Electromechanical detection device for constructional engineering pump house

By integrating storage compartment, electric push rod and other components on the pump effect tester, the automatic winding and fixing of the connecting pipe is solved, and the problem of easy forgetting or less loading of the connecting pipe in the electromechanical testing equipment of the pump room is improved, improving the smoothness of the inspection and the practicality of the equipment.

CN222647339UActive Publication Date: 2025-03-21THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421015800.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-11
Publication Date
2025-03-21
Estimated Expiration
2034-05-11

AI Technical Summary

Technical Problem

The existing pump room electromechanical testing equipment lacks storage space during the inspection process, which makes it easy to forget or carry less connection pipes, affecting the smooth progress of the inspection, and the winding process is cumbersome, which increases the burden on staff.

Method used

A telescopic flexible fastening device is designed, including welding and fixing the storage compartment on the side wall of the pump effect tester, and installing electric push rods, connecting frames, rotary shafts, handwheels and solenoids in the storage compartment, so as to realize the automatic winding and fixing of the connecting pipe through these components.

Benefits of technology

By automatically winding and fixing the connecting pipe, the situation of forgetting or less carrying is avoided, the inspection process is simplified, the burden on staff is reduced, and the practicality of the equipment is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222647339U_ABST
    Figure CN222647339U_ABST
Patent Text Reader

Abstract

The utility model discloses a constructional engineering pump house electromechanical detection device, and relates to the technical field of pump house electromechanical detection equipment, and adopts the technical scheme that the constructional engineering pump house electromechanical detection device comprises a pump efficiency tester, a storage bin is welded and fixed on one side of the pump efficiency tester, an electric push rod is mounted at the upper end of one side wall in the storage bin, and a connecting frame is fixed at the output end of the electric push rod; a rotating shaft is rotationally connected into the connecting frame, a hand wheel is fixedly welded to one end of the rotating shaft, the other end of the rotating shaft penetrates through the connecting frame, and winding drums are fixed to the rotating shaft at equal intervals. The storage bin is arranged on the side wall of the pump efficiency tester, then the electric push rod is arranged in the storage bin, the connecting frame is pushed to be located outside the storage bin, then the rotating shaft is driven to rotate through the hand wheel, then the winding drum winds the multiple connecting pipes at the same time, the connecting pipes can be arranged in order in a unified mode, and a worker can conveniently carry the pump efficiency tester; and moreover, the condition of forgetting to take or lacking the take is avoided, and the orderly detection can be ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electromechanical detection equipment for pump rooms, in particular to an electromechanical detection device for a pump room in a construction project. Background Art

[0002] The pump room refers to the plant where water pumps, power machines and their auxiliary equipment are installed. It is the main project of the pump station building, and the pump room is indispensable when constructing the building. During the operation of the pump room, the electromechanical equipment in the pump room, such as water pumps, needs to be tested by detection equipment to ensure its normal operation.

[0003] In order to ensure the normal operation of the water pump in the pump room, the water pump in the existing pump room needs to be inspected regularly during use, and the inspection equipment is a pump efficiency tester. During the inspection process, the connecting pipe needs to be connected to the tester and the water pump, and then the connecting pipe needs to be carried, but the device itself cannot provide storage space for it, so there is a situation of forgetting or not bringing enough, resulting in the inability to carry out the inspection, and it needs to be rolled up after the inspection is completed, and since there are multiple connecting pipes, the workload of the staff is large, affecting the practicality of the equipment.

[0004] Therefore, improvements need to be made to the above problems. Utility Model Content

[0005] In order to achieve the above-mentioned purpose of the utility model and to address the above-mentioned technical problem, the utility model provides a retractable flexible fastening device.

[0006] The technical solution is as follows: it includes a pump efficiency tester, a storage bin is welded and fixed on one side of the pump efficiency tester, a sealing cover is installed on one side wall of the storage bin through a hinge, an electric push rod is installed on the upper end of one side wall inside the storage bin, a connecting frame is fixed to the output end of the electric push rod, a rotating shaft is rotatably connected inside the connecting frame, a hand wheel is welded and fixed to one end of the rotating shaft, the other end of the rotating shaft passes through the connecting frame, an electromagnet is arranged on the upper side of one end of the rotating shaft, the electromagnet is a semicircular ring structure, the rotating shaft is made of iron material, winding drums are fixed on the rotating shaft at equal intervals, and a fixing hook is welded on one side of the upper end of the winding drum.

[0007] Preferably, guide rails are installed on both side walls of the storage bin by screws, a placement plate is slidably connected inside the guide rails, and two groups of the guide rails and the placement plate are provided.

[0008] Preferably, connection nozzles are evenly spaced on one side wall of the pump efficiency tester, and the connection nozzles are threaded, and the connection nozzles connect one end of the connecting pipe to the pump efficiency tester.

[0009] Preferably, a display screen is installed on one side wall of the pump efficiency tester, and buttons for adjusting and controlling the pump efficiency tester, the electric push rod and the electromagnet are installed on one side of the display screen.

[0010] Preferably, a handle is fixed to the upper end of the pump efficiency tester by screws, and a rubber sleeve is provided on the outer side of the handle.

[0011] Preferably, a sealing cover is installed on one side wall of the storage bin via a hinge.

[0012] Preferably, the electromagnet is a semicircular ring structure made of a coil.

[0013] Preferably, the rotating shaft is made of iron.

[0014] The beneficial effects of the technical solution provided by the embodiment of the utility model are as follows: by setting a storage bin on the side wall of the pump efficiency tester, and then setting an electric push rod in the storage bin, controlling the action of the electric push rod so that it pushes the connecting frame outside the storage bin, and then fixing one end of the connecting pipe to be carried on the fixed hook of the winding drum, and then driving the rotating shaft to rotate through the hand wheel, so that the winding drum can simultaneously wind up multiple connecting pipes, and the connecting pipes can be put in a unified place, and when the winding is completed, the electromagnet is energized to adsorb and fix the rotating shaft. It is convenient for staff to carry, and there will be no situation of forgetting or taking less, ensuring that the test can be carried out in an orderly manner, and the placement plate can be easily pulled out through the guide rail, so that the tools needed in the test process can be placed on the placement plate, so that they can be stored and carried together. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The overall structure of the embodiment of the utility model is shown in FIG. Figure 1 .

[0016] Figure 2 The cross-sectional structure of the storage bin of the utility model embodiment is shown in FIG. Figure 2 .

[0017] Figure 3 This is a schematic diagram of the longitudinal section structure of the storage bin in the embodiment of the utility model. Figure 3 .

[0018] Among them, the figure markings are: 1. storage bin; 2. handle; 3. rubber sleeve; 4. pump efficiency tester; 5. connection nozzle; 6. operation button; 7. display screen; 8. sealing cover; 9. connecting frame; 10. rotating shaft; 11. electromagnet; 12. electric push rod; 13. guide rail; 14. placement plate; 15. hand wheel; 16. fixing hook; 17 winding drum. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. Of course, the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0020] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0021] In the description of the invention of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the invention of the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention of the utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the invention of the present utility model, unless otherwise specified, "multiple" means two or more.

[0022] In the description of the invention of the utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention of the utility model can be understood according to specific circumstances.

[0023] Example 1

[0024] See also Figure 1-Figure 3 A mechanical and electrical detection device for a pump room of a construction project, comprising a pump efficiency tester (4), a storage bin 1 is welded and fixed to one side of the pump efficiency tester 4, an electric push rod 12 is installed at the upper end of a side wall in the storage bin 1, a connecting frame 9 is fixed to the output end of the electric push rod 12, a rotating shaft 10 is rotatably connected in the connecting frame 9, a hand wheel 15 is welded and fixed to one end of the rotating shaft 10, and the other end of the rotating shaft 10 passes through the connecting frame 9, an electromagnet 11 is arranged on the upper side of one end of the rotating shaft 10, winding drums 17 are fixed at equal intervals on the rotating shaft 10, and a fixing hook 16 is welded to one side of the upper end of the winding drum 17.

[0025] Specifically, guide rails 13 are installed on the two side walls of the storage bin 1 by screws, and a placement plate 14 is slidably connected to the guide rails 13. There are two groups of guide rails 13 and placement plates 14. The placement plates 14 can be pulled out conveniently through the guide rails 13, and then the tools needed in the detection process can be placed on the placement plates 14 so that they can be stored and carried together.

[0026] Specifically, connection nozzles 5 are evenly spaced on one side wall of the pump efficiency tester 4 , and the connection nozzles 5 are threaded. The connection nozzles 5 connect one end of a connection pipe to the pump efficiency tester 4 , and the other end of the connection pipe is connected to a water pump to be tested.

[0027] Specifically, a display screen 7 is installed on one side wall of the pump efficiency tester 4, and operation buttons 6 for adjusting and controlling the pump efficiency tester 4, the electric push rod 12 and the electromagnet 11 are installed on one side of the display screen 7. The operation buttons 6 can adjust and control the pump efficiency tester 4, and also control the electric push rod 12 and the electromagnet 11, while the display screen 7 displays the detection data of the pump efficiency tester 4, which is convenient for the staff to understand.

[0028] Specifically, a handle 2 is fixed to the upper end of the pump efficiency tester 4 by screws, and a rubber sleeve 3 is sleeved on the outer side of the handle 2. The handle 2 is convenient for the staff to carry the device, and the rubber sleeve 3 can improve the comfort of the staff during the carrying process.

[0029] Specifically, a sealing cover 8 is installed on one side wall of the storage bin 1 through a hinge.

[0030] Specifically, the electromagnet 11 is a semicircular ring structure made of a coil.

[0031] Specifically, the rotating shaft 10 is made of iron.

[0032] When the utility model is used, first, the sealing cover 8 is opened, and then the electric push rod 12 is controlled to move so that it pushes the connecting frame 9 to be outside the storage bin 1, and then one end of the connecting tube that needs to be carried is fixed on the fixing hook 16 of the winding drum 17, and then the rotating shaft 10 is driven to rotate by the hand wheel 15, so that the winding drum 17 can simultaneously wind up multiple connecting tubes, and the connecting tubes can be put in a unified manner. When the winding is completed, the electromagnet 11 is energized to adsorb and fix the rotating shaft 10 to prevent the rotating shaft 10 from releasing the connecting tube due to free rotation. Then the electric push rod 12 is put into the storage bin 1 and the sealing cover 8 is closed, which is convenient for the staff to carry, and there will be no situation of forgetting or taking less, ensuring that the inspection can be carried out in an orderly manner. The placement plate 14 can be pulled out through the guide rail 13, and then the tools needed in the inspection process can be placed on the placement plate 14, so that they can be stored and carried together.

[0033] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A mechanical and electrical detection device for a pump room in a construction project, characterized in that: The pump efficiency tester (4) comprises a storage bin (1) welded and fixed on one side of the pump efficiency tester (4), an electric push rod (12) is installed on the upper end of a side wall in the storage bin (1), a connecting frame (9) is fixed on the output end of the electric push rod (12), a rotating shaft (10) is rotatably connected in the connecting frame (9), a hand wheel (15) is welded and fixed on one end of the rotating shaft (10), the other end of the rotating shaft (10) passes through the connecting frame (9), an electromagnet (11) is arranged on the upper side of one end of the rotating shaft (10), winding drums (17) are fixed on the rotating shaft (10) at equal intervals, and a fixing hook (16) is welded on one side of the upper end of the winding drum (17).

2. A construction engineering pump room electromechanical detection device according to claim 1, characterized in that: Guide rails (13) are installed on both side walls of the storage bin (1) by means of screws, and a placement plate (14) is slidably connected inside the guide rails (13). Two sets of the guide rails (13) and the placement plate (14) are provided.

3. A construction engineering pump room electromechanical detection device according to claim 1, characterized in that: Connecting nozzles (5) are arranged at equal intervals on a side wall of the pump efficiency tester (4); the connecting nozzles (5) are threaded and connect one end of a connecting pipe to the pump efficiency tester 4.

4. A construction engineering pump room electromechanical detection device according to claim 2, characterized in that: A display screen (7) is installed on one side wall of the pump efficiency tester (4), and buttons (6) for adjusting and controlling the pump efficiency tester (4), the electric push rod (12), and the electromagnet (11) are installed on one side of the display screen (7).

5. A construction engineering pump room electromechanical detection device according to claim 1, characterized in that: A handle (2) is fixed to the upper end of the pump efficiency tester (4) by means of screws, and a rubber sleeve (3) is sleeved on the outer side of the handle (2).

6. A construction engineering pump room electromechanical detection device according to claim 2, characterized in that: A sealing cover (8) is installed on one side wall of the storage bin (1) via a hinge.

7. A construction engineering pump room electromechanical detection device according to claim 4, characterized in that: The electromagnet (11) is a semicircular ring structure made of a coil.