Project progress display device for constructional engineering management
By designing a project progress display device for construction engineering management with electric telescopic rods and stable structures, the problem of troublesome display forms and fixed methods in the prior art are solved, and the effect of automated progress display and convenient movement is achieved.
Patent Information
- Application Number
- CN202420714440.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2034-04-09
AI Technical Summary
The existing construction project management project management is troublesome in the form of project progress display devices, which require multiple human postings or writings, and the fixing method is not conducive to the movement of the device.
An engineering progress display device including a base, an electric telescopic rod, a support plate, a protective box, a visual box door, a shading structure and a stable structure is designed. The device achieves convenient height and position adjustment through an electric telescopic rod and a stable structure, and automatically displays the project progress through a video display module and a progress display module.
The device reduces the frequency of human operation through automated progress display, improves the convenience and accuracy of display, and at the same time, due to the stable structure design, the device is more stable and easy to move.
Smart Images

Figure CN222703005U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering progress display devices, in particular to an engineering progress display device for construction engineering management. Background Art
[0002] Types of construction plans include: daily plans, weekly plans, and monthly plans. Construction companies should make full and rational use of their own human, material, financial, and personal resources to ensure that the construction schedule is carried out step by step under the planning, organization, and management of the overall goal to achieve the expected tasks and improve economic benefits. In order to allow workers to see the progress of the project on the construction site, progress display devices are generally used.
[0003] Most of the existing construction project management project progress display devices are equipped with an exhibition board inside a protective box. The exhibition board uses posting or writing to inform the progress of the project. This display method requires manual posting or writing many times, which brings trouble to users. In addition, most progress display devices use a fixed column buried underground, which is not conducive to the movement of the device. Utility Model Content
[0004] The technical problem to be solved by the utility model is that the form of displaying the progress of the construction project is relatively cumbersome, and the fixing method is cumbersome and not conducive to movement.
[0005] In order to solve the above technical problems, the technical solution provided by the utility model is as follows: a construction project management project progress display device comprises a base, both sides of the base are connected with electric telescopic rods, the telescopic ends of the two electric telescopic rods are connected with support plates, the upper side of the support plate is connected with a protection box, one side of the protection box is hinged with a visual box door, the upper side of the protection box is connected with a shielding structure, the lower side of the base is connected with universal wheels,
[0006] The two electric telescopic rods are connected around a plurality of groups of stabilizing structures, and the protection box is internally connected to a progress display structure.
[0007] As an improvement, the shielding structure includes a fixing rod, and the upper sides of the protection box are fixedly connected to the fixing rods on all sides. The upper ends of the two fixing rods on the same left and right sides are connected with inclined shielding plates, and the upper sides of the shielding plates are connected with solar panels. The upper ends of the two shielding plates are connected, and the shielding structure is used to shield the protection box from rain.
[0008] As an improvement, the stabilizing structure includes an articulated block, and the electric telescopic rod is provided with a plurality of articulated blocks in an array along its edge, the end of the articulated block is hingedly provided with a telescopic rod, and the telescopic end of the telescopic rod is connected with a stabilizing cone, and the stabilizing structure is used to enhance the stability of the progress display device.
[0009] As an improvement, the progress display structure includes a video display module, one side of the interior of the protection box is connected to the video display module, the other side of the protection box is connected to the progress display module, and the interior of the protection box is connected to a controller. The progress display structure is used to display the progress of the construction project.
[0010] As an improvement, the solar panel is electrically connected to the controller, the video display module, the progress display module and the electric telescopic rod.
[0011] Compared with the prior art, the utility model has the following advantages: the utility model displays the progress of the construction project through the video display module and the progress display module of the progress display structure, which brings convenience to the user; in addition, the utility model is provided with a special stabilizing structure, which stabilizes the device by using a telescopic rod and a stabilizing cone, thereby facilitating the movement of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of a project progress display device for construction project management.
[0013] Figure 2 The invention is a schematic diagram of a progress display structure of a project progress display device for construction project management.
[0014] Figure 3 It is a schematic diagram of the stable structure of a project progress display device for construction project management.
[0015] Figure 4 It is an enlarged schematic diagram of the structure of part A of a construction progress display device for construction project management.
[0016] As shown in the figure: 1. Base; 2. Electric telescopic rod; 3. Support plate; 4. Protective box; 5. Visual box door; 6. Video display module; 7. Progress display module; 8. Shielding plate; 9. Solar panel; 10. Controller; 11. Articulated block; 12. Telescopic rod; 13. Stabilizing cone; 14. Universal wheel; 15. Fixed rod. DETAILED DESCRIPTION
[0017] In the description of the present utility model, it should be understood that the terms "center", "lateral", "up", "down", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more. In addition, the term "including" and any variation thereof are intended to cover non-exclusive inclusions.
[0018] The utility model is further described in detail below in conjunction with the accompanying drawings.
[0019] When the utility model is implemented, the construction progress display device for construction project management includes a base 1, and electric telescopic rods 2 are connected on both sides of the base 1, and the telescopic ends of the two electric telescopic rods 2 are connected with support plates 3, and the upper side of the support plate 3 is connected with a protection box 4, and a visual box door 5 is hinged on one side of the protection box 4. The upper side of the protection box 4 is connected with a shielding structure, and the shielding structure includes a fixed rod 15, and the upper sides of the two fixed rods 15 on the same side are connected with inclined shielding plates 8, and the upper side of the shielding plates 8 is connected with a solar panel 9, and a battery and an inverter are connected between the shielding plates 8 and the solar panel 9, and the upper ends of the two shielding plates 8 are connected.
[0020] Combined with Figure 1 and attached Figure 3 As shown, universal wheels 14 are connected to the lower side of the base 1 on all sides, and multiple groups of stabilizing structures are connected around the two electric telescopic rods 2. The stabilizing structures include hinge blocks 11. The electric telescopic rods 2 are sequentially arrayed along their edges with multiple groups of hinge blocks 11. Telescopic rods 12 are hingedly provided at the ends of the hinge blocks 11, and stabilizing cones 13 are connected to the telescopic ends of the telescopic rods 12.
[0021] Combined with Figure 1 and attached Figure 2 As shown, the internal connection of the protection box 4 is provided with a progress display structure, and the progress display structure includes a video display module 6. One side of the internal part of the protection box 4 is connected to the video display module 6, and the other side of the protection box 4 is connected with a progress display module 7. The internal part of the protection box 4 is provided with a controller 10.
[0022] Combined with Figure 1 and attached Figure 2 As shown, the solar panel 9 is electrically connected to the controller 10 , the video display module 6 , the progress display module 7 and the electric telescopic rod 2 .
[0023] During the actual use of this device, the technician first pushes the construction project management project progress display device to a position where it will not affect the construction project and is exposed to sunlight, adjusts the height of the device through the electric telescopic rod, adjusts the angle of the telescopic rod through the hinge block, pulls out the telescopic end of the telescopic rod, and makes the stabilizing cone in close contact with the ground, so that the stabilizing structure can stabilize the device. The technician uses a computer to control the video display module through the controller to play videos related to the construction project, and controls the progress display module to display the daily progress, weekly progress and monthly progress of the construction project. When sunlight shines on the solar panels, the solar panels and the inverter convert the direct current (DC) power generated from the solar panels into alternating current (AC) power for use by the controller, the video display module, the progress display module and the electric telescopic rod.
[0024] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.
Claims
1. A construction project progress display device for construction project management, comprising a base (1), wherein both sides of the base (1) are connected with electric telescopic rods (2), the telescopic ends of the two electric telescopic rods (2) are connected with support plates (3), the upper side of the support plate (3) is connected with a protection box (4), one side of the protection box (4) is hinged with a visible box door (5), the upper side of the protection box (4) is connected with a shielding structure, and the lower side of the base (1) is connected with universal wheels (14) on all sides, characterized in that: The two electric telescopic rods (2) are connected around a plurality of groups of stabilizing structures, and the protection box (4) is connected inside a progress display structure.
2. The construction project management project progress display device according to claim 1, characterized in that: The shielding structure comprises a fixing rod (15), the upper sides of the protection box (4) are fixedly connected to the fixing rod (15) on all sides, the upper ends of two fixing rods (15) on the same left and right sides are connected to inclined shielding plates (8), the upper side of the shielding plates (8) is connected to a solar panel (9), and the upper ends of the two shielding plates (8) are connected.
3. The construction project management project progress display device according to claim 1, characterized in that: The stabilizing structure comprises an articulated block (11), the electric telescopic rod (2) is provided with a plurality of articulated blocks (11) in an array along its edge, the end of the articulated block (11) is hingedly provided with a telescopic rod (12), and the telescopic end of the telescopic rod (12) is connected with a stabilizing cone (13).
4. The construction project management project progress display device according to claim 1, characterized in that: The progress display structure comprises a video display module (6), one side of the interior of the protection box (4) is connected to the video display module (6), the other side of the protection box (4) is connected to a progress display module (7), and the interior of the protection box (4) is connected to a controller (10).
5. The construction project management project progress display device according to claim 2, characterized in that: The solar panel (9) is electrically connected to the controller (10), the video display module (6), the progress display module (7) and the electric telescopic rod (2).