 and the first partition 25. The first stiffening plate 40 increases the stability of the entire structure by connecting with the connection portion 12 (single-column pier 10) and the first partition 25.

[0051] In some embodiments, the pier-beam connection structure 100 further includes a second stiffening plate 50, and the first steel box chamber 20 includes a web 26, and the web 26 and the connection portion 12 are connected in the transverse bridge direction (the transverse bridge direction refers to the direction perpendicular to the central axis of the bridge) by the second stiffening plate 50. The second stiffening plate 50 can be used to increase the rigidity and strength of the structural element between the connection portion 12 and the first steel box chamber 20, so that the structure of the single-column pier 10 and the first steel box chamber 20 in the transverse bridge direction is more stable. Specifically, the web 26 of the first steel box chamber 20 is connected to the second stiffening plate 50, and the second stiffening plate 50 is located in the transverse bridge direction, and the connection portion 12 and the web 26 are connected by the second stiffening plate 50. The second stiffening plate 50 can provide additional support and stability to enhance the connection between the connection portion 12 (single-column pier 10) and the first steel box chamber 20.

[0052] In some embodiments, the pier-beam connection structure 100 further includes a heightened stiffening plate 60, the second steel box chamber 30 includes a fifth stiffening plate 31, and the fifth stiffening plate 31 and the first stiffening plate 40 are connected through the heightened stiffening plate 60. The two ends of the heightened stiffening plate 60 have a certain height difference, and when the heightened stiffening plate 60 is connected to the fifth stiffening plate 31 of the second steel box chamber 30 and the other end is connected to the first stiffening plate 40, the bridge can have a curved surface shape, making the bridge more beautiful.

[0053] In some embodiments, the second steel box chamber 30 is provided with a second partition 32, and through holes are provided on the first partition 25 and the second partition 32; the first stiffening plate 40, the heightened stiffening plate 60 and the fifth stiffening plate 31 are arranged successively in the first steel box chamber 20 and the second steel box chamber 30; the first stiffening plate 40, the heightened stiffening plate 60 and the fifth stiffening plate 31 are penetrated in the through holes. Through such an arrangement, the connection between the first stiffening plate 40, the heightened stiffening plate 60 and the fifth stiffening plate 31 can be achieved, and the first stiffening plate 40, the heightened stiffening plate 60 and the fifth stiffening plate 31 can be prevented from being isolated by the first partition 25 and the second partition 32 and unable to be connected to each other.

[0054] In some embodiments, a sixth stiffening plate 70 is welded to the outside of the bottom plate 21 of the first steel box chamber 20, and the sixth stiffening plate 70 is connected to the single column pier 10. The sixth stiffening plate 70 is located on the outside of the bottom plate 21 of the first steel box chamber 20, and is welded to the bottom plate 21 of the first steel box chamber 20 and the steel pipe. The sixth stiffening plate 70 can increase the overall stiffness and strength of the bridge, and improve the bearing capacity and stability of the bridge. At the same time, the sixth stiffening plate 70 can also disperse the load transfer, reduce the local load concentration of the bridge, and improve the durability of the bridge.

[0055] It should be particularly noted that the pier-beam connection structure 100 provided in the embodiment of the utility model only shows the part related to the technical problem to be solved by the embodiment of the utility model. It can be understood that the pier-beam connection structure 100 provided in the embodiment of the utility model also includes other structures for realizing the functions of the pier-beam connection structure 100, including but not limited to casting structures, lifting machines and temporary support columns.

[0056] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Under the idea of ​​the present invention, the technical features in the above embodiments or different embodiments can also be combined, the steps can be implemented in any order, and there are many other changes in different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity. Although the present invention is described in detail with reference to the aforementioned embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the aforementioned embodiments can still be modified, or some of the technical features can be replaced by equivalents. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A pier-beam connection structure, characterized in that: include: A single-column pier, wherein the single-column pier is arranged on the ground; A first steel box chamber, wherein the first steel box chamber is provided with a fixing hole, and the single column pier is passed through the fixing hole and is arranged in the first steel box chamber and connected to the top plate of the first steel box chamber; The second steel box chamber is located at both sides of the first steel box chamber and is connected to the first steel box chamber.

2. The pier-beam connection structure according to claim 1, characterized in that: The single column pier comprises a main body portion and a connecting portion, wherein the main body portion and the connecting portion are fixedly connected; The main body is disposed on the ground, and the connecting portion is penetrated into the first steel box chamber through the fixing hole and connected to the top plate of the first steel box chamber.

3. The pier-beam connection structure according to claim 2, characterized in that: The connecting part and the main body are both steel pipes, and the connecting part and the main body are hollow inside and connected to each other; A casting hole is opened on the top plate of the first steel box chamber, and the position of the casting hole corresponds to the position of the single column pier. External concrete can enter the connecting part and the main body of the single column pier through the casting hole.

4. The pier-beam connection structure according to claim 3, characterized in that: A third stiffening plate and a fourth stiffening plate are arranged inside the first steel box chamber, and the third stiffening plate and the fourth stiffening plate are arranged perpendicular to each other.

5. The pier-beam connection structure according to claim 4, characterized in that: The top plate includes a steel plate, the steel plate is detachably connected to the top plate, and the steel plate can be covered on the casting hole.

6. The pier-beam connection structure according to claim 2, characterized in that: The pier-beam connection structure further includes a first stiffening plate, and the first steel box chamber includes a first partition plate. The first partition plate and the connection portion are connected in the direction along the bridge via the first stiffening plate.

7. The pier-beam connection structure according to claim 6, characterized in that: The pier-beam connection structure further includes a second stiffening plate, the first steel box chamber includes a web, and the web and the connection portion are connected in the transverse bridge direction via the second stiffening plate.

8. The pier-beam connection structure according to claim 7, characterized in that: The pier-beam connection structure further includes a heightened stiffening plate, the second steel box chamber includes a fifth stiffening plate, and the fifth stiffening plate and the first stiffening plate are connected via the heightened stiffening plate.

9. The pier-beam connection structure according to claim 8, characterized in that: The second steel box chamber is provided with a second partition plate, and through holes are provided on the first partition plate and the second partition plate; The first stiffening plate, the height-changing stiffening plate and the fifth stiffening plate are continuously and sequentially arranged in the first steel box chamber and the second steel box chamber; The first stiffening plate, the height-changing stiffening plate and the fifth stiffening plate are inserted into the through hole.

10. The pier-beam connection structure according to claim 1, characterized in that: A sixth stiffening plate is welded to the outer side of the bottom plate of the first steel box chamber, and the sixth stiffening plate is connected to the single column pier.