Artificial stone ground line pipe access hole

By designing a sealing structure for reinforced steel plates and fixing bolts in the artificial stone floor line pipe maintenance port, the problem of poor sealing of the existing maintenance port is solved, and the safety and service life of the cable is improved, while improving the durability and aesthetics of the maintenance port.

CN222649335UActive Publication Date: 2025-03-21DECAI DECORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421169408.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-27
Publication Date
2025-03-21
Estimated Expiration
2034-05-27

AI Technical Summary

Technical Problem

The cover plate of the existing artificial stone floor pipe maintenance port has poor sealing and is not firm after installation, resulting in easy damage to the cable and affecting the safety and service life of the cable.

Method used

An artificial stone floor line pipe maintenance port is designed, including artificial stone floor and bottom plate. A wire trough is installed on the top of the bottom plate, and a adhesive layer and reinforced steel plate are installed at the bottom of the floor. The reinforced steel plate is fixed to the angle steel by fixing bolts to form a sealing and reinforced structure.

Benefits of technology

By forming a sealing structure, water in the wire duct is prevented from damage, the cable is protected from damage, and the safety and service life of the cable is improved. At the same time, the reinforcement structure improves the durability and aesthetics of the maintenance port.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222649335U_ABST
    Figure CN222649335U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of ground wire pipe maintenance, in particular to an artificial stone ground wire pipe maintenance port which comprises an artificial stone floor and a bottom plate, two wire grooves are formed in the top of the bottom plate, a bonding layer is arranged at the bottom of the artificial stone floor, and a reinforcing steel plate is arranged at the bottom of the bonding layer. Filling layers are arranged on the left side and the right side of the top of the bottom plate, and the close sides of the two filling layers are attached to the bottom of the adhesive layer; the beneficial effects are that sealing is formed on the outer side of the wire duct, water can be effectively prevented from entering the wire duct, a cable is protected from being damaged, the safety of the cable is improved, the service life of the cable is prolonged, meanwhile, the reinforcing steel plate is installed and fixed on the two steel angles through the fixing bolts, the wire duct can be effectively reinforced, the situation that the wire duct is easily damaged is reduced, and the service life of the cable is prolonged. Therefore, the use effect of the access hole is improved, the practicability and the attractiveness of the access hole are improved, and the durability of the access hole is enhanced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ground wire pipe maintenance, in particular to an artificial stone ground wire pipe maintenance opening. Background Art

[0002] Ground conduits are widely used in construction and road engineering for installing power lines, communication lines and pipeline facilities. In existing ground conduit systems, the design and layout of inspection openings are crucial because they allow maintenance and inspection of underground facilities, thereby ensuring the normal operation of the facilities.

[0003] In the prior art, the inspection openings on artificial stone floors are mainly made of metal inspection covers. When the artificial stone is laid on the floor, electrical pipe ducts are usually reserved. After the paving is completed, the inspection covers are directly buckled on the outside without corresponding reinforcement and sealing treatment. This causes water to easily enter the duct, keeping it in a wet state for a long time, thereby affecting the safety and service life of the cables, and even causing damage to the cables.

[0004] Therefore, an artificial stone floor wire conduit inspection port is needed to solve the problem that the existing inspection port has poor sealing and is not firm after installation, which makes the cables easily damaged and affects the safety and service life of the cables. Utility Model Content

[0005] The utility model aims to provide an artificial stone floor wire pipe inspection port to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an artificial stone floor wire pipe inspection port, comprising an artificial stone floor and a base plate, two wire troughs are installed on the top of the base plate, an adhesive layer is provided at the bottom of the artificial stone floor, a reinforcing steel plate is provided at the bottom of the adhesive layer, filling layers are provided on the left and right sides of the top of the base plate, and the adjacent sides of the two filling layers are both in contact with the bottom of the adhesive layer.

[0007] Preferably, multiple fixing bolts are inserted on the left and right sides of the reinforced steel plate, multiple angle codes are installed in the middle of the base plate, expansion bolts are inserted at the bottom of the side where the angle codes on the left and right sides are separated, angle steels are provided on the side where the angle codes on the left and right sides are separated, and multiple connecting columns are installed on the side where the two angle steels are close to each other.

[0008] Preferably, the expansion bolts are inserted into the interior of the base plate, the fixing bolts penetrate the reinforcing steel plate, and the lower ends of the fixing bolts are threadedly connected to the middle of the angle steel, and the connecting columns on the left and right sides are both inserted into the upper part of the angle code.

[0009] Preferably, a plurality of slide grooves 1 are provided in the middle of the wire trough, the inner wall of the slide groove 1 is slidably connected with a support block, and an elastic clamp is installed on the top of the support block.

[0010] Preferably, the bottom wall of the slide groove one is provided with a plurality of slots, the interior of the support block is provided with a slide groove two, the inner wall of the slide groove two is slidably connected with a slider, a locking block is installed at the bottom of the slider, two springs are installed on the top of the slider, and pressing blocks are inserted on both the left and right sides of the support block.

[0011] Preferably, the upper ends of the two springs are mounted on the top wall of the second slide slot, the adjacent sides of the two pressing blocks are fitted with the slider, and the clamping block passes through the bottom of the support block and is inserted into the inner wall of the clamping slot.

[0012] Preferably, adjacent sides of the two filling layers are both in contact with the reinforcing steel plate.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] The artificial stone floor wire tube inspection port proposed by the utility model can effectively prevent water from entering the inside by forming a seal on the outside of the wire duct, thereby protecting the cables from damage and improving the safety and service life of the cables. At the same time, by installing a reinforcing steel plate and fixing it on two angle steels with fixing bolts, the wire duct can be effectively reinforced to reduce its susceptibility to damage, thereby improving the use effect of the inspection port, which not only improves the practicability and aesthetics of the inspection port, but also enhances its durability. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional diagram of the utility model;

[0016] Figure 2 This is a schematic diagram of the structure of the reinforced steel plate of the utility model;

[0017] Figure 3 This is a schematic diagram of the angle steel structure of the utility model;

[0018] Figure 4 This is a schematic diagram of the angle code structure of the utility model;

[0019] Figure 5 This is a schematic diagram of the elastic clamp structure of the utility model;

[0020] Figure 6 This is a schematic diagram of the support block structure of the utility model;

[0021] Figure 7 for Figure 6 Structural cross-section at AA in the middle;

[0022] Figure 8 This is a schematic diagram of the card block structure of the utility model.

[0023] In the figure: 1. artificial stone floor; 2. adhesive layer; 3. reinforcement steel plate; 4. filling layer; 5. angle code; 6. wire trough; 7. angle steel; 8. bottom plate; 9. expansion bolt; 10. fixing bolt; 11. connecting column; 12. elastic clamp; 13. slide groove 1; 14. clamping groove; 15. support block; 16. pressing block; 17. spring; 18. slide groove 2; 19. slider; 20. clamping block. DETAILED DESCRIPTION

[0024] In order to make the purpose and technical solution of the utility model clearly and completely described, and the advantages more clearly understood, the embodiments of the utility model are further described in detail in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are part of the embodiments of the utility model, not all of the embodiments, and are only used to explain the embodiments of the utility model, and are not used to limit the embodiments of the utility model. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] Embodiment 1

[0026] See also Figures 1 to 8 The utility model provides a technical solution: an artificial stone floor wire pipe inspection port, comprising an artificial stone floor 1 and a base plate 8, the base plate 8 is a concrete floor, two wire troughs 6 are installed on the top of the base plate 8, an adhesive layer 2 is provided at the bottom of the artificial stone floor 1, the adhesive layer 2 is a special adhesive for artificial stone, a reinforcing steel plate 3 is provided at the bottom of the adhesive layer 2, the reinforcing steel plate 3 is a hot-dip galvanized threaded steel plate, filling layers 4 are provided on the left and right sides of the top of the base plate 8, and the adjacent sides of the two filling layers 4 are both in contact with the bottom of the adhesive layer 2, the filling layer 4 is fine stone concrete; the adjacent sides of the two filling layers 4 are both in contact with the reinforcing steel plate 3.

[0027] First, workers install two cable ducts 6 on the upper part of the base plate 8, and then fill the filling layer 4 to the upper part of the base plate 8, and at the same time place the reinforcing steel plate 3 on the top of the two cable ducts 6. After the reinforcing steel plate 3 is installed, the adhesive layer 2 is applied to form a sealing state between the reinforcing steel plate 3 and the filling layer 4, and then the artificial stone floor 1 is laid, which is convenient for later maintenance and use, and there is no need to use a metal maintenance cover, thereby increasing the service life of the cable and reducing its damage, and the artificial stone floor 1 is paved throughout, thereby improving its use effect and aesthetics.

[0028] Embodiment 2

[0029] On the basis of Example 1, in order to improve the firmness and sealing of the cable trough 6 after installation, multiple fixing bolts 10 are inserted on the left and right sides of the reinforcement steel plate 3, and multiple angle codes 5 are installed in the middle of the bottom plate 8. Expansion bolts 9 are inserted at the bottom of the side where the left and right angle codes 5 are separated. Angle steels 7 are provided on the side where the left and right angle codes 5 are separated. The angle steels 7 are made of hot-dip galvanized material, and multiple connecting columns 11 are installed on the side where the two angle steels 7 are close to each other; the expansion bolts 9 are inserted into the inside of the bottom plate 8, so as to facilitate fixing the angle code 5 and the bottom plate 8 together, the fixing bolts 10 pass through the reinforcement steel plate 3, and the lower end of the fixing bolts 10 is threadedly connected to the middle of the angle steel 7, so as to facilitate fixing the reinforcement steel plate 3 and the two angle steels 7 together, and the connecting columns 11 on the left and right sides are inserted into the upper part of the angle code 5.

[0030] When installing the cable trough 6, the angle codes 5 on the left and right sides are respectively fixed between the expansion bolts 9 and the base plate 8, and the angle steels 7 are welded and fixed to the multiple angle codes 5 through the connecting columns 11. Then, the reinforcing steel plate 3 is installed on the upper part of the two angle steels 7 and fixed by the fixing bolts 10, so as to reinforce the outer side of the cable trough 6 and increase its sealing performance to prevent the cable from being damaged due to moisture.

[0031] Embodiment 3

[0032] On the basis of the second embodiment, in order to facilitate the front and rear adjustment of the elastic clamp 12 to adapt to cable tubes of different lengths, a plurality of slide grooves 13 are opened in the middle of the cable trough 6, and the inner wall of the slide groove 13 is slidably connected to a support block 15, and the top of the support block 15 is installed with an elastic clamp 12.

[0033] When disassembling and assembling cables, the front, middle and rear parts of the cable tube are respectively engaged with the elastic clamp 12. When the distance is short, the elastic clamp 12 can be adjusted to slide forward and backward by letting the bottom of the support block 15 slide on the inner wall of the slide groove 13. After the adjustment, the worker installs the cable tube on the upper part of the elastic clamp 12, so as to facilitate the disassembly and assembly of cable tubes of different lengths, thereby improving its use effect.

[0034] Embodiment 4

[0035] On the basis of the third embodiment, in order to facilitate fixing the position of the elastic clamp 12 after adjustment, a plurality of slots 14 are provided on the bottom wall of the first slide 13, a second slide 18 is provided inside the support block 15, a slider 19 is slidably connected to the inner wall of the second slide 18, a block 20 is installed at the bottom of the slider 19, two springs 17 are installed on the top of the slider 19, and pressing blocks 16 are inserted on the left and right sides of the support block 15; the upper ends of the two springs 17 are installed on the top wall of the second slide 18, and the adjacent sides of the two pressing blocks 16 are both fitted with the slider 19, and the block 20 passes through the bottom of the support block 15 and is inserted into the inner wall of the slot 14, so that the elastic force of the two springs 17 drives the block 20 to be inserted into the inner wall of the slot 14 to facilitate its reset.

[0036] When it is necessary to adjust the position of the elastic clamp 12, first press the two pressing blocks 16 to move toward the middle of the support block 15. Since one side of the support block 15 is set as an inclined surface, and the inclined surface fits with the slider 19, the two pressing blocks 16 are squeezed to drive the slider 19 to move upward along the inner wall of the slide groove 18, while squeezing the two springs 17. Then the worker adjusts the position of the elastic clamp 12. After the adjustment, the worker releases the two pressing blocks 16. At this time, due to the elastic force of the two springs 17, the slider 19 is driven to move downward, and then the clamping block 20 is driven to be plugged into the inner wall of the clamping groove 14, so as to fix the adjusted position, thereby facilitating the workers to replace wire tubes of different lengths later.

[0037] In actual use, workers first install two wire troughs 6 on the upper part of the base plate 8, then fill the filling layer 4 to the upper part of the base plate 8, and at the same time place the reinforcing steel plate 3 on the top of the two wire troughs 6. After the reinforcing steel plate 3 is installed, the adhesive layer 2 is applied to form a sealing state between the reinforcing steel plate 3 and the filling layer 4, and then the artificial stone floor 1 is laid, which is convenient for later maintenance and use, and there is no need to use a metal inspection cover, thereby increasing the service life of the cable and reducing its damage. The artificial stone floor 1 is paved throughout, thereby improving its use effect and aesthetics.

[0038] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An artificial stone floor wire pipe inspection port, comprising an artificial stone floor (1) and a bottom plate (8), wherein two wire troughs (6) are installed on the top of the bottom plate (8), characterized in that: The bottom of the artificial stone floor (1) is provided with an adhesive layer (2), the bottom of the adhesive layer (2) is provided with a reinforcing steel plate (3), and the top left and right sides of the bottom plate (8) are provided with filling layers (4), and the adjacent sides of the two filling layers (4) are both in contact with the bottom of the adhesive layer (2).

2. The artificial stone floor wire pipe inspection port according to claim 1, characterized in that: A plurality of fixing bolts (10) are inserted into the left and right sides of the reinforcing steel plate (3), a plurality of angle brackets (5) are installed in the middle of the bottom plate (8), expansion bolts (9) are inserted into the bottom of the sides where the angle brackets (5) on the left and right sides are separated, angle steels (7) are arranged on the sides where the angle brackets (5) on the left and right sides are separated, and a plurality of connecting columns (11) are installed on the sides where the two angle steels (7) are close to each other.

3. The artificial stone floor wire pipe inspection port according to claim 2, characterized in that: The expansion bolts (9) are inserted into the interior of the base plate (8), the fixing bolts (10) penetrate the reinforcing steel plate (3), and the lower ends of the fixing bolts (10) are threadedly connected to the middle of the angle steel (7), and the connecting columns (11) on the left and right sides are both inserted into the upper part of the angle code (5).

4. The artificial stone floor wire pipe inspection port according to claim 1, characterized in that: A plurality of slide grooves (13) are provided in the middle of the wire trough (6), the inner wall of the slide groove (13) is slidably connected to a support block (15), and an elastic clamp (12) is installed on the top of the support block (15).

5. The artificial stone floor wire pipe inspection port according to claim 4, characterized in that: The bottom wall of the slide groove 1 (13) is provided with a plurality of slots (14); the interior of the support block (15) is provided with a slide groove 2 (18); the inner wall of the slide groove 2 (18) is slidably connected with a slider (19); a locking block (20) is installed at the bottom of the slider (19); two springs (17) are installed at the top of the slider (19); and pressing blocks (16) are inserted on both the left and right sides of the support block (15).

6. The artificial stone floor wire pipe inspection port according to claim 5, characterized in that: The upper ends of the two springs (17) are both mounted on the top wall of the second slide groove (18), the adjacent sides of the two pressing blocks (16) are both in contact with the slider (19), and the clamping block (20) passes through the bottom of the supporting block (15) and is plugged into the inner wall of the clamping groove (14).

7. The artificial stone floor wire pipe inspection port according to claim 1, characterized in that: The adjacent sides of the two filling layers (4) are both in contact with the reinforcing steel plate (3).